HomeMy WebLinkAboutR-79-0694• RESOLUTION NO. 7 9 - 694 A RESOLUTION ACCEPTING THE COMPLETED WORK PERFORMED BY D.M.P. CORPORATION AT A TOTAL COST OF $176,217.50 FOR NORTHERN DRAINAGE PROJECT E-44; AND AUTHORIZING A FINAL PAYMENT OF $17,621.75 WHEREAS, there exists a contract dated January 26, 1979 between the City of Miami and D.M.P. Corporation; and WHEREAS the work has been satisfactorily completed, and D.M.P. Corporation has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by . . D M P. Corporation for NORTHERN DRAINAGE PROJECT E-14 4 at a_pai cost of $176,217.50 is hereby approved. ITEM NO. Section 2. The proper officials of the City of Miami are hereby authorized to pay $17,621.75 to D.M.P. Corporation as full and final payment for all work performed and all materials furnished in connection with NORTHERN DRAINAGE PROJECT E-1414. PASSED AND ADOPTED this 17th day of October 1979. RAL G. 0 GIE, IT?CLERK PREPARED AND APP R BERT F. CLAR ASSISTANT CITY ATTORNEY AP GEOR CIT "SUPPORTIII. DOCIJP,IEN f3 .FOL 0V" Maurice A. Ferre CE A. FERRE, M A YOR D AS TO FORM AND CORRECTNESS: F. KNOX, J TTORNEY CITY COMMISSION MEETING OF OCT1 7 1979 NOOLIMON NO. 79-694 ROWS& 34 I VE 7-1 -0 1\4 Joseph R. Grassie. City Manager d ...., -, 2//e< X.?e,..a., Donald W. Cather f." Director Department of Public Works September 26, 1979 _B-5451 5ULIJLCT: NORTHERN DRAINAGE 17R(Nnciii. E-44 - Resolution for Final:Payment (For Commisslon- Meeting EFRNC1S• of October:11',H1979) ENCLOSURES; The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $17,621.75 to D.M.P. Corporation' for NORTHERN DRAINAGE PROJECT E-44. D.M.P. Corporation has completed the project consisting of constructing 22 drainage structures in the area bounded by the north and west City limits, on the south by N. 36 Street, and on the east by Biscayne Bay, with two structures outside this area. The original contract amount was for $188,491.80, but the completed contract amount is $176,217.50, and it was completed on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. }7,-E:hc 71) , 4,',..i. resolution attached `SLIPOPCI-IVE DC)CUM1-11\11.S FOLI__O\N" 79-694 /"" FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME• Northern Drainage Project E-44 CONTRACTOR DM.P: Corporation JOB SCOPE. REASON FOR WORK SOURCE OF FUNDS PROJECT HISTORY CONTRACT TIME STARTED CONTRACT T IlvIE SCHEDULED COMPLETION DATE ACTUAL COMPLETION DATE BID AMOUNT CONTRACT FINAL COST CURRENT ITEM FOR Construct 22 drainage structures in area bounded by the North and West City Limits on the South by N. 36 Street and on the; East 'by; Biscayne Bay, with two structures outside this area. Bids Received: 12/12/78 Contract Awarded 1/18/79 Preconstruction Meeting 1/22/79 14 days delay from rain 43 days delay from extra` work & in receiving materials for extra work. CONSIDERATION Resolution to accept completed final payment. 79" 694