HomeMy WebLinkAboutR-80-0056RESOLUTION NO. 8 0 - 5 6 A RESOLUTION ACCEPTING THE COMPLETED WORK PERFORMED BY JOE REINERTSON EQUIPMENT CO., INC. AT A TOTAL COST OF $180,688.97 FOR CONVENTION CENTER, PHASE I - SITE EXCAVATION; AND AUTHORIZING A FINAL PAYMENT OF $18,068.90 WHEREAS, there exists a contract dated December 28, 1977 between Reinertson Equipment Co., Inc.; the City of Miami and Joe and WHEREAS, the originalcontract was increased Resolution No. on February 23, 1978 by 78-120 to a total not to exceed $182,000.00; and WHEREAS, the work has been satisfactorily has , and Joe Reinertson Equipment Co., Inc. completed, and .for labor furnished andthe required materialsthe contract; documentsci havety m beenaanndagcertifyingepraaidnd' i nt he fullotrD hekaptiba nnealltmaecncbteip lot lef connectionsd with the aforesaid EREAS, he . WorWklis recommend 70atthet contractor; _ completed Bwy THE COMMISSION and final payment made p Public OF THE CITYOF MIAMI, FLORIDA. 1. Reinertson Equipment Co.' Inc. for CONVENTIONi80here pp Section The completed work perforcrnENedTEbRy, Joe i _ THEREFORE, BE IT.RESOLVED BY approved. SITE EXCAVATION at a total cost of ‘r 1 d tei C 688I.T, tE7riih is 4 moECityi 1 - r 0 INDEXf Section 2. The proper official6s8 o9fo t Miami are hereby authorized to pay $18,0 • 0 Joe Reinertson Equipment Co., Inc. as full and final payment for all work performed and all materials furnished in connection -• • . • with CONVENTION CENTER, PHASE 1 - SITE EXCAVATION. , :• LJ CITY COMMISSION MEETING OF AN 2 4 1980 mow= 11.11111101011•1110011111••••••••••••••••••• 19.80. ATTEST: MAURICEA. FERRE MAURICE A. FERRE M.;-A Y 0 R P . 1NGIE, CITY CL..- PREPARED AND APPROVED BY: rewt ROBERT F. CLARK ASSISTANT CITY ATTORNEY KNOX ORNEY r M Joseph R. Grassie City Manager Donald W. Cather Director ofrublic Works CLO January 7, 1980 B-3148-C CONVENTION CENTER, PHASE SITE EXCAVATION Resolution for Final I - Payment (For Commission Meeting of January-24,.1980): The Department of Public Works recommends the adoption of the resolution; accepting the completed work and:authorizing .a final payment of $18,068.90-;`for CONVENTION CENTER,, PHASE I SITE EXCAVATION. Joe Reinertson Equipment Co., Inc. has completed the project consisting of furnishing labor and equipment for the hand - excavation to perform an archaeological search at the Convention Center site prior to starting construction of the center, requested by the Florida State Division of Archives History and Records Management. The original contract amount was $88,000.00, increased by Resolution No. 78-120 on February 23, 1978 to a total not to exceed $182,000.00, but the completed amount is $180,688.97, and it was completed on time. It is now, in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. H: he esolution attached`: Frpj 1l1� f��t 4 80 1;t JOB NAME CONTRACTOR JOB' SCOPE* REASON FOR :WORK FINAL CONSTRUCTION FACT, SHEET FOR THE CITY MANAGER onvention Center Phase I'= Site Excavation Joe Reinertson Equipment Co.,Inc Furnishing labor and equipment for the hand excavation to perform an archaeological search at the `,convention center site'=prior to starting construction of the center. Requested by the'Florida State History and Records Management Division of Archive's SOURCE OF' 'FUNDS. EDA Grant PROJECT Bids Received12/27/77 HISTORY Contract `Awarded: Preconstruction Meet`ing:- 12/28/77 CONTRACT TIME STARTED 1/3/7 CONTRACT TIME 15 Calendar weeks plus additional time because of the increase incontract SCHEDULED. COMPLETION DATE Undetermined. ACTUAL COMPLETION DATE 6/30/78 BID AMOUNT $ 88,000.00 CONTRACT FINAL COST $ 180,688.97 (Note: Res. 78-120:dated 2/23/78. authorized an increase`in. contract up, to a total" of $ 182,000.00) CURRENT UR ITEI4 FOR CONSIDERATION - Resolution to accept the completed' work a final payment to the contractor. d authorize 12/28/79; 1