HomeMy WebLinkAboutR-82-0410RESOLUTION NO. 8 2- 4 1 U A RESOLUTION AUTHORIZING AN I;iCP.EASE IN COZITRACT AMOUNT NOT TO E'X=ED $113 , 100. , AND AUTHORIZING AN INCREASE IN THE CONSTRUCTION =IE OF 90 WORKING DAYS IN THE CONTRACT BETVTEEN THE. CITY OF iII:L'II, FLORIDA AND FIRST FLORIDA BUILDIN'G CORPORATION FOP. THE CONSTRUCTION OF FIRE -RESCUE TRAINING , Ci::ITI:R, SAID ��;i0U:1T FOI: THE IIiCRE::SE I`: CONTRACT TO B P1;OVIDED BY INCREASED API?F.OPI.I��TIOIiS TO THE PROJECT MADE BY ORDMANCE 140. 9395 PASSED APRIL 16, 1982 WHEREAS, there exists a contract dated April 29, 1981 bet�..een the City of Miami, Florida and First Florida Building Corporation in the amount of $1,818,000 for construction of t:,c: Fire -Rescue Tr.aini= Center, and WHEREAS, the Fire Dep_irtment has requested additional interior -codifications that vil._ allow for t:-,e expansion of rescue.training and physical fitness programms and for the re- finement of institutional office spaces, and t:THEREAS, the consultants on the project had prepared revised plans and specifications showing additional work and submitted them to the contractor for a price quotation for doing the work, and t•dHEREAS, the contractor has provided a lump sum. quotation for doing the work, in the amount of $113,100.,and [1IiEREAS, the contractor's quotation is conditional upon his additional 90 working days being added to the construc- tion time, and WHEREAS, the Departments of Public Works and Fire and the consultants have found the contractor's quotation for doing the work: and his request for an extension of construction time to be fair and reasonable, and WHEREAS, the Directors of the Departments of Public l orks and Fire rec:omri-Le �d C-An increase in contract amount neces- sary to cover the work, and an increase in contract time necessary for the contractor to do the work, and CJTf COMMIS3SI0d MEETING 00 MAY 118 2 _4 � gamma 14 ... ...»...., DI r 0 UTHEREAS, Ordinance No. 9395, passed April 16, 1982, amended the Capital Improvement Appropriations Ordinance for the fiscal year 1931-82, providing $125,000 additional funds to cover the cost of the additional work; NOW, THEREFORE, BE IT RESOLVED BY THE CO-eMISSION OF THE CITY OF ?IIAM, FLO:IDA: Section 1. The work under the contract between the City of Miami, Florida and First Fl;)rida Buildin- Corporation for tl-.e construction of Fire -Fescue Train- ng Censer is hereby increased in an amount not to e::ceed $11.3 ,1On, , with the fun, s for this increase to be provided entirely by an increase in the appropriations to the project -provided by Ordinance No. 9395, passed April 16, 1982. Section 2. The construction time for the above contract between the City of Miami, Florida and First Florida Building Corporation is hereby increased by 90 working days for Fire - Rescue Training; Center. PASSED AND ADOPTED this nth day of May , 1982. ATTEST: APPROVED AS TO FOR1•1 AND CORRECTNESS: ::2 JR. , CITY ATTO = Maurice A. Ferre M A Y O R - 2 - 82-410 i 101 Howard V. Gary May 5, 1982 B-2773 City Manager - ,.�,_ FIRE -RESCUE TRAINING CENTER Resolution for Increase in Contract Amount and Construction Time Donald W. Cather, Director Department of blic W rks 'of-May For Commission Meeting o f May 11, 19 8 2) The Departments of Public Works and Fire recommend the adoption of a resolution authorizing an increase in contract amount not to exceed $113,100 and an increase in construction time of 90 working days for FIRE -RESCUE TRAINING CENTER, said funds for the increase in contract amount to be provided by increased appropriations to the project made by Ordinance No. 9395 passed April 16, 1982. A contract dated April 29, 1981 exists between the City of Miami and First Florida Building Corporation for the construction of Fire -Rescue Training Center in the amount of $1,818,600. The Fire Department has requested additional interior modifications that will allow for the expansion of rescue training and physical fitness programs and for