RESOLUTION NO. 8 0- 6 5 0
A RESOLUTION ACCEPTI14G THE COMPLETED WORK
OF D.M.P. CORPORATION AT A TOTAL COST OF
$208,5f19.00 .FOR SOUTHERN DRAINAGE PROJECT
`Ij 57�1ND 5 AUTHORIZING A FINAL PAYMEIJT OF
SUPPORTIVE $2,
DOCUMENTS
FOLLOW,, WHEREAS, there exists a contract dated May 13,
1980 between the City of 141ami and D.M.P. Corporation; and
WHEREAS, the t�iorit has been satisfactorily completed,
and D.M.P. Corporation has furnished the required documents
certifying that all bills for labor and materials have been
paid in full in connectiori with the aforesaid contract; and
WHEREAS, the City Manager and the Department of
Public Works recommend that the completed work be accepted
and .final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION
OIL THE CITY OF MIAMI, PLORIDA:
Section 1. The completed work performed by
D.14-P. Corporation for SOUTHERN DRAINAGE; PROJECT E-117 at a
total cost of $208,5)49.00 is hereby approved.
Section 2. The proper officials of the City of
Miami are hereby authorized to pay $2,157.15 to D.M.P.
Corporation as full and final payment .for a1.1 work performed
and all materials furnished in connection with SOUTHERN
DRAINAGE: PROJECT E-47.
PASSED AND ADOPTED this 15 day of SEPTEMBER, 1980.
00USIA
c►�r
ITEM I'kIO. r•
PREPARE'D AND APPROVEID BY:
v
Assistant City Att;011110y
MAURICE A. IaERRE
M A Y O R
APE,ll A� �RM AND CORRECTNESS:
orney
CITY COMMISSION
MEETING OF
S E P 15 1980
a umoN sa..8 0, - 6 5
iNTa:?'� r=1-7C�., i•:lslvlC)H�1�•1::1.;t.1
I
TO Joseph R. Grassie August 29, 1980 r- B-5465
City Manager SOUTHERN DRAINAGE PROJECT E-47 -
Resolution for Final Payment
Donald W. Cather (For Commission Meeting
Director £
of September 15, 1980)
oo ks
vL
The Department of Public Works recommends
the adoption of the resolution accepting
the completed work and authorizing a final
payment of $2,157.15 to U.M.P. Corporation
for SOUTHERN DRAINAGE PROJECT E-117.
D.M.P. Corporation has completed the project consisting
of construction of 23 drainage structures in the area
bounded by S. W. 8 Street, N. Prospect Drive, Biscayne
Bay, and the westerly City limits)' and 5 structures
outside this area. The original contract amount was for
$210,998.02, and the completed amount is $2089549.00. It
was completed on time.
It is now in order for the Commission to accept the
completed work and authorize final payment, after all
conditions are met.
AE:hc
e
solution attached
M
::'
I•`
~
•7
r
�7
r1-1
"SUPPORTIVE
cc
�r
DOCUMENTS
FOLLOW��
so-650
_FINAL CONSTRUCTION FACT SHEET
FOR THE CITY 11ANAGER
JOB NAME
Southern Drainage Project E-I47 -
B-5465
CONTRACTOR
D.M.P. Corporation
JOB SCOPE
Construct 23 drainage structures in
the area
bounded by S.W. 8 Street, N. Prospect
Drive,
Biscayne Bay, and the Westerly City
Limits,
and 5 structures outside this area.
REASON
_
FOR WORK
Provide storm sewers to locations of
greatest
need.
SOURCE OF
FUNDS
Storm Sewer G.O. Bond Fund
PROJECT
HISTORY
Bids Received: 4/23/80
Contract Awarded: 5/8/80
Preconstruction Meeting: 5/12/80
CONTRACT
TIME
STARTED 6/4/8o
CONTRACT
TIME 90 working days
SCHEDULED
COMPLETION
DATE
1.0/9/80
ACTUAL
COMPLETION
DATE
8/13/80
BID AMOUNT
$210,998.02
CONTRACT
FINAL, COST
$208,5L19.00
CURREN`t'
ITEM FOR
CONSIDERATION Resolution to accept completed work and authorize
final payment to the contractor.
80-650
I/.9J/�)