Loading...
HomeMy WebLinkAboutR-80-085720 LL. RrsoLuTTON NO. ��; �57 A RESOLUTION ALLOCATING ADDITTONAL FUNDS NOT TO EXCEED $200,000 UNDER T1117 EXISTING CONTRACT FOR PROFESSIONAL. SE . RV ICI:S 1,7ITH THE Fll:M OF FF.R- ENDTNO, GRAFTON, S1'II,I.IS, CANDELA, ARCHITECTS, ENGINEERS, PL\NNI:I:S, FM\, THE CITY OF 'ITAMT/UNTVER- SITi' ()F MIA'11 l A'1F5 I_ KN E(;IlT 1 tiTFIv)N ATTONAL CHINTER TO PIMV I DF. FOr: CIIAN(; ES IN THE l:'(1RK ON Tll),, BrASI S 017 A MUTA, I PLF OF DIRECT TECHNICAL EXPENSE: FROM TIIF CONVENT ION CENT1:1: CONSTNUC 1' I ON ACCOUNT ESTAB- LTSTED FROM 'I'llE SAI.I; OF $60,000,000 TN CONVENTION CENTER AND PARKING GARAGE REVENUE. BONDS. WHEREAS, there is an existing contract between the City of Miami and Ferendino, Grafton, Spillis, Candela, Architects, Engineers, Planners, dated ,tune 19, 1979 for architectural ser- vices for the City of Miami/University of Miami James L. Knight International. Center; and WHEREAS, said agreement in Section V provides for additional work authorized by the City for professional and technical ser- vices reimbursed on the basis of a multiple of direct technical salarV expe115e; all WHEREAS, it was necessary for the City to make changes in the work to provide for State of Florida, Department of Transporta- tion and for University of Miami requirements and to provide for a future V.I.P. area and for signs, graphics and miscellaneous future changes to interface with the Hotel and University spaces; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: "CUCUr,11ENIT 11NIDEX Section 1. Additional funds not to RUJI'PQ244;-0A4-in'the existing contract for professional services with the firm of Ferendino, Grafton, Spillis, Candela, Architects, Jngineers, Planners, for the Planning and Design of Interior Architectural Spaces at the City of Miami, university of 'Miami James L. Knight International Center to provide for changes in the work on the basis of a multiple of direct technical expense are hereby allo- cated from the Construction Account established from the sale of $60,000,000 in Convention Center and Parking Garage Revenue Bonds. CITY WhItAiSSION MEETING OF ! astr ...`....`.'.... tct+nl,�...................... PASSED AND ADOPTED this 26 day of November i 1980. MAURICE A. FERRE M A Y 0 R ATTEST: RALP G. ONGIE ITY CLERK PREPARED AND APPROVED BY: R BERT F. CLERK ASSISTANT CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: GEORGEF. KNON, JR. CITY AJTORNEY _2- � `7 Aftko a Richard Fosmoen November 12, 1980 City Manager i Resolution Authorizing Amendment o PUEi:CC'. iI Existing Contract to Provide for I Changes in the 'Mork on the Basis of a AEFE4E Y<.EM Y 1 e omDirect Te n alp Ex se Allan I. Poms F� C� rh q � 11/26 Project Director Conference Center "" ;' Arch t 's Amended Proposal dated ��t%7/80 The Project Director recommends the adoption of the attached resolution to allocate _ additional funds not to exceed $200,000 in the existing contract with Ferendino, Grafton, o Spillis, Candela, Architect's, Engineers, Planners to provide for chances in the ^7or_k on the basis of a mul.ti.nle of direct technical ex-ensc- funds for these services are available in the Convention Center Construction Account. -__The -Agreement dated June 19, 1979 between the City of Miami and Ferendino, Grafct- n, Spillis, Candela, Architects, Engineers, Planners for the City of r,i'ami/University of Miami James L. Knight International Center provides under Section V for additional work authorized by the City for professional and technical services reimbursed on the basis of two and one-half. times (2.5! the direct technical salary expense. Since these extra services could not be determined in advance, it is in the best interest of the City to allocate the funds to acquire these services. Althoucih additional services were anticipated in the existina Agreement no funds were provided to pay for these services. It was necessary for the Cit'21's former Project Director, James J. Connally to direct chances in the work required by the State of Florida, Department of Transportation to provide for future I-95 e:,:pressway ramps r.esultinci - in the real ic:nment of S.I. 4th Street and the connector buildinc; to the yarage and modification of the entry plaza; to direct chances in the work required by the University of: %iiami to est:ibl.ish their unique interior design imac;e as provided by their a(ireement with the City; to direct changes in the work to provide for a future V.I.P. area as recommended by the theater consultants and to be finished in the future pending available construction funds; appro:-:irlately $120,000 in extra services were accrued at the direction of the former project director to make these changes and it was intended to establish a cost and to seek Commission approval at a later date after the sale of the Convention Center bond. In addition he directed extra services for interior design work which will be credited to the lump sum fee for interior design services. 