refinement of instructional office spaces. Attached to this memorandum is a supplement that will state in general terms the additional work to be done. Attached to it will be a detailed list of the work to be done, prepared by the Consultant, and the contractor's price quotation for this work. The Consultant, Tacquechel Associates, Inc., has prepared revised plans showing the additional work, submitted them to the contrac- tor and received a quotation of $113,100 for doing the work that the Public Works Department, the Fire Department, and the Consult- ant consider fair and reasonable. A condition of the contractor's quotation was that the construction time granted by the contract would be increased by 90 working days to allow time for him to do the work and to compensate him for delays already caused by the proposed work. The Departments of Public Works and Fire and the Consultant consider the contractor's request fair and reasonable. The cost of the work will exceed the remaining Provision for Special Items in the Contract and an increase in contract amount will be required to do the work. Ordinance No. 9395, passed April 16, 1982, amended the City Capital Improvement Appropriations Ordinance for fiscal year 1981-82 and provided $125,000 to cover the cost of the additional work. A/EL:vh - Resolution Attached 82-110 FIRE -RESCUE TRAINING CENTER - B-2773 SUPPLEMENT TO MEMORANDUM ACCOMPANYING RESOLUTION FOR INCREASE IN CONTRACT AMOUNT AND CONSTRUCTION TIME (For Commission Meeting May 11, 1982) The additional work to be covered by the increase in contract amount is as follows: GROUND FLOOR: 1. A hose rack will be added in the Apparatus Room. 2. A new storage closet will be provided in the Work Shop. 3. Gunite will be added to the walls of the Rescue Training Pool. Stucco will be added to the walls above the training pool at the viewing deck and to three walls of the racketball area. 4. The fire rated drywall ceiling above the pool area will be changed to fire rated acoustical tile. 5. Improvements will be made in the rescue pool lighting system. 6. Additional spare conduits will be added for future use. 7. A new 75 KVA panel will be provided in the Switch Gear Room. MEZZANINE: 1. A new mezzanine will be built over the auditorium/classroom area which will provide 1200± additional sq.ft. of usable floor space. SECOND FLOOR: 1. Revisions will be made to the rescue pool ladders and swim -out deck. 2. A special outlet will be provided at the rescue pool ceiling for special TV lighting. 82-41U THIRD FLOOR: 1. There will be a rearrangement of office and lounge areas. 2. Fire rated drywall over the office areas will be changed to acoustical tile. 3. A new folding partition will be added. 4. An additional 363 sq.ft. of carpet will be added. 5. Plumbing and air conditioning changes will be made. 6. Lighting fixtures and outlets will be rearranged. 7. Two spare conduits will be installed for later use from the museum and auditorium/classroom areas to TV Control on the Fifth Floor. FOURTH FLOOR: 1. Fire rated drywall over classrooms and simulator area will be changed to fire rated acoustical tile. 2. Three additional spare conduits will be provided from the classrooms to TV Control at the Fifth Floor. FIFTH FLOOR: 1. There will be a rearrangement of the storage areas, office areas, and offices. 2. A new classroom will be provided. 3. A new 8' wide movie screen in the rescue stations and a 10' wide screen in the new classroom will be provided. 4. A new TV producer's office will be provided. 5. An additional 563 sq. ft. of new carpet will be provided. 6. Additional plumbing* will be provided and revisions to the specified plumbing will be made. 7. An air cascade and suction system will be provided in the rescue stations. 8. A new air conditioning system will be provided for the TV producer's office. 