HomeMy WebLinkAboutR-82-0406RESOLUTION NO. 8 2- 4 0 6 A RESOLUTION ACCEPTING THE COMPLETED WORK PERFOP14ED BY P.N.M. CORPORATION AT A TOTAL COST OF $176,156.00; ASSESSING $1,200.00 AS LIQUIDATED DAMAGES FOR 15 DAYS OVERRUN OF CONTRACT TIME; AND AUTHORIZING A FINAL PAYMENT OF $14,723.92 FOR CENTRAL DRAINAGE PROJECT L-49 WHEREAS, there exists a contract dated Decem- ber 10, 1980 between the City of Miami and P,N.M. Corporation; and WHEREAS, the work has been satisfactorily completed, and P.N.M. Corporation has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, liquidated damages for 15 days overrun a� of contract time should be deducted from the final payment = due the contractor; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted E and final payment made to the contractor; A i NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by P.N.M. Corporation for CENTRAL DRAINAGE PROJECT E-49, at a total cost of $176,156.00, is hereby approved. Section 2. That liquidated damages in the amount of $1,200.00 for 15 days overrun of contract time shall be deducted from the balance due the contractor. Section 3. The proper officials of the City of Miami are hereby authorized to pay P.N.M. Corporation, after all adjustments are made, a balance of $14,723.92 as full and final payment for all work performed and all materials furnished in connection with CENTRAL DRAINAGE PROJECT E-49. Is MEETN6 OF. MAY 1 1 1982 oumai W 8 2 CITY OF MIAMI, FLOO110A \ 114 INTER -OFFICE MEMORANDUM To. Howard V. Gary DATE: April 23, 1982 B-5472 City Manager SUBJECT: CENTRAL DRAINAGE PROJECT E-49 - — Resolution assessing liquidated damages and authorizing final FROM: Donald W. Cather REFERENCES: payment Director/of/ Publ' orks � �! /1 ENCLOSURES: (For Commission Meeting r. of May 1982) The Department of Public Works recommends the adoption of a resolution accepting the completed work performed by P.N.M. Corporation, at a total cost of $176,156.00; assessing $1,200.00 as liquidated damages for overrun of contract time; and author- izing a final payment of $14,723.92 for CENTRAL DRAINAGE PROJECT E-49. P.N.M. Corporation has completed the project consisting of constructing 16 drainage structures at locations of greatest need in an area bounded by N. 36 Street to S. 8 Street between Biscayne Bay and 14. 27 Avenue, with three locations outside this area. This project was a typical drainage project. Even though the contractor has been granted delays for rain, utility conflicts, and an extra drainage location, he was unable to complete the project within the adjusted contract time. This was a unit price contract in the amount of $185,501.00, but the completed contract amount is $176,156.00, less $1,200.00 as liquidated damages for 15 days overrun of contract. It is now in order for the Commission to accept the completed 4 work and authorize final payment, after all conditions are met. N n he esolution attached co F+ 82 - 106 FINAL CONSTRUCTION FACT SHEET FOR E CITY MANAGER JOB NAME Central Drainage Project E-49 B-5472 CONTRACTOR P.N.M. Corporation JOB SCOPE Construct drainage structures at 16 locations in the _ area bounded by N. 36 Street, S. 8 Street, W. 27 Avenue E. Biscayne Bay, with 3 locations outside this area. REASON Eliminate drainage problems at locations of greatest FOR WORK need. SOURCE OF FUNDS Storm Sewer G. 0. Bond Fund PROJECT Bids Received: 11/12/80 HISTORY Contract Awarded: 11/26/80 , Preconstruction Meeting: 12/8/80 CONTRACT _ TIME STARTED 2/23/81 CONTRACT 90 Working days plus 13 days delay from rain - - T ME and 20 days delay from utility conflicts and 20 days for extra drainage location — -3'3—days total delay SCHEDULED COMPLETION DATE 9/14/81 ACTUAL - COMPLETION 9/29/81 (15 calendar days overrun of contract time DATE at $80.00 per calendar day =$1,200.00) BID AMOUNT $ 185,501.00 CONTRACT FINAL COST $ 176,156.00 (less $1,200.00 liquidated damages) CURRENT ITEM FOR Resolution to accept completed work, assess $1,200.00 CONSIDERATION liquidated damages, and authorize final payment to the contractor. 82 - 4 06 PACCFn AMn Ann,,.n.,.