Loading...
HomeMy WebLinkAboutR-81-0759RESOLUTION NO. 81 " 7 5 9 A RESOLUTION APPROVING, IN PRINCIPLE, THE FINAL DRAFT REPORT, PREPARED BY KIMLEY-HORN AND ASSOCIATES, INC., ENTITLED "MIAMI PARKING STUDY, CORE AREA WEST", DATED JULY, 1981, RECOGNIZING THAT THE FINAL REPORT IS SUBJECT TO CHANGE; FURTHER RECOGNIZING THAT LAND TAKING MAY BE NECESSARY; FURTHER AUTHORIZING AND INSTRUCTING THE CITY MANAGER TO PROCEED WITH DEVELOPMENT OF AN ECONOMICALLY FEASIBLE PROJECT PROPOSAL THAT WILL MEET THE PUBLIC NEED FOR PARKING IN CORE AREA WEST, MORE SPECIFICALLY: (1) TO MEET WITH LAND OWNERS, (2) INVESTIGATE METHODS OF FI- NANCING THE DEVELOPMENT, AND (3) INVESTIGATE METHODS TO - ACQUIRE LAND AND AUTHORIZE THE CITY ATTORNEY TO ENGAGE THE SERVICES OF OUTSIDE LEGAL COUNSEL IN CONNECTION THEREWITH, IF NECESSARY, SUBJECT TO THE AVAILABILITY OF FUNDS. WHEREAS, by adoption of Resolution No. 80-819, dated Novem- ber 61 1980, and Resolution No. 80-861, dated November 26, 1980, the City Manager was authorized to initiate a study to investigate the public need for parking in that portion of the Central Business Districted designated as Core Area West and to determine the economi- cal feasibility of developing a multi -story public parking facility; and WHEREAS, the selected professional consulting firm, Kimley-Horn and Associates, Inc., has thoroughly investigated the parking require- ments and needs and has considered the economics of undertaking a parking facility development; and WHEREAS, the consultant has found that there is an existing defi- ciency in parking spaces and that there will be a continual increase in the deficiency in Core Area West, with such deficiency having established a need for public parking; and WHEREAS, the consultant has indicated that under certain con- ditions the development of such a project could be self-liquidating; and WHEREAS, it is in the best interest of the City to proceed with the development of such an undertaking; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The final draft report, prepared by Kimley-Horn and Associates, Inc., entitled "Miami Parking Study, Core Area West", dated July, 1981, is hereby approved, in principle, recognizing that F OMMISSIONTING OF 10 1 lci' $175 maw.......... , ......,.. ««-. i the Report will be modified to reflect City Commission comments and such technical comments, if approved by the City Commission, as may be generated in the development process. Section 2. It is hereby further recognized that in order to develop a project, land taking may be necessary. Section 3. The City Manager is hereby authorized to continue his efforts in the development of a multi -story public parking facility that will meet as much of the public need as is economically prudent and possible in Core Area West. The City Manager is hereby instruc- ted to proceed in accordance with the following: (a) Meet with property owners in Block 25, the block bounded by SE First Street, SE First Avenue, SE Second Street and South Miami Avenue, and with property owners in adjacent blocks to advise them of the City's intentions and to ascertain their interest in the project development. (b) Investigate methods for acquiring the necessary land for the project development. (c) Investigate financing methods to accomplish the project development. It is intended that the City Manager would consult with the City's financial advi- sor, James J. Lowrey & Co.; bond counsel, Brown, Wood, Ivey, Mitchell and Petty, and to coordinate his efforts with the Off -Street Parking Authority, the Downtown Development Authority and other inter- ested parties. Section 4. The City Attorney is hereby authorized, subject to the availability of funds, to engage the services of outside legal counsel to assist him, if necessary, in accomplishing necessary land acquisition. PASSED AND ADOPTED this 10 day of September , 1981. MAURICE A. FERRE M A Y 0 R SST: Q 1 I RALN G. ONGIE, CITY CLERK PREPARED AND APPROVED BY: ROBERT F. CLARK ASSISTANT CITY ATTORNEY APP AS TO FORM AND RECTNESS: GEOR F. KNOX, JR., TY ATTORNEY -2- 81 -759 31 '� Howard V. Gar City Manager Morris I. Kaufmann Assistant to the City Manager I ;iJ ti - N cO Background August- 24, 1981 Proposed Resolution on Core Area West for City Commission