8w 4 10 FIRE -RESCUE TRAINING CENTER A. TAGUISCHEL ASSOC., INC.3425 Jefferson street LOIN Coconut Grove, �4iami, Fla. 23 rALWHIASAVENlit C(MArJ 6A LbFF FIA 33134 TEL�4a59 82. B-2773 Contractor: First Florida Building Corp, 3 u5. L-rovide ;lew outlets in corridor area. ou. :rovide ." (3m_)ty coriduit in rescue �3Lt.Liu.is rc„a east I..all to crest wali. 67. . rovide =." um)t%r conduit in new claasrov,l zo:.l e.-:st wall to west wall. b8- .rovide two 2 ° a-ipty co,iduit; Prow rescue; :;t;CtiollS alit: new classroom to vV co_]trol room. 69. ..-rovide new outlets ill llew classroolil. 70. i-rovide new outlets in ' V,iroducer oL:-:ice at1C gra_.hic art3 office. Si::thr'loor: 71. rrovide new office and training room. 72. i-rovide new storage closet. 73. Relocate maze. 74. change waterproof drywall in toilet wet Fxeas ::or lath and plaster. 75. Aevision of hardware schedt"e for all si;:tn Moor doors. 76. rrovide 1,716 sr. rt. of new'car?et in area. 77. ;?rovide -9a s;.I. it. of neiq carpet i;i trai,iinr.1 of�ice. 78. rrovide new .packaged air couuitioninc_, uai - in trailing office. 79. -nstall all lighting fixtures in gird area ac 15' a..ove finish floor. 80. Grnit lighting fi::tures over ;,laze. 81. rovide .lets lighting fi;:tures in trai:iix... o�l:ace. 62. unlit one s-.)eaker over maze. 83 s. rrovide ooze 211 empty conduit i-ro.,l o.: ]Lcf:., 'Co TV control roo;n at fifth floor. 84. :rovide I" e:aaty conduit rro.,i traini.ig o.: rice to tole_phone gear room at around floor. L.1.) SIXTH FLOOR: 1. A new office and training room will be provided. 2. A new storage closet will be provided. 3. The maze will be relocated. 4. An additional 2024 sq. ft. of new carpet will be installed. 5. A new packaged air system for the training office will be provided. 6. A spare conduit to the TV Control at the Fifth Floor will be provided. GENERAL: The hardware for the entire building will be changed to provide a better class of hardware, and additional accessories -type hardware, such as kick plates and push plates, will be provided where they were not originally specified. Attached to this is a detailed description of the work. 82-410 Q FIRE —RESCUE TRAIVIN :r24TER A. -rAQU WF_L ASSOC., INC:. 3425 Jefferson street Coconut Grove, Aiami Fla, ARCHITECTS ENGINEERS PLANNERS 23 ALMERIA AVENIIE CORAI GABI ES FLA 33134 TEL 445-968> B-2773 Contractor: First Florida Buildina Corn. ADDITIO.4,hL 40A& A"UU,sSTc;i) BY FiAE 1).�PiuZTj.s 1i :iflo,PIN U 1 'e,'VISED - 0lUCI JG L1tr.�:i.dGS, Lti'1'.:L ,iiuiCri 2, 1982, REVIoi:U 1 7=3 Ground Floor: 1. .4ew hose rack in apparatus room. 2. .dew storage closet in workshop. 3. Jew gunite for three walls of rescue training pool, from floor to wood deck. 4. Aew stucco for three walls of rescue training pool, from wood deck to ceiling. 5. .Jew stucco for two walls of viewing deck. 6. :Jew stucco for three walls of racketuall area. 7. Change fire rated drywall at ceiling of racketb-all area, viewing area and rescue training pool for fire rated acoustical tile. 6. rrovide 21Istainless steel U tolts at to;) and bottom of each under- water view ports and three U bolts 7' ai.,ove wood deck in rescue training pool area. 9. Changing of door it 1 from flush wood aoora to glass and aluminum doors. 10. Revision of hardware schedule for all ground floor doors. 11. Install new air cascade system in apparatus room. 12. Omit lighting fixtures under wood deck at rescue training pool. 13. rrovide new lighting fixture and switch at storage room in workshop. 14. Provide new hydrophone station and 3/4" conduit from station to two locations in rescue training pool. 15. rrovide 2" empty conduit from under the stairs to top of rescue training pool, and provide disconnect switch for air compressor under the stairs. 16. Provide two 2" empty conduits from view area to 'TV control room at fifth floor. 17. rrovide new 75 KVA panel in switchgear room. Second Floor: IS. Umit 10' pool ladder and install new 6' nool ladi'c:r at water level deck in rescma training pool. 19. rrovide 10' long removable railing at wood deck, in rescue training pool, across from door ;f27. 