RESOLUTION NO.
-r
A RESOLUTION ACCEPTING THE COMPLETED VTOPK
OF FRE CONSTRUCTION CO., INC AT A TOTAL
COST OF $531,597.29 FOR ALLAPATTAH NW 23
STREET C.D. PAVING PROJECT - PHASE II;
AND AUTHORIZING A FINAL PAYMENT OF
$71,889.50
WHEREAS, there exists a contract dated May 19, 1981
between the City of Miami and FRE Construction Co., Inc; and
WHEREAS, the work has been satisfactorily completed, and
FRE Construction Co., Inc. has furnished the required documents
certifying that all bills for labor and Materials have been paid in
full in connection with the aforesaid contract; and
WHEREAS, the City Manager and the Department of Public
Works recommend that the completed work be accepted and final pay-
ment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA:
Section 1. The completed wore: performed by FRE Construction
for ALLAPATTAH NW 23 STREET C.D. PAVING PROJECT - PHASE II at a total
cost of $531,597.29 is hereby approved.
Section 2. The proper officials of the City of Miami are
hereby authorized to pay $71,889.50 to FRE Construction Co., Inc. as
full and final payment for all work performed and all materials
furnished in connection with ALLAPATTAH NW 23 STREET C.D. PAVING PROJECT -
PHASE II.
PASSED AND ADOPTED this 17 day of
Tz
� 4er .
June , 1982.
Maurice A. Ferre
P1AY0 R.
PREPARED AND APPROVED BY: APPPOVED AS TO FORP4 AND CORRECTNESS:
4eputy ity Attorney City At t(0"3C0jSSI0
MEETING 419
J U N 14 1982
C r
CITY OF MIAMI, FLORIDA
77 INTER -OFFICE MEMORANDUM
TO Howard V . Gary DATE June 2, 1982 FILE B- 4448
City Manager
Sl B.TC* ALLAPATTAH NW 23 STREET C.D.
PAVING PROJECT - PHASE II
Resolution for Final Payment
FROM. Donald W. Cather Director REFERENCES
rP.s
D rtme t b 'c Wo(For Commission Meeting
Dt
of June 17, 1982)
V
The Department of Public Works recommends
the adoption of the resolution accepting
the completed work and authorizing a final
payment of $71,889.50 to FRE Construction
Co., Inc. for ALLAPATTAH NW 23 STREET C.D.
PAVING PROJECT - PHASE II.
FRE Construction Co., Inc. has completed the project consisting
of constructing one-half mile of street including asphaltic pave-
ment, concrete sidewalk, concrete curbs and/or gutters, a covered
ditch drainage system, landscaping and sanitary sewer modifications
located on-N. W. 23 Street between N. W. 17-22 Avenues. The original
contract amount was for $540,677.00, and the completed amount is
$531,597.29. It was completed on time.
It is now in order for the Commission to accept the completed cork
and authorize final payment, after all conditions are met.
EP:mh
Resolution attached
82-S,S2-'
FINAL CONSTRUCTION FACT SHEET
OR THE CITY MANAGER
JOB NAME Allapattah NW 23 Street Community Development Paving Project
- Phase II B-4448
Allapattah NU7, 23 Street Community Development Sanitary Sewer
Modifications - B-5464
CONTRACTOR FRE Construction, Inc.
JOB SCOPE Construct one-half mile of street including asphaltic pave-
ment, concrete sidewalk, concrete curbs and/or gutters, a
covered ditch drainage system, landscaping and sanitary sewer
modifications located on N. W. 23 Street between N. W. 17-22
Avenues.
REASON Side parkways deteriorated from extensive on -street parking
FOR WORK and elimination of drainage problems.
SOURCE
OF FUNDS Federal Community Development Block Grant Fund
PROJECT Bids Received: 5/13/81
HISTORY Contract Awarded: 5/15/81
Preconstruction Meeting: 6/1/81
CONTRACT
TIME 6/10/81
STARTED
CONTRACT
TIME 120 Working days.
SCHEDULED
COMPLETION
DATE
12/3/81
ACTUAL
COMPLETION
12/2/81
DATE
BID AMOUNT
$ 540,677.00
CONTRACT
FINAL COST
$ 531,597.29
CURRENT
ITEM FOR
CONSIDERATION
Resolution to accept completed work and authorize final
payment to the contractor.