Loading...
HomeMy WebLinkAboutR-79-0404RFC /rb 5 /30 / 79 RESOLUTION. N0. >7 9 4 A RESOLUTION AUTHORIZING"THE"CITY MANAGER • TO RECEIVE ,BIDS FOR THE STRUCTURAL STEEL WORK FOR CONSTRUCTION"OF THE;"CITY OF:-MIAMI/UNIVERSITY._OF� MTAbiI 'JAMES,=•L. KNTGHT,INTERNATIONAL CENTER PROJECT; CONDITIONALLY AUTHORIZING THE CITY MANAGER,TO'. ENTER 'INTO A CONTRACT WITH -THE APPARENT LOWEST RESPONSIBLE BIDDER: SOLELY FOR THE PREPARATION OF STRUCTURAL --;STEEL DETAILINGS,.(SHOP DRAWINGS). IN AN"AMOUNT.NOT TO EXC,EED.'$30,000; AUTHORIZING THE CITY MANAGER TO BRING ::THE BIDS FOR: FABRICATION AND INSTALLATION OF THE STRUCTURAL " ST:EEL .BEFORE THE CITY COMMIS ITS; SUBSEQUENT AWARD:OF. CON- TRACT; AND FURTHER DIRECTING THAT, FUNDS FOR THE "SU PPOf;TiV l.WARDOF SFROMDTHEIUGS . DEPARTMENTDOFR TLE 1 FUNDSCOMMERCE DOCU `v+ ENT URSUANTTTO GRANOMDATEDVSEPTEMBERA16INlg �RATZON, FOLLOW" Administration Resolution' WHEREAS the City has accepted an Economic Development Grant,"No• 04-51-20591, dated September 16,"1977, .by' 77-795, dated: October 13, 1977,to;assist in thee, construction of the CITY OF MIAMI/UNIVERSITY OF MIAMI JAMESL. KNIGHT' INTERNATIONAL CENTER whereby the City agreed to maintain` continuous .onsite tised May was this rescheduled ,t Project; and construction work; and WHEREAS, bids for the structural steel work were 18, 1979, `. to be received June 6, 1979; an adver- WHEREAS,;the City Commission meeting of June "14,1979 June 4, 1979,.and time is ":of the essence fo the bids being received, there WHEREAS, among; each of will be a provision calling for the preparation of shop drawings or structural steel detailings; and WHEREAS, the awarding of the fabrication and installation of structural steel cannot take been reviewed; and WHEREAS the comp letio it is in the` best interest of the have and therefore for the detailings (shop sible bidder, subject place until all other bid phases "DOCUMENT USIA -EX ITEM .NNQQ n of drawings wi'Il'save time shop 1r City to contract drawings) with the apparent lowest a maximum amount of $30,000and respon- arif COMMISSION MEE flNQ ' JUN4 1979 mum ma 9 ' 4,1 OWN' ....................— the WHEREAS, the 'herein conditionally- authorized action o,f City Manager will mission be subsequently presented to the City Com- for formal ratification' NOW, THEREFORE, BE IT .RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI', receive CITY OF CENTER enter FLORIDA: Section 1. The City Manager is hereby authorized to bids for thestructural steel work for construction of the MIAMI/UNIVERSITY OFt1IAMI JAMES L. KNIGHT INTERNATIONAL Project. Section 2. The City Manager is hereby authorized .to.. nto a contract with the apparent lowest responsible bidder solely for the preparation of structural steel 'detailings=, (shop draw- ings) in an amountno to exceed $30,000 with funds be expended. from Title I funds from the U.S. Department of Commerce through the Economic ber made Development Administration pursuant to grant 16, 1977, subject to the condition that the award to the lowest responsible bidder. directed its subse tion of Section 3. dated Septem contract be The City Manager is hereby authorized and to bring the original bids before the City Commission for quentaward of the contracts, for fabrication and installa-- the structural steel PASSED AND ADOPTED this 4th day rune,; Maurice A- Ferre 1? 79. R LPH G. ONGIE, CITY CLER PREPARED AND APPROVED BY: EERT F.. CLARK ASSISTANT, CITY ATTORNEY APPROVE GEORGE F CITY AT TO FORM AND CORRECTNESS • KNOX, JR. NEY M A,Y ;O R «SU-PPORTIVIE. FOLLOW" �� imiium1lUlIl!1 79-404 r TO! Joseph!R. ;Grassie City Manager" Vincent E..rrimm, Jr.- Assistant,JCi ty %Mai ger L!r•...ri %I CITY or MIAMI, FLOF2!D. 7; i ER•c,-rIcr ;1( MORANDUM Conference/ConventionCenter In order to meet a co mpletion date of August, 1981, for the.Conference/ConventionCenter, it isessential that we schedule with this date uppermost in our mind. One, of the major bid packages is the fabrication and erection of the structural steel. Before fabrication of the steel components can be started, it is necessary that detailed shop drawings be made and approved. It is our estimation that the preparation of these detailed drawings will take at least three months. It is for this reason that we feel that it is essentia you, be given authority to award that portion of the structural steel contractwhich will allow the preparation of the shop drawings. The attached resolution gives you the authority 'to award this portion of the contract and requires that the remaining portion of the contract for fabrication and erection be formally awarded by the City Commission at a later date. 0,4