Loading...
HomeMy WebLinkAboutR-79-0460RESOLUTION NO. 7 9 460 A RESOLUTION ACCEPTING THE COMPLETED WORK PERFORMED BY IRPCO PAVING COMPANY, INC. AT A TOTAL COST OF $36,220.72 FOR CHOPIN PLAZA STORM SEWER REPAIR; AND AUTHORIZING A FINAL PAYMENT TO BE MADE JOINTLY TO RINKER MATERIALS CORP. AND IRPCO PAVING COMPANY,: INC. IN THE AMOUNT "SUPPORTIVE !'� � `��'[' OF $1 834 76 AND JOINTLY TO ABLE BUILDING �JV,^lJ�'1�I Y C. 'INDUSTRIES, IN C AND IRPCO PAVING COMPANY, $200 ...' INC. IN' THE AMOUNT'OF` .00 DOCUME N'r FOLLOW WHEREAS,there exists a contract dated March 1976 between The City and 3 of Miami and Irpco Paving Company and Irpco Paving Company, ocuments have been paid in full in contract; and WHEREAS, the City Manager and the Department. Public Inc WHEREAS, the work has been satisfactorily. completed, Inc. has furnished the. required certifying that all bills for labor and materials connection with the aforesaid and final payment made jointly Materials Industries, Inc.; NOW OF THE CITY Section. Works recommend that the completed work be accepted to the contractor and Rinker Corp. and to the contractor and Able Building; THEREFORE, BE IT RESOLVED OF MIAMI, FLORIDA: The completed work performed by Irpco` Paving Company, ;Inc. for CHOPIN PLAZA STORM SEWER REPAIR at BY THE COMMISSION total cost of $36,220.72 is hereby approved. ection Miami are hereby 2. -The proper officials of, The City of authorized - to pay $1,834.76 to Rinker Materials Corp. and Irpco Paving Company, Inc.<jointly_ and $200.00 to Able Building Industries, Inc. and Irpco Paving Company, Inc. jointly as full and final payment performed and CHOPIN PLAZA STORM all materials furnished in SEWER REPAIR. for all work connection with "DOCUMENT,. INDEX ITEM NO.3 tl aTY COMMISSION METING OF JUN4 51979 7 9 -„ Maurice A. Ferre MAURICE A. FERRE, M A Y 0.R 79-460 Joseph R. Grassie City Manager Donald W. Director Department ;I Y tA;.lt. : ptn\ c-k 0 iJ Fri Works 0,,rc May 25, 1979 CHOPIN PLAZA STORM SEWER REPAIR Resolution for Final Payment cF "4c,b--.(For Commission Meeting June 25, 1979) The Irpco Paving Company, 'Inc, has,: completed the project consisting of.placing 680°linear feet of 8=foot wide concrete top slab on existing storm. sewer outfall,•located "on Chopin Plaza;(S. E�. 2�Street) between Biscayne Boulevard • and Biscayne"Bay. ""The original contract amount_,was for $37,984 40, but the completed contract' amount is $36.,220.72, and: it was `completed on -time. It is now in order for the.Commiss"ion to accept the ,completed work and authorize final payment, after all conditions are met. B-5419 THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OF A RESOLUTION ACCEPTING THE COMPLETED WORK AND AUTHORIZING A FINAL- PAYMENT TO , BE MADE JOINTLY TO THE IRPCO PAVING COMPANY;, INC. AND RINKER MATERIALS CORP. IN THE AMOUNT OF $1,834.76 AND JOINTLY TO THE ABLE BUILDING; INDUSTRIES, INC. AND IRPCO PAVING COMPANY, INC. INS THE AMOUNT OF $200.00 "SUPPOR WE DOCUMENTS JOB NAM CONTRACTOR JOB SCOPE REASON FOR WORK SOURCE OF FUNDS PROJECT' HISTORY CONTRACT TIME STARTED CONTRACT TIME SCHEDULED COMPLETION DATE ACTUAL COMPLETION DATE BID AMOUNT CONTRACT FINAL: COST. CURRENT ITEM FOR CONSIDERATION FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER' Chopin Plaza Storm Sewer Repair B-51419 Irpco Paving Company, Inc. Replacement of 680± feet of 8 foot width concrete slab over existing storm sewer outfall located on Chopin Plaza (S. E. 2 St.), between Biscayne Boulevard and Biscayne' Bay. Failure and deterioration of roof slab. Storm Sewer Bond Funds Bids Received: 3/19/76 Contract Awarded:' 3/25/76/20/76 Preconstructi0n Meeting: 6/7/76 0 working days plus 8/12/76 8 clays delay' due rain 9/2/76 (No liquidated damages recommended) NOTE: Final payment, was delayed because we were 984.40 directed by an Internal Revenue Service "Notice • of Levy" to withhold all payments to the contractor. The Levy was recently lifted. $37 $36 , 220.72 Resolution to accept completed work, final payment to the Contractor. and authorize