HomeMy WebLinkAboutR-81-0224RESOLUTION NO. -'
A RESOLUTION GRANTING A CONDITIONAL USE
AS LISTED IN ORDINANCE NO. 6871, ARTICLE
XV, SECTION 2(8)(a), TO PERMIT CONSTRUCTION
OF A PARKING GARAGE ON ALL OF BLOCK 5,
DUPONT PLAZA (50-11), BEING THE BLOCK
BOUNDED BY S.E. 2ND AND 3RD STREETS AND
S.E. 3RD AVENUE AND BISCAYNE BOULEVARD,
AS PER PLANS ON FILE, ZONED C-3 (CENTRAL
COMMERCIAL), BEING IN CONJUNCTION WITH A
VARIANCE. REQUEST.
WHEREAS, the Miami. Zoning Board, at its meeting of March 2,
1981, Item #2(b), following an advertised hearing, adopted
Resolution No. 7_B 37-81 by a 7 to 0 vote recommending approval
of a Conditional Use, as hereinafter set_ forth: and
WHEREAS, the City Commission deems it advisable and in the
best interest of the general welfare of the Citv of Miami and
its inhabitants to grant approval of the Conditional Use, as
hereinafter set forth;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA-
Section 1. The request for approval of a Conditional Use
as listed in Ordinance No. 6871, Article XV, Section 2(8)(a),
to permit construction of a parking garage on All. of Block 5,
DUPONT PLAZA (50-11). being the block bounded by S.E. 2nd and
3rd Streets and S.E. 3rd Avenue and Biscayne Boulevard, as per
plans on film, zoned C-3 (Central Commercial), in conjunction
with a Variance request_, be and the same is hereby granted.
PASSED AND ADOPTED this Is day of MARCH 1981.
MAURICE A. FERRE
�-- ATT,5 'T r�-, ; -, — MAURICE A. FERRE,_MAYOR ---_
41
RALP1fG. ONGIE, CITY CLEn---
PRE ARIJD AND PRO Ep BY- APP�VED AS TO FORM,,AND CORRECTNESS:
RK A.. ALENTTTIE R0 ERT F. CI.ARK -� -
SSISTANT CITY ATTORNEY ACTING CITY ATTO -• - -- --�-- ---- -
„p01f]
L
ZONING FACT SHEET
LOCATION/LEGAL
Block Bounded S.E. 2nd & 3rd Street and
S.E. 3rd Avenue and Biscayne Boulevard.
All of Block 5;
DU PONT PLAZA (50-11)
OWNER
Southeast Properties, Inc.
Affiliate of Southeast Banking Corporation
100 South Biscayne Boulevard
Miami, Florida 33131 Phone r577-3718
APPLICANT
William R. Colson
Concord Building, 2nd Floor
66 West Flagler St.
Miami, Florida Phone=373-9016
ZONING
C-3 (Central Commercial).
REQUEST
Variance to permit construction of an office
tower structure on above site, as per plans
on file, with a proposed height of 765' (300'
allowed) and providing 4 of 24 required off-street
loading spaces. This petition in conjunction with
a conditional use application..
and
Conditional Use to permit construction of a
parking garage on above site, as per plans on
file. This application in conjunction with a
variance request.
RECOMMENDATIONS ;
D.O.T.T. While the previous conceptual plan was found to be acceptable,
we have the following comments on the currently proposed
site plan:
A. We recommend that the ramp system be reexamined as we
feel one lane up and one lane down is inadequate to accom-
modate the traffic during peak hours in a garage of this
magnitude.
B. Entrances to the garage should have a minimum width of
14 feet plus adequate turning radii.
C. Ramp grades should be indicated on plans.
D. Please note that at a Task Force Meeting held at the
DDA on December 18, 1980, a representative of Southeast
Bank indicated there would be approximately 7 or 8 loading
bays provided as opposed to the four loading bays plus
two security truck bays now shown on the plans. We fail
to see the 10 van spaces indicated in the November 12,
1980, letter attached to the plans. At this time, we
recommend that the Variance not be granted.
E. All parking stalls appear to be compact in size according
to City of Miami standards. This is not recommended. _
F. The recommended maximum height of parking garages is
six to seven floors. Please note however that the levels
on the plans do not directly correspond to floors.
G. There is insufficient stacking area provided past the
co.1lection booths at the S.E. 2nd Street exit for efficient
operation of a signal at this location. Thus signalization
of this intersection is not acceptable and closure of
this exit ramp during the P.M. Peak Hours may be indicated,
unless the site plans are significantly modified.
H. During P.M. Peak period operation, the queuing area between
the S.E. 2nd Street collection booths and the helical
ramp appears to be insufficient (stacking for only 3
or 4 vehicles), thereby allowing exiting vehicles to
stack onto the helical ramp and prevent reasonable usage
of the S.E. 3rd Street exit.
I. Ticket dispensers are not shown on the plans. We recommend
that they be provided at the entry into parking level
114.11
A
PUBLIC WORKS No dedication requested.
PLANNING DEPT. DEFERRAL. By terms of Resolution 81-36; January 15, 1981,
the Development Order for the Southeast Bank Financial
Center, the applicant is to:
a) prepare an external access and internal circulation
analysis of the parking garage by February 15, 1981;
b) redesign the S.E. 3rd Street truck service area to
ensure off-street loading and unloading operations
and unobstructed flow of traffic on S.E. 3rd Street;
c) ensure that trucks will not be allowed to either
back from or into S.E. 2nd Street; and
d) address issue of a deceleration lane and an existing
portal on S.E. 2nd Street.