8-857 r.. Richard Fosmoen November 12, 1980 Page 2 In order to provide for signs, graphics, and miscellaneous future changes to interface with the hotel and University and to complete the project, the architects have submitted a proposal for extra services on a basis of multiple of direct technical expense not to exceed $80,000 which is enclosed. Between the Architect's basic fee in the Agreement and the Interior Design Services and extra services in this resolution, there should be no need for additional services unless the City requests major changes in the project. Funds for these services are available from the construction account established from the proceeds of the sale of $60,000,000 in Convention Center and Parking Garage Revenue Bonds, $2,000,000 is provided in the budget for the City's furniture, fixtures and equipment, and $1,150,000 is provided in the construction contract for additional work. AIP/mim cc: Vincent E. Grimm, Jr., Asst City Manager Public Works Dept November 7, 1980 Mr. Allan I. Poms Project Director Ci-ty of Miami 150 S.E. 2nd Ave., 12th Floor Miami, Florida 33131 RE: Graphic Design for the City of Miami/University of Miami, James L. Knight International Center. Dear Mr. Poms, We are pleased to submit this amendment to our pro- posal of October 20, 1980. The Interior Designer would provide Graphic Design Services as outlined herein. SCOPE OF WORK The Scope of Work for graphic design shall include the areas defined in section 1.0 Interior Design: Scope of Work, James L.Knight International Center. We do not include the parking facility signage, University of Miami spaces or Hotel spaces. We do not include the major exterior building identi- fication or interior buildinc signage such as room name, room number signs and regulatory/code required signage. We shall provide the following: 'Secondary exterior information signage 'Interior information signage 'Interior directional signage 'Interior maps and directories 'Graphic posters and advertising kiosks 'A manual of graphic design criteria for retail space signage 'A written signage guideline for University of Miami spaces and Hyatt spaces 'Consultation regarding size, location and placement of interior computerized advertising signage, but not specifications. Ferendino Grafton Spillis Caner !a Cam• .., .�..� `S -- �� "2" SCOPE OF SERVICES Phase I - Schematic Design 1. Consult with management, architects and operational personnel to establish criteria. 2. Analyze graphic systems, materials and format to determine which solution is most appropriate to the criteria. 3. Prepare an estimated cost for review. 4. Prepare a formal presentation indicating location and types of graphic signage including concepts to meet variable requirements. Phase II - Design Development I. Upon approval of the Schematic Phase by the client's author- ized representative, the complete graphics concept will be developed. 2. Finalize the design format of the various types of signage. 3. Prepare a presentation indicating the final design solutions, including drawings, samples of selected material and any mock up materials that might be required. 4. Prepare a preliminary cost estimate based upon design solutions. S. The client shall submit a list of copy for all signs. Phase III - ;aorkina Drawinas and Specifications 1. Upon approval of the Design Devcl.opment Phase by the client's authorized representative, the final detailed documentation will be prepared. Changes to the approved design development documents become an additional service. 2. Advise Architecture of any structural or electrical conditions requiring modification. 3. Working drawings, details, specifications, installation drawings and bidding docwnents will be prepared. 4. These documents will be reviewed with the client's authorized representative prior to bidding. ..v FOOL VV,. r m3A r' Phase IV - Bidding 1. Provide a bidder's list for competitive bidding to the City of Miami. 2. Assist the City in evaluating the bids and answering questions pertaining to the contract documents. Phase V - Fabrication and Installation 1. Review and approve all shop drawings and samples. 2. Site observation of the final placement of all items, and review for damage, quality, assembly and function. Estimated Cost Our fee for Graphic Design Services will be 2.50 times direct personnel expense, not to exceed $80,000.00. The fee will be billed on monthly cumulative percentages, not to exceed the following: Phase I - Schematic Design - 25% Phase II - Design Development - 35a Phase III - Working Drawings - 25% Phase IV & V - Bidding, Fabrication - 15% and Installation In addition, we will rebill you at our cost for all out-of-pocket expenses incurred on behalf of the project. These will include travel, lodging, reproduction, long distance telephone, tole - copier, postage, preparation of camera ready artwork, photography, typography, photo reproduction, special illustration, etc. f'1'�iL L Y�1f _ 80-857 If this proposal meets with your approval, please sign where indicated below and return a copy to our office. We greatly appreciate this opportunity to work with you, and look forward to a successful graphic design program. THIS AGREEMENT EXECUTED AS OF: DATE: DATE: CITY OF MIAMI DESIGN MATRIX DIVISION OF FERENDINO/GRAFTON/ SPILLIS/CANDELA AUTHORIZED SIGNATURE WITNESS WITNESS .;s VA 7 �t(� _ .7 i..'� _'� _l 7t �;�� ...'4.�_ �♦ �.��. r