20. Kevision of hardware schedule for all second floor doors. 21. erovide special outlet a� 1:eiling or rescue training pool for special TV lighting. 'ihird Floor: 22, Rearrange office area. 23. Umit fire rated drywall over office area and install fire rated acoustical tile. 24. Relocate lounge area. 25. Omit grille block in new longe area and install new glass and aluminum windows. FIRE -RESCUE TRAINIIJGZNTER A. TACiiU GiHEL ASSOC:., INC. 3425 Jefferson Street Coconut Grove, a am Fla. '3 Al T1-MA k NhINF L S PLANNERS MFNIavFN��F �:�)F7At i�4HI 5 Ft 33134 TEl 445 36V B-2773 Contractor: First Florida Building Corp. 2 26. ,rovide new folding partition in front of lounge area. 27. Revision of hardware schedule for all third floor doors. 28. rrovide 363 sq, ftl, of new carpet in ot.Zicc area. 29. :=rovide new mezzanine over auditoriums/classroom area. 33. , rovide new dishwasher in lounge area. 31. Relocate plumbing for lounge. area and add _)1im1iAnrj for new dishwas' 32. Rework air conditioning in office area. 3:S. Rework air conditioning in new ►nezza;ii,i..D acid auditorium/classroom area. 34. Rearrange lighting fixtures in office area. 35. Aearrange lighting fixtures in new area. 36. Rearrange lighting fixtures in new lounge aruil. 37. Ltearraage outlets in office area. 3c3. Rearrange outlets in lounge area. 39. rrovide new outlets in inezz,anine. 40. krovide two 2" atipty conduits from imiseu,n and auditorium/classroom to 't'V control rooi;i at fifth floor. Fouth Floor: 41. Revision of hardware schedule for all :ouch floor doors. 42. Omit fire rated drywall Lrori classroo;as a:iu si;,iulazor area and install new fire rated acoustical tiles. 43. erovide three 2 " e moty conduits fro1,1 cl to TV control roora at fifth floor. Fifth floor: 44. rrovide new storage area in rescue stations. 45. L-rovide new shelving and storage caLinct with dou::le sink in storage and maintenance area. 46. rrovide new shelving in rescue station. 47. Wit storage closets in corridor. 46. umit fire rated drywall over rescue stations and TV studio and install fire rated acoustical tiles. 49. i-rovide new classroom. 50. rrovide new 81 wide movie screen in rescue stations and 10' wide movie screen in new classroom. 51. rroviue new TV producer office. 52. .-relocate graphic arts office. 53. ;rrovide 80 scl. ft, of new carpet in rescue, and corridor area. 54. L-rovide 312 sal. ft. of new carpet in new classroom. 55. erovide 171 sq. ft. of new carpet in new '1'V ;:)roducer office. 56. Revision of hardware schedule for all firth floor doors. 57. rrovide plumbing for double sink in storage and maintenance area. 5b. erovide air cascade and suction system in rescue stations. 5:j. •rovide oxigen cascade system in corridor area. 60. Relocate sin): and trap priiaing system in Iraphic arts office. 61. Install new packaged air conditioning unit for TV producer office and graphic arts office. 62. Rearrange lighting fixtures in corridor area. 63. -rovide aew lighting fixtures in new classroom. t+4. erovide new lighting fixtures in TV producer office and graphic arts office. 82-1110 FLORIDA 3900 SOUTHWEST 73Ro STREET • P.O. BOX 430990 • MIAMI. FLORIDA 33143 • TELEPHONE 668•tt46 • AREA CODE 309 April 29, 1982 Cite of Miami Department of Public Works Construction -Division Mr. Luther Long Page 2 It is understood that the gunniting of the pool walls was estimated to be a thickness of three inches for a total cost of $5,940.00, however the Architect feels that a one inch minimum coverage will be adequate to prevent any corrosion to bleed through the walls at a later date. In speaking with the gunnite contrac- tor he felt that the savings between an inch to three inches would be negligible, reason being that the biggest expenditure he has is the setting up and tearing down of his equipment. The subcontractor also mentioned that due to the irregu- larity of the surface of the swimming pool walls he was not sure that one inch would be