HomeMy WebLinkAboutR-82-0142RESOLUTION NO. 82-1.42 A RESOLUTION ACCEPTING THE COMPLETED WORK OF WILLIAMS PAVING CO., INC. AT A TOTAL COST OF $132,890.77 FOR RIVERVIEW STORM SEWER PROJECT - PHASE II; AND AUTHORIZING A FI14AL PAYMENT OF $15,422.05 WHEREAS, there exists a contract dated July 18, 1980 between the City of Miami and Williams Paving Co., Inc.; and WHEREAS, the work has been satisfactorily completed, and Williams Paving Co., Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City lllanager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW) THEREFORE, BE IT RESOLVED BY THE C011MISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Williams Paving Co., Inc. for RIVERVIEW STORM SEWER PROJECT - PHASE II at a total cost of $132,890.77 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $15,422.05 to Williams Paving Co., Inc. as full and final payment for all work performed and all materials furnished in connection with RIVERVIEW STORM SEWER PROJECT - PHASE II. PASSED AND ADOPTED this 11 day of FEBRUARY City Clerk PREPARED AND APPROVED BY: APP eputy City Attorney MAURICE A. FERRE M A Y 0 R , 1982. DAAS TO FORM AND CORRECTNESS: City Att r METING OF F E B 1 11982 82-1.4 r1ounu wa.................,... r- C:I—Y OF 111AMI. F LOR!DA 484 .,=M0RA 1G.J'*4 TO Howard V . Gary (•,TF January 19, 1982 B-5471 City ManaCD RIVERVIE 1 STORM SEWER PROJECT - •i'IlJECT. PHP.SE II - Resolution for Final Payment FROM Donald W. Cather FUPE"rE' (For Commission Meeting Director of lic Works of February 11, 1982) E 4 Z L 0 ES The Department of Public Works recommends the adoption of the resolution accepting the completed worlt and authorizing a final payment of $15,1122.05 to Williams Paving Co., Inc. for RIVERVIE;1 STORM SEWER PROJECT - PHASE II. Williams Paving Co., Inc. has completed the projectco- sisting of construction of 643 feet of covered ditchn 984 feet of 12" through 30" storm sewer pipe in the area bounded by S. 61. 3 Street, S. �11. 13 Avenue, Ilest Flagler Street, and S. W. 12 Avenue. The original contract amount was for $174,913.112, and the completed amount is $132,890.77. It was completed on time. It is now in order for the commission to accept the com- pleted work and authorize final payment, after all coedi- tions are met. co N c"` C— —� Z EL:hc rN solution attached -o r ' J 82-142 JOB NAME C014TRACTOR JOB SCOPE REAS014 FOR WORD: SOURCE OF FUNDS PROJECT HISTORY CONTRACT TIME STARTED CONTRACT TIME SCHEDULED COMPLETION DATE ACTUAL COPIPLETIO14 DATE BID AMOUNT CONTRACT FINAL COST FINAL CONSTRUCTI0r FACT SHEET FOR THE CITY MANAGER Riverview Storm Sevier Project - Phase II B-5471 Williams Paving Co., Inc. Construct 643 feet of 3' Aide covered ditch and 984' of 12" through 30" storm sewer pipe in the area bounded by S. W. 3 Street, S. W. 13 Avenue, West Flagler Street, and S. W. 12 Avenue. Eliminate drainage problems Storm Sewer General Obligation Bond Fund Bids Received: 5/28/80 Contract Awarded: 7/10/80 Preconstruction Meeting: 7/23/80 3/2/81 80 Calendar Days 5/20/81 5/14/81 $ 174,913.42 $ 132,890.77 *NOTE: Final payment delayed by the contractor's delay in providing as -built dray ink,: CURRENT ITE? FOR Resolution to accept completed word: and authorize CONISIDERATION final payment to the contractor. 82-142