Loading...
HomeMy WebLinkAboutR-80-0702RESOLUTION NO. 0 - 7 0 2 A RESOLUTION ACCEPTING THE COMPLETED WORK OF THE SABRE CORPORATION AT A TOTAL COST OF $516,1119.00 FOR ORANGE BOWL - UPPER LEVEL CONCESSION AREAS; AND AUTHORIZING <<0 is"�' 1 / A FINAL PAYMENT OF $51, 61A .90 U P 1' C RI) '` r11 I)LL0V` WHEREAS, there exists a contract dated January 29, 1980 between the City of Miami and The Sabre Corporation; and WHEREAS, the work has been satisfactorily com- pleted, and The Sabre Corporation has furnished the required documents certifying; that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; HOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION ''DOCUMENT INDEX OF THE CITY OF MIAMI, FLORIDA: ITEM NO..�2. " Section 1. The completed work performed by The Sabre Corporation for ORANGE BOWL - UPPER LEVEL CONCESSION AREAS at a total cost of $516,1119.00 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $51,61A.90 to The Sabre Corporation as Cull and final payment for all work performed and all materials furnished in connection with ORANGE BOWL - UPPf R LEVEL CONCESSION AREAS. PASSED AND ADOPTED this 25 clay of SEPTEMBER 1 1980. MAURICE A. FERRE "'T: M A Y 0 R 'if,y Cleric _ PRLPAR,F:1) 111111) APPROVED BY: APPf VE;D �. F eAA 'Ile !Assistant City Attoor` y Ci RM AND CORRECTNESS: yAt't paey.-.I....- -..-.__ ITY COMMISSION MEETING OF F. P 2 5 1980 SO- 02 7 :I-rY of MIAMI, -I_ar710A 35 I`JY'SH-OFFICi£ `iJ 'rIL'?;eF1Nf7UM ,., Richard L. Fosmoen City Manager Donald W. Cather Director of Public Works September 10, 1980 '*IL.r - B-2735 ORANGE BOVIL - UPPER LEVEL CONCESSION AREAS - Resolution for Final Payment (For Commission Meeting TIC of -September 25, 1980) I The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of .1>51,614.90 to The Sabre Corporation for ORANGE BOWL - UPPER LEVEL CONCESSIO14 AREAS. The Sabre Corporation has completed the project consisting of constructing 8 new concession areas and renovating; 4 existing; concession areas, all located in the upper deck portions of the Orange Bowl Stadium. The original contract amount was for $1194,81.8.00, plus $30,000 increase In scope of.' contract authori%ed by Commission Resolution No. 80-276. The completed amount is $516,1119.00, and it was completed on time. DWC : tic Resolution attached D LLLOW L w 80-702 r'71Afdwbl�i.:.aa.w..u»«...r.�w...w...............«+...r.«...,......,�..-...._....._..... .. "."""•....... �-------------- __ r_r FINAL CONSTRUCTION FACT SHEET_ FOR THE CITY MANAGER JOB NAME Orange Bowl - Upper, Level Concession Ardas - B-2785 CONTRACTOR The Sabre Corporation JOB SCOPE Construct 8 new concession areas and renovate 11'existing concession areas, all located in the upper deck portions of the Orange Bowl Stadium. REASON FOR WORK Increase concession capabilities for serving the public. SOURCE OF Orange Bowl Enterprise Fund from Resort Tax FUNDS monies. PROJECT Bids Received: 1/21./80 HISTORY Contract Awarded: 1/24/80 Preconstruction Meeting;: 1/28/80 CONTRACT TI14E STARTED N/A (Contract stipulates work to be completed by June 30, 1.980) CONTRACT TIME; N/A SCHEDULED COMPLETION DATE r _ 6/30/80 ACTUAL COMPLETION DATE 6/30/80 BID AMOUNT :,5211,818.00 (Includes a $30,000.00 increase in the 5(,ope of contract - authorized by Commission Resolution 80-276). CONTRACT FINAL COST $516,149.00 CURRENT ITEM FOR CONSIDERATION I{esolution to accopt completed work and authorize final payment to the contractor. 80-'7 02 ----........�..w