HomeMy WebLinkAboutR-82-05521 ti RESOLUTION NO. -r A RESOLUTION ACCEPTING THE COMPLETED VTOPK OF FRE CONSTRUCTION CO., INC AT A TOTAL COST OF $531,597.29 FOR ALLAPATTAH NW 23 STREET C.D. PAVING PROJECT - PHASE II; AND AUTHORIZING A FINAL PAYMENT OF $71,889.50 WHEREAS, there exists a contract dated May 19, 1981 between the City of Miami and FRE Construction Co., Inc; and WHEREAS, the work has been satisfactorily completed, and FRE Construction Co., Inc. has furnished the required documents certifying that all bills for labor and Materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final pay- ment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed wore: performed by FRE Construction for ALLAPATTAH NW 23 STREET C.D. PAVING PROJECT - PHASE II at a total cost of $531,597.29 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $71,889.50 to FRE Construction Co., Inc. as full and final payment for all work performed and all materials furnished in connection with ALLAPATTAH NW 23 STREET C.D. PAVING PROJECT - PHASE II. PASSED AND ADOPTED this 17 day of Tz � 4er . June , 1982. Maurice A. Ferre P1AY0 R. PREPARED AND APPROVED BY: APPPOVED AS TO FORP4 AND CORRECTNESS: 4eputy ity Attorney City At t(0"3C0jSSI0 MEETING 419 J U N 14 1982 C r CITY OF MIAMI, FLORIDA 77 INTER -OFFICE MEMORANDUM TO Howard V . Gary DATE June 2, 1982 FILE B- 4448 City Manager Sl B.TC* ALLAPATTAH NW 23 STREET C.D. PAVING PROJECT - PHASE II Resolution for Final Payment FROM. Donald W. Cather Director REFERENCES rP.s D rtme t b 'c Wo(For Commission Meeting Dt of June 17, 1982) V The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $71,889.50 to FRE Construction Co., Inc. for ALLAPATTAH NW 23 STREET C.D. PAVING PROJECT - PHASE II. FRE Construction Co., Inc. has completed the project consisting of constructing one-half mile of street including asphaltic pave- ment, concrete sidewalk, concrete curbs and/or gutters, a covered ditch drainage system, landscaping and sanitary sewer modifications located on-N. W. 23 Street between N. W. 17-22 Avenues. The original contract amount was for $540,677.00, and the completed amount is $531,597.29. It was completed on time. It is now in order for the Commission to accept the completed cork and authorize final payment, after all conditions are met. EP:mh Resolution attached 82-S,S2-' FINAL CONSTRUCTION FACT SHEET OR THE CITY MANAGER JOB NAME Allapattah NW 23 Street Community Development Paving Project - Phase II B-4448 Allapattah NU7, 23 Street Community Development Sanitary Sewer Modifications - B-5464 CONTRACTOR FRE Construction, Inc. JOB SCOPE Construct one-half mile of street including asphaltic pave- ment, concrete sidewalk, concrete curbs and/or gutters, a covered ditch drainage system, landscaping and sanitary sewer modifications located on N. W. 23 Street between N. W. 17-22 Avenues. REASON Side parkways deteriorated from extensive on -street parking FOR WORK and elimination of drainage problems. SOURCE OF FUNDS Federal Community Development Block Grant Fund PROJECT Bids Received: 5/13/81 HISTORY Contract Awarded: 5/15/81 Preconstruction Meeting: 6/1/81 CONTRACT TIME 6/10/81 STARTED CONTRACT TIME 120 Working days. SCHEDULED COMPLETION DATE 12/3/81 ACTUAL COMPLETION 12/2/81 DATE BID AMOUNT $ 540,677.00 CONTRACT FINAL COST $ 531,597.29 CURRENT ITEM FOR CONSIDERATION Resolution to accept completed work and authorize final payment to the contractor. 82-552Ab.