HomeMy WebLinkAboutR-79-0602RESOLUTION NO. 7 9- O O 2 A RESOLUTION ACCEPTING THE COMPLETED WORK PERFORMED BY MET CONSTRUCTION, INC. AT A TOTAL COST OF $29,723.50 FOR THE ORANGE BOWL - LOWER PRESS BOX REFURBISHING PHASE I - 1978 WHEREAS, there exists a contract dated November 17, 1978 between the City of Miami and MET, Construction, Inc.; and WHEREAS, the Work has been satisfactorily completed,' Construction, Inc. has furnished the required documents MET an d certifying -that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and. WHEREAS, the City Manager and the Department o'f Public Works recommend that the completed work be accepted; NOW THEREFORE, BE IT: RESOLVED BY THE COMMISSION OF THE CITY OF MAIMI, FLORIDA: The completed wo Construction, Inc. for ORANGE BOWL - PHASE I ATTEST.: Section 1. rlc performed by MET LOWER PRESS BOX REFURBISHING 1978 at a total' cost of. $29,723:50 is hereby _approved.: .PASSED AND ADOPTED this`. 13th day of Sept. 1979:. "SUPPORTIVE DOCUPb.1ENTS FOLLOW" ONGIE, CITY CLE PREPARED AND APPROVED BY: ie ate ROBERT F. CLARK ASSISTANT CITY ATTORNEY Maurice A.,Ferre MAURICE A. FERRE MAY 0 R "DOCUMENT. INDEX ITEM NO. = " APPROVED AS TO FORM AND CORRECTNESS: E F. KNO ATTORNEY CITY COMMISSION MEETING OF SEP.3-�xr� ho79-60 II11111I 11I■IuIUU11111111 1111inmeeen REMAittli 111iiIIIIM11111111111111 111111111Piniminimenswirm 40 • I:ITY OF hilAMI. LOFIID TO: Joseph R. Grassie City Manager rnom„. ,Donald Donald W. Cather. r4..Director Department of Public Works - - 04.7r: August 29, 1979. -c: B-2758A .s.w4JE.cn ORANGE BOWL - LOWER PRESS. BOX REFURBISHING - PHASE',I - 1978 - Resolution for Final p5FtnENcts: Acceptance (For Commission Meeting of September 13, 1979) H. NCLOSUflCS: The Department of Public Works recommends adoption of the resolution accepting the completed work of MET Construction, Inc. for ORANGE BOWL - LOWER PRESS BOX REFURBISHING PHASE I - 1978. MET Construction, Inc. has completed the project consisting of constructing a new drop ceiling, installation of new and existing light fixtures, overhead air conditioning ducts, signs, repairs to partitions and glass replacement. The Orange Bowl Stadium is located at 1400 N.W. 4th Street. The original contract amount was for $29,756.00, but the completed contract amount is $29,723.50, and it was completed on time. It is now in order for the Commission to accept the work, after all conditions are met. JAH:-az Re(i1-111(?ri.:::ti...°.......:'_,,--.:::: ---'-' . .'. -::..-- -..-.-..• ...,. , , , .-.-. -.-,-.:.--....'.' ..,..,............,........,,,,,,.,,,... _ , .• --, ....'....-,,-- ,..',..._. _ .. ..,..-,,..,.......,....,.. ... ...,,..„ ,.,..., , .,....... . . -- . -.•.- '..--- . ...... „..-.; -.....:......;... ,.,,... .., , , - --....--... '-'...--..:::'.• ....: ..-...-2__., ......,,..„,,.:,.,„ .,., . ., , , , ,,,, , ,, , . — - . .............,„........ _. , , ,.. - - . .,..,,-.......,.'...."...•,...,,...',..- -.,...,....,,....,.. ,,,......„,.: , . . ., , , '..--:....,,,..,,,....,,,.....:-,...,:.,, ,,,-.......,.'...-.•:.,.,.,....,-.,......y,...,-.-,,,,,-;',..-..:H..'.::.--,,,--,--,':' ,'.'.-, ---_ - _ , _ ,, . .,.., .,....,.._ ;....... .. '...-',:...-:'...,.:;-:.:,.',.:--.:.-:1';':•-::::',...'f$:2-ilPPORTIVE - • DOCLJP4ENTS FOLLOW" comp leted VI • ;-..ITY MIA -II, i":-OP.11D1. TO: Joseph R. Grassie City Manager 01/ er-e- FflCM. ,Donald W. Cather r"Director Department of Public Works„: tT August 29:1 1979 B-2758A ORANGE BOWL LOWER PRESS BOXREFURBISHING PHASEHI - 1978 Resolution4'OrFinal .Acceptance • (For Commission Me.eting of ctosuRcs: September 13, 1979) The:Department of Public Works recommends theadoption of the resolution accepting the completed work of MET Construction, for ORANGE BOWL - LOWER PRESS BOX REFURBISHING PHASE I - 1978. MET Construction, Inc. has completed the project consisting of constructing a new drop ceiling, installation of new and existing light fixtures, overhead air conditioning ducts, signs, repairs to partitions and glass replacement. The Orange Bowl Stadium is located at 1400 N.W. 4th Street. The original contract amount was for $29,756.00, but the completed contract amount is $29,723.50, and it was completed on time. It is now in order for the Commission to accept the completed work, after all conditions are met. FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME Orange Bowl - Lower Press Box Refurbishing Phase I - 1978 B-2758A CONTRACTOR MET Construction, Inc. JOB SCOPE .Construct new drop ceiling, install new and existing light fixtures, two overhead A/C ducts, signs, repair Partitions and sliding doors and glass replacement. REASON FOR W0RK Modernize and upgrade SOURCE OF FUNDS Orange Bowl Enterprise' Fund PROJECT Bids. Received: 8/21/78 HISTORY Contract Awarded: 12/14/78 Preconstruction Meeting: 11/20/78 CONTRACT TIi1E STARTED CONTRACT TINE SCHEDULED COr 4PLETION DATE ACTUAL COT PLETIOU DATE . BID AMOUNT CONTRACT FINAL COST CURRENT ITEM FOR CONSIDERATION Resolution to accept completed, work. and authorize final payment to the contract�r. 12/14/78 facilities 15 WD plus 32 days delay due to material deliveries and design changes. 2/21/79 2/21/79 $ 29 1 111111•11111111111 11111 1111110111 79-602