RESOLUTION NO. 7 9- 8 42
A RESOLUTION ACCEPTING THE BID OF FRISA
CORPORATION IN THE PROPOSED AMOUNT OF
$726,997.50, THE BASE BID OF THE
PROPOSAL, FOR THE WEST END STORM SEWER
PROJECT; WITH MONIES THEREFOR ALLOCATED
FROM THE "STORM SEWER G.O. BOND FUND"
IN THE AMOUNT OF $726,997.50 TO COVER
THE CONTRACT COST; ALLOCATING FROM SAID
FUND THE AMOUNT OF $79,970.00 TO COVER
THE COST OF PROJECT EXPENSE; ALLOCATING
FROM SAID FUND THE AMOUNT OF $14,539.50
TO COVER THE COST OF SUCH ITEMS AS
ADVERTISING,. TESTING LABORATORIES,; AND
POSTAGE; AND AUTHORIZING THE CITY
MANAGER TO EXECUTE A CONTRACT WITH
SAID FIRM
WHEREAS, sealed bids were received November 19,
1979 for WEST END STORM SEWER PROJECT; and
WHEREAS, the City Manager reports that the
$726,997.50 bid of Frisa Corporation for the base bid of
the proposal is the lowest responsible bid and recommends
that a contract be awarded to said firm; and
WHEREAS, the Capital Improvements Appropriation
Ordinance No. 9019 was adopted on November 8, 1979, and
monies are available for the proposed amount of the
contract, project expense, and incidentals from the account
entitled "Storm Sewer G.O. Bond Fund" as set forth under
Section V, Item B-4, of said ordinance;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION
OF THE CITY OF MIAMI, FLORIDA: "DOCUMENT NDLX
fl
Section 1. The November 19, 1 PI011t .
Corporation in the proposed amount of $726,997.50 for the
project entitled WEST END STORM SEWER PROJECT for the base
bid of the proposal, based on unit Prices, is
hereby accepted
at the price stated therein to cover the cost of
contract.
said
CITY COMMISSION
MEETING OF
mums io.' 9 - 8 4
Section 2. The amount of $726,997.50 is hereby
allocated from the account entitled "Storm Sewer G.O.
Bond Fund" to cover the cost of said contract.
Section 3. The amount of $79070.00 is hereby
allocated from the aforesaid fund to cover the cost of
project expense.
Section 4. The amount of.$14,539.50 is hereby
allocated from the aforesaid fund to cover the cost of
such incidental items as advertising, testing laboratories,
and postage.
Section 5.The City Manager is hereby authorized
to enter into a contract on behalf of The City of Miami
with Frisa Corporation for WEST END STORM SEWER PROJECT,
base bid of the proposal.
PASSED AND ADOPTED this 5th day of December
1979.
ATTEST:
PREPARED AND APPROVED BY:
/14,(4.
Assistant City Attorney
APPAS TO
Maurice A. Ferre
AND CORRECTNESS:
MAYOR
Lt y
DO C,t_ MEN
2
79-842
3t/
Joseph R. Grassie
City Manager
Donald W. Cather
Director
Department of Public Works
November 21, 1979 'B-5452
WEST END STORM SEWER PROJECT -
Resolution Awarding Contract
(For December 13, 1979
Commission Meeting)
The Department of Public Works recommends
adoption of the resolution accepting the.
bid received November 19, 1979 of Frisa
Corporation in the amount of $726,997.50
and authorizing the City Manager to
enter into a contract in behalf of the
City of Miami for WEST END STORM SEWER
PROJECT.
Bids were received November 19, 1979 to provide a system
of interconnecting French drains with a high level over-
flow to the Tamiami Canal to relieve flooding in the
Lake Darlow area.
As reflected in the tabulation of bids, the $726,997.50
bid of Frisa Corporation is the lowest responsible bid
for base bid of the proposal.
Funds have been allocated under the "Storm Sewer G.O.
Bond Fund" for the estimated amount of the contract, for
project expense, and for such items as advertising,
testing laboratories, postage.
JAH:hc
Resolution attached
"SUPPORTIVE
DOCUMENTS
FOLLOW"
BID AWARD FACT SHEET
For The City Manager
PROJECT NAME WEST END STORM SEWER PROJECT (3-5452)
AND LOCATION (Area bounded by W. Flagler Street, S.W. 66 Ave.,
S.W. 8 St., and S.W. 60 Court)
PROJECT SCOPE To provide a system of interconnecting French Drains
with a high level overflow to the Tamiami Canal to
relieve flooding in the Lake Darlow area.
ESTIMATED
CONSTRUCTION $800,000
COST
DATE BIDS
RECEIVED
NUMBER OF
BIDS RECEIVED
NAME OF LOW
BIDDER
AMOUNT OF
LOW BID
November 19-, 1979
FRISA CORPORATION
$726,997.50 (Base Bid)
TOTAL FUNDS TO
BE ALLOCATED $821,507.00
LENGTH OF TIME
ALLOWED FOR 130 Working Days
CONSTRUCTION
SOURCE OF FUNDS G.O.B. STORM SEWER
Form PW #389 1/79
'SUPPORTIVE
FOLLOWT'
11/26/79
79-842
WEST END STORM SEWER PROJECT.
JOB NO. B-5452
CONTRACTOR'S FACT SHEET
1. FRISA CORPORATION
1150 N.W. 72 Avenue, Suite 730
Miami, Florida 33126
Phone: 592-6426
2. Principals: Jose Frias President
,Victor Gallo- Secretary/Treasurer
3•'Contractor is properly licensed and insured
4. Subcontractors: None requiredat this time.
5. Experience: 5 years
Western Drainage Project E-46 $252,600.00`
Virginia Key Rubbish Pit Closing - Phase I 107,000.00
Virginia Key Rubbish Pit Closing- Phase II 611,000.00
Virginia Key Fill (City of Miami) 59,250.00
Virginia Key Restoration (City of Miami) 78,500.,00
6. A minority contractor
. 47 advertisements mailed out by regular mail
15 advertisements mailed out by certified mail
17 contractors picked up plans and specifications.
8 contractors submitted bids
Bidder
Licensed a Insured as Per City Code S Metro Ord.
Bid Bond Amount
leregulGrit ies
TABULATION OF BIDS FOR
Vl T EFl j r> A ,' : ! F: W/? . , >-'zf
City Manager, City Clerk P. M. / �.•�) % �✓ C»
Received by the == == = : City of Miami. Florida et
FL.," �.3 'i .,.i' �� i�T. f� ••ice_%.. kit f 7).,f. ( �` f • ) a ..._ f.� :L l.�.! a:l �.._l +1tI ;i!irf,�"Jt✓fIr
_ t :,11:
t..?
•
i C)
1 s
S J•
DESCRIPTION
TOTAL
TOTAL
TOTAL
TOTAL
EASE 13112 : THE ToraL J "r= I TE;A
1 1-1,412U 37
_l'f'.:J. I '?!,
aF i Etas I ra-irz .3
, ? :3
ey ,1 f� —.
IRREGULARITIES LEGEND
A — No Power -el- Attorney
B_
C Corrected Errtensiens
D — Proposer Unsigned or improperly Signet. or No Corporate Seel
E_
F_
G — Improper Bid Bond
M — Corrected Bid