RESOLUTION N0.
$1 ..898
A RESOLUTION AUTHORIZING AN INCREASE IN THE SCOPE
OF THE CONTRACT BETWEEN THE CITY OF MIAMI AND
D.M.P. CORPORATION FOR THE CONSTRUCTION OF SOUTHERN
DRAINAGE PROJECT E-51 IN AN AMOUNT OF $40,000; AND
ALLOCATING THE ADDITIONAL $40,000 FROM THE "STORM
SEWER G.O. BOND FUND"
WHEREAS, there exists a contract dated June ll, 1M
between the City of Miami and D.M.P. Corporation; and
WHEREAS, builders doing_; construction on the north side
of N. W. 22 Street between 17 and 21 Avenues have agreed to
rebuild the north one-half of the street providing; the City
will construct drainage prior to their doing; the work; and
WHEREAS, the existing contract between the City of Miami
and the D.M.P. Corporation for Southern Drainage Project E-51
provides the best means for doing; the work within the time available:
and
WHEREAS, the contractor on the project has agreed to do
the work at a price based upon his contract prices; and
WHEREAS, the cost of the additional work will be
$70,000 and will require an additional 30 working days; and
WHEREAS, only $30,000 is available in funds already
allocated to the project to cover the work; and
WHEREAS, the Public Works Department recommends an
increase in scope of contract of $40,000 to cover the addi-
tional cost of the work and an additional 30 working days.
construction time to do the work; and
WHEREAS, the additional $40,000 is available from the
"Storm Sewer G.O. Bond Fund";
T10W, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF
THE CITY OF MIAMI, FLORIDA:
Section 1. An increase in scope of work in the amount'
of contract for SOUTHERN DRAINAGE PROJECT E-51 is hereby
authorized in an amount of $40,000, with funds therefor being
allocated from the "Storm Sewer G.O. Bond Fund".
M
•
2
t I
1
PREPARED AND APPROVED BY:
J
�t
i 1
1
4ISTANT CITY ATTORNEY
s
ti
{
APPROVED AS TO FORM AND CORRECTNESS:
1(40,A A,^
r {
I I,
A q t l
vF i
.
28 • CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO. Howard V. Gary
City Manager
DATE- September 2, 1981 FILE: B-5479
SUBJECT: SOUTHERN DRAINAGE PROJECT E-51
Resolution for Increase in
Scope
FRO ire rr' ofaPublic Works t er REFERENCES
(For Commission Meeting of
a� September 10, 1981)
ENCLOSURES:
The Department of Public Works recommends
CA- the adoption of a resolution authorizing
_ h an increase in the scope of the contract
Z3 in an amount of $40,000 for the SOUTHERN
;o DRAINAGE PROJECT E-51, allocating the
additional $40,000 from the "Storm Sewer
G.O. Bond Fund".
New buildings are under construction along the entire length of
the north side of NW 22 Street between 17 and 21 Avenues. City
Ordinances require builders to construct or repair the existing
sidewalks and curb and gutter in connection with the building
construction. In this case, the builders (3) have agreed to
exceed the requirement and construct pavement in front of the
curb and gutter if the City will construct the drainage that
must precede the repaving. Existing utilities prohibits con-
struction of drainage on the south side of the street.
The only method we have to do the drainage work in the short
• time available is to include it in an existing contract.
Southern Drainage Project E-51 now under construction contains
work identical to the drainage work proposed for NW 22 Street.
The successful bidder on the project, who was low by $92,000 on
a $355,771 contract (26%) has agreed to do the additional work
at his contract prices. VTe believe the cost, t70,000, is lower
than we can achieve by any other means of doing the work, and
recommend acceptance of both the builder's and contractor's offers.
We estimate that we will be receiving $63,000+ worth of addi-
tional improvements from the builders. The ultimate result will
be that the City will receive the rebuilding of the north one-
half of the street (0.38 miles) at a very low cost. We believe
we can obtain the rebuilding of the south one-half of the street
similarly within the next few years.