RESOLUTION NO.
79-886
A RESOLUTIONACCEPTING THE COMPLETED
WORK OF M.E.T. CONSTRUCTION, INC. FOR
THE HOSE DRYING TOWERS (2ND BIDDING)
AT A TOTAL COST OF $23,249.00;'
AUTHORIZING AN INCREASE IN THE CONTRACT
IN THE NET AMOUNT OF $1,800.00; AND
AUTHORIZING A FINAL PAYMENT OF
$7,099.04
WHEREAS, there exists a contract dated June 6,
1979 between the City of Miami and M.E.T. Construction,
Inc.; and
WHEREAS, the work has been satisfactorily
completed,; and M.E.T. Construction, Inc. has furnished the
required documents certifying that all bills for labor
and materials have been paid in full in connection with
the aforesaid contract; and
WHEREAS, there were 22 days extra work due to
additional bracing for the towers which resulted in an
increase in the contract; also new lower price was
negotiated with the contractor for performing the painting
work, and it was subsequently included in the work; and
WHEREAS, sufficient funds are available in the
account "Fire Fighting, Fire Prevention, and Rescue,f;
1UCUMEI%
Facilities G.O. Bond Fund"; and
ITEM NO.
WHEREAS, the City Manager and the Department o
Public Works recommend the increase of $1,800.00 to cover
the increase in the contract;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION
OF THE CITY OF MIAMI, FLORIDA:
Section 1. The
increased in the amount of
Section 2. The
Construction,
amount of the contract is hereby
$1,800.00.
completed work performed by M.E.T.
Inc for HOSE DRYING TOWERS (2ND BIDDING) ie
hereby accepted at a total cost of $23,'249.00.
CITY COMMISSION
MEETING OF
DEC 3 i i9i
miaow,0 7 9 - 8 8 6
•
Section 3. Sufficient funds are available in
the account "Fire Fighting, Fire Prevention, and Rescue
Facilities G.O. Bond Fund".
Section 4. The proper officials of The City
of Miami are hereby authorized to pay M.E.T. Construction,
Inc. a balance of $7,099.04 as full and final payment for
all work performed and all materials furnished in connection
with the aforesaid contract.
PASSED AND ADOPTED this 27th day of. December',
1979.
ATTEST:
k
Maurice A. Ferre
MAYOR
(T31' ° J "SUPPORTIVE
S U PPO TIVE
DOCUMENTS
PREPARED AND APPROVED BY:
/e
Assistant City Attorney'
e(a.,t"
APPROVED AS TO FORM AND CORRECTNESS:
2
79-886
4/4,
•
Joseph R. Grassie
City Manager
Donald W. Cather
i" Director of Public -Works
December 14, 1979
HOSE DRYING TOWERS
(2ND, BIDDING) - Resolution
for Increase in Contract
and Final Payment
B-2741
(For Commission Meeting
of December 27, 1979)
The Department of Public Works recommends
the adoption of the resolution authorizing
an increase in the contract in the amount
of_$1,800.00 for the HOSE DRYING TOWERS
(2ND BIDDING), accepting the completed
work performed by M.E.T. Construction, Inc.
at a total cost of $23,249.00, and author-
izing a final payment of $7,099.04.
M.E.T. Construction, Inc. has completed the project con-
sisting of constructing a new.hose drying tower at Fire
Station No. 11, located at 5920 West Flagler Street, and
relocating an existing tower to Fire Station No. 12,
located at 1455 N. W. 46 Street. During the course of
the work it was determined that additional bracing for
the towers would be required resulting in 22 days extra
work. New lower price was negotiated with the contractor
for performing the painting work, and it was subsequently
included in the work. Sufficient funds are available in
the Fire Fighting, Fire Prevention,. and Rescue Facilities
G.O. Bond Fund. ` This was a lump ; sum contract in the
amount of $21,449.00, but the 'completed contract amount
is plus $1,800.00 for the increase.
It is now in order for the Commission to accept the
completed work and authorize final payment, after all
conditions are met.
,.�AH:hc
Resolution attached
"SUPPORTIVE
DOCUMENTS
FOLLOW"
79-886
MR
MR
mw
MB
•
JOB NAME
CONTRACTOR
JOB:SCOPE
REASON.
FOR WORK
SOURCE
OF FUNDS
PROJECT
HISTORY.
CONTRACT
TIME
STARTED
CONTRACT
TIME
SCHEDULED
COMPLETION
DATE.
ACTUAL
COMPLETION
DATE
BID AMOUNT.
CONTRACT
FINAL COST
CURRENT
ITEM FOR
CONSIDERATION
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
Hose Drying Towers (2n.d Bidding) B-2741
MET Construction, Inc.
Construct new hose dry tower at Fire Station #11
located at 5920 W. Flagler Street, relocate existing
hose tower to Fire Station #12 located at 1455 N. W.
46 Street.
Provide drying apparatus for fire hoses.
Fire Fighting, Fire Prevention, and Rescue Facilities
G. 0. Bond Fund
Bids Received: 4/24/79
Contract Awarded: 5/22/79
Preconstruction Meeting: 6/25/79
7/20/79
60 Working days plus 22 days for extra work.
11/15/79
11/15/79
21,1449.00
$ 23,249.00
Resolution to accept completed work,
in contract amount by $1-,800.00, and
payment to the contractor.
authorize
authorize
increase
final:
9 886
-2'�-