Section 3. The additional amount of $30,166.00
is hereby allocated from the aforesaid fund to cover the
cost of project expense.
Section 4. The additional amount of $5,485.00
is hereby allocated from the aforesaid fund to cover the
cost of such incidental items as advertising, testing
laboratories, and postage.
Section 5. The City Manager is hereby authorized
to enter into a contract on behalf of the City of Miami
with The Sabre Corporation for ORANGE BOWL REPAIRS -
MISCELLANEOUS, base bid of the proposal, subject to the
availability of funds.
PASSED AND ADOPTED this 1.0 day of April
1980.
Maurice A. Ferre
M A Y O R
ATTEST:
CITY ('LIB;
PRE'PAREi) A11U APPR(_)V:-"D :3Y:
e-r4a -I. -&44e�<
ROFT,RT I C!,ARF;, CIl'Y ATTORNEY
APPROVEL A:; `'t) 101f',-1 (,0RTi :C`PI'JLSS:
"SUPPORTIVE
DOCUMENTS
FOLLOW"
80-277
Joseph R. (brassie >>r- April 1, 1980 ,LE B-2789-C
City 'Manager,
ORANGE BOWL REPAIRS -
MISCELLANEOUS - Resolution
Awarding Contract
Donald W. Cather
ector of Public Works (For Commission Meeting
of April 10, 1980)
The Department of Public Works recommends
adoption of the resolution accepting the
bid received March 31, 1980 of The Sabre
Corporation in the amount of $274,242.00,
and authorizing the City Manager to enter
into a contract on behalf of the City of
Miami for ORANGE BOWL REPAIRS - MISCELLANEOUS
Bids were received March 31, 1980 for the removal and
replacement of the steel deck at the 12-foot level walkway
behind Row 17; the addition of support braces to the 36
pole lights at the back of the upper deck; the addition
of support angles to each end of the 8 spiral ramps; and
reworking the lower portions of 12 ramps at the 9.5-foot
- - - - -I I. . . - - - - - - -- - - - - - 9 O 4..-.14 I -
BID AWARD FACT SHEET
For The City Manager
PROJECT NAME
AND LOCATIO11 ORANGE BOWL REPAIRS _ MISCELLANEOUS - 1980 (B-2789-C)
1400 N. W. 11 Street
PROJECT SCOPE The removal and replacement of a row of steel
decking, the addition of supports for pole
lights, and other small repairs
ESTIMATED
CONSTRUCTION
COST $3439000.00
DATE BIDS
RECEIVED 3/31/80
NUi1BER OF
BIDS RECEIVED 3
NA,4E OF LOW
BIDDER The Sabre Corporation
AMOUNT OF
LOW BID $274,242.00
TOTAL FUNDS TO
BE ALLOCATED $309, 893.00
LENGTH OF TIME
ALLOWED FOR
CONSTRUCTION
SOURCE Or FUNDS
Form PW #389 1/79
90 working days
Orange Bowl Enterprise Fund a 'mil i ��
4/1/80
j
ORANGE BOWL REPAIRS - MISCELLANEOUS - 1980
JOB NO. B-2789-C
CONTRACTOR'S FACT SHEET
T4 The Sabre Corporation
P. 0. Box 1.894
South Miami, Florida 33155 Phone: 667-5159
II. Principals: Jack Rosenthal - President
Arleen Rosenthal - Secretary
III. Contractor is properly licensed and insured.
IV. Subcontractors: None required at this time
V, Exnerience: 16 years
Orange Bowl - Upper Level Concession Areas $495,000
Tropical Park (Metro -Dade County) $600,000
VI. Not a minority contractor
VII. 4 contractors picked up plans and specifications
3 contractors submitted bids
60 advertisements mailed out by regular mail
"SUPPORTIVE
DOCUMENTS
FOLLOW,
4/l/80
EL
TABULATION OF BIDS FOR
01 e-ol-41,116
L
City Manager, City Clerk
--• M. A/A?
Received by the City Commission, C;1y Clerk, City of Miami, Florida of M.
Bidder
-0
Licensed & Insured as Per City Code S Metro Ord.
Bid Bond Amount
7-71
Irregularities
Item
Unit
i
Total
Unit
Total
Unit
Total
Unit
Total
Unit
Price
Total
Unit
Price
Total
No.
DESCRIPTION
Price
Price
Price
Price
61L
-BA-59-
77--
4
17
of J 0 X7?
rn r- /Z itS
r I
II/A
I'V f AW17
2P
r 14,t 4-
DISTRIBUTION:
IRREGULARITIES LEGEND,
IT IS RECOMMENDED
THA Z-1
A - No Power- of - Attorney
B
C - Corrected Extensions
improperly Signed at No Corporate Seat
D - Proposal Unsigned or impro
e
BID
F
.�
�� .
G Bid Bond
-!Lj —trz—
iL.
_Improper
H - Corrected Bid
JOB NO.
I
j-
evo. Acid'e-d
W2739-C
Prep. By.
'N