HomeMy WebLinkAboutR-79-0484RESOLUTIONNO.
7 -484
A -RESOLUTION ACCEPTING THE 'COMPLETED WORK
PERFORMED BY ASSOCIATES CONSTRUCTION
CORPORATION AT A TOTAL COST OF $90, 8214.62
" FOR THE CURTIS AND MORNINGSIDE PARKS -'
SUPPORTIVE SWIMMING POOL MODIFICATIONS - 1978; AND
j''�t �t j AUTHORIZING A FINAL PAYMENT Or ' $9 , 816. 52
VVVV
FOLLOW"
WHEREAS, there exists a contract dated December 18,;
1978 between the City of Miami and Associated ,Construction
Corporation; and
WHEREAS, the work has been satisfactorily ;completed,':
and Associates Construction Corporation has furnished the
required documents certifying that all bills for labor and
materials have been.paid in full in connection with the
aforesaid
contract; and
WHEREAS, the City Manager and the Department of Public
Works recommend that the completed work be accepted and final
payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF
THE CITY OF MIAMI, FLORIDA:
Section'1. The completed work performed by Associated
Construction Corporation for CURTIS AND'MORNINGSIDE PARKS -
SWIMMING POOL MODIFICATIONS - 1978 at a total cost of $90,824.62
is hereby approved.
Section 2. The proper officials of the City of Miami
are hereby authorized to pay $9,81652 to Associates. -Construction
Corporation as full and final payment for all work performed
and all materials furnished in connection with CURTIS AND
MORNINGSIDE PARKS - SWIMMING POOL MODIFICATIONS - 1978.
"DOCUMENT INDEX
ITEM NO
!O
CITY COMMISSION
MEETING OF
JUL . iyi
RESOLUTION NO. ` , .,9 , 4..8 •4
REMARKS:
Maurice A. Ferre
MAURICEA.;FERRE', MAYOR
RALPH G. ONGIE, CITY CLERK
PREPARED AND APPROVED BY:
641 7f&
ROBERT F. CLARK
ASSISTANT CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
F. KNOX, JR.
TORNEY
Joseph R. Grassie
City Manager
Donald W. Cather
Director
�Hepert.Tnent)
J.
Works
June 25, '_1979�.
-3188
CURTIS AND MORNINGSIDE; PARKS
SWIMMING POOL MODIFICATIONS 1978
Resolution 'for Final Payment
, :F1=n NCE_a"i • ..
(for Commission Meeting of.
July 11, 1979)
•
The Department of Public Works recommends
the adoption of the resolution 'accepting
the completed work and authorizing a final.
payment .,of_-$9,816.52 toAssociates Construe=
tion Corporation for .CURTIS:AND MORNINGSIDE
PARKS - SWIMMING POOL MODIFICATIONS-'1978.
Associates Construction, has completed the project
•
consisting of constructing entry ramps, ramps into the 'swimming
pools, and modifications ;to the shower 'rooms, at Curtis 'Park
Poll located at�2300 N.W. North River, Drive and at Morningside
Park Pool locate•d at 850 N.E. 55,Terrace. The` original contract'
amount was for $94,L00.00, but the completed contract amount
is $90,i824.62, and it was completed on time.
It is now in order for the Commission; to accept the completed
work and authorize final payment, after all conditions are met.
JAH : az
r fl
Resolution attached.
JOB HA?,!E
COi:TP.ACTOR
JOB .SCOPE.'
REASOW
FOR -WORK
SOURCE
OF FT??1P
PROJECT
HISTORY
CONTPACT
TI"tE
STARTED
FINAL CONSTRUCTION FACT SHEET,
FOR THE CITYMANAGER
Curtis & Morningside Parks Swimming Pool Modifications
1978 B-3188
Associates Construction Corporation
Construct entry ramps, ramps into the pools, and
,::odifications to the shower rooms' at Curtis Park
located at 2300 N. W. N. River Drive and at Morningside
Park located at 850 N. E. 55 Terrace.
To remove architectural barriers to the handicapper'.
in the use of the pools.
Third and Fourth, Year Federal
Block Grant Funds
Bids Received: 11/8/78
Contract Awarded: 12/14/78
?reconstruction Meeting: 12/21/78
1/15/79
Community Development
CONTRACT
T11E 1}5'.Calendar Days. plus 4 calendar 'days delay due to rain
` and 73 calendar days due to delay; in
receiving materials' and .redesign
of. :foundation, for,the '�ramp'at
SCHEDULED . Morningside Pool.
CO?"PLETIO:I
DATE
ACTUAL
CO?IPLETI0N
DATE
BID AV,OUNT
CONT?ACT
FIHAj COST
CURRENT
ITEM FOR
C0?I SIDERATIO'I.
5/16/79
5/16/79
v.94;400.0
90,8214.62
resolution to accept completed work
final payment to the contractor.
and authorize