HomeMy WebLinkAboutR-82-0553RESOLUTION NO. J a�y3 A RESOLUTION ACCEPTING THE COMPLETED WORK OF 11IRI CONSTRUCTION, INC. AT A TOTAL COST OF $435,382.98 FOR LAWRENCE STORM SE14ER PROJECT - PHASE 1 ; AND AUTHORIZING A FINAL PAYMENT OF $47,808.15 WHEREAS, there exists a contract dated April 15, 1981 between the City of Miami and Miri Construction, Inc; and WHEREAS, the work has been satisfactorily completed, and Miri Construction has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final piy-.gent made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI , FLORIDA: Section 1. The completed work performed by 14iri Construction, Inc. for LAWRENCE STORM SEVIER PROJECT - PHASE I at a total cost of $435,382.98 is hereby approved. Section 2. The proper officials of the City of 'Miami are hereby authorized to pay $47,808.15 to Miri Construction as full and final payment for all work performed and all materials furnished in connection with LAWRE14CE STOR14 SEWER PROJECT - PHASE I. PASSED AND ADOPTED this 17 day of June , 1982. Maurice A. Ferre T: 11AY0R liq�t—y Zl er PREPARED AND APPROVED BY: APPROVED AS TO FORM AND CORRECTNESS: /' �'; , "y / - &"' r Ic Deputy ity Attorney ty At MEETING OF. lgg� M30U ON Na.................... CITY OF MIAMI• FLORIDA 71; INTER. -OFFICE MEMORANDUM To Howard V. Gary ot•TE June 2, 1982 B-546E City Manager s. e �E_ LAWRENCE STORM SEWER PROJECT PHASE I Resolution for Final Payment fR' Donald W. Cather, Director REFERENCES eP tment Pu o s (For Commission Meeting f f:CIC=JPfS of June 17, 1982) The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $47,808.15 to Miri Construction, Inc. for LAWRENCE STORM SEWER PROJECT - PHASE I. Miri Construction, inc. has completed the project consisting of the construction of 3262 feet of 3' wide covered ditch and 1844 feet of 24" French drain including pipe, manholes and catch basins in the area bounded by S. W. 12-17 Avenues between West Flagler Street and S. W. 10 Street. The original contract amount was for $451,205.00, and the completed amount is $435,382.98. It was completed on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. EP:nh Resolution attached _ 82-5►5�'' FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME Lawrence Storm Sewer Project - Phase I - B;5466 CONTRACTOR Miri Construction, Inc. JOB SCOPE Construct 3262 feet of 3' wide covered ditch and 1844 feet of 24" French drain including pipe, manholes and catch basins in the area bounded by S. W. 12-17 Aves. between 6-lest Flagler Street and S. W. 10 Street. REASON FOR WORK Eliminate drainage problems. SOURCE OF FUNDS Storm Sewer General Obligation Bond Fund PROJECT Bids Received: 2/10/81 HISTORY Contract Awarded: 4/9/81 Preconstruction Meeting: 5/27/81 CONTRACT TIME 7/17/81 STARTEn CONTRACT 130 Calendar Days plus 17 days delay from rain TIME 21 days for extra drainage location 73 days delay due to unforeseen soil conditions resulting in changes SCHEDULED to the type of drainage system COMPLETION 3/15/82 constructed. DATE ACTUAL COMPLETION 3/15/82 DATE BID AMOUNT $ 451,205.00 CONTRACT FINAL COST $ 435,382.98 CURRENT ITEM FOR Resolution to accept completed work and authorize final CONSIDERATION payment to the contractor. 82- 33