Loading...
HomeMy WebLinkAboutR-82-0251RESOLUTION NO. 8 2 2 5 1 A RESOLUTION AUTHORIZING THE CITY MANAGER TO INCREASE h THE TURNKEY CONTRACT BETWEEN THE CITY OF MIAMI AND MIAMI CENTER ASSOCIATES, INC., FOR THE CONVENTION CENTER PARKING GARAGE IN THE AMOUNT OF $127,660, IN ACCORDANCE WITH THE PROVISIONS OF THE CONTRACT, FUNDS THEREFOR TO BE EXPENDED FROM THE CITY OF MIAMI CONVENTION CENTER AND PARKING GARAGE REVENUE BONDS. a I i i WHEREAS, there exists a Turnkey Contract between the City ?� of Miami and Miami Center Associates, Inc., dated May 20, 1980, _f for the building of a parking garage of at least 1,450 spaces for I a cost not to exceed $15,000,000 and providing for appropriate cost safeguards, and WHEREAS, the City Commission, on November 26, 1980, authorized an increase in the scope of the Turnkey Contract in the amount of $4,800,000, with the requirement said funds be provided by Dade Savings and Loan and deposited with the Pan American Bank, in accordance with the applicable Trust Indenture provision and that the basic provisions of the Turnkey Contract remain the same, and WHEREAS, the contract provides such a safeguard in that if unforeseen and abnormal subsoil conditions that could not have been anticipated through adequate and sound test borings and subsurface engineering were encountered, Miami Center Associates, Inc. would be entitled to an adjustment in contract, said adjustment requiring Commission approval, and WHEREAS, the contractor has provided documentation that such abnormal subsoil conditions were encountered and the anticipated number of piles required for the foundation was increased from 1,500 to 1,629, and WHEREAS, the Project Director and the consultants recommend approval of the request for the increase in contract, and WHEREAS, funds for the increase are available from Convention Center and Parking Garage Revenue Bond funds; CITY COMMISSION MEETING OF MAR 1 6 1982 1 4t 4k 1 NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The City Manager is hereby authorized to issue a Change Order to the Turnkey Contract between the City of Miami and Miami Center Associates, Inc., for the Convention Center 7�f `i Parking Garage in the amount of $127,660, said funds for the increase to be provided from Convention Center and Parking Garage } Revenue Bonds. PASSED AND ADOPTED this 16 day of _ MARCH , 1982. ATTEST: PREPARED BY: el • DEPUTY CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: MAURICE A. FERRE MAURICE A. FERRE, MAYOR _2_ 82-251 ---- - ---- - '82 Ft�`h A4 To Howard V . a Mar FROM 11' Ln I. oms Project Director J.L. Knight International F I L.= • Ablruary 24, 1982 S'HJF-rr Proposed Resolution to increase Turnkey Contract for Convention Center Center Parking Garage in the amount of $127,660. Commission Meeting of 3-11-82 A Resolution authorizing the City Manaaer to increase the Turnkey Contract for the Convention Center Parking Garage between the City of Miami and Miami Center Associates, Inc. in the amount of $127,660, in accordance with the provisions of the contract, funds therefor to be expended from the City of Miami Convention Center and Parking Garage Revenue Bonds. On January 10, 1980, the City Commission by Resolution No. 80-21 authorized the City Manager to negotiate a contract with Miami Center Associates, Inc., for the turnkey design and construction of the Convention Center Parking Garage. On May 20, 1980, the City Manager negotiated such a contract with Miami Center Associates, Inc. in an amount not to exceed $15,000,000, with provisions for appropriate cost safeguards included. The Turnkey Contract made provisions for adjustment of the contract price to Miami Center Associates in the event that abnormal subsoil conditions so unusual that they could not have been anticipated through adequate and sound test borings and subsurface engineering were encountered, said adjustment(s) requiring approval of the Commission. Although on November 26, 1980, the City Commission authorized the City Manager, by Resolution No. 80-856, to increase scope of the Turnkey Contract in the amount of $4,800,000, with the requirement that said funds be provided by Dade Savings and Loan and deposited with the Pan American Bank in accordance with the applicable Trust Indenture provision, the basic provisions of the Agreement remained the same. During the construction of the foundation, subsoil conditions were encountered that required an increase in the piles required from 1,500 to 1,629. The increase in the number of piles was as directed by independent soil engineers and is considered to serve as documentation that abnormal subsoil conditions warranting adjustment of the contract price were encountered. The soil engineers, Langan Engineering Associates, Inc. have certified to this change in requirements. s2-251 Fr f ■ 0 Howard V. Gary - Page 2 February 24, 1982 The contractor has billed Miami Center Associates, Inc. for theLk extra work, and they, in turn, have requested an increase of $127,660 in their contract amount to cover the cost of the additional work. The architectural consultants have concurred with my recommendation for an approval of the increase. Funds for the increase in the contract amount are available from Convention Center and Parking Garage Revenue Bond funds. i AIP:bf cc: Vincent Grimm George Knox, Jr. 82-251