Loading...
HomeMy WebLinkAboutR-80-0277r � f - 277 Noun" NO ..................... lopm ............... f Section 3. The additional amount of $30,166.00 is hereby allocated from the aforesaid fund to cover the cost of project expense. Section 4. The additional amount of $5,485.00 is hereby allocated from the aforesaid fund to cover the cost of such incidental items as advertising, testing laboratories, and postage. Section 5. The City Manager is hereby authorized to enter into a contract on behalf of the City of Miami with The Sabre Corporation for ORANGE BOWL REPAIRS - MISCELLANEOUS, base bid of the proposal, subject to the availability of funds. PASSED AND ADOPTED this 1.0 day of April 1980. Maurice A. Ferre M A Y O R ATTEST: CITY ('LIB; PRE'PAREi) A11U APPR(_)V:-"D :3Y: e-r4a -I. -&44e�< ROFT,RT I C!,ARF;, CIl'Y ATTORNEY APPROVEL A:; `'t) 101f',-1 (,0RTi :C`PI'JLSS: "SUPPORTIVE DOCUMENTS FOLLOW" 80-277 Joseph R. (brassie >>r- April 1, 1980 ,LE B-2789-C City 'Manager, ORANGE BOWL REPAIRS - MISCELLANEOUS - Resolution Awarding Contract Donald W. Cather ector of Public Works (For Commission Meeting of April 10, 1980) The Department of Public Works recommends adoption of the resolution accepting the bid received March 31, 1980 of The Sabre Corporation in the amount of $274,242.00, and authorizing the City Manager to enter into a contract on behalf of the City of Miami for ORANGE BOWL REPAIRS - MISCELLANEOUS Bids were received March 31, 1980 for the removal and replacement of the steel deck at the 12-foot level walkway behind Row 17; the addition of support braces to the 36 pole lights at the back of the upper deck; the addition of support angles to each end of the 8 spiral ramps; and reworking the lower portions of 12 ramps at the 9.5-foot - - - - -I I. . . - - - - - - -- - - - - - 9 O 4..-.14 I - BID AWARD FACT SHEET For The City Manager PROJECT NAME AND LOCATIO11 ORANGE BOWL REPAIRS _ MISCELLANEOUS - 1980 (B-2789-C) 1400 N. W. 11 Street PROJECT SCOPE The removal and replacement of a row of steel decking, the addition of supports for pole lights, and other small repairs ESTIMATED CONSTRUCTION COST $3439000.00 DATE BIDS RECEIVED 3/31/80 NUi1BER OF BIDS RECEIVED 3 NA,4E OF LOW BIDDER The Sabre Corporation AMOUNT OF LOW BID $274,242.00 TOTAL FUNDS TO BE ALLOCATED $309, 893.00 LENGTH OF TIME ALLOWED FOR CONSTRUCTION SOURCE Or FUNDS Form PW #389 1/79 90 working days Orange Bowl Enterprise Fund a 'mil i �� 4/1/80 j ORANGE BOWL REPAIRS - MISCELLANEOUS - 1980 JOB NO. B-2789-C CONTRACTOR'S FACT SHEET T4 The Sabre Corporation P. 0. Box 1.894 South Miami, Florida 33155 Phone: 667-5159 II. Principals: Jack Rosenthal - President Arleen Rosenthal - Secretary III. Contractor is properly licensed and insured. IV. Subcontractors: None required at this time V, Exnerience: 16 years Orange Bowl - Upper Level Concession Areas $495,000 Tropical Park (Metro -Dade County) $600,000 VI. Not a minority contractor VII. 4 contractors picked up plans and specifications 3 contractors submitted bids 60 advertisements mailed out by regular mail "SUPPORTIVE DOCUMENTS FOLLOW, 4/l/80 EL TABULATION OF BIDS FOR 01 e-ol-41,116 L City Manager, City Clerk --• M. A/A? Received by the City Commission, C;1y Clerk, City of Miami, Florida of M. Bidder -0 Licensed & Insured as Per City Code S Metro Ord. Bid Bond Amount 7-71 Irregularities Item Unit i Total Unit Total Unit Total Unit Total Unit Price Total Unit Price Total No. DESCRIPTION Price Price Price Price 61L -BA-59- 77-- 4 17 of J 0 X7? rn r- /Z itS r I II/A I'V f AW17 2P r 14,t 4- DISTRIBUTION: IRREGULARITIES LEGEND, IT IS RECOMMENDED THA Z-1 A - No Power- of - Attorney B C - Corrected Extensions improperly Signed at No Corporate Seat D - Proposal Unsigned or impro e BID F .� �� . G Bid Bond -!Lj —trz— iL. _Improper H - Corrected Bid JOB NO. I j- evo. Acid'e-d W2739-C Prep. By. 'N