Loading...
HomeMy WebLinkAboutR-79-0891RESOLUTION No. 7 9- 8 9 1 A RESOLUTION ACCEPTING THE COMPLETED WORK PERFORMED BY JOE REINERTSON EQUIPMENT CO. tc, i 7. �t AT A TOTAL COST OF $521,750.50 FOR THE ...? ,.,' � V CITY WIDE SANITARY SEWER EXTENSIONS FO IMPROVEMENT SR-5448C; AND AUTHORIZING A DO URA EN T*S FINAL PAYMENT OF $50, 808 . 94 L OWff WHEREAS, there exists a contract dated December 19, 1978 between the City of Miami and Joe Reinertson' Equipment Co; and WHEREAS, the work has been satisfactorily completed, and Joe Reinertson Equipment Co. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Joe Reinertson Equipment Co. for CITY WIDE SANITARY SEWER EXTENSIONS IMPROVEMENT SR-5448C at a total cost of $521,750.50 is hereby. approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $50,808.94 to. Joe Reinertson Equipment Co. as full and final payment for all work performed and all materials furnished in connection with CITY WIDE SANITARY SEWER EXTENSIONS IMPROVEI!IENT SR-5448C. "DOCUMENT INDEX ITEM NO`. CITY COMMISSION MEETING OF DEC 2 7 197, mouninem 7 9 - 8 9 �1 mm MO MW 1 PASSED AND ADOPTED this 27th day of December , 1979. Maurice A. Ferre MAURICE A FERRE, M A Y O R ATTEST: RALPI-f G . ONGIE, CITY CLE PREPARED AND APPROVED BY: e-4tj eXtx,t,/t ROBERT F. CLARK ASSISTANT CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: GEORF. KNOX, CITi TTORNEY "SUPPORTIVE DOCUMENT'S FOLLOW" FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME City Wide Sanitary Sevier Extensions Improvement SR-5448-C CONTRACTOR JOB SCOPE Joe Reinertson Equipment Co. Construct a sanitary sewage system including 8" thru 18" pipe, 6" house laterals, together with all necessary appurtenances located in the unsewered portion of the area bounded by the Miami River, N. W. 20 Street, iv. W. 17-27 Avenues. REASON FOR WORK Provide sanitary sewers to previously unse,•rered area. SOURCE OF FUNDS Sanitary Sewer G . O . Bond Funds PROJECT Lids Received: 11/9/78 • HISTORY Contract Awarded: 12/14/78 Preconstruction Meetingi 12/28/78 CONTRACT TIi'EE STARTED 2/5/79 CONTRACT TIME 110 Workin days SCHEDULED -COMPLETION DATE ACTUAL COMPLETION DATE BID AMOUNT CONTRACT FINAL COST CURRENT ITEM FOR .CONSIDERATION 7/11/79 7/11/79 5113,757.50 521,750.50 "SUPPORTIVE DOCUMENTS FOLLOW" Resolution to accent completed work and authorize final payment to the contractor. 79-891 // 30/ 7 Joseph R. Grassie City Manager Donald W. Cather Dire tor D orks November 30, 1979 B-5448C CITY WIDE SANITARY SEWER: EXTENSIONS IMPROVEMENT SR-5448C Resolution for FinalPayment (For Commission Meeting of December 2 7, The Department of Public Works recommends the adoption of the resolution accepting' the completed work and authorizing a final payment of $50,808.94 to Joe Re,inertson Equipment Co. for CITY WIDE SANITARY SEWER EXTENSIONS IMPROVEMENT SR-5448C. Joe Reinertson Equipment Co. has completed the project con- sisting of constructing a sanitary sewage system including. 8" thmugh 18" pipe, 6" house laterals, together with all necessary appurtenances, located in the unsewered portion of the area bounded by the Miami River, N.W. 20 Street, and M.W. 17-27 Avenues. The original contract amount was for $54 ,757.50, and the completed amount is $521,750.50, and it was completed on time. It is now in order for the Commission to accept the completed. work and authorise final payment, after all conditions are met. J,AH : az 1'/ Resolution attached