Loading...
HomeMy WebLinkAboutR-79-0275RESOLUTION NO. 7 9- 2 7 5 A RESOLUTION ORDERING 'JEST TRATLVTEW HIGHWAY IMPROVEMENT H-4447 AND DESIfNATTUI THE PROPERTY AGAINST WHICH SPECIAL ASSESSMENTS SHALL P}? MADE FOR A PORTION 0ry THE COST THEn1?Or' AS WEST T TRAILVTEW HTGII;'1A`' T'-1r'R07EMENT I)ISTRTc7 - H-4447; AIID ALLOcATING THE A'1OLJIJ ' (T ;i,l ,nr)r; t'RO!1 THE r'' ���I•��,1 HI�,II!+JAY BOND FUND FOR r ' LTi1TIIAR'� EXPENSE �+ . , .+ `� DCC FOLLOW" WHEREAS, the streets in the area between I-95 and S. W. 12 Avenue and S. W. 3 Street and the Roads Area that were not rebuilt under Trailview Highway Improvement are in poor condition, with some out -of -grade, o`f-center, or have drainage problems, and all have parkways in poor condition due to extensive on -street parkinr; and WHEREAS, this results in this area having*, a dilapidated appearance, and much dust and dirt in the air; and WHEREAS, improvements are to include new pavement, curbs and gutter's, and drainare and landscapinm; NOW, THEREFORE, BE IT RESOLVED By THE COMMISSION OF THE CITY Or' MIAMI, FLORIDA: Section 1. A local improvement described as WEST TRAILVIEW HIGHWAY I'•MPROVEMENT Ii-4447 shall be made under Section 56 of the Charter of The City of Miami as amended, located in the area bounded by S. W. 8 Street on the north, S. W. 13 Street on the south, S. W. 8 Avenue on the east, and S. W. 12 Avenue on the west. "DOCUMENT ;,INDEX , Section 2. This improvement �.ill �Ii�1Par1r-rr'' and grading*, construction of asphaltic concrete nay ment, concrete curbs and p'iitters, 4" and f " :, idewalk replacement as required, landscaped planter areas, and new or modified drainage structures. Section 3. This improvement shall be designated in all proceedings and assessments as WEST TRAILVIEWJ HIGHWAY IMPROVEMENT }I-4447 and the property which special assessment:; shall be made for a portion of the cot thereof', hereunder shall be des; rnated as WEST `T'RAILVIE''J HT'",}E'JAY Ir'1PROVENL:i•JT DISTRICT - H-4447. CITY COMMISSION MEETING OF APR 1 9 1979 .9 7 2. 7 5 ENO* ..w...-... Section 4. The sum of $10,000 be, and is hereby, allocated from the Highway Bond Fund for preliminary expense. PASSED AND ADOPTED this 19 day of APRIL 1979. ATTEST: PREPARED AND APPROVED BY: Assistant City Attorney MAURICE A. FERRE APPROVED AS TO F0Ri4 AND CORRECTNESS: MAYO R `S�.; E!`r!E DC` a_,,,. _�.5 lJLt_L �1f1 79-275 • Joseph R. Grassie City Manager Donald W. Cather Director apartment of Public Works April 2, 1979 West Trailview Highway Improvement H-4447, Resolution Ordering and Allocating Funds (Fnr ('omrii..,s1-n Neetinc of .,;April 19, 1979) Plans and specifications are being prepared to rebuild the existing streets in this area, bounded by S.W. 8 Street on the north, S.W. 13 Street on the south, S.W. 8 Avenue on the east, and S.W. 12 Avenue on the west. Improvements are to include, new pavement, curbs and gutters, drainage and land- scaping. The construction will be limited to the following streets: SW 8 Court from SW 8 Street to 390'- South of SW 9 Street SW 9 Avenue from SW 8 Street to SW 11 Street SW 9 Court from SW 8 Street to SW 11 Street SW 10 Avenue from SW 8 Street to SW 13 Street SW 11 Avenue from SW 8 Street to SW 13 Street SW 9 Street from SW 8 Avenue to SW 12 Avenue SW 10 Street from SW 9 Svenue to SW 12 Avenue SW 11 Street from SW 8 Avenue to SW 11 Avenue SW 12 Street from SW 10 Avenue to SW 11 Avenue SW 13 Street from SW 10 Avenue to SW 12 Avenue Funds will come from the Highway G.O. Bond Fund and the work will be assessed to the abutting property owners. THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OF A RESOLUTION ORDERING WEST TRAILVIEW HIGHWAY IMPROVEMENT H-4447 IN THE WEST TRAILVIEW HIGHWAY IMPROVEMENT DISTRICT H-4447 AND ALLOCATING$10,000 FROM THE HIGHWAY BOND FUND FOR PRELIMINARY EXPENSE JHO:rp B-4447 79.275 JOB NAME JOB SITE JOB SCOPE REASON FOR WORK FACT SHEET - WEST TRAILVIEW HIGHWAY IMPROVEMENT H-4447 - SW 8 Court (SW 8 St. - 390'± S. of SW 9 St.) SW 9 Avenue (SW 8 St. - SW 11 St.) SW 9 Court (SW 8 St. - SW 11 St.) SW 10 Avenue (SW 8 St. - SW 13 St.) SW 11 Avenue (SW 8 St. - SW 13 St.) SW 9 Street (SW 8 Ave. - SW 12 Ave.) SW 10 Street (SW 9 Ave. - SW 12 Ave.) SW 11 Street (SW 8 Ave. - SW 11 Ave.) SW 12 Street (SW 10 Ave. - SW 11 Ave.) SW 13 Street (SW 10 Ave. - SW 12 Ave.) - West Trailview improvements include clearing and grading, construction of asphaltic concrete pavement, concrete curbs and gutters, 4" and 6" sidewalk replacement as required, landscaped planter areas and new or modified drainage structures. - Previously scheduled for construction in future; rapid deterioration of pavement and parkways indicate need for re -scheduling to earlier time -frame. SOURCE OF FUNDS - Highway G.O. Bond Funds JOB COST - Estimated total cost - $1,200,000 A portion of the cost will be assessed to the abutting property owners. CURRENT ITEM FOR CONSIDERATION - To be ordered April 19, 1979 PROPERTY OWNER INQUIRIES - None as yet 79-275