HomeMy WebLinkAboutR-81-0016RESOLUTIO}•I NO 8 1 - 1 i
y A RESOLUTION ACCEPTINIG THE COMPLETED WORT;
I I'IC . A 1 A r0 AL COS s
OF I l.T CONSTRI!CTION T T ` "'
OF 280 887 , 00 FOR ORANGE D01�1L REPAIRS
-� RESTROOM RE140Vr'1'i'IOid 19 °0 � AND AUTHOR"
I ZING A FI14AL P A`_ "IEI T OF $1.15,172.40
WF1,REA;. , there exists a contract dated May 9, 1980
between the City of 1•11am and MET Construction, Inc..; and
HE,REAS the work has been satisfactorily completed,
and MET Constrt.tction, Inc, his furnished the required dom ments
certifying' that all bills for labor and materials have- been
naid in full in connection with the aforesaid contract, and
WHEREAS the City Manafer and the Department of
Public Works recommend that the completed work be accepted
ar:d final nayment oracle to the rontractor;
: OJIU';1, T;IR'FORIE, IT, RI.)0LVi-D 31 'l'iilCiJF
i'HE "I�y io. "1 AIII, FLOF;1i t,
`-, ''} ^'l ied igor;i performed by I''II;T
.,crtzozl 1. _ 7e cot.,J�
wore:,truct:ion, Tnc . for ORl1IIGt i301�1L RI::I'AIR;3 RES TROO}i_REI�lOVA`IIO}J -
t $`) y �� 7.00 is
1_,o 80 at a s total cots of f_2> hereby approved.
Sect9on 2. The proper officials of the City of Miami
are hereby authorized to pay ",45,172.40 to MET Construction, Inc.
as full and final payment for all work_ performed and all
materials furnished in connection with ORANGE i?01,?L REPAIRS
RESi'R0O1M RE'NOVA 'ION - 1980.
PA;';SIHD ATND ADOPTED this 15 day of January
MAURICE A. FFRRE
1.1 A Y O R
mm n m
Clerk
I'R'EPAR':D f;JJD APPROVED BY; APPIiOV?'i) AS TO F RM AND)-,0RR''CTHE S;
o _
F
A �, i.stant CIt,y At11 e � Cit,,� A or�ney 4WM lip
city 3F hildP.11,10�?tG'A ���
iN7E-R-OFFICE `•t�tA0HANb13M
28
�c
*° Richard Lo Fosmoen A`T. ri
December 243 1980 B-2789D
City Manager •��.,.�_
ORANGE BOWL REPAIRS RESTROOM �
RENOVATION - 1980
Resolution for Final Payment
Donald W s Cather
/-�-rDirector of Public Works
(For Comm issiln$1 eting of
January 15, 9 Y
The Department of Public Works recommends
the adoption of the resolution accepting -
the completed work and authorising a final
payment of $45,172.40 to MET Construction,
Inc, for ORANGE BOWL REPAIRS RESTROOM
RENOVATION - 1980.
MEET construction, Inc. has completed the project consisting of -
remo•ting and replacing concrete floors in eight restrooms at _
the 68-foot level on both sides of the stadium and renovation
to tine lower press box. The original contract amount was for
$283,887.00, and the completed amount is $288,887-00, It was
completed on time.
It is now in order for the Commission to accept the completed
wort: and authorize final payment, after all conditions are met.
:.]'A H : a;-
� oluttcn at' ,� Berl Its .�.�, SUPPORTIVE
DOCUMENTS
FOLLOW"
c--i
f
8T-16