HomeMy WebLinkAboutR-80-0056RESOLUTION NO. 8 0 - 5 6
A RESOLUTION ACCEPTING THE COMPLETED
WORK PERFORMED BY JOE REINERTSON
EQUIPMENT CO., INC. AT A TOTAL COST
OF $180,688.97 FOR CONVENTION CENTER,
PHASE I - SITE EXCAVATION; AND
AUTHORIZING A FINAL PAYMENT OF
$18,068.90
WHEREAS, there exists a contract dated
December 28, 1977 between
Reinertson Equipment Co., Inc.;
the City of Miami and Joe
and
WHEREAS, the originalcontract was increased
Resolution
No.
on February 23, 1978 by 78-120 to a total
not to exceed $182,000.00; and
WHEREAS, the work has been satisfactorily
has
, and Joe Reinertson Equipment Co., Inc.
completed, and
.for labor furnished andthe required materialsthe contract; documentsci havety m beenaanndagcertifyingepraaidnd' i nt he fullotrD hekaptiba nnealltmaecncbteip lot lef connectionsd
with the aforesaid
EREAS,
he
. WorWklis recommend 70atthet contractor; _ completed
Bwy THE COMMISSION
and final payment made p
Public
OF THE CITYOF MIAMI, FLORIDA.
1.
Reinertson Equipment Co.' Inc. for CONVENTIONi80here pp
Section The completed work perforcrnENedTEbRy, Joe
i _
THEREFORE, BE IT.RESOLVED BY
approved.
SITE EXCAVATION at a total cost of ‘r 1 d tei C
688I.T, tE7riih is 4 moECityi 1 - r 0 INDEXf
Section 2. The proper official6s8 o9fo t
Miami are hereby authorized to pay $18,0 • 0 Joe
Reinertson Equipment Co., Inc. as full and final payment for
all work performed and all materials furnished in connection
-• • . •
with CONVENTION CENTER, PHASE 1 - SITE EXCAVATION. , :•
LJ
CITY COMMISSION
MEETING OF
AN 2 4 1980
mow=
11.11111101011•1110011111•••••••••••••••••••
19.80.
ATTEST:
MAURICEA. FERRE
MAURICE A. FERRE M.;-A Y 0 R
P . 1NGIE, CITY CL..-
PREPARED AND APPROVED BY:
rewt
ROBERT F. CLARK
ASSISTANT CITY ATTORNEY
KNOX
ORNEY
r M
Joseph R. Grassie
City Manager
Donald W. Cather
Director ofrublic Works
CLO
January 7, 1980
B-3148-C
CONVENTION CENTER, PHASE
SITE EXCAVATION
Resolution for Final
I -
Payment
(For Commission Meeting
of January-24,.1980):
The Department of Public Works recommends
the adoption of the resolution; accepting
the completed work and:authorizing .a final
payment of $18,068.90-;`for CONVENTION CENTER,,
PHASE I SITE EXCAVATION.
Joe Reinertson Equipment Co., Inc. has completed the project
consisting of furnishing labor and equipment for the hand -
excavation to perform an archaeological search at the
Convention Center site prior to starting construction of
the center, requested by the Florida State Division of
Archives History and Records Management. The original
contract amount was $88,000.00, increased by Resolution
No. 78-120 on February 23, 1978 to a total not to exceed
$182,000.00, but the completed amount is $180,688.97, and
it was completed on time.
It is now, in order for the Commission to accept the completed
work and authorize final payment, after all conditions are
met.
H: he
esolution
attached`:
Frpj 1l1� f��t 4
80
1;t
JOB NAME
CONTRACTOR
JOB' SCOPE*
REASON
FOR :WORK
FINAL CONSTRUCTION FACT, SHEET
FOR THE CITY MANAGER
onvention Center Phase I'= Site Excavation
Joe Reinertson Equipment Co.,Inc
Furnishing labor and equipment for the hand excavation
to perform an archaeological search at the `,convention
center site'=prior to starting construction of the
center.
Requested by the'Florida State
History and Records Management
Division of Archive's
SOURCE
OF' 'FUNDS. EDA Grant
PROJECT Bids Received12/27/77
HISTORY Contract `Awarded:
Preconstruction Meet`ing:- 12/28/77
CONTRACT
TIME
STARTED 1/3/7
CONTRACT
TIME 15 Calendar weeks plus additional time because of
the increase incontract
SCHEDULED.
COMPLETION
DATE
Undetermined.
ACTUAL
COMPLETION
DATE 6/30/78
BID AMOUNT $ 88,000.00
CONTRACT
FINAL COST $ 180,688.97 (Note: Res. 78-120:dated 2/23/78.
authorized an increase`in.
contract up, to a total" of
$ 182,000.00)
CURRENT
UR
ITEI4 FOR
CONSIDERATION -
Resolution to accept the completed' work a
final payment to the contractor.
d authorize
12/28/79;
1