PROM: Cesar Odio
Assistant City Manager
.CS
Ct?Y or MIAMI. 0
IN?Eft- OFFICE MEMORANDUM
Howard V. Gary DATE: July 17, 1981
City Manager
'Lionel: Status Report on Permitting for
Dinner Key Marina
REFERENCES:
ENCLOSURES:
OILS:
Attached for your review is a letter dated July 6, 1981 authorizing Biscayne
Recreation Development Company to secure all necessary permits in the name
of the City of Miami for the reconstruction of the Dinner Key Marina.
Biscayne Recreation Development Company, by letter June 3, 1981, outlined
a status report as of May 31, 1981. This report outlined the preliminary
planning required for the permitting process. A detailed synopsis of the
required permits for the project was given with an anticipated submittal
time for the permit applications being June 30, 1981.
An updated status report has been submitted to Biscayne Recreation Development
Company from Crowder, Mahoney, Makowski, Rice & Associates, Inc., consulting
engineers for the management company (copy attached). This report indicates
that the necessary studies have been completed and final application along
with the appropriate exhibits prepared. The joint Department of Environ-
mental Regulations and U. S. Army Corp of Engineers' application should be
submitted on or before July 20, 1981.
1,
Crowder, Mahoney, Makowski, Rice & Associates, Inc.
°r ,Rtnq tngineers • Land Surveyors • Planners
8394 BIRD ROAD • MIA ME FLORIDA 33155 • 1ELEPH0NE (305) 223.8182 — 223.2400
Sieenbr
Amencon Consulting Enviers Co
Florida Sockry of
Prolesswnol Land Suroeyons
flonido how, of ConsoltrnQ Entrees
IAMOPOS
A W. Crowder, P1.
0.1 Mohorne�►. lr. P.E. P.LS
frank Makowski. PLS.
• L Roy Rice. P.E. P.LS.
Associates
Ashur E Dodow. P.E. PLS.
July 15, 1981
Mr. Robert M. Traugott, President
Biscayne Recreation Development Corp.
3400 Pan American Drive
Miami. Florida 33133
RE: Environmental Permits
Dinner Key Marina
Status Report No. 2
OUR JOB NO.: 811.113.
Dear Mr. Traugott:
Pursuant to your request of July 10, 1981 we are pleased to submit
herewith an updated teport captioned one status tst of the Environmental per-
mit application for the
On June 2nd we handed you a copy of a proposed draft of status
report No. 1 (copy attached) to be submitted to the City by
Biscayne Recreation. This report also gave a general description
of what was required for these Permits. It states that permit
applications and exhibits would t e be ready
me because
et submittal
1981 however, this date,could n o
reasons:
1. Weather conditions completion of the
which in turn prevented co p
ana preliminary design by our consultant, Professor Stevens.
2. Co,rdinating could not be
appropriate DER and Corps of Engineers
late June.
3. We were informed DER wPurr
quality information would
suant to your subsequent authorization we retained Dr.
Iverson of the University of
*pr quality data.
Mr. Robert M. traugott, President
July 18, 1281
Page 2
4. In late June we were directed byl
to include in the mooring permit app d
within the Easterly "hook "rao part
be obtained
Anchorage area. Field inf omation then had t
and layouts made.
All studies have now been completed and final applications and
appropriate exhibits prepared. The joint DER /USCOE application
should be submitted on or about July 20, 1981.
� 1 the bond issue. Finally, preliminary Marina design is now sufficiently compete
'1 so tha+ r a n
t oably good estimate of cost can be prepared for
This estimate should be completed and submitted
to you by July 31, 1981. We shall be happy to meet with you and/
or representatives of the City to discuss these reports.
• Very truly yours,
CROWDER, MAHONEY, MAKOWSKI, RICE & ASSOCIATES, INC.
BY:
A.W. Crowder, P.E.
President
4 • f.J� rY • * , .` ~. . . « • •
wM "• •• ..•• t• ' • •
A. AM ..;• . • it _ : _ y - • N •r .. • '.. i~ •
• . w A • . • •.•• ♦♦ •..... �,/'...! . 1 • • • .. ,•.
. •.
• • - • . • ..•... •... ' 4 ' -. ••• . ...11:...' ...Alm - .4—
•
,•-.•
•
• ;.. • 1. • • .� .D . •
. ..... • • • . ;: t.. '-. � .. -�' • •
.. .
1.•...,•1".• • + •':!.. . ••LM..
L r. . -•• ••.• • . .y: . ..
• •
- � Kr. Howard V. Gary
City Manager.
• ..•.• y.. .
4_
- Dear 14r. Gary:
�r e.
•
•. -t i
.4 -.
•
•
Y
•
• t- •
R • N
•
ij.i:r •. .. •.N.• • . . .
•
•
~ • . 1 .
June 3,1981
.Pursuant to•your request we. herewith a status
report.ai of May'31.1981 for the captioned project.
This material is 'based on :information from our con-
sultant; Crowder, Mahoney,' Makowski, Rice, i Associates;•'
x: Inc:
•
•
• • •• 1. PRELIMINARY PLANS In order to accumulate the
. information .required for the permitting process,
•• _. 'it is necessary to prepare preliminary plans in
. sufficient detail -to adequately show the scope
• •
- - -of work for which permits are sought. Prelimin-
• 4 ary plans are'needed also to prepare a reasonably
_ . '_,'accurate estimate of cost of the proposed improve-
• .,;, .• .ments for issuance of City revenue bonds.
`� " �•
.To date; "a' Preliminary master plan has been prepared
for the marina providing for an increase in capacity
_ • from the.current existing 276 slips (including the • ▪ = ... space . along the bulkhead) to an 'estimated total of
, -- 'r:�- -552 . slips .producing an accumulated total of 25,360
N - - ilip- feet.: %tn additioA to the marina, a preliminary
•':� ..plan for the'offshore•aooring area which will enema-
;p some '85, to 90 •mooring areas is also being prepared.
'. -t The :final qount has 'not been actually determined peed-
. ••ing completion of soil borings and preliminary designs
of the'anchor system to be used.
The landside site plan is currently being updated
from that originally submitted and will include, but
not necessarily be limited to a perimeter boardwalk,
area, upgrading of the dockmaster facility,
- architectural encloseres of garbage and trash recept-
- ..aoles, a new bait and tackle facility with carry out
..food service, fueling 'facilities and other concessions
. !pplicable to a marina environment.
�•�!t!...q_�yw..r.v.• ....... ... r. •••w...•••••••••••••••••••••••••••,.....1•00.04. /0014!•4 •∎••'e e,ii n#0, P.M' s •. x.r t tr.:" •-••••t••••• •.. • ... •. ..� . .i 37'. • •
SISCAYNERECOMATION
O*YELOPM MT 00*PAN
$1 PM *m*k$ bo11r
0.
•
••
A i.
.1
• • • •
•
•
•� 1
•
_.. _ r...i 4..- .(c'itYc.',+i�ic - _.. _ i..S�.T.:•J �iy.ic.Cli'LC ' pptt.� •-
istiWil.lii4i[ _ • • • i...... • • a . ... ..•.
•
•
4
• • ••
•
•
i •w
ii/•■••• ... • • • .6 t • • . •
•
• aTV,••4; :!* Y .:• .' ; • ..• ••;� .. .0 :
•• i. .. . ••.3. .• :•Jrt."' • 4: T ..0,. ••
.� :.. Kr. u .H • Y. ,:Cary �..: -:
r r • r:• • • .•r» :. 4 ' r w i;:: � ! :t' t s . r - fir=
••••• _ -• -2. ENVIRONMENTAL PERMITS Two separate applications w ' • -
•.,,.." • - -are to be submitte ,
d one for the mooring area and - `: .--
:,=•_ - 'one for the marina area proper. Considerable 'pre- . f.":'1. , ',':.'
'.- Viz — - -=' • liminary 'studies' and investigations have been' made
• , by our consultant 'and their associates as follows: T
•
* __ • •-•: • Updated ';,aerial photograph .. ; • • - •
'• •. ; • . 8. '8ottom and b iological investigation by Tropical -
- - .. - • - Bio- Industries - - r�� -'�: • • ' --"` • • C. Hydrological and related coastal engineering ••w. t:i;::.• •-
} D. Anchorage Investigation and preliminary- design: _ 4 ,=1:••
- — „ • :t ;,- :..;_•• ..: rby :Dr....Earl. "Stevens; Florida Atlantic Universit” 4•!w'
. .....•,:.:.;-'•
,.. • .; . • • E.. Soil Borings] Pittsburgh Testing Laboratory .•--6. ;• 6 . L_ . :' -
• - Applications and supporting exhibits are currently being .'_ i;::•
...-.,s prepared by consultant, as required by our management ''f
t•
:.:'agreement, along with the preliminary design and master .. 4; :':
•? ' ' plan ; of .the ' marina and Supporting . facilities. It is anti- ••- -..''
cipated that all preliminary plans and permit applications '
s;- , will. be 'completed and .ready for submittal by June 30,1961..
•. Permits will be required from': the following agencies in
j; addition to local permits required for building and con -
;.• struction by the City of Miami: • •
•• _ 1.'..Class I Coastal Permit, Metropolitan Dade County
• •�2. State of Florida Department of Environmental
' • 'Regulation with input from various State agencies
3. United States Corps of Engineers with input from
-.- various Federal agencies.
,'.Since this project falls within the limits of the Biscayne
..Bay Aquatic Preserve it will be necessary for public hear-
ings to'be held. We do not anticipate any difficulty in
these public hearings as our proposals fall within those
approved execptions provided for in the Aquatic Preserve
Act.
Parallel with 'the above activities Biscayne Recreation
is preparing the preliminary work necessary for revenue
bonding including feasability studies, project pro formes,
"f "'- demand /supply analyses 'and other materials as required
for review by the City.
4
r
•t
IA.
•
•
Mr, Howard V. Gary
Page 3
We would be happy to meet with you at your convenience
and,provide you at that time with copies of all of our
•reports, .studies,'documentation and /or preliminary
plans prepared to date.
Very truly yours,
Robert M. Traugot
President
Biscayne Recreation
a • •
•
July 6, 1981
Signed,
• - r • I •• %• l • ' .
...r '•.-.- • , •
TO WHOM IT MAY CONCERN:
' -Avne Recreation Development Compafly is hereby commanded and
authorized by the City of Miami to make presentation i and secur
r
in the name of the City of Miami, the necessary p
concerned regulatory and permitting agencies for the rebuilding
and reconstruction of Dinner Key
Cesar H. Odio
Assistant City Manager
tOWAR) °' • '';
•