The Development Order further requires State, County and
City departmental review of the above prior to recommending
any zoning approvals. The Department also has not had the
opportunity of reviewing the number and layout of truck
bays. The Department requests a deferral at least until
February 16, 1981.
(4
4
ZONING BOARD This Item was deferred from the meeting of
February 2, 1981.
PLANNING DEPT. APPROVAL WITH CONDITIONS AS SET FORTH HEREIN.
REVISED Per Resolution - ; anuary 15, 1981, the
Development Order for the Southeast Bank
Financial Center, the City was to "carefully
evaluate any application for a zoning variance
for off-street truck loading bays in the
context of provision of the proposed new _
Comprehensive Zoning Ordinance (January 1979 -
Draft)". The new provisions would require
12 bays 35' X 12' and 6 bays 44' X 12' for
the 1,356,500 square foot floor area of build-
ing in the site. The applicant is supplying
4 bays 12' X 55'; 2 bays 12' X 24' solely
•for armored truck and 16 bays 12' X 20'
spaces for vans. Approval is recommended on
the following conditions.
1. Reservation for space for 2 additional
truck spaces 12' X 55' adjacent to the
ground -level public plaza and S.E. 3rd
Street, as a holding area, to be implemented
by the applicant upon a request from the
City.
2. Reservation of the 16 van spaces cannot be
converted to other uses without express
permission of the City.
3. Prohibition of unloading, on -site or street
storage of trucks or semi trailers in excess
of 35' during the A.M. peak hours of 7:30
AM ' 9:30 A.M.
The building height requested is proper in light
of pending changes in this zoning district that
would provide for unlimited height. The parking
facility for 1150 cars is appropriate to
accomodate the buildings needs and general need
for parking in this area.
D.O.T.T. After review of the new site plan dated 2/23/81 and a cursory
REVISED' review of other submitted information dated 2/15/81, we
RECOMMENDATIONS have the following comments:
2-25-81
A. All parking stall dimensions should meet the City standards.
The applicant's architect has verbally stated this can
and will be accomplished.
B. The 3rd Street entrance should have an intermediate
slope between the street level and the ultimate 12
ramp slope. The applicant's architect has verbally -
indicated this will be incorporated into the plans.
C. Upon review of the applicant's submitted information,
exiting vehicles during the F.M. peak hour will likely
queue onto the helical exit ramp for many of the cycles
of the S.E. 2nd Street exit ramp signal. Such a queue
wduld block access to the 3rd Street exit and limit
_ its effectiveness. Thus, extensive delays may be en-
countered by nearly all exiting vehicles. If this projec-
tion is realized in the P.M. peak hour, the management
of the Southeast Financial Center may wish to coordinate
efforts with this departrlent as to possible remedial
solutions which would likely include a P.M.. peak hour
closure of the S.E. 2nd Street exit from the garage.
ZONING BOARD (a) GRANTED subject to provisions as read into the
record on 3/2/81 ZB 36-81 by a 7 to 0 vote.
(b) GRANTED on 3/2/81 ZB 37-81 by a 7 to 0 vote.
-1
POST, BUCKLEY,
SCHUH & JERNIGAN, INC.
Consultino Engineers 6 PI
onners
SCALE: 10 ass Aso �tooEt.�
UDALE DUNE t9i0
eessns
SOUTHEAST FINANCIAL CENTER
MASTER DEVELOPMENT PLANS
SOURCE: Edward C. Bassett & John O. Merrill -Skidmore, Owings d
Merrill•Ferendino, Grafton, Spillis, Candelo,•I. A. Namon E, Associates.
Ej
Typical Office Level
i
k
�
t
I
1
E
UCK,LEY,
\ 3 JERNIGAN, INC.
Jino Engineers & Planners
SCAU. Not to Scale
DATE JUKE 19�0
1
Dining Club -Level 3
Employees Cafeteria -level 4
SOUTHEAST FINANCIAL CENTER
MASTER DEVELOPMENT PLANS
SOURCE: Edward C. Bassett & John O. Met rill•Skidmore, Owings &
Merrill-Ferendino, Grafton, Spiliis, Candelo,el. A. Noman & Associates;.manommouNIG
1
III
POST, BUCKLEY,
SCHUH & JERNIGAN, INC.
' Consultina Enaineers & Planners
DAtE JUNE 1960 j
op
i
I
I
Executive Dining -Level 54
Rool Plan -Bank Annex
Planting Scheme
e _
•
�
rr
1
C Ex- a
.f
RN
FIG
AF
LM
SOUTHEAST FINANCIAL CENTER
MASTER DEVELOPMENT PLANS
SOURCE: Edward C. Basso" & John O. Merrill,* Skidmore, Owings &
Merrill-Ferendino, Grafton, Soillis, Candelo •I. A. Nomon & Associates.
:7�-77,
--I_
k=Lj -1-
J 1y
EAST ELEVATION SOUTH EEEVATION
.POST, BUCKLEY,
SCHUH & JERNIGAN, INC
Con:ultinn Enaineers & Planners
SCAB. Not to Stab
DATE JUNE19e0
EAST -WEST SECTION
SOUTHEAST F114ANCIAL CENTER
MASTER DEVELOPMENT PLANS
SOURCE: Edward C. Bassett d John O. Merril! -Skidmore. Owings &
Merrill •Ferendino. Grafton, Soillis, Condelo.•I. A. Nomon & Associates.
MAP:
H -4