HomeMy WebLinkAboutR-82-0321RESOLUTION NO. S 2- 3 2 1
A RESOLUTION AUTHORIZING AN INCREASE IN AN
AMOUNT NOT TO EXCEED $12,000 IN THE CONTRACT
BETWEEN THE CITY OF MIAMI AND INTERCOUNTY
CONSTRUCTION CORPORATION FOR THE CONSTRUCTION
OF RIVERVIEW STORM SEWER PROJECT PHASE I
(2ND BIDDING) BID "B" (PUMP STATION) FOR THE
ADDITION OF DESIRABLE SOPHISTICATED FIRE CONTROL
EQUIPMENT AND OTHER MISCELLANEOUS WORK; SAID
FUNDS FOR THE INCREASE TO BE PROVIDED FROM UNUSED
BID ITEM MONIES AVAILABLE FROM BID "A" OF RIVERVIEW
STORM SEWER PROJECT PHASE I (2ND BIDDING).
WHEREAS, there exists a contract dated August 14, 1980
between the City of Miami and Intercounty Construction Cor-
poration in the amount of $2,146,000 for the construction of
Riverview Storm Sewer Project (2nd Bidding) Bid "B" (Pump
Station); and
WHEREAS, the addition of desirable sophisticated fire
control equipment and other miscellaneous work will cause an
overrun of approximately $12,000; and
WHEREAS, the City Manager and the Director of the Department
of Public Works recommend an increase in contract amount to cover
the additional work; and
WHEREAS, funds to cover the additional work are available
from unused bid item monies allocated to Bid "A" of the same
project;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA:
Section 1. An increase in an amount not to exceed $12,000
is hereby authorized in the contract between the City of Miami
and the Intercounty Construction Corporation for the construction
of Riverview Storm Sewer Project Phase I (2nd Bidding) Bid "B"
(Pump Station) for the addition of desirable sophisticated fire
control equipment and other miscellaneous work with funds there-
for to be provided from unused bid item monies previously alloca-
ted to Bid "A" of Riverview Storm Sewer Project Phase I (2nd
Bidding).
PASSED AND ADOPTED this first day of April , 1982.
Maurice A. Ferre
M A Y O R CITY COMMISSION '
MEETING OF
AL H G. ONGIE, CITY CLERK
'iFR 1 i9982
AMLUTION NO.8 2„ , 3 I
REMARK$:............................
PREPARED AND APPROVED BY:
ROBERT F. CLARK
DEPUTY CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
GE E F. KNOX, JR.
CI ATTORNEY
-2-
82-321
^N
36'-
_!7y OF
Howard V. Gary
City Manager
Donald W. Cather
Director.of blic Works
March 25, 1982
"'-` B-5441-B
RIVERVIEW STORM SEWER PROJECT
PHASE I, BID "B", PUMP STATION
Resolution for Increase in
_ Contract Amount
(For Commission
Resolution Meeting 4-1-82)
The Department of Public Works recommends the
adoption of a resolution authorizing an increase
in the contract between The City of Miami and
Intercounty Construction Corporation for the
construction of Riverview Storm Sewer Project,
Phase I, Bid "B", (Pump Station), in an amount
not to exceed $12,000; said funds for the
increase to come from unused bid item money of
Riverview Storm Sewer Project, Phase I, Bid "A"
- (Storm Sewers).
The addition of:
1. Louvers on the intake and exhaust vents and the supply
fan openings that will close automatically in the event
of a fire in the station.
2. Wiring and controls to shut down all electric pumps,
all pump engines, the generators and the supply fans
in the event of a fire.
3. Six additional fire detectors.
4. Reversing the flow of cooling air for pump engines and
generators to exhaust hot air out of the station.
5. A watertight alarm bell outside the building
as requested by the Fire Department, if done, will cause an over-
run of approximately $12,000 in the Pump Station portion (Bid B)
of the Riverview Storm Sewer Phase I project.
82-321
I-N
Howard V. Gary - 2 - March 25, 1982
We recommend doing the additional work and are requesting a
resolution authorizing an increase in contract of $121.000
to cover the work,
Bid "A", (Storm Sewers), of the same project is being done con-
currently by another contractor, and we have determined that
we will experience an underrun on the project that will more than
cover the overrun on Bid "B". We will request that unused funds
from the underrun on the Bid "A" project be used to fund the
increase in contract requested by the resolution.
LEL:vh
."�e
Resolution Attached
W 2-3w1