HomeMy WebLinkAboutR-81-06399
6/22/8l
't
77777
RACT MET
J0 fiAt
City Wide 1681 Sanitary Serer 2Xtehsio4�i�'
tfthove eht Sit-54760 7092
Corietruotioh of a sanitary sewer improvefiient
by a private contractor under contract with
the City of lhiani at an estimated total cast
bf $310�000,00.
The district is comprised of isolated'un-
set�iered locations throughout the generally
sewered part of the City of MiaMIIG
REASONS P01i
Fart of the City's continuing program to
WORK:
provide sanitary set -:el throughout the City
_
of Miami,
SIZE OF AREA:
Approximate Acres
Approximate Population -6-0145
SOURCE OF FUNDS:
' G.O. Bond Sanitary Sewers
PROJECT HISTORY:
This project was scheduled to provide sanitary
sever service to properties which for Various
reasons were not served by the existing sewer
systems in their areas. This is the second
City glide pr•ooect intended to serve isolated
locations which would not have been included'
in our larger sewer districts.
CURRENT ITEM
To confirm a Resolution ordering City 1.4ide -
FOR CONSIDERATI0N:1081
Sanitary Extensions Improvement - SR;5476C
(centerline sewers) and authorize the City
Clerk to advertise for sealed bids for
construction.
6/22/81
11 keti,�ers�. ............:
f'T ''RANAZRI A EATTMATE OP COST
-
6V
-=
LOCAL IN!i'RO TEi ENT AND INCIDENTAL tM14SE
CITY WIDE-io'814ANITARY SEWER EXTENSIONS IMPROI/tMENT 8R.511766
(Cthterline sei-.e:
ORDERED BY RESOLUTION NO. 8I-406 ADOPTED MAY 281 1581
ESTIMATED C0148TRUCTION COST OF 1MPROVt1`1ENT
ESTIMATED INCIDENTAL EXPENSES:
Surveys; Inspection and Supervision of
work; Preparation of Plans) Spec IPie a_
$�2., 0'OLC
tions and Estimates; etc. _ _ _
Printing; Publishing of notices and
—
proceedings; Preparation of bonds;
Legal services; Abstracts; etc.; and
expenses.
-
other necessary and proper
Total estimated incidental expenses= _ _ _._
_$, 4+450=00
Indirect cost allocation _ _ . _ _ _ _ _ _ _
_$ lOs-990.00
TOTAL ESTIMATED CONSTRUCTION COST, INCIDENTAL EXPENSES
AND INDIRECT COSTS
=
.w310,440.00
DISTRIBUTION:
Estimated Cost to be paid by Citti► of Miami. _ _ .
.$199707.00
Estimated cost of all items to be assessed. . .
.$110.733.00
Estimated cost of 85 Average Lats . . . . . .
$6,125.00
Estimated cost of 4663 Linear Feet of Frontage. .
.$ 74,608.00
Estimated assessment per front foot . . . .
.$16.00
Estimated assessment per average centerline lateral
.$425.00
WITNESS any signature at Miami, Florida this day of
A.A•, 1Q81•
liOWARp v, GAFX, C TY 1�1AN� GEE .^
- 81 - t i 3 9
I�tAiAOER� .E�fATE OF COS'
OP
v=
LOCAL IMP%OtiEMENT AND INOIM. NTAL EXPENSES
s
CITY WIDE-10$1-8ANITARY SEWER EXHEN81ONS IMPROVEMENT8R-5-476c
(Oehterlibe sev:e:
ORDERED BY RE80LUTI014 NO, 81-406 ADOPTED MAY 283 1581
ESTIMATED 0014STRUCTION COST OF IMPROVV,1ENT
$g s000.00
ESTIMATED INCIDENTAL EXPENSES:
Surveys; Inspection and Supervision of
• work; Preparation of Plans, Speciflcay-
$ 21-brbb
tions and Estimates; etc. 6_
Printing; Publishing of notices and
proceedings; Preparation of bonds,
Legal services; Abstracts, etc.; and
other necessary and proper expenses .' $ _.._..rj,Q.�.► 0,0
Total estimated incidental expenses. _ • . .
. .$ 34,_450.00
Indirect cost allocation . . . . 6 . . • . . •'.
. .$ 10990.00
TOTAL ESTIMATED CONSTRUCTION COST, INCIDENTAL EXPENSES
AND INDIRECT COSTS .
$310,40.00
DISTRIBUTION:
Estimated Cost to be paid by City of Miami. 6 4. . 06
. .$ 99 707.00
Estimated cost of all items to be assessed. 6 .'
. 6$110,733.00-
Estimated cost of 85 Average Lats 6 0. .'
.$36.125.00
Estimated cost of 4663 Linear Feet of Frontage.
.$ 74,608.00
Estimated assessment per front foot .,
.$16.00
Estimated assessment per average centerline lateral
.$425.00
WITNESS my signature at Miami, Florida this day of
A.D., 1981,
HOARD V G�1�?Y, CITY MANAGER