Loading...
HomeMy WebLinkAboutR-82-0139- 1 :9 RESOLUTION I,10. A RESOLUTION ACCEPTING THE COMPLETED WORK OF D.M.P. CORPORATION FOR THE SOUTHERN DRAINAGE PROJECT E-51 AT A TOTAL COST OF $396,247.36; AUTHORIZING AN INCREASE I14 THE CONTRACT IN THE AMOUNT OF V176.34; AND AUTHORIZING A FINAL PAYMENT OF $23,131.08 WHEREAS, there exists a contract dated June 11, 1981 between the City of Miami and D.M.P. Corporation; and WHEREAS, the original contract was increased on October 7, 1981 by Resolution No. 81-898 in the amount of $40,000.00; and WHEREAS, the work has been satisfactorily completed, and D.M.P. Corporation has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection Faith the aforesaid contract; and WHEREAS, during; the construction, unforeseen soil conditions were encountered requiring repairs, resulting: in extra work. This extra work caused an overrun to the contract in the amount of $476.34; and WHEREAS, sufficient funds are available in the "Storm Sewer G.O. Bond Fund" to cover the increase in the contract; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by D.M.P. Corporation for the SOUTHERN DRAINAGE PROJECT E-51 is hereby accepted at a total cost of $396,247.36, which includes an increase of $476.34 in the contract, which is hereby authorized. Section 2. Sufficient funds are available in the "Storm Sewer G.O. Bond Fund" to cover the increase in the contract price. CITY COMMISSION MEETING OF FEB18 282Boom 1 3 .......».w............... Section 3. The proper officials of the City of Miami are hereby authorized to pay D.M.P. Corporation a balance of $23,131.08 as full and final payment for all work performed and all materials furnished in connection with the aforesaid contract. PASSED AND ADOPTED this 11 day of FEBRUARY , 1982. MAURICE A. FERRE M A Y O R ATTEST: Cit Clerk PREPARED AND APPROVED BY: Aw-A-ttorney APPROVED AS TO FORM AND CORRECTNESS: City ttorney ) -2- 82-139 FQZ ki �1 Howard V. Gary zr January 25, 1982 FILE B-5479 City Manager SOUTHERN DRAINAGE PROJECT E-51 �V"7J cG• Resol,_ltion for Increase in Contract and Final Payment (For Commission Meeting Donald W. Cather of February 11, 1982) Director of P�ubli` 10 r cs The Department of Public Works recommends the adoption of the resolution authorizing: an increase in the contract in the amount of $476.34 for the SOUTHERN DRAI:lit(IIE PROJECT E-51, accenting the completed work performed by D.i•i.P. Corporaticn at a total cost of $396,2117.36, and authorizing a final payment of $23,131.08. D."•I.P. Corporation has completed. the project consl&tin of the construction of 37 drainage structures in the area bounded by S. W. 8 Street, N. Prospect Drive, Bisca;,�ne Ray, and the west City liTnits. The original contract amount was $355,771.02, an;;', i•aaa increased by Resoluticn Igo. 81-898 in the amount of $40,000.00. During- con- structi.on, ;re encountered unforeseen soil conditioll.'72 regairin- repairs • ihi:-, r emir %,.,a5 necessary to the construction of thy? drainatstructure and resultedt in an overrun to the contract of $476. 34 , Su"Icie"" funds are available frori monies already allocated to the project. ` hio ,as a unit price: contract in the amount Of $395,771.02, but the completed contract amount is $396,247.36. It is now in order for the Commission to accept thy, com— pleted work and authorize final pnyin.,?nt, after all conditions are mot. ' N L�L . he l Resolution attach,,ed N 7 90 82-139 FINAL CONSTRUCTION FACT SHEET FOR THE CITY I1ANAGER JOB NAIT, Southern Drainage Project E-51 B-5479 CONTRACTOR D.IM.P. Corporation JOB SCOPE Construct 37 drainage structures in the area bounded by S. W. 8 Street, N. Prospect Drive, Biscayne Bay, and the Westerly City Limits. REASON FOR WORK SOURCE OF FUNDS PROJECT HISTORY CONTRACT TI;^,E STARTED CONTRACT = SCHEDULED COI,"PLETiON DATE ACTUAL COMPLETIO;? DATE BID AIi'OU;IT Eliminate drainage problems at locations of greatest need. Storm Sewer G. 0. Bond Fund Bids Received: 5/26/81 Contract Awarded: 6/8/81 Preconstruction I,Teetin�: 6/24/81 7/27/81 150 working; days 3/5/82 $ 395,771.02 CONTRACT FINAL COST $ 396.1247.36 CURRENT Resolution to accept completed w orl., increase contract ITEM FOR amount :1476.314, and authorise final payment to the COI.ISIDERATTOII contractor. 82-139