RESOLUTION NO. "' 7 9' 5 3 6
A RESOLUTION ACCEPTING THE COMPLETED WORK
PERFORMED BY DICK MORTON, INC. AT A TOTAL
COST OF $131,366.22 FOR. THE SOUTHERN
DRAINAGE PROJECT E-39; AND AUTHORIZING
A FINAL PAYMENT OF $14,522.60
WHEREAS, there exists a contract' dated; March 31,
1977 between the City of Miami and Dick Morton, Inc.; and
WHEREAS, the work has been satisfactorily -completed ,
and Dick Morton, Inc. .has furnished the required documents
certifying' that all bills for labor and materials have been
paid in full in connection with the aforesaid contract; and.
WHEREAS, the City Manager and the Department of :Public
Works recommend that the
payment
THE CITY
Morton:*
cost
completed work be accepted and
final
made to the contractor;`
NOW, THEREFORE, BE IT RESOLVED BY THE' COMMISSION OF
OF MIAMI, FLORIDA:
Section
.; The, completed work performed
y
Dick
Inc. for SOUTHERN DRAINAGE PROJECT E-39 a total
of $131,366.22 is hereby approved.
Section
The proper officials of the City of Miami
are hereby authorized to pay '$14,522.60 as full and final
payment for all work performed and all materials furnished
in connection with SOUTHERN DRAINAGE PROJECT E-39.
PASSED AND ADOPTED this 23rd day of July ,i 1979.
ATTES
RALPH
;g161(f*e
G. 0 GIE, CITY CLERK
PREPARED AND APPROVED BY:
OBERT F. CLARK
ASSISTANT CITY ATTORNEY
Maurice A. Ferre
MgRICE A. FERRE, MAYOR
I,k4At')
"DOCUMENT (y,DEX
ITEM NO
VED AS TO FORM AND CORRECTNESS:
+GEOF ]E F. KNOX,
CIT ATTORNEY
Cf1Y OMMISSION
OF
JUL2 3 1979
000umoN NI 7 9 - 5 3
6
7
y�
(.',"_.�"''.'t•t 1.._ t'::rylCSrcr�t`4L�e.li+9
!
Joseph R•.""Gr,assi'e !��ri
City. Manager
Donald W. Cat her
Director.
epartment f (Rubil ti Works
NF:FF.RENCES:
ENCL' iUrICS;`
July 10, 1979
FIL B-5424
SOUTHERN DRAINAGE PROJECT E-39
Resolution for Final Payment
For Commission Meeting
f July 23, 1979)
y' L
The Department of Public Works recommends
the adoption of the resolution accepting
the completed work and authorizing a final
payment of $14,522.60 to 'Dick Morton, Inc.
for SOUTHERN DRAINAGE PROJECT E-39.'.
Dick Morton,, .Inc. has completed the project, consisting of,,
constructinh •25 drainage structures at locations of gr,eat'est
need in an_ area bounded.by S..W8 Stre_et,.NorthProspect
•
•
Drive, Biscayne Bay, and the westerly City limits, with=
'three< structures 'outside this area. ` The, original contract:.
amount was' for: $138,845 00, `but -'the completed contract` amount
is,$1,31,366.22, an,d it":was completed>on time.l
It` is 'now in order for the Commission to accept the completed
•
work and authorize` final., payments-after_',all conditions areamet
.JAH:hc
/,r
r' Resolution
•
•
E
r
04
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NATE Southern Drainage Project E-39 B 5424
CONTRACTOR. Dick Morton, Inc.
JOB SCOPE Construct 25 Drainage Structures in an area bounded by
S. W. 8 Street, North Prospect Drive, Biscayne Bay and
Westerly City Limits, with 3 structures outside this area.
REASON
FOR WORK Provide drainage to loce.tions of greatest need
SOURCE
•
OF FUNDS Storm Sewer Bond Fund
PROJECT Bids
HISTORY CporneconstriAucido:nedyil:/elet13//in7277g/:774/25/77
CONTRACT
TITS
STARTED 5/17/77
CONTRACT
TITT, 80 Working days plus 19 days delay due to ramr:
and 4 days delay due to material delivery
SCHEDULED
COMPLETION
DATE 10/12/77
ACTUAL
COMPLETION
DATE 10/12/77
BID AMOUNT $ 138,845.00
CONTRACT
FINAL COST $ 131,366.22
CURRENT
ITEM FOR
CONSIDERATION Resolution to accept completed work and authorize
final payment to contractor.
NOTE: Final payment on the project was
delayed by the contractor's
inability to settle claims
against the job.