Meeting Scheduled for September 10, 1981 It is recommended that the City Commission adopt the proposed Resolution whereby the City Commission approves the feasibility study, in principle, on Core Area West, prepared by Kimley-Horn and Associates, Inc., and thereby authorizes the City Manager to proceed with the development of a multi. -story, public parking facility that will meet the public need and be self liquidating. By Resolution Nos. 80-819, dated November 6, 1980, and 80-861, dated November 26, 1980, the City initiated a study of parking needs in the Central Business District, designated as Core Area West (SW and SE First Street, SE First Avenue, SE and SW Third Street and SW First Avenue). See Figure 1. The selected professional firm, Kimley-Horn and Associates, Inc., began the study in early December 1_980 anti produced '.heir final draft report in July 1981. In this period Kimley-Morn produced a number of preliminary studies which were reviewed by a Technical Committee in a continuous exchange of information and ideas. The Technical Committee consisted of I•;orris Kaufmann, Project Director; Richard LaHaw, Director, Off -Street Parkina Authority; Don Cather, Director, Department of Public Works; Joseph McManus, Acting Director, Planning Department; Gerardo Salman, Director, Building and Zoning Inspections Department; and Roy Kenzie, Director of Downtown Development Authority. In early March 1981, }:imley-Horn identified Core Area West as having a parking deficiency of some 1540 _paces and predicted that there would be a shortage of 3100 spaces by 19'85. r i 81 -759 I Howard V. Gary Page 2 August 24, 1981 As provided by the agreement and as directed by the Technical Committee, Kimley-Horn investigated three alternative concepts, one of which appeared the most feasible. Initially this concept envisioned an eight -story public parking facility with some commercial space on the first and second stories and a capacity of 1,200 spaces, situated in Block 25, between SE First Street and SE Second Street. In the latest version, as indicated in the final draft report, the project is envisioned as a six -story parking structure accommodating 1,800 spaces with some commercial space on the ground level only. The foot print would be in the order of 400 feet along the east -west axis and 250 feet along the north -south axis. The magnitude of the project as estimated by Kimley-Horn is approximately $30,600,000, as shown in Table 8, enclosed, of their final draft report. It is my belief that this estimate can be substantially reduced during the project development. From the economic feasibility view, the final draft report indicates that the proposed development is a marginal undertaking, with a debt service ratio of about 0.90. Land costs which represents about 45 percent of the estimated development costs (exclusive of financing costs) greatly affect the project financial performance. If the project revenues are considered without land costs, the projected debt service ratio would be in the order of 1.40. Nonetheless, Kimley-Horn indicates that the project would become feasible (that is, having a debt service ratio in the order of 1.25) if certain measures are taken. Among these, the most interesting appears to be packaging the project in a manner that would alloti, development of the ground and air space rights. Under the prober conditions these lease rights together with certain other measures could vastly improve the financial performance of the project to the point that the project would, first, serve the public purpose of providing needed parking and, second, be self sustaining. Recommendation Because time is of the essence in developing a feasible project it appears appropriate to request the City Commission to take action as outlined in the proposed Resolution. Proposed Resolution The proposed Resolution provides for the f.ol.lowing: 1. The City Commission approves the final draft report in principle, recognizing that the report will be modified to reflect their comments, as well as comments from members of the Technical Committee, legal counsel, financial consultants and bond counsel prior to final acceptance and incorporation into an Official Statement. 