HomeMy WebLinkAboutR-79-0602RESOLUTION NO. 7 9- O O 2
A RESOLUTION ACCEPTING THE COMPLETED WORK
PERFORMED BY MET CONSTRUCTION, INC. AT A
TOTAL COST OF $29,723.50 FOR THE ORANGE
BOWL - LOWER PRESS BOX REFURBISHING PHASE
I - 1978
WHEREAS, there exists a
contract dated November
17,
1978 between the City of Miami and MET, Construction, Inc.; and
WHEREAS, the Work has been satisfactorily completed,'
Construction, Inc. has furnished the required documents
MET
an d
certifying -that all bills for labor and materials have been paid
in full in connection with the aforesaid contract; and.
WHEREAS, the City Manager and the Department o'f Public
Works recommend that the completed work be accepted;
NOW THEREFORE, BE IT: RESOLVED BY THE COMMISSION OF THE
CITY OF MAIMI, FLORIDA:
The completed wo
Construction, Inc. for ORANGE BOWL -
PHASE I
ATTEST.:
Section
1.
rlc performed by MET
LOWER PRESS BOX REFURBISHING
1978 at a total' cost of. $29,723:50 is hereby _approved.:
.PASSED AND ADOPTED this`. 13th day of Sept. 1979:.
"SUPPORTIVE
DOCUPb.1ENTS
FOLLOW"
ONGIE, CITY CLE
PREPARED AND APPROVED BY:
ie ate
ROBERT F. CLARK
ASSISTANT CITY ATTORNEY
Maurice A.,Ferre
MAURICE A. FERRE MAY 0 R
"DOCUMENT. INDEX
ITEM NO. = "
APPROVED AS TO FORM AND CORRECTNESS:
E F. KNO
ATTORNEY
CITY COMMISSION
MEETING OF
SEP.3-�xr�
ho79-60
II11111I 11I■IuIUU11111111 1111inmeeen
REMAittli
111iiIIIIM11111111111111 111111111Piniminimenswirm
40
•
I:ITY OF hilAMI. LOFIID
TO:
Joseph R. Grassie
City Manager
rnom„. ,Donald
Donald W. Cather.
r4..Director
Department of Public Works
- -
04.7r:
August 29, 1979. -c: B-2758A
.s.w4JE.cn ORANGE BOWL - LOWER PRESS.
BOX REFURBISHING - PHASE',I -
1978 - Resolution for Final
p5FtnENcts: Acceptance
(For Commission Meeting of
September 13, 1979) H.
NCLOSUflCS:
The Department of Public Works recommends
adoption of the resolution accepting
the completed work of MET Construction, Inc.
for ORANGE BOWL - LOWER PRESS BOX
REFURBISHING PHASE I - 1978.
MET Construction, Inc. has completed the project consisting
of constructing a new drop ceiling, installation of new and
existing light fixtures, overhead air conditioning ducts,
signs, repairs to partitions and glass replacement. The
Orange Bowl Stadium is located at 1400 N.W. 4th Street. The
original contract amount was for $29,756.00, but the completed
contract amount is $29,723.50, and it was completed on time.
It is now in order for the Commission to accept the
work, after all conditions are met.
JAH:-az
Re(i1-111(?ri.:::ti...°.......:'_,,--.::::
---'-' . .'. -::..-- -..-.-..• ...,. , , ,
.-.-. -.-,-.:.--....'.' ..,..,............,........,,,,,,.,,,... _ ,
.• --, ....'....-,,-- ,..',..._. _ .. ..,..-,,..,.......,....,.. ... ...,,..„ ,.,..., , .,.......
. . -- . -.•.- '..--- . ...... „..-.; -.....:......;... ,.,,... .., , ,
- --....--... '-'...--..:::'.• ....: ..-...-2__., ......,,..„,,.:,.,„ .,., . ., , , , ,,,, , ,, ,
. — - . .............,„........ _. , , ,..
- - . .,..,,-.......,.'...."...•,...,,...',..- -.,...,....,,....,.. ,,,......„,.: , . . ., , ,
'..--:....,,,..,,,....,,,.....:-,...,:.,, ,,,-.......,.'...-.•:.,.,.,....,-.,......y,...,-.-,,,,,-;',..-..:H..'.::.--,,,--,--,':' ,'.'.-, ---_ - _
, _ ,, . .,.., .,....,.._ ;....... ..
'...-',:...-:'...,.:;-:.:,.',.:--.:.-:1';':•-::::',...'f$:2-ilPPORTIVE - • DOCLJP4ENTS
FOLLOW"
comp leted
VI •
;-..ITY MIA -II, i":-OP.11D1.
TO:
Joseph R. Grassie
City Manager
01/ er-e-
FflCM. ,Donald W. Cather
r"Director
Department of Public Works„:
tT August 29:1 1979 B-2758A
ORANGE BOWL LOWER PRESS
BOXREFURBISHING PHASEHI -
1978 Resolution4'OrFinal
.Acceptance
•
(For Commission Me.eting of
ctosuRcs:
September 13, 1979)
The:Department of Public Works recommends
theadoption of the resolution accepting
the completed work of MET Construction,
for ORANGE BOWL - LOWER PRESS BOX
REFURBISHING PHASE I - 1978.
MET Construction, Inc. has completed the project consisting
of constructing a new drop ceiling, installation of new and
existing light fixtures, overhead air conditioning ducts,
signs, repairs to partitions and glass replacement. The
Orange Bowl Stadium is located at 1400 N.W. 4th Street. The
original contract amount was for $29,756.00, but the completed
contract amount is $29,723.50, and it was completed on time.
It is now in order for the Commission to accept the completed
work, after all conditions are met.
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NAME Orange Bowl - Lower Press Box Refurbishing
Phase I - 1978 B-2758A
CONTRACTOR MET Construction, Inc.
JOB SCOPE .Construct new drop ceiling, install new and existing
light fixtures, two overhead A/C ducts, signs, repair
Partitions and sliding doors and glass replacement.
REASON
FOR W0RK Modernize and upgrade
SOURCE
OF FUNDS Orange Bowl Enterprise' Fund
PROJECT Bids. Received: 8/21/78
HISTORY Contract Awarded: 12/14/78
Preconstruction Meeting: 11/20/78
CONTRACT
TIi1E
STARTED
CONTRACT
TINE
SCHEDULED
COr 4PLETION
DATE
ACTUAL
COT PLETIOU
DATE .
BID AMOUNT
CONTRACT
FINAL COST
CURRENT
ITEM FOR
CONSIDERATION Resolution to accept completed, work. and authorize
final payment to the contract�r.
12/14/78
facilities
15 WD plus 32 days delay due to material deliveries
and design changes.
2/21/79
2/21/79
$ 29