Loading...
HomeMy WebLinkAboutR-81-06399 6/22/8l 't 77777 RACT MET J0 fiAt City Wide 1681 Sanitary Serer 2Xtehsio4�i�' tfthove eht Sit-54760 7092 Corietruotioh of a sanitary sewer improvefiient by a private contractor under contract with the City of lhiani at an estimated total cast bf $310�000,00. The district is comprised of isolated'un- set�iered locations throughout the generally sewered part of the City of MiaMIIG REASONS P01i Fart of the City's continuing program to WORK: provide sanitary set -:el throughout the City _ of Miami, SIZE OF AREA: Approximate Acres Approximate Population -6-0145 SOURCE OF FUNDS: ' G.O. Bond Sanitary Sewers PROJECT HISTORY: This project was scheduled to provide sanitary sever service to properties which for Various reasons were not served by the existing sewer systems in their areas. This is the second City glide pr•ooect intended to serve isolated locations which would not have been included' in our larger sewer districts. CURRENT ITEM To confirm a Resolution ordering City 1.4ide - FOR CONSIDERATI0N:1081 Sanitary Extensions Improvement - SR;5476C (centerline sewers) and authorize the City Clerk to advertise for sealed bids for construction. 6/22/81 11 keti,�ers�. ............: f'T ''RANAZRI A EATTMATE OP COST - 6V -= LOCAL IN!i'RO TEi ENT AND INCIDENTAL tM14SE CITY WIDE-io'814ANITARY SEWER EXTENSIONS IMPROI/tMENT 8R.511766 (Cthterline sei-.e: ORDERED BY RESOLUTION NO. 8I-406 ADOPTED MAY 281 1581 ESTIMATED C0148TRUCTION COST OF 1MPROVt1`1ENT ESTIMATED INCIDENTAL EXPENSES: Surveys; Inspection and Supervision of work; Preparation of Plans) Spec IPie a_ $�2., 0'OLC tions and Estimates; etc. _ _ _ Printing; Publishing of notices and — proceedings; Preparation of bonds; Legal services; Abstracts; etc.; and expenses. - other necessary and proper Total estimated incidental expenses= _ _ _._ _$, 4+450=00 Indirect cost allocation _ _ . _ _ _ _ _ _ _ _$ lOs-990.00 TOTAL ESTIMATED CONSTRUCTION COST, INCIDENTAL EXPENSES AND INDIRECT COSTS = .w310,440.00 DISTRIBUTION: Estimated Cost to be paid by Citti► of Miami. _ _ . .$199707.00 Estimated cost of all items to be assessed. . . .$110.733.00 Estimated cost of 85 Average Lats . . . . . . $6,125.00 Estimated cost of 4663 Linear Feet of Frontage. . .$ 74,608.00 Estimated assessment per front foot . . . . .$16.00 Estimated assessment per average centerline lateral .$425.00 WITNESS any signature at Miami, Florida this day of A.A•, 1Q81• liOWARp v, GAFX, C TY 1�1AN� GEE .^ - 81 - t i 3 9 I�tAiAOER� .E�fATE OF COS' OP v= LOCAL IMP%OtiEMENT AND INOIM. NTAL EXPENSES s CITY WIDE-10$1-8ANITARY SEWER EXHEN81ONS IMPROVEMENT8R-5-476c (Oehterlibe sev:e: ORDERED BY RE80LUTI014 NO, 81-406 ADOPTED MAY 283 1581 ESTIMATED 0014STRUCTION COST OF IMPROVV,1ENT $g s000.00 ESTIMATED INCIDENTAL EXPENSES: Surveys; Inspection and Supervision of • work; Preparation of Plans, Speciflcay- $ 21-brbb tions and Estimates; etc. 6_ Printing; Publishing of notices and proceedings; Preparation of bonds, Legal services; Abstracts, etc.; and other necessary and proper expenses .' $ _.._..rj,Q.�.► 0,0 Total estimated incidental expenses. _ • . . . .$ 34,_450.00 Indirect cost allocation . . . . 6 . . • . . •'. . .$ 10990.00 TOTAL ESTIMATED CONSTRUCTION COST, INCIDENTAL EXPENSES AND INDIRECT COSTS . $310,40.00 DISTRIBUTION: Estimated Cost to be paid by City of Miami. 6 4. . 06 . .$ 99 707.00 Estimated cost of all items to be assessed. 6 .' . 6$110,733.00- Estimated cost of 85 Average Lats 6 0. .' .$36.125.00 Estimated cost of 4663 Linear Feet of Frontage. .$ 74,608.00 Estimated assessment per front foot ., .$16.00 Estimated assessment per average centerline lateral .$425.00 WITNESS my signature at Miami, Florida this day of A.D., 1981, HOARD V G�1�?Y, CITY MANAGER