HomeMy WebLinkAboutR-80-0583RESOLUTION NO. 80-583 A RESOLUTION ACCEPTING THE COMPLETED WORK PERFORMED BY MARKS BROTHERS COMPANY AT A TOTAL COST OF $676,012.75 FOR THE FLAGLER STREET HIGHWAY IMPROVEMENT (3RD BIDDING) AND THE FLAGLER STREET HIGHWAY IMPROVEMENT EXTENSION (3RD BIDDING) IN THE FLAGLER STREET HIGHWAY IMPROVEMENT DISTRICT H-4372-A (3RD BIDDING)AND FLAGLER STREET HIGHWAY IMPROVEMENT EXTENSION DISTRICT H-4391-A (3RD BIDDING); AUTHORIZING AN INCREASE IN THE CONTRACT IN THE NET AMOUNT OF $36,797.75; AND AUTHORIZ- ING A FINAL PAYMENT OF $120,403.61. WHEREAS, there exists a contract dated August 2, 1978 between the City of Miami and Marks Brothers Company; and WEEREAS, the work has been satisfactorily completed, and Marks Brothers Company has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, Marks Brothers Company has completed the pro- ject consisting of the completion of a partially completed project begun by C. A. Davis, Inc. in 1976. The overrun in the use of cash allowance was caused by greater than antici- pated adjustments that had to be made to the paver base installed by C. A. Davis, Inc. The overrun should not result in additional cost to the City because it is covered by the amount of a court award at the trial level in favor of the 1/ City in litigation initiated by the City's original contrac- tor, which award is being challenged on the appeal level with slim chance of reversal. The increase in the contract is in the amount of $36,797.75 for this additional construction cost; and WHEREAS, sufficient funds are available from the Highway G.O. Bond Funds and the Storm Sewer G.O. Bond Funds; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment be made to the contractor; "DOCUMENT INDEX ----------REM-No .0. 1/ C. A. Davis, Inc., etc. v. City of Miami, Circuit Court Case No. 77-28347 CA 05 and Central Tile, Inc., et al. v. C. A. Davis, Inc., Case No. 77-18505 CA 5 c "SUPPORTIVE CMCOMMISSIOn MEETING OF DOCUNIE �.' lT6 JUL241 g FOLLOW .,�,w -5ss %' NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Marks Brothers Company for FLAGLER STREET HIGHWA" IMPROVF..I,IENT ( 3Ri_) BIDDI141') and FLAGLER :,TREET IFIGHWAY Z:-IPROVEv1EI1lT E CTF.:ISIOil (�RD 5IDDIi11'j) in t:jc! FLr+'-;L??R STREET H:.,HWAY I:1FROVF.:1I?iIT DISTRICT H-4 37 -r (JRI) BIDDII,J ;) and FLAGLER S TRI-'ET HIGIiGIAY I:,11-1ROVE',1E:IT EK'"Ei]SIOII DISTPIICT H-4391-A (3RD BIDDTIIG) is heron;; accepted at a total cast of $676,012.75 .qr 112it ino.ludes a iiet; increase of �36,797.75 "rim theprevlousl;; attthori,ed cost, Asinr HiFrhway G.O. F3ond F,_inds aril Storm Sewer G.O. Bond Funds to cover said A -L I I,' Vc', S _'. S,_ct,ion 'I'h,° I:roi2er oft'lclal:; of the City of :-Iiumi .trf. �ier,�b:; rvithorl.�ed t,,-) pay :Mark: Brothers Company a C;1' w1)a,4�)',.C,1 as full and final payment for all work p,:,rfovmtt.i :tm1 all m%terlals furnished in connection -aith the Cvlltr%ct. this 24 Jay of July , 1980. MAURICE A. FERRE „ •- M A Y O R 4-71 G TY PRt;F'F�RFD AIJi) APhRC)VIII) i'�Y e,&t y ROBi"H11' F. CILAit'r; IS1t11I♦ CI1y ..0l1i.. PHO V:-:I) AS TU FOR:: Ah.t CORRECTIIESS: '1 "SUPPORTIVE DOCUMENTS FOLLOW" 80-583 Joseph R. Gras3ie City Manager Donald W. Cather ect P cLf__Public Works July 11, 1980 B-4 372-A B-4391-A FLAGLER STREET HIGHWAY IMPROVE- MENT (3RD BIDDING) and FLAGLER STREET HIGHWAY IMPROVEMENT EXTENSION (3RD BIDDING) - Resolution for Increase in Contra and Final Payment (For Commission Meeting of July 2u, 1980),, Tile Deuart:,,ient of Public Work's recommends the the adortion of the resolution authorizing an in th,-, contract in the amount of $36,797.71, for the S7RE1E*7 H1!1'jH't1A', and F11, 0!1 in the F L J: ?I T I S T 1311 T i i I )RD an C1 F L A T 'X T.::: S T (I . D I S .�T S 1� P -.1 li-4 3 9 i -"k ( ", , ,.)-,I., 'Icce")tIn- the C,-,M- R- I by tl .-,rs tot '11 !,-),st "",r�76,012.75 an I a Drojcct ro,lp,-t by 6 T; I )P,, done wl:, the In-stalla- :-),jv,po, a paver constructed A. t, 'ill trl b� M',1,i,t�!- t!10 ol" tno completed 'ire "SUPPORTIVE DOCUMENTS FQ or FINAL CnNSTPUCTION FACT SHEET 0R THE CITY MANAGER JOB NAME Flarler Street Highway Improvement (Third Bidding) H-4372A rlagler Street Hi}*hway Improvement Extension (Third Bidding) H-4391A CONTpAr:TOR ''arks Brothers Company JOB SCIPE Construct nee: decorative sidewalk including minimum 1and3caninr and draina-e. Located on Flary-ler Street between I-95 and Biscayne Boulevard. RFA90:1- To comnlete and correct wcrk previously under contract FOR WOP, with C. A. Davis. SO"P(-F }11 r*hera r G. O. Bond Fund:, ()r. r•TT-DC! Sto-m Seeger C. C. Bond Funds PROJECT n,gds Received: F/22/78 HIS^)RY Contract Awarded: 7/27/78 Prc•construction %Te^tin: : 8/21/78 CO!'TTRACT TIVE STAR= • CONTRA::7 r'lus 147 da•ra del,-.,,,, from add'_t.ional TI%1F un1preseer repr)irs to paver base constructed b-; C. A. rnvi:. Sr'HFDTTT ??-� rOTpLt_TIr•T DAT7 9 ACTTI T C0;'.?7 ••1}. (`T?pPr.•;r^ ^nf1 Iut'cn to ?C'C!'rt ('nr,I'lt,ted wOr;' increase contract T-1?" .'n1' ".4 '�r ,707. 7'; id .,iut hori -.e final r?)yrnont to the Cn•1�7r1:n,,^I�):: r,actnr. 80-�)03