HomeMy WebLinkAboutR-79-0786FOLLOW
RESOLUTION NO. 7 9 - 7 v' 6
A RESOLUTION CONFIRMING ORDERING RESOLUTION
NO. 79-668 AND AUTHORIZING THE CITY CLERK
TO ADVERTISE FOR SEALED BIDS FOR THE
CONSTRUCTION OF NORTH 59TH STREET HIGHWAY
IMPROVEMENT H-4452 IN NORTH 59TH STREET.
HIGHWAY IMPROVEMENT DISTRICT H-4452
WHEREAS, at the City Commission meeting of
September 27, 1979 Resolution No. 79-668 was passed which
ordered a highway improvement identified as NORTH 59TH
STREET HIGHWAY IMPROVEMENT H-4452 in NORTH 59TH STREET
HIGHWAY IMPROVEMENT DISTRICT H-4452; and
WHEREAS, pursuant to due public notice a public
hearing was held before the City Commission on November 20,
1979 as to any objections to the confirmation of Resolution
No. 79-668, which resolution ordered NORTH 59TH STREET
HIGHWAY IMPROVEMENT H-4452 in NORTH 59TH STREET HIGHWAY
IMPROVEMENT DISTRICT H-4452; and
WHEREAS, no objections to the confirmation of said
highway improvement were sustained by the Commission, it is
therefore in order for the Commission to confirm said ordering
resolution and authorize the City Clerk to advertise for
sealed bids for the construction of said improvement;
NOW, THEREFORE, BE IT RESOLVED BY TIHEfg�COMMISSION
"CVCV IYILM I-� ,j•i-1\
OF THE CITY OF MIAMI, FLORIDA:
ITEM_ NO.
Section 1. Resolution No. 79-bb8 dated September 27,
1979 which ordered NORTH 59TH STREET HIGHWAY IMPROVEMENT
H-4452 in NORTH 59TH STREET HIGHWAY IMPROVEMENT DISTRICT
H-4452 is hereby confirmed.
Section 2. That the City Clerk be, and he is hereby,
authorized to advertise for sealed bids for the construction
of NORTH 59TH STREET HIGHWAY IMPROVEMENT H-4452 in NORTH 59TH
STREET HIGHWAY IMPROVEMENT DISTRICT H-4452.
r►
CITY COMMISSION
MEETING OF
NOV?, 6 +979
79-786
ltdourtas NO.
SWAM
1979.
ATTEST:
PASSED AND ADOPTED this 26th day of November
Maurice A. Ferre
C32/2<eie)1
City Cler
PREPARED AND APPROVED BY:
Assistant City Attorney
APPROVED AS TO FORM AND CORRECTNESS:
C
ney
MAYOR
! v1 � S
C.)L O
79-786
CITY MANAGER'S ESTIMATE OF COST
OF
LOCAL IMPROVEMENT AND INCIDENTAL EXPENSES
NORTH 59TH STREET HIGHWAY IMPROVEMENT B-4452
ORDERED BY RESOLUTION NO. 79-668 ADOPTED SEPTEMBER 27, 1979
ESTIMATED CONSTRUCTION COST OF IMPROVEMENT . . ▪ . . . $.432,000
ESTIMATED INCIDENTAL EXPENSES:
Surveys; inspection and supervision of
work; preparation of plans, specifica-
tions and estimates . . . . . .
Printing; publishing of notices and
proceedings; preparation of bonds;
legal services; abstracts; and $ $,600
other necessary and proper expenses
Total estimated incidental expenses $ 56,000
TOTAL ESTIMATED CONSTRUCTION COST AND INCIDENTAL EXPENSES. . $488,000
DISTRIBUTION:
Estimated cost to be paid by City of Miami. .
Estimated cost of all items to be assessed. .
Estimated assessment per front foot .
Estimated assessment per L.Ft. of curb and gutter . . •
Estimated assessment per L.Ft. of sidewalk. . .
Estimated assessment per L.Ft. of 8-inch limerock base.
Estimated assessment per L.Ft. of 1-1/2-inch asphalt
surface . . . . . . . . . . . . . • . . •
WITNESS my signature at Miami, Florida this
A.D., 19 .
'SUPPORTIVE
$408
000;
$ 80, 000
• $ 10.00
1.86
1.94
4.49
$
. $
1.73
10/30/79
79-786
FACT SHEET
JOB NAME NORTH 59th STREET HIGHWAY IMPROVEMENT
JOB SITE N. 59 Street (N.W. 2 Ave.-N.E. 2 Ave.)
JOB SCOPE -Improvements will include new asphaltic
concrete pavement, concrete curbs and/or
gutters, concrete sidewalk replacement,
drainage facilities and landscaping.
REASON FOR PROJECT - N.59 Street, between N.W. 2 Avenue and
N.E. 2 Avenue, is in poor condition.
Portions of the street are out of grade
and off center. The existing pavement
and side parkways have become severely
deteriorated causing drainageand dust
problems.
SOURCE OF FUNDS
JOB COST
Highway & Storm Sewer G.O.Bonds
$488,00
0 Estimated Total Cost
A portion of the cost will be assessed
to the abutting property owners.
Estimated. Assessment: ck10.0 per
front foot
PROJECT HISTORY - Ordered Sept 27, 1979
Property Owners Notified Oct. 25, 1979
CURRENT ITEM
FOR CONSIDERATION
To be Confirmed Nov.
10/30/79
15
It47E=F .(:)i
Joseph R. Grassie
City Manager
Donald W. Cather
Director
Drarmt o V•, c , Works
October 30, 1979
B-4452
NORTH 59TH STREET HIGHWAY
IMPROVEMENT - Resolution.
Confirming Ordering Resolution
(For Commission Meeting
November 20, 1979).
The Department of Public Works recommends the
adoption of the resolution confirming Ordering
Resolution No. 79-668 and authorizing the City
Clerk to advertise for sealed bids for the
construction of NORTH 59TH STREET HIGHWAY
IMPROVEMENT H-4452 in the NORTH 59TH STREET
HIGHWAY IMPROVEMENT DISTRICT H-4452.
Improvements to rebuild North 59th Street between N. W. 2
Avenue and N. E. 2 Avenue will include new asphaltic pavement,
curbs and/or gutters, sidewalk replacement, drainage, and
landscaping, and were ordered by the City Commission at their
meeting of September 27,.1979.
It is now in order to confirm the Ordering Resolution
No. 79-668 and authorize advertising for bids. A public
hearing will be held on November 20, 1979, at which time
the Commission will hear objections to the confirmation of
the ordering resolution.
JAH:hc
Resolution attached
79-786