HomeMy WebLinkAboutR-79-0275RESOLUTION NO. 7 9- 2 7 5
A RESOLUTION ORDERING 'JEST TRATLVTEW HIGHWAY
IMPROVEMENT H-4447 AND DESIfNATTUI THE PROPERTY
AGAINST WHICH SPECIAL ASSESSMENTS SHALL P}? MADE
FOR A PORTION 0ry THE COST THEn1?Or' AS WEST
T
TRAILVTEW HTGII;'1A`' T'-1r'R07EMENT I)ISTRTc7 - H-4447;
AIID ALLOcATING THE A'1OLJIJ ' (T ;i,l ,nr)r; t'RO!1 THE
r'' ���I•��,1 HI�,II!+JAY BOND FUND FOR r ' LTi1TIIAR'� EXPENSE
�+ . , .+ `�
DCC
FOLLOW" WHEREAS, the streets in the area between I-95 and
S. W. 12 Avenue and S. W. 3 Street and the Roads Area that
were not rebuilt under Trailview Highway Improvement are in
poor condition, with some out -of -grade, o`f-center, or have
drainage problems, and all have parkways in poor condition
due to extensive on -street parkinr; and
WHEREAS, this results in this area having*, a dilapidated
appearance, and much dust and dirt in the air; and
WHEREAS, improvements are to include new pavement,
curbs and gutter's, and drainare and landscapinm;
NOW, THEREFORE, BE IT RESOLVED By THE COMMISSION OF
THE CITY Or' MIAMI, FLORIDA:
Section 1. A local improvement described as WEST
TRAILVIEW HIGHWAY I'•MPROVEMENT Ii-4447 shall be made under
Section 56 of the Charter of The City of Miami as amended,
located in the area bounded by S. W. 8 Street on the north,
S. W. 13 Street on the south, S. W. 8 Avenue on the east, and
S. W. 12 Avenue on the west. "DOCUMENT ;,INDEX
,
Section 2. This improvement �.ill �Ii�1Par1r-rr''
and grading*, construction of asphaltic concrete nay ment,
concrete curbs and p'iitters, 4" and f " :, idewalk replacement as
required, landscaped planter areas, and new or modified drainage
structures.
Section 3. This improvement shall be designated in
all proceedings and assessments as WEST TRAILVIEWJ HIGHWAY
IMPROVEMENT }I-4447 and the property which special
assessment:; shall be made for a portion of the cot thereof',
hereunder shall be des; rnated as WEST `T'RAILVIE''J HT'",}E'JAY
Ir'1PROVENL:i•JT DISTRICT - H-4447.
CITY COMMISSION
MEETING OF
APR 1 9 1979
.9 7 2. 7 5
ENO* ..w...-...
Section 4. The sum of $10,000 be, and is hereby,
allocated from the Highway Bond Fund for preliminary expense.
PASSED AND ADOPTED this 19 day of APRIL
1979.
ATTEST:
PREPARED AND APPROVED BY:
Assistant
City
Attorney
MAURICE A. FERRE
APPROVED AS TO F0Ri4 AND CORRECTNESS:
MAYO R
`S�.; E!`r!E
DC` a_,,,. _�.5
lJLt_L �1f1
79-275
•
Joseph R. Grassie
City Manager
Donald W. Cather
Director
apartment of Public Works
April 2, 1979
West Trailview Highway
Improvement H-4447, Resolution
Ordering and Allocating Funds
(Fnr ('omrii..,s1-n Neetinc of
.,;April 19, 1979)
Plans and specifications are being prepared to rebuild the
existing streets in this area, bounded by S.W. 8 Street on
the north, S.W. 13 Street on the south, S.W. 8 Avenue on the
east, and S.W. 12 Avenue on the west. Improvements are to
include, new pavement, curbs and gutters, drainage and land-
scaping.
The construction will be limited to the following streets:
SW 8 Court from SW 8 Street to 390'- South of SW 9 Street
SW 9 Avenue from SW 8 Street to SW 11 Street
SW 9 Court from SW 8 Street to SW 11 Street
SW 10 Avenue from SW 8 Street to SW 13 Street
SW 11 Avenue from SW 8 Street to SW 13 Street
SW 9 Street from SW 8 Avenue to SW 12 Avenue
SW 10 Street from SW 9 Svenue to SW 12 Avenue
SW 11 Street from SW 8 Avenue to SW 11 Avenue
SW 12 Street from SW 10 Avenue to SW 11 Avenue
SW 13 Street from SW 10 Avenue to SW 12 Avenue
Funds will come from the Highway G.O. Bond Fund and the work
will be assessed to the abutting property owners.
THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OF A
RESOLUTION ORDERING WEST TRAILVIEW HIGHWAY IMPROVEMENT H-4447
IN THE WEST TRAILVIEW HIGHWAY IMPROVEMENT DISTRICT H-4447 AND
ALLOCATING$10,000 FROM THE HIGHWAY BOND FUND FOR PRELIMINARY
EXPENSE
JHO:rp
B-4447
79.275
JOB NAME
JOB SITE
JOB SCOPE
REASON FOR WORK
FACT SHEET
- WEST TRAILVIEW HIGHWAY IMPROVEMENT H-4447
- SW 8 Court (SW 8 St. - 390'± S. of SW 9 St.)
SW 9 Avenue (SW 8 St. - SW 11 St.)
SW 9 Court (SW 8 St. - SW 11 St.)
SW 10 Avenue (SW 8 St. - SW 13 St.)
SW 11 Avenue (SW 8 St. - SW 13 St.)
SW 9 Street (SW 8 Ave. - SW 12 Ave.)
SW 10 Street (SW 9 Ave. - SW 12 Ave.)
SW 11 Street (SW 8 Ave. - SW 11 Ave.)
SW 12 Street (SW 10 Ave. - SW 11 Ave.)
SW 13 Street (SW 10 Ave. - SW 12 Ave.)
- West Trailview improvements include clearing
and grading, construction of asphaltic
concrete pavement, concrete curbs and gutters,
4" and 6" sidewalk replacement as required,
landscaped planter areas and new or modified
drainage structures.
- Previously scheduled for construction in
future; rapid deterioration of pavement
and parkways indicate need for re -scheduling
to earlier time -frame.
SOURCE OF FUNDS - Highway G.O. Bond Funds
JOB COST - Estimated total cost - $1,200,000
A portion of the cost will be assessed to
the abutting property owners.
CURRENT ITEM FOR
CONSIDERATION - To be ordered April 19, 1979
PROPERTY OWNER
INQUIRIES - None as yet
79-275