HomeMy WebLinkAboutR-79-0668RESOLUTION NO r' 7 9' 6 6 8
A RESOLUTION ORDERING NORTH 59TH STREET
HIGHWAY IMPROVEMENT H-4452 AND DESIGNATING
THE PROPERTY AGAINST WHICH SPECIAL ASSESSMENTS
SHALL BE MADE FOR A PORTION OF THE COST
THEREOF AS NORTH 59TH STREET HIGHWAY
IMPROVEMENT DISTRICT H-4452
WHEREAS, North 59th Street between, N. W:
and
E. 2 Avenue is in poor condition.
existing street are out of grade and off center;
WHEREAS, the existing pavement and side
N.
2 Avenue
Portions of.the
and`
parkways
have become severely deteriorated, causing--drainage:a
dust problems; and
WHEREAS, NORTH 59TH STREET HIGHWAY
is currently included in the City of Miami's
Program; and
WHEREAS, the proposed improvements will include
IMPROVEMENT H-4452
Capital Improvement
new.
asphaltic pavement, concrete curbs .and/or gutters, concrete
sidewalk, ,drainage , and landscaping;.
NOW, THEREFORE, BE IT RESOLVED, BY THE 'COMMISSI.ON
•
OF .THE CITY OF MIAMI, FLORIDA
Section 1. A local improvement described`as
59TH STREET HIGHWAY IMPROVEMENT H-44.52 shall be made under
Section 56 of the Charter of The City of
located at North 59th Street.between'N
NORTH
Miami, as amended,
2 Avenue and
"DOCUMENT i��tx
include !I
shallg
N. E. 2 Avenue.
Section 2. This improvement
and grading', construction of asphaltic concrete pavement,
concrete curbs and/or gutters, concrete
parkway' areas
sidewalk, landscaped
and new 'or modified drainage structures.
Section 3.' This improvement shall
be designated
in all proceedings and assessments as NORTH 59TH STREET
HIGHWAY` IMPROVEMENT H-4452, and the property against which
special assessments shall be made fora portion of the cost
thereof hereunder shall be designated as NORTH 59TH STREET
HIGHWAY IMPROVEMENT DISTRICT H-4452 with the fo
cm coMM%ss*o* ,
MEE11NG OF
'SEP 2 7
.oun+oss lm 7 9- 6 6
property descriptions by lot and block number
all
merit (plus property describedas noted by asterisks
Constituting,
of the pieces.of property affected by the said Improve'
Plat, Book
Subdivision and:Page. Block Lot
HIGHSCHOOL PARK TRACT, 4-44 1 11-18.;
2 11-18 -,
:g. 812
4 1-6.
5 1-,8
6 1-8 <_
ROCKMOOR VILLA TRACT
*LITTLE
ROCKMOOR CENTRAL.
BISCAYNE"`AVENUE TRACT
DIXIE''HI,GHWAY ;TRACT
RHODY
*AF. MERRITT SUBDIVISION:
4-182' 6 14-2
1 9
59-43
TRACT 4 19.7
3'-19.5
5-24
B-104
Tract:
10
10' 1=10
.17 1-3
Portion described below:
The West 1/2 of: beginning.442.42'W. and 854.29'S. of the
N.E. corner of the, S.E. 1/4.of Sec.13, Twsp. 53S., R.41E.,
then S..208.71', W.`208.71',. N. 208.71', and E. 208.71' to
Point of Beginning.
PASSEDAND ADOPTED
ATTEST:
6C::::°2/2,4441)
RALPH G. 0 IE
CITY C RK
is.'27thday of
September
Maurice A. Ferre
PREPARED AND APPROVED BY:
esoz,d
ROBERT F. CLARK
ASSISTANT CITY ATTORNEY
APP D AS TO FORM AND CORRECTNESS:..
c_ , -)-f
GEORGE . KNOX, JR:
CITY ORNEY ///
MAYOR
�79- 668
Joseph R. Grassie
City Manager
�!<i:'i�/ G •' - J' ec.•ice' ` ✓
Donald W. Cather
re, Director
Department of Public Works
September 13, 1979 B-4452
NORTH 59th STREET .HIGHWAY
IMPROVEMENT H-4452 -
Resolution Ordering
(For Commission Meeting
of September 27, 1,979)
The Department of Public Works recommends
the adoption of a resolution ordering
NORTH 59th STREET HIGHWAY IMPROVEMENT
H-4452 in the NORTH 59th STREET HIGHWAY
IMPROVEMENT DISTRICT H-4452.
Plans and specifications are being prepared to rebuild'`
North 59th Street between N. W. 2 Avenue and N. E. 2
Avenue. Improvements will include new asphaltic pavement,
curbs and/or gutters, sidewalk replacement, drainage
and landscaping.
This project is included in the Capital Improvement:Program,
and funds will come from. the. Highway G,O. Bond Fund. This
will be an assessable project,
JOB' NAME
JOB SITE
JOB SCOPE
REASON. FOR
PROJECT
NORTH"59th STREET, HIGHWAY IMPROVEMENT
N. 59 . Street (N.W. 2 Ave.-N.E.
2.
':Improvements will include new asphaltic
concrete pavement, concrete curbs and/or
gutters;, concrete sidewalk replacement,
drainage facilities and landscaping.
N.59 Street, between N.W. 2 Avenue and
:.E. 2 Avenue, is in poor condition.
Portions' of the street are out of grade.
and off center. The existing` pavement
and,. side parkways have become :severely
deteriorated causing drainage arid dust
problems.
SOURCE OF FUNDS - Highway G. 0. Bond Funds
JOB
COST $)488,000 Estimated Total Cost'
A portion of the Cost will be assesse
to. the abutting <property owners
CURRENT ITEM
FOR CONSIDERATION
N79.668
PERTINENT INFORMATION
A. North 59th Street between N.W. 2 Avenue and N.E. 2 Avenue
is in poor condition. Portions of the existing street
are out of grade and off -center;
B. .The existing pavement and side parkways have become severely,.
deteriorated causing drainage and dust_ problems;,'
C. t'Iorth 59th Street Highway Improvement'is currently included'
in the City of Miami's Capital Improvement Program.
D. The proposed improvements will include new asphaltic:,pavemen
concrete curbs and/or gutters, concrete sidewalk; drainage,
and landscaping.
ACTION. TO BE TAKEN
1. A local improvement described as NORTH 59TH STREET HIGHWAY.
IMPROVEMENT H-4452 shall be made under Section 56 of the
Charter of The City of Miami, as amended, located at North
59th Street between N.W. 2 Avenue and N.E. 2 Avenue.
2. This improvement shall include clearing and grading, con-
struction of asphaltic concrete pavement, concrete curbs
and/or gutters, concrete sidewalk, landscaped parkway areas
and new or modified drainage structures.
3. This improvement shall be designated in all proceedings
and assessments as NORTH 59TH STREET HIGHWAY IMPROVEMENT
H-4452 and the property against which special assessments
shall be made for a portion of the cost thereof, hereunder
shall be designated as NORTH 59TH STREET HIGHWAY IMPROVE-
MENT DISTRICT H-4452 .