adequate coverage. In all probability the minimum should be maybe an inch and a half for adequate coverage. Once the subcontractor is ready to commence working we will notify_ the Architect so he can be present in order for all of us to dot=rmine what the proper thickness should be. It is understood that a credit will be issued once the final thickness of the pool wall is determined. Be advised that not included in this Change Order are the ceramic the and the general conditions which we have requested in our letter to you dated April 2, 1982. General conditions on a job of this nature are customarily requested when the job has been shut down and our personel has been kept on the payroll indefin- ately until such time as the customer, in this case the Miami Fire Department decides how they want to proceed with their proposed changes. Once again I would like to direct your attention to our letter to you dated April 2, 1982 where by we respectively request $10,000.00 in general conditions for an exact period of thirty days of not being able to accomplish any work in the building due to the proposed changes by the Fire Department. In the event that another thirty days are required to finalize the decisions of the proposed changes by the Fire Department, an.additional $10,000.00 will be charged for each thirty days that we are not able to accomplish any work in the building. Thanking you in advance for your usual cooperation. spectively remain, BUILDING CORPORATION M e Murciano cc: A. Taquechel ject Manager Steven L. Torrance Bill Rose MM/bs Andy Mirowitz Cindy Mead File FIRS 1 _I FLORIDA 8900 SOUTHWEST 730to STREET • P.O. BOX 430990 • MIAM1. FLORIDA 33143 • TELEPMONE 6E9•1146 • AREA CODE SOS April 29, 1982 City of Miami Department of Public Works Construction Division 275 N.W. 2 Street Miami, FL 33128 ATTN: Mr. Luther Long RE: Fire Rescue Training Center r2086 - Proposed Chances Dear Pete: On April 14, 1982 a meeting aas held in Taquechel's office at which time the cost for the proposed changes was discussed. The followinq exclusions were approved by Mr. McLean and Mr. Taquechel. Biscayne Electric A. Credit for lobby light fixtures on the third floor shown on sheet E-4 B. Credit for 751VA transformer, breaker and wiring on the ground floor plan shown on sheet E-6. The piping work remains in the price. C. Movement of panel as shown on sheet E-6. TOTAL Mado Plumbing A. Substitution of vacuum pump (Dentist vacuum pump) B. Substitution of priming floor drains C. Omission of the air piping system TOTAL Dixie Metal Products A. Omission of subframing for proposed folding partition. B. Eleminate roof railing. C. Eleminate perimeter roof angle. D. Cost of econo-rack hose rack. Modern Folding Partitions A. Provide folding partition with the same apperance as specified however, it is not as soundproofed as the one that is specified. (continued) $220.00 2,700.00 415.00 $3,335.00 $2,000.00 800.00 4,400.00 $7,200.00 $2,700.00 1,700.00 3,300.00 2,500.00 $10,200.00 ($3,495.00) 82-4 10 C FIRS FLORIDA 5900 SOUTHWEST 73no STREET • P.O. BOX 430990 • MIAM1. FLORIOA 33t43 • TELEPHONE ESS•1144 • AREA CODE 309 Fira Rescue 'rraining Center F.F.B.C. 42086 Rev. No. 3 April 29, 1982 Biscayne Electric $9,557.00 Mado Plumbing 9,960.00 Mesa Brothers 4,370.00 Dixie :fetal Products 26,036.00 Masonry 550.00 Consolidated Bldg. Products 4,435.00 Cynamon Brothers 3,371.00 Phil Kaplan 9,208.00 Hurricane Glass 10,244.00 Modern Fold 8,720.00 Regal Wood Cabinet 990.00 Dishwasher 343.00 Movie Screen 1 ,a 8' & 1 @ 10' 515.00 Black Board 3 @ 10' & 1 a 14' 845.00 Stucco Raquet Ball Court & Viewing Area 2,420.00 Lath & Plaster on Shower Walls on 6th Floor Bathrooms 1,250.00 Hardware Installation 3,650.00 Gunite Pool Wall (3) 5,940.00 Carpeting Allowance 5,216.00 F.F.B.C. 4,290.00 Clean-up 550.00 Subtotal 112,460.00 Credit C.O. 1#2 Item #3 (15,104.00) 97,356.00 15% overhead & profit 14,603.40 111,959.40 Performance Bond 1,119.60 TOTAL $113.079.00 e g2-410