HomeMy WebLinkAboutR-79-0773RESOLUTION NO. r1 0' -. 77 3
A RESOLUTION CONFIRMING ASSESSMENT ROLL
FOR CONSTRUCTION OF N. E.-4 COURT HIGHWAY
IMPROVEMENT H-4360 AND REMOVING ALL
PENDING LIENS FOR THIS IMPROVEMENT NOT
HEREBY CERTIFIED
WHEREAS, the Commission of The City of Miami,
Florida met on the 8th day of November, 1979, pursuant
to due legal notice of said meeting under Section 56 of
the City Charter, as amended, to receive all written
objections to the confirmation of the preliminary
assessment roll for the cost of N. E. 4 COURT HIGHWAY
IMPROVEMENT H-4360 on the following streets:
N. E. 4 Court from N. E. 54-58 Streets;
N. E. 4 Court from N. E. 60-79 Streets.
WHEREAS, no objections thereto by any person
interested in, or affected by, said assessments were.
sustained by the Commission, and said assessment roll
appeared, in all respects, regular and in accordance with
the requirements and provisions of the City Charter, as
amended;
NOW, THEREFORE, BE IT RESOLVED. BY THE COMMISSION
OF THE CITY OF MIAMI, FLORIDA: "DOCUNIDIT INULh
ITEM NO.
Section 1. That the prima facie assessments, as
apportioned and indicated on the preliminary assessment
roll for N. E. 4 COURT HIGHWAY IMPROVEMENT H-4360 be, and
they are hereby, in all things, confirmed and sustained
against any and all lots or parcels of ground described
therein.
Section 2. That the sums and amounts assessed
against each of the lots or parcels of ground in said
preliminary assessment roll are less than the amount that
CITY COMMISSION
MEETING OF
NOV3 19701
n�
79-t'7
rourraN ,,,�,
Malt
each of the said lots or parcels of ground is especially
benefited by said improvement and that such amounts are
in proportion to the special benefits that the property
received.
Section 3. That the total assessable cost of
said N. E. 4 COURT HIGHWAY IMPROVEMENT H-4360 of $76,937.59
be, and the same is hereby, approved and confirmed.
Section 4. That any pending lien in N. E. 4 COURT
HIGHWAY IMPROVEMENT H-4360 for improvements not appearing
in the preliminary assessment roll and not certified hereby
be, and the same is hereby, canceled and removed.
PASSED AND ADOPTED this g day of
1979..
unvember
MAURICE A. FERRE
M A Y O R
ATTEST:
PREPARED AND APPROVED BY:
e g A4t::
Assistant City Attorney
APPROVED AS TO FORM AND CORRECTNESS:
IIIIIIIIIuIIIIuIIwiwIIuuIIIi Iu
TO.
FROM
Joseph R. Grassie
City Manager
Donald W. Cather
Director
Dana me
;TT. October 22, 1979
4360
N. E. 4 COURT HIGHWAY
IMPROVEMENT H-4360 - Resolution
Confirming Assessment Roll
NCF_��sur;Fa:
(For Commission Meeting
of November 8, 1979)
If no objections are sustained, the Department
of Public Works recommends the adoption of
the attached resolution confirming the
preliminary assessment roll for N..E.'4 COURT
HIGHWAY IMPROVEMENT H-4 360 .
Construction of N. E. 4 COURT HIGHWAY IMPROVEMENT H-4360 has
been completed, and the preliminary assessment roll for this
improvement is ready to be presented to the Commission for
confirmation. This improvement consisted of clearing and
grading; excavation and filling; construction of a full -width
asphaltic concrete pavement, consisting of limerock base
material and asphalt binder and surface courses; concrete
curb and gutter; drainage structures; landscaping;and ac-
quisition of right of way. The improvements involved the
following streets:
N. E. 4 Court from N. E. 54-58 Streets;
N. E. 4 Court from N. E. 60-79 Streets.
A public hearing is scheduled for November 8, 1979 to hear .`
objections to confirmation of the assessment roll. If no
objections are sustained, it will be in order for the
Commission to adopt the resolution confirming the assessment
roll.
A section has been included canceling and removing pending
liens placed against properties not benefited by the
improvement.
JAH:hc
Resolution attached
79- 7 7 3
1
r' �_r •,::�=F;c, .i l,;rORANOU
Joseph R. Grassie
City Manager
Donald W. Ca.ther
r-ROM Director
❑4r
October 22, 1979
rILE ' B-4360
N. E. 4 COURT HIGHWAY
IMPROVEMENT H-4360 - Resolution
Confirming Assessment Roll
ErrfENCES
(For Commission Meeting
D= pa mere o ,;r Works of November 8, 1979)
c LUsuRE,, ..
If no objections are sustained, the Department
of Public Works recommends the adoption of
the attached resolution confirming the
preliminary assessment roll for N. E. 4 COURT
HIGHWAY IMPROVEMENT H-4360.
Construction of N. E. 4 COURT HIGHWAY IMPROVEMENT H-4360 has
been completed, and the preliminary assessment roll for this
improvement is ready to be presented to the Commission for
confirmation. This improvement consisted of clearing and
grading; excavation and filling; construction of a full -width
asphaltic concrete pavement, consisting of limerock base
material and asphalt binder and surface courses; concrete
curb and gutter; drainage structures; landscaping;and ac-
quisition of right of way. The improvements involved the
following streets:
N. E. 4 Court from N. E. 54-58 Streets;
N. E. 4 Court from N. E. 60-79 Streets.
A public hearing is scheduled for November 8, 1979 to hear
objections to confirmation of the assessment roll, If no
objections are sustained, it will be in order for the.
Commission to adopt the resolution confirming the assessment
roll.
A section has been included canceling and removing pending
liens placed against properties not benefited by the
improvement.
JAH:hc
Resolution attached
79- 773
1111110111111
PUBLIC HEARING ASSESSMENT. ROLL_
MEETING DATE:
AGENDA ITEM NO.
MAP MADE: (Yes) (No)
JOB N.E. 4 COURT HIGHWAY IMPROVEMENT H-4360
LOCATION N.E. 4 COURT FROM 54-58 STREETS AND FROM 60-79`STREETS
COST OF IMPROVEMENT ESTIMATED ACTUAL ASSESSED
Front foot $ ± 30.00 $ $
Front foot ( )(Curb and Gutter) $ 7.40 $ 6.05 $ 1.512426
Front foot (Sidewalk) 4" $ 6.20 $ 5.50 $
Front Foot (Sidewalk) 6" $ 7.40 $ 6.25 $
Front Foot (Gutter) $ 6.16 $ 6.62 $1.6564.67
Front Foot (Curb) $ 4.64 $ 6.05 $1.512427
Typical 50 _' lot ( )(Pavement) $1 500.00 $1,700.00 $ 425_00
Typical 50 ' lot ( )(Sidewalk) $ 316.00 $ 778_7s `$ -
Number of parcels in District: 106
CONTRACTOR: MARKS BROTHERS CO.
Amount $ 521,402.70 Final Cost $ 526,168.56
Started Work 2-10-75 Completed Work 11-5-75
PREVIOUS COMMISSION ACTION:
Ordered on 3-22-73 'Confirmed on 7-12-7.3
Accepted work -Final Payment on 2-26-76
This project'was originally designed from N.E. 54 to
REMARKS:
N.E. 79 Streets; the two blocks were deleted by Commission
action due to property owner objections. All preliminary
project work was done by an outside consultant.
Prepared
Form - PW #356 5/72
6-6-79
79 773