Loading...
HomeMy WebLinkAboutR-82-0263RESOLUTION 140. 8 2- 2 6 3 A RESOLUTION ACCEPTING THE COMPLETED WORK OF SUNSET ENTERPRISES, INC. AT A TOTAL COST OF $39,478 FOR BELLE MEADE ISLAND BRIDGE P40DIFICATIONS - 1981; AND AUTHORIZING A FINAL PAYMENT OF $4,495. WHEREAS, there exists a contract dated August 10, 1981 between the City of Miami and Sunset Enterprises, Inc.; and WHEREAS, the work has been satisfactorily completed, and Sunset Enterprises, Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; 14014, THEREFORE, BE IT RESOLVED BY THE C0I4MISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Sunset Enterprises, Inc. for BELLE MEADE ISLAND BRIDGE MODIFICATIONS - 1981 at a total cost of $39,478 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $4,495 to Sunset Enterprises, Inc. as full and final payment for all work performed and all materials furnished in connection with BELLE MEADE ISLAND BRIDGE MODIFICATIONS - 1981. PASSED AND ADOPTED this 16 day of MARCH , 1982. ATTEST: eREP ClerkARED AND APPROVED BY: APPRO A-OL .�. &M Deputy City Attorney MAURICE A. FERRE M A Y 0 R AS TO 'FORM AND CORRECTNESS: y AttzSP►— CITY )COMMISSION MEETING OF MAR t 6 1982 82-26 ItMOT101t NO..... r i ._,r•r '.lta,Mt, rLcz10., 52 Howard V. Gary February 19, 1982 -•L4 B-2830 City ^rIanacer BELLE '-IEADE ISLAND BRIDGE NODIFICA.1=71S - 1981 - Resolution for Final Payment Donald W. Cathe (For Commission Meeting ector� Works of Narch 11, 1982) The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizinc a final payment of $4,495 to Sunset Enterprises, Inc. for BELLE MEADS I5LAND BRIDGE MODIFICATIONS - 1931. Sunset Enterprises, Inc. has completed the project consisting of making repairs to 16 existing pile; and replacing selected wood decking on an existing; wood trestle bridge to the Island, located at N. E. 9 Avenue and N. E. 76 Street. The original _ contract amount was for $40,752, a unit price contract with one lump sum item, includin, a $5,000 cash allowance for special items. The completed a::nount is $39,473. It was completed on time. It is now in order for the Corutiission to acce t the completed work and authorize final payment, after all conditions are met. L:hc ir4C solution attached 82-263 FI'll AL CONSTRUCTION FACT SHEET FOR THE CITY 'LlAI AGF.R JOB NAME Belle Meade Island Bridge Modifications - 1981 B-2830 CONTRACTOR Sunset Enterprises, Inc. JOB SCOPE Make pile repairs and replace selected rood decking on an existing wood trestle brad-e to Belle Meade Island located at 11. E. 76 Street and N. E. 9 Avenue. REASON FOR WORK Reolace deteriorated wood SOURCE OF FUNDS High,ra-; General Obligation 3onds PROJECT Bids Received: 7/13/81 HISTORY Contract Awarded: 7/23/81 Preconstruction I"eeting: 9/24/81 CONTRACT T I ME STARTED 10/13/81 CONTRACT TIIiG 45 Working days plus 14 da,s delay due to tides. SCHEDULED CO'1PLETT0j DATE 1/8/82 ACTUAL, COMPLETION DATE BID AMOUI1T CONTRACT FINAL COST CURRENT ITEIM FOR CONSIDERATION 1/8/82 $ 40,752.00 $ 39,478.00 Resolution to accept completed work and authorize final payment to the contractor 82-263