HomeMy WebLinkAboutR-80-0583RESOLUTION NO. 80-583
A RESOLUTION ACCEPTING THE COMPLETED WORK
PERFORMED BY MARKS BROTHERS COMPANY AT A
TOTAL COST OF $676,012.75 FOR THE FLAGLER
STREET HIGHWAY IMPROVEMENT (3RD BIDDING)
AND THE FLAGLER STREET HIGHWAY IMPROVEMENT
EXTENSION (3RD BIDDING) IN THE FLAGLER STREET
HIGHWAY IMPROVEMENT DISTRICT H-4372-A (3RD
BIDDING)AND FLAGLER STREET HIGHWAY IMPROVEMENT
EXTENSION DISTRICT H-4391-A (3RD BIDDING);
AUTHORIZING AN INCREASE IN THE CONTRACT IN
THE NET AMOUNT OF $36,797.75; AND AUTHORIZ-
ING A FINAL PAYMENT OF $120,403.61.
WHEREAS, there exists a contract dated August 2, 1978
between the City of Miami and Marks Brothers Company; and
WEEREAS, the work has been satisfactorily completed, and
Marks Brothers Company has furnished the required documents
certifying that all bills for labor and materials have been
paid in full in connection with the aforesaid contract; and
WHEREAS, Marks Brothers Company has completed the pro-
ject consisting of the completion of a partially completed
project begun by C. A. Davis, Inc. in 1976. The overrun in
the use of cash allowance was caused by greater than antici-
pated adjustments that had to be made to the paver base
installed by C. A. Davis, Inc. The overrun should not result
in additional cost to the City because it is covered by the
amount of a court award at the trial level in favor of the
1/
City in litigation initiated by the City's original contrac-
tor, which award is being challenged on the appeal level with
slim chance of reversal. The increase in the contract is in
the amount of $36,797.75 for this additional construction
cost; and
WHEREAS, sufficient funds are available from the Highway
G.O. Bond Funds and the Storm Sewer G.O. Bond Funds; and
WHEREAS, the City Manager and the Department of Public
Works recommend that the completed work be accepted and final payment be made to the contractor; "DOCUMENT INDEX
----------REM-No .0.
1/ C. A. Davis, Inc., etc. v. City of Miami, Circuit Court
Case No. 77-28347 CA 05 and Central Tile, Inc., et al. v.
C. A. Davis, Inc., Case No. 77-18505 CA 5
c
"SUPPORTIVE CMCOMMISSIOn
MEETING OF
DOCUNIE �.' lT6 JUL241 g
FOLLOW .,�,w -5ss
%'
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION
OF THE CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by Marks
Brothers Company for FLAGLER STREET HIGHWA" IMPROVF..I,IENT
( 3Ri_) BIDDI141') and FLAGLER :,TREET IFIGHWAY Z:-IPROVEv1EI1lT
E CTF.:ISIOil (�RD 5IDDIi11'j) in t:jc! FLr+'-;L??R STREET H:.,HWAY
I:1FROVF.:1I?iIT DISTRICT H-4 37 -r (JRI) BIDDII,J ;) and FLAGLER
S TRI-'ET HIGIiGIAY I:,11-1ROVE',1E:IT EK'"Ei]SIOII DISTPIICT H-4391-A
(3RD BIDDTIIG) is heron;; accepted at a total cast of
$676,012.75 .qr 112it ino.ludes a iiet; increase of �36,797.75
"rim theprevlousl;; attthori,ed cost, Asinr HiFrhway G.O.
F3ond F,_inds aril Storm Sewer G.O. Bond Funds to cover said
A
-L I I,' Vc', S _'.
S,_ct,ion 'I'h,° I:roi2er oft'lclal:; of the City of
:-Iiumi .trf. �ier,�b:; rvithorl.�ed t,,-) pay :Mark: Brothers Company
a C;1' w1)a,4�)',.C,1 as full and final payment for
all work p,:,rfovmtt.i :tm1 all m%terlals furnished in connection
-aith the Cvlltr%ct.
this 24 Jay of July , 1980.
MAURICE A. FERRE
„ •- M A Y O R
4-71
G TY
PRt;F'F�RFD AIJi) APhRC)VIII) i'�Y
e,&t
y
ROBi"H11' F. CILAit'r;
IS1t11I♦ CI1y ..0l1i..
PHO V:-:I)
AS
TU
FOR:: Ah.t
CORRECTIIESS:
'1
"SUPPORTIVE
DOCUMENTS
FOLLOW"
80-583
Joseph R. Gras3ie
City Manager
Donald W. Cather
ect P cLf__Public Works
July 11, 1980
B-4 372-A
B-4391-A
FLAGLER STREET HIGHWAY IMPROVE-
MENT (3RD BIDDING) and FLAGLER
STREET HIGHWAY IMPROVEMENT
EXTENSION (3RD BIDDING) -
Resolution for Increase in Contra
and Final Payment
(For Commission Meeting
of July 2u, 1980),,
Tile Deuart:,,ient of Public Work's recommends the
the adortion of the resolution authorizing an
in th,-, contract in the amount of
$36,797.71, for the S7RE1E*7 H1!1'jH't1A',
and F11,
0!1
in the F L J: ?I T I
S T 1311 T i i I
)RD an C1 F L A T
'X T.::: S T (I .
D I S .�T
S 1� P -.1
li-4 3 9 i -"k ( ", , ,.)-,I.,
'Icce")tIn- the C,-,M-
R-
I by tl .-,rs
tot '11 !,-),st "",r�76,012.75 an I
a
Drojcct
ro,lp,-t by
6 T; I )P,, done wl:, the In-stalla-
:-),jv,po, a paver constructed A.
t, 'ill trl b� M',1,i,t�!-
t!10
ol"
tno completed
'ire
"SUPPORTIVE
DOCUMENTS
FQ
or
FINAL CnNSTPUCTION FACT SHEET
0R THE CITY MANAGER
JOB NAME Flarler Street Highway Improvement (Third Bidding) H-4372A
rlagler Street Hi}*hway Improvement Extension (Third
Bidding) H-4391A
CONTpAr:TOR ''arks Brothers Company
JOB SCIPE Construct nee: decorative sidewalk including minimum
1and3caninr and draina-e. Located on Flary-ler Street
between I-95 and Biscayne Boulevard.
RFA90:1- To comnlete and correct wcrk previously under contract
FOR WOP, with C. A. Davis.
SO"P(-F }11 r*hera r G. O. Bond Fund:,
()r. r•TT-DC! Sto-m Seeger C. C. Bond Funds
PROJECT n,gds Received: F/22/78
HIS^)RY Contract Awarded: 7/27/78
Prc•construction %Te^tin: : 8/21/78
CO!'TTRACT
TIVE
STAR=
• CONTRA::7 r'lus 147 da•ra del,-.,,,, from add'_t.ional
TI%1F un1preseer repr)irs to paver base constructed
b-; C. A. rnvi:.
Sr'HFDTTT ??-�
rOTpLt_TIr•T
DAT7 9
ACTTI T
C0;'.?7
••1}.
(`T?pPr.•;r^ ^nf1 Iut'cn to ?C'C!'rt ('nr,I'lt,ted wOr;' increase contract
T-1?" .'n1' ".4 '�r ,707. 7'; id .,iut hori -.e final r?)yrnont to the
Cn•1�7r1:n,,^I�):: r,actnr.
80-�)03