1 8I - 759 J d Howard V. Gary Page 3 August 24, 1981 2. The City Commission further recognizes that in order to develop the project, land taking may be necessary. 3. The City Commission by approving the final draft report in principle, recognizes the need for public parking in Core Area West and authorizes the City Manager to continue to develop an economically feasible project that will meet as much of that need as is prudently possible. More specifically, this authorization directs the City Manager to take the following actions: a. Meet with property owners in Block 25 and adjacent blocks to advise them of the City's intentions and to ascertain their interest in the project. b. Investigate methods to acquire the necessary land. In this regard, the City Commission authorizes the City Attorney to engage the law firm of Steel Hector & Davis, 1400 SF First National Bank Building, Miami, Florida 33131, subject to availability of funds, to assist in the land transaction. C. Investigate financing methods to accomplish the development. In this regard, the City Manager would consult with its financial advisor, James J. Lowrey & Co.; bond counsel, Brown, Wood, Ivey, Mitchell and Petty, the Off -Street Parking Authority, the Downtown Development Authority and other interested parties. MIY.:bf Enclosure 1 E 0 i -Ki coley -Horn and Associates,Ine, Sol Jones Franklin Road, Raleigh, N.C. 27606 • (919) 851-8260 Raleigh. West Palm Beach. Tampa. Orlando, Knoxville. Dallas July 15, 1981 i Mr. Morris I. Kaufmann Assistant to the City Manager City of Miami 150 S. E. 2nd Avenue, 12th Floor Miami, Florida 33131 Re: Miami Parking Study - Core Area West-, Final Draft Report Dear Mr. Kaufmann: We are transmitting three (3) copies of our final draft of the pre- liminary feasibility study for the Core Area West. In preparing this final draft report, we have incorporated the City's comments, and updated our analysis and recommendations. Specifically, as recommended by the City, Concepts A and B as des- cribed in the prelinary draft report, have been eliminated from this report and refinements have been made to the earlier Concept C (which in this report is now referred to as Concept A. The recommended concept: now is a si::-Level structure having a capacity of about 1,800 spaces. It has a footprint of 400 feet by 250 feet and it occupies all of the block east of the Immigration and Naturalization Building. In updating, our analyses for the new Concept A, we. have noted that the facility size now can be reduced in accordance with the current provisions of the City's amended parking ordinance. This option would now permit shifting the entire facility to the eastern boundary of the block (adjacent to S. E. 1st Avenue), thus l.eavi.nh intact the existin , 290-space parkins; deck. We appreciate this opportunity to submit this report. A;;ain, we ex- press our gratitude to you and the City for your cooperation and help in the study. Very truly yours, KIMLEY-11ORN AND ASSOCIATES, INC. James L. 'Zimmerman, Jr., P.G. i Senior Associate i 81-759 j? r K mley.Horn and Associates, Inc. 901 Jones Franklin Road, Raleigh, N.C. 27606 • (919) 851-8260 t Raleigh. West Palm Beach, Tampa. Orlando, Knoxville. Dallas July 15, 1981 `a ;I Mr. Morris I. Kaufmann Assistant to the City Manager ( City of Miami 150 S. E. 2nd Avenue, 12th Floor Miami, Florida 33131 I Re: Miami Parkin' Study - Core Area West, Final Draft Report j Dear I•fr. Kaufmann: We are transmitting three (3) copies of our finaldraft of the pre- liminary feasibility study for the Core Area West. In preparing this final draft report, we have incorporated the City's comments, and updated our analysis and recommendations. I Specifically, as recommended by the City, Concepts A and B as des- cribed in the prelinary draft report, have been eliminated from this report and refinements have been made to the earlier Concept C (which in this report is now referred to as Concept A. The recommended concept now is a six -level structure having; a capacity of about 1,800 spaces. It has a footprint of 400 feet by 250 feet and it occupies all of j the block east of the Immigrat:i_on and Naturalization Buildin,. In updating our analyses for the new Concept A, we Have noted that the facility size now can be reduced in accordance with the current provisions of the City's amended parking; ordinance. This option %.rould now permit shifting tho entire facility to the eastern boundary of. I the block (adjacent to S. 1'. lst Avenue), thus leaving; intact the e::isti.ng 290-Space parking; deck. We appreciate this opportunity to submit this report. Alain, we es - press Our gratitude to you and the City for your cooperation and help in the study. Very truly yours, KII.ILLY-1101t;; ANll ASSOCIATLS, INC. L• � James L. Zimmerman, Jr., P.E. Senior Associate 82-759 TABLE OF CONTENTS MIAMI PARKING STUDY CORE AREA WEST Page CHAPTER 1: Introduction 1 Existing Conditions 1 City's Goals 2 Study Objective 2 CHAPTER II: Study Area and Information Assembly 3 Study Area 3 Data Collection 3 Other Data and Information 6 Existing Land Use and Employment 7 Future Land Use and Employment 7 CHAPTER III: Analy-is and Development of Needs 12 Accumulation 12 Demand Characteristics 12 Present Parking Needs 14 Future Parking Needs 16 Summary - Parking Needs 16 Impact of Downtown People %,lover (DPM) Is CHAPTER IV: Concept Development 20 Site Investigation and Selection 20 Alternate Concept Considerations 20 Recommended Concept 22 CHAPTER V: Feasibility Analysis 26 Project Costs 26 Operating; Costs 29 Parking Use 29 Proposed Fee Schedule 30 Estimated Gross Revenues 34 Financial Performance 34 Inf lation Impact 38 Financing Option 39 Other Financial Considerations 40 Impacts of Land Costs on Feasibility 43 CHAPTER VI: Summary and Conclusions 44 ft 81 -759 TABLE OF CONTENTS MIAMI PARKING STUDY CORE AREA WEST CHAPTER I: Introduction Existing Conditions City's Goals Study Objective CHAPTER iI: Study Area and Information Assembly Study Area Data Collection Other Data and Information Existing Land Use and Employment Future Land Use and Employment CHAPTER III: Analy ;is and Development of Needs Accumulation Demand Characteristics Present Parking Needs Future Parking Needs Summary - Parking Needs Impact of Downtown People Mover (DPM) CHAPTER IV: Concept Development Site Investigation and Selection Alternate Concept Considerations Recommended Concept CHAPTER V: Feasibility Analysis Project Costs Operating Costs Parking Use Proposed Fee Schedule Estimated Gross Revenues Financial Performance Inflation Impact Financing Option Other Financial Considerations Impacts of Land Costs on Feasibility CHAPTER VI: Summary and Conclusions ft Page 1 1 2 2 3 3 3 6 7 7 12 12 12 14 16 16 18 20 20 20 22 26 26 29 29 30 34 34 38 39 40 43 44 81 - 759 0 u' LIST OF TABLES Table Page 3, 1 g Y Parkin Inventor - Off Street 6 t t 2 Existing Land Use Summary 8 3 Land Use Summary - Proposed Developments 10 4 Accumulation Summary 13 I 5 Existing Parking Demands 15 ' 6 Future Parking Demands 17 a 7 Parking Needs 18 8 Cost Estimates - Recommended Concept (1,800 Spaces) 27 �. 9 Estimated Operating and Administrative Costs 29 — 10 Estimated Parking Use 31 j, 11 Parking and Rental Rates 33 12 Annual Facility Revenue 35 13 Cost Income Summary 36 j I 14 Financial Performance 37 15 Required Additional Facility Income 40 f r 16 Coverage Ratio without Land Costs 43 i i f I f� I f i i 1 -11- � t APPENDIX Appendix Table Page 1 Concept Cost Estimates - Concept A 45 2 Cost Income Summary - Concept A 46 Under Separate Cover Analysis of Impact of Proposed Downtown People Mover, April, 1981 report by Simpson & Curtin for Kimley-Horn and Associates, Inc. -iii- 81-759 1 CHAPTER I INTRODUCTION Downtown Miami, the heart of south Florida's governmental, commercial, legal and } financial community, is undergoing a tremendous business expansion. This business i boom, which is attracting large numbers of people to downtown, is expected to '9 continue its steep growth in the future years. This is evidenced by the fact that 1 there are some 37 major developments in the core area, either underway or slated for construction over the next few years. Among others, some notable projects in the core area are: International Center and Hyatt Hotel at 400 S.E. 2nd Avenue; International Trade Center at S.E. 2nd Street and lst Avenue; Southeast Bank Building at S.E. 3rd Avenue and S.E. 3rd Street and the Government Center Complex. Realizing the impact of the rapid growth, both current and future, on parking needs in the core area, the City of Miami is responding to the challenge of ensuring that present parking shortfalls, where they occur, are eliminated and adequate provi- sions are made to meet future demands. Accordingly, the City has commissioned several studies of both the economic and physical aspects of providing additional off-street parking in the downtown area. This particular study, which relates specifically to the feasibility and functional concept development for a parking garage to be located in the southwest part of the downtown core area, is a part of the objective mentioned above. EXISTING CONDITIONS The City ofMiami currently has three municipal garages and 21 municipal lots in the core area. These facilities are managed by the Department of Off -Street Parking which is responsible for their operation. The facilities are expected to generate $2.7 million in anticipated revenue this year. This revenue goes into a parking system fund which covers the operations expenses and the debt service on the bond issues. The City's downtown parking system competes with about 50 privately -owned and operated parking facilities in the core area. r81"'759 CITY'S GOALS The City is seeking to provide an adequate parking supply in attractive off-street facilities to meet both the immediate and future needs of the central business district (CBD) redevelopment. In order that these facilities blend with the CBD environment and to coordinate the parking supply with pedestrian and traffic circulation, the City created a special function in 1980 under the direction of an assistant to the City Manager. This office has been charged with the task of ensuring that the new parking facilities, in addition to having a sound financial base themselves, will stimulate growth, investment and development by combining parking with other public services while being compatible with environment, traffic circulation and a proposed Downtovin People Mover (DPN1) system. STUDY OBJECTIVE This study relates specifically to the feasibility of a parking garage to be located in the southwest part of downtown Miami - referred to in this report as Core Area Nest. This report describes the information and data assembly effort, analysis and development of parking needs, impact of the DPI, site selection for the proposed facility, development of functional concepts and the financial feasibility of an appropriately -sized parking facility. -2- t 1' CHAPTER 11 STUDY AREA AND INFORMATION ASSEMBLY 1 STUDY AREA The study area, including the environs, and the zones used for data collection, data summary, and analysis are shown in Figure 1. The primary study area is contained within the bounds of S.E. and S.W. 1st Street on the north, S.E. 1st Avenue on the s east, S.E. and S.W. 3rd Street on the south, and S.W. lst Avenue on the west. Four blocks, grouped into two analysis zones (TAZ 25 and 27), comprise the primary study area where the proposed facility is to be located. In order to assess the influence of environs on the primary study area, an additional area containing seven additional traffic zones was included in the study and is outlined in Figure 1. This enlarged study area is bounded by Flagler Street on the north, S.E. 2nd Avenue on the east, the Miami River on the south, and S.W. lst Avenue on the west. In all, nine analysis (traffic) zones (TAZ 20 to 28) comprise the study area and its environs. DATA COLLECTION Data collection consisted of a detailed parking space inventory, parking usage studies and Downtown People Mover (DPW gavel simulation studies. The detailed parking inventory was carried out for the nine analysis zones. Inventory data were supplied by the Downtown Development Authority (DDA) and field checked by the consultant. The inventory reflects a total number of 3,587 parking spaces in the study area, of which there are 64 curb spaces, comprising less than two percent of the inventory. The remaining 3,523 spaces, constituting 98 percent of the inventory, are in off-street facilities, i.e., municipal lots, other lots and garages. The off-street inventory is shown in Figure 2 and is summarized by zone in Table 1. -3- L I >w at LEGEND PRIMARY STUDY AREA ENVIRONS STUDY AREA iliii ANALYSIS ZONE BOUNDARY 21 ANALYSIS ZONE NUUaER .cn. r..t MIAMI PARKING STUDY CORE AREA WEST April 11,81 STUDY AREA Figure 1 /?Ihs 1 TABLE 1 OFF-STREET PARKING INVENTORY Number of Parking Spaces Traffic Zones (1) Municipal Lots Other Lots Garages Zone Totals 20 -- 286 -- 286 21 _- -- 250 250 22 -- 200 200 400 23 -- -- -- -- 24 -- -- -- -- 25 73 363 290 726 26 127 800 -- 927 27 22 128 427 577 28 -- 48 309 357 Total 222 1,825 1,476 3,523 Refer to Figure 1 Parking accumulation studies were conducted during February, 1981, for the inventoried parking spaces in several off-street facilities and at the curb. The total nurnber of parked vehicles at each facility was recorded at 10 a.m. and 2 p.m. on a weekday. In addition, information about Municipal Garage No. 3 was obtained from the Department of Off -Street Parking. The accumulation studies were used as an indicator to assess the parking demand and the level of space utilization in the Core Area West. The results of this data assembly phase were employed in the analysis of existing conditions and developing the parking needs for the study area. OTHER DATA AND INFORMATION In addition to the data collected through field surveys, other pertinent data and information were assembled. This included information on existing land use obtained from Downtown Development Authority (DDA) and the City's Planning Department, identification of major generators, working with the DDA and the Planning Department's staffs to identify the type and size of the proposed -6- I r 0 LEGEND i MUNICIPAL LOTS PRIVATE LOTS GARAGES 105 NUMSER OF PARKING SPACES MIAMI PARKING STUDY CORE AREA WEST OFF-STREET INVENTORY APIII 1931 Fi9Yft 2 — 81 ,t a developments within the study area, meetings with the Department of Off -Street Parking, and working with the office of the Assistant to the City Manager. The information obtained from the Department of Off -Street Parking and the Finance Department of the City related to the operating procedures, organization, enforcement, and financial/budgetary information for the current parking revenue bond issues. EXISTING LAND USE AND EMPLOYMENT The nine -zone study area contains some 1,993,000 square feet of gross floor area for commercial (office, retail and institutional) use. A summary of the existing land use and employment data obtained from the DDA and the City of Miami Planning Department, is shown in Table 2. As shown in the table, this information is summarized for the traffic analysis zones by land use type, area (number of rooms for hotels), and number of employees. This table also shows that the commercial use is supported by some 5,913 employees and further that there are some 615 hotel rooms in the study area and the environs. A graphic form of Table 2 is shown in Figure 3. The information obtained on the land use was subsequently utilized in determining parking characteristics and parking demand in the study area. FUTURE LAND USE AND E1IPLOY:MENT S' Working with the City of Miami Planning Department and DDA, information about future land use and employment was obtained for those developments which are either committed or proposed to be completed by the year 1955. The summary of the major new land uses expected to occur by 1985 is shown in Table 3. The table shows that in the future years there will be new commercial (office, retail and institutional) space grossing some 1,144,000 square feet supported by an estimated additional 3,566 employees. The table also shows that in the next five years there will be an addition of 603 hotel or apartment rooms. Information contained in Table 3 is shown graphically in Figure 4. -7- TABLE 2 EXISTING LAND USE SUMMARY Existing Land Use (1) Traffic Office Retail Service/Inst. Hotels Zone (2) 1000 sf Employees 1000 sf Employees 1000 sf Employees Rooms Primary Study Area 25 203 450 33 89 -- -- -- 26 114 107 15 41 -- -- -= 27 23 103 22 60 -- -- -- Subtotal 340 660 70 190 Environs 20 -- -- -- -- 131 200 -- 21 -- -- 5 14 -- -- 386 22 -- -- 12 33 -- -- -- 23 196 871 144 390 -- -- 229 24 -- -- 561 1,520 -- -- -- 2S 379 1,634 155 420 -- -- -- Subtotal 575 2,555 877 2,377 131 200 615 Totals 915. 3,215 947 2,567 131 200 615 (1) Existing land use and employment information provided by the City of Miami Planning Department and DDA. (2) Refer to Figure 1 for Traffic Zone location. -8-