HomeMy WebLinkAboutR-79-0891RESOLUTION No. 7 9- 8 9 1
A RESOLUTION ACCEPTING THE COMPLETED WORK
PERFORMED BY JOE REINERTSON EQUIPMENT CO. tc, i 7. �t AT A TOTAL COST OF $521,750.50 FOR THE ...? ,.,' � V
CITY WIDE SANITARY SEWER EXTENSIONS
FO
IMPROVEMENT SR-5448C; AND AUTHORIZING A DO URA EN T*S
FINAL PAYMENT OF $50, 808 . 94 L OWff
WHEREAS, there exists a contract dated December 19,
1978 between the City of Miami and Joe Reinertson' Equipment
Co; and
WHEREAS, the work has been satisfactorily completed,
and Joe Reinertson Equipment Co. has furnished the required
documents certifying that all bills for labor and materials
have been paid in full in connection with the aforesaid
contract; and
WHEREAS, the City Manager and the Department of Public
Works recommend that the completed work be accepted and final
payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF
THE CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by Joe
Reinertson Equipment Co. for CITY WIDE SANITARY SEWER EXTENSIONS
IMPROVEMENT SR-5448C at a total cost of $521,750.50 is hereby.
approved.
Section 2. The proper officials of the City of Miami
are hereby authorized to pay $50,808.94 to. Joe Reinertson
Equipment Co. as full and final payment for all work performed
and all materials furnished in connection with CITY WIDE SANITARY
SEWER EXTENSIONS IMPROVEI!IENT SR-5448C.
"DOCUMENT INDEX
ITEM NO`.
CITY COMMISSION
MEETING OF
DEC 2 7 197,
mouninem 7 9 - 8 9 �1
mm
MO
MW
1
PASSED AND ADOPTED this 27th day of December , 1979.
Maurice A. Ferre
MAURICE A FERRE, M A Y O R
ATTEST:
RALPI-f G . ONGIE, CITY CLE
PREPARED AND APPROVED BY:
e-4tj eXtx,t,/t
ROBERT F. CLARK
ASSISTANT CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
GEORF. KNOX,
CITi TTORNEY
"SUPPORTIVE
DOCUMENT'S
FOLLOW"
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NAME City Wide Sanitary Sevier Extensions Improvement
SR-5448-C
CONTRACTOR
JOB SCOPE
Joe Reinertson Equipment Co.
Construct a sanitary sewage system including 8" thru
18" pipe, 6" house laterals, together with all necessary
appurtenances located in the unsewered portion of the
area bounded by the Miami River, N. W. 20 Street, iv. W.
17-27 Avenues.
REASON
FOR WORK Provide sanitary sewers to previously unse,•rered area.
SOURCE
OF FUNDS Sanitary Sewer G . O . Bond Funds
PROJECT Lids Received: 11/9/78 •
HISTORY Contract Awarded: 12/14/78
Preconstruction Meetingi 12/28/78
CONTRACT
TIi'EE
STARTED 2/5/79
CONTRACT
TIME 110 Workin days
SCHEDULED
-COMPLETION
DATE
ACTUAL
COMPLETION
DATE
BID AMOUNT
CONTRACT
FINAL COST
CURRENT
ITEM FOR
.CONSIDERATION
7/11/79
7/11/79
5113,757.50
521,750.50
"SUPPORTIVE
DOCUMENTS
FOLLOW"
Resolution to accent completed work and authorize
final payment to the contractor.
79-891
// 30/ 7
Joseph R. Grassie
City Manager
Donald W. Cather
Dire tor
D
orks
November 30, 1979
B-5448C
CITY WIDE SANITARY SEWER:
EXTENSIONS IMPROVEMENT
SR-5448C
Resolution for FinalPayment
(For Commission Meeting
of December 2 7,
The Department of Public Works recommends
the adoption of the resolution accepting'
the completed work and authorizing a
final payment of $50,808.94 to Joe Re,inertson
Equipment Co. for CITY WIDE SANITARY SEWER
EXTENSIONS IMPROVEMENT SR-5448C.
Joe Reinertson Equipment Co. has completed the project con-
sisting of constructing a sanitary sewage system including.
8" thmugh 18" pipe, 6" house laterals, together with all
necessary appurtenances, located in the unsewered portion of
the area bounded by the Miami River, N.W. 20 Street, and
M.W. 17-27 Avenues. The original contract amount was for
$54 ,757.50, and the completed amount is $521,750.50, and
it was completed on time.
It is now in order for the Commission to accept the completed.
work and authorise final payment, after all conditions are
met.
J,AH : az
1'/
Resolution attached