HomeMy WebLinkAboutR-80-0702RESOLUTION NO. 0 - 7 0 2
A RESOLUTION ACCEPTING THE COMPLETED WORK
OF THE SABRE CORPORATION AT A TOTAL COST
OF $516,1119.00 FOR ORANGE BOWL - UPPER
LEVEL CONCESSION AREAS; AND AUTHORIZING
<<0 is"�' 1 / A FINAL PAYMENT OF $51, 61A .90
U P 1' C
RI)
'` r11
I)LL0V` WHEREAS, there exists a contract dated January 29,
1980 between the City of Miami and The Sabre Corporation;
and
WHEREAS, the work has been satisfactorily com-
pleted, and The Sabre Corporation has furnished the required
documents certifying; that all bills for labor and materials
have been paid in full in connection with the aforesaid
contract; and
WHEREAS, the City Manager and the Department of
Public Works recommend that the completed work be accepted
and final payment made to the contractor;
HOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION
''DOCUMENT INDEX
OF THE CITY OF MIAMI, FLORIDA:
ITEM NO..�2. "
Section 1. The completed work performed by The
Sabre Corporation for ORANGE BOWL - UPPER LEVEL CONCESSION
AREAS at a total cost of $516,1119.00 is hereby approved.
Section 2. The proper officials of the City of
Miami are hereby authorized to pay $51,61A.90 to The Sabre
Corporation as Cull and final payment for all work performed
and all materials furnished in connection with ORANGE BOWL -
UPPf R LEVEL CONCESSION AREAS.
PASSED AND ADOPTED this 25 clay of SEPTEMBER 1 1980.
MAURICE A. FERRE
"'T: M A Y 0 R
'if,y Cleric _
PRLPAR,F:1) 111111) APPROVED BY: APPf VE;D
�. F eAA 'Ile
!Assistant City Attoor` y Ci
RM AND CORRECTNESS:
yAt't paey.-.I....- -..-.__
ITY COMMISSION
MEETING OF
F. P 2 5 1980
SO- 02
7
:I-rY of MIAMI, -I_ar710A
35 I`JY'SH-OFFICi£ `iJ 'rIL'?;eF1Nf7UM
,., Richard L. Fosmoen
City Manager
Donald W. Cather
Director of Public Works
September 10, 1980 '*IL.r - B-2735
ORANGE BOVIL - UPPER LEVEL
CONCESSION AREAS -
Resolution for Final Payment
(For Commission Meeting
TIC of -September 25, 1980)
I
The Department of Public Works recommends
the adoption of the resolution accepting
the completed work and authorizing a
final payment of .1>51,614.90 to The Sabre
Corporation for ORANGE BOWL - UPPER LEVEL
CONCESSIO14 AREAS.
The Sabre Corporation has completed the project consisting
of constructing 8 new concession areas and renovating; 4
existing; concession areas, all located in the upper deck
portions of the Orange Bowl Stadium. The original contract
amount was for $1194,81.8.00, plus $30,000 increase In scope
of.' contract authori%ed by Commission Resolution No. 80-276.
The completed amount is $516,1119.00, and it was completed
on time.
DWC : tic
Resolution attached D
LLLOW
L
w
80-702
r'71Afdwbl�i.:.aa.w..u»«...r.�w...w...............«+...r.«...,......,�..-...._....._..... .. "."""•....... �-------------- __
r_r
FINAL CONSTRUCTION FACT SHEET_
FOR THE CITY MANAGER
JOB NAME Orange Bowl - Upper, Level Concession Ardas - B-2785
CONTRACTOR The Sabre Corporation
JOB SCOPE Construct 8 new concession areas and renovate
11'existing concession areas, all located in
the upper deck portions of the Orange Bowl
Stadium.
REASON
FOR WORK Increase concession capabilities for serving
the public.
SOURCE OF Orange Bowl Enterprise Fund from Resort Tax
FUNDS monies.
PROJECT
Bids Received: 1/21./80
HISTORY
Contract Awarded: 1/24/80
Preconstruction Meeting;: 1/28/80
CONTRACT
TI14E
STARTED
N/A (Contract stipulates work to be completed
by June 30, 1.980)
CONTRACT
TIME;
N/A
SCHEDULED
COMPLETION
DATE r _
6/30/80
ACTUAL
COMPLETION
DATE
6/30/80
BID AMOUNT
:,5211,818.00 (Includes a $30,000.00 increase in
the 5(,ope of contract - authorized
by Commission Resolution 80-276).
CONTRACT
FINAL COST $516,149.00
CURRENT
ITEM FOR
CONSIDERATION I{esolution to accopt completed work and
authorize final payment to the contractor.
80-'7 02
----........�..w