HomeMy WebLinkAboutR-82-0214R RESOLUTION NO. 8 2- 2 1 4 A RESOLUTION ACCEPTING THE COMPLETED WORK OF MIRI CONSTRUCTION, INC. AT A TOTAL COST OF $1,132,093.83 FOR WEST TRAILVIEW HIGHWAY IMPROVEMENT IN WEST TRAILVIEW HIGHWAY IMPROVEME14T DISTRICT H-4447; AND AUTHORIZ- ING A FINAL PAYMENT OF $110,264.10 WHEREAS, there exists a contract dated April 22, 1980 between the City of Miami and Miri Construction, Inc.; and WHEREAS, the original contract was increased on October 7, 1981 by Resolution No. 81-899 in an amount not to exceed $40,000.00; and WHEREAS, the work has been satisfactorily completed, and Miri Construction, Inc. has furnished the required documents certifying; that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA. Section 1. The completed work performed by Miri Construction, Inc. for WEST TRAILVIEW HIGHWAY IMPROVEMENT in WEST TRAILVIEW HIGHWAY IMPROVEMENT DISTRICT H-4447 at a total cost of $1,132,093.83 is hereby approved. Section 2. The proper officials of the City of Miami are herewith authorized to pay $110,264.10 to Miri Construction, Inc. as full and final payment for all work performed and all materials furnished in connection with WEST TRAILVIEW HIGHWAY IMPROVEMENT in 14EST TRAILVIEW HIGHWAY IMPROVEMENT DISTRICT H-4447. CITY COMMISSION MEETING OF MAR 11 1982 �/�y u�Ay 8 2 - 2 1 Kn "�•. N.f.Nf..FNww... ^'0m, .......fN.MNM..►..M�.M PASSED AND ADOPTED this 11 day of MARCH , 1982. MAURICE A. FERRE PSI A Y 0 R ATTEST: Cit Clerk — PREPARED AND APPROVED BY: Deputy City Attorney APPROVED AS TO FOR',! AND CORRECTNESS: t � - Ci Attor ey - j - 2 - 82-214 1 ION c,T•( tzar-tt. '"U RICA TC. Howard V. Gary _.> Februar;: 22, 1982 -�,.�. B-4447 City Manager WEST TRAILVIEW HIGHWAY IMPRO`JE;1Eiff - Resolution for Final Payment =�oM Donald ;d. Cather .„ «-,_ :.t , r �,� Director of Tubla Works or Commission Meeting J-- of March 11, 1982) The Department of Public Works recommends the adoption of the resolution accepting; the completed cork and authorizing a final payment of $110,264.10 to Mir.-1- Construc- tion, Inc. for WEST TftnIL`.'IEW HIGH`, -"AY IMPROVEMENT in WEST TRAILVIE•t•i ?TG::':iA`i IMPROVEMENT DISTRICT H-4447. Miri Construction, Inc. has completed the project consisting; of the construction of 2.2 miles of street, includin, clearing and gradin ;, asphaltic pavement:, concrete curbs and/or F;utters, side - Walk, drainage, sanitary se;•;er replacement-, paint striping,, and landscaping. The project is located in the area bounded by S. 8-13 Streets bet:•reer. S. W. 8-12 Avenues. Durin,, construction of the project, we encountered more darr:a�,ed side,aall{ in need of replacement and some drainage problems, v;hich required an increase in the contract amount. An increase in the contract not to exceed �40,000.00 ;:as authorized by Commission Resolution No. 81-899 on October 7, 1981. This ryas a unit price contract in the amount of $1,160,296.73, including the $40,000.00 increase in contract amount. However, total payments to the contractor :rill be less than the increased contract amount. The actual construction cost is $1,132,093.83, and the work was completed on time. At the Commission meetinr* of dovember 12, 1981, Resolution NO. 81-974 passed, directinc, the City Clerk to publish a notice of Public Hearin", on WEST TRAILVIE'% HTCHI•'A%- TMPROVEME'lT in the WEST TRAIL - VIEW HIGHWAY IMPROVEMENT DT"TRICT H-44117. It is now in order :'or the Commission to accent the completed :Mork and authori�:e final t'3';: 'nt, aftor all cond1tion3 are met. u : I1C �.t ,esolution atta.ch`d 82-214 FILIAL COTI TR''CTTON FACT SHE--" JOB I1Ar-"E West Trailvie i Highway Improvement B-4447 CONTRACTOR Miri Construction, Inc. JOB SCOPE Construct 2.2 miles of street including; clearing and grading, asphaltic pavement, concrete curbs and/or gutters, concrete side-vialk, drainage, sanitary sewer replacement, paint striping and landscaping in an area bounded by S. W. 8-13 Streets between S.W. 8-12 Avenues. REASOIN Streets out of grade or off center with side parkways FOR WORK deteriorated because of extensive en -street parking. SOURCE Highway G. 0. Bond Funds OF'FUNDS Storm Sewer G. 0. Bond Funds PROJECT Bids Received: 2/28/80 HISTORY Contract Awarded: 4/10/80 Preconstruction Meeting: 4/21/80 CONTRACT TI"",E STARTED 8/12/80 CONTRACT TIME 200 �vorl:ing days Plus 34 days delay from rain and 3, days delay from utili., companies relocation wor.c SCHEDULED COI-IPLETIOId DATE 9/4/81 ACTUAL COMPLETION DATE BID AMOU:?T CONTRACT FINAL COST CURRENT ITEM FOR CONSIDERATION 9/4/81 $ 1,160,296.73 - (includes $40,000 increase in contract authorized by Comm. Reso. 81-899 dated Oct. 7, 1981) $ 1�l3.21093,83 Resolution to accept completed ;:orl: and authorize final payment to the contractor. 82-214