Loading...
HomeMy WebLinkAboutR-82-0802RESOLUTION NO. 8 2 _ $ 0 3. A RESOLUTION ACCEPTI14G THE COMPLETED WORK OF JOB REINERTSON EQUIPMENT COMPANY AT A TOTAL COST OF $81,898.36 FOR WYNDWOOD COMMUNITY DEVELOPMENT PAVING PROJECT - PHASE VI (BID "B" - DRAINAGE); AND AUTHORIZING A FINAL PAYMENT OF $8,952.46 WHEREAS, there exists a contract dated December 15, 1981 between the City of Miami and Joe Reinertson Equipment Company; and WHEREAS, the work has been satisfactorily com- pleted, and Joe Reinertson Equipment Company has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Joe Reinertson Equipment Company for WYNDWOOD COMMUNITY DEVELOPMENT PAVING PROJECT - PHASE VI (BID "B" - DRAINAGE) at a total cost of $81,898.36 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $8,952.46 to Joe Reinertson Equipment Company as full and final payment for all wort: performed and all materials furnished in connection with WYNDWOOD COMMUNITY DEVELOPMENT PAVING PROJECT - PHASE VI (BID "B" - DRAINAGE). CITY COMMISSION MEETING OF S E P 9 1982 mm ux 8 2_;.,8 0 PASSED A14D ADOPTED this 9TH day of SEPTEMBER 1982. ATTEST: -77 Q City ler / PREPARED AND APPROVED BY: Deputy City Attorney APPROVED AS TO FORK AND CORRECTNESS: C.YW Attorