Loading...
HomeMy WebLinkAboutR-79-0668RESOLUTION NO r' 7 9' 6 6 8 A RESOLUTION ORDERING NORTH 59TH STREET HIGHWAY IMPROVEMENT H-4452 AND DESIGNATING THE PROPERTY AGAINST WHICH SPECIAL ASSESSMENTS SHALL BE MADE FOR A PORTION OF THE COST THEREOF AS NORTH 59TH STREET HIGHWAY IMPROVEMENT DISTRICT H-4452 WHEREAS, North 59th Street between, N. W: and E. 2 Avenue is in poor condition. existing street are out of grade and off center; WHEREAS, the existing pavement and side N. 2 Avenue Portions of.the and` parkways have become severely deteriorated, causing--drainage:a dust problems; and WHEREAS, NORTH 59TH STREET HIGHWAY is currently included in the City of Miami's Program; and WHEREAS, the proposed improvements will include IMPROVEMENT H-4452 Capital Improvement new. asphaltic pavement, concrete curbs .and/or gutters, concrete sidewalk, ,drainage , and landscaping;. NOW, THEREFORE, BE IT RESOLVED, BY THE 'COMMISSI.ON • OF .THE CITY OF MIAMI, FLORIDA Section 1. A local improvement described`as 59TH STREET HIGHWAY IMPROVEMENT H-44.52 shall be made under Section 56 of the Charter of The City of located at North 59th Street.between'N NORTH Miami, as amended, 2 Avenue and "DOCUMENT i��tx include !I shallg N. E. 2 Avenue. Section 2. This improvement and grading', construction of asphaltic concrete pavement, concrete curbs and/or gutters, concrete parkway' areas sidewalk, landscaped and new 'or modified drainage structures. Section 3.' This improvement shall be designated in all proceedings and assessments as NORTH 59TH STREET HIGHWAY` IMPROVEMENT H-4452, and the property against which special assessments shall be made fora portion of the cost thereof hereunder shall be designated as NORTH 59TH STREET HIGHWAY IMPROVEMENT DISTRICT H-4452 with the fo cm coMM%ss*o* , MEE11NG OF 'SEP 2 7 .oun+oss lm 7 9- 6 6 property descriptions by lot and block number all merit (plus property describedas noted by asterisks Constituting, of the pieces.of property affected by the said Improve' Plat, Book Subdivision and:Page. Block Lot HIGHSCHOOL PARK TRACT, 4-44 1 11-18.; 2 11-18 -, :g. 812 4 1-6. 5 1-,8 6 1-8 <_ ROCKMOOR VILLA TRACT *LITTLE ROCKMOOR CENTRAL. BISCAYNE"`AVENUE TRACT DIXIE''HI,GHWAY ;TRACT RHODY *AF. MERRITT SUBDIVISION: 4-182' 6 14-2 1 9 59-43 TRACT 4 19.7 3'-19.5 5-24 B-104 Tract: 10 10' 1=10 .17 1-3 Portion described below: The West 1/2 of: beginning.442.42'W. and 854.29'S. of the N.E. corner of the, S.E. 1/4.of Sec.13, Twsp. 53S., R.41E., then S..208.71', W.`208.71',. N. 208.71', and E. 208.71' to Point of Beginning. PASSEDAND ADOPTED ATTEST: 6C::::°2/2,4441) RALPH G. 0 IE CITY C RK is.'27thday of September Maurice A. Ferre PREPARED AND APPROVED BY: esoz,d ROBERT F. CLARK ASSISTANT CITY ATTORNEY APP D AS TO FORM AND CORRECTNESS:.. c_ , -)-f GEORGE . KNOX, JR: CITY ORNEY /// MAYOR �79- 668 Joseph R. Grassie City Manager �!<i:'i�/ G •' - J' ec.•ice' ` ✓ Donald W. Cather re, Director Department of Public Works September 13, 1979 B-4452 NORTH 59th STREET .HIGHWAY IMPROVEMENT H-4452 - Resolution Ordering (For Commission Meeting of September 27, 1,979) The Department of Public Works recommends the adoption of a resolution ordering NORTH 59th STREET HIGHWAY IMPROVEMENT H-4452 in the NORTH 59th STREET HIGHWAY IMPROVEMENT DISTRICT H-4452. Plans and specifications are being prepared to rebuild'` North 59th Street between N. W. 2 Avenue and N. E. 2 Avenue. Improvements will include new asphaltic pavement, curbs and/or gutters, sidewalk replacement, drainage and landscaping. This project is included in the Capital Improvement:Program, and funds will come from. the. Highway G,O. Bond Fund. This will be an assessable project, JOB' NAME JOB SITE JOB SCOPE REASON. FOR PROJECT NORTH"59th STREET, HIGHWAY IMPROVEMENT N. 59 . Street (N.W. 2 Ave.-N.E. 2. ':Improvements will include new asphaltic concrete pavement, concrete curbs and/or gutters;, concrete sidewalk replacement, drainage facilities and landscaping. N.59 Street, between N.W. 2 Avenue and :.E. 2 Avenue, is in poor condition. Portions' of the street are out of grade. and off center. The existing` pavement and,. side parkways have become :severely deteriorated causing drainage arid dust problems. SOURCE OF FUNDS - Highway G. 0. Bond Funds JOB COST $)488,000 Estimated Total Cost' A portion of the Cost will be assesse to. the abutting <property owners CURRENT ITEM FOR CONSIDERATION N79.668 PERTINENT INFORMATION A. North 59th Street between N.W. 2 Avenue and N.E. 2 Avenue is in poor condition. Portions of the existing street are out of grade and off -center; B. .The existing pavement and side parkways have become severely,. deteriorated causing drainage and dust_ problems;,' C. t'Iorth 59th Street Highway Improvement'is currently included' in the City of Miami's Capital Improvement Program. D. The proposed improvements will include new asphaltic:,pavemen concrete curbs and/or gutters, concrete sidewalk; drainage, and landscaping. ACTION. TO BE TAKEN 1. A local improvement described as NORTH 59TH STREET HIGHWAY. IMPROVEMENT H-4452 shall be made under Section 56 of the Charter of The City of Miami, as amended, located at North 59th Street between N.W. 2 Avenue and N.E. 2 Avenue. 2. This improvement shall include clearing and grading, con- struction of asphaltic concrete pavement, concrete curbs and/or gutters, concrete sidewalk, landscaped parkway areas and new or modified drainage structures. 3. This improvement shall be designated in all proceedings and assessments as NORTH 59TH STREET HIGHWAY IMPROVEMENT H-4452 and the property against which special assessments shall be made for a portion of the cost thereof, hereunder shall be designated as NORTH 59TH STREET HIGHWAY IMPROVE- MENT DISTRICT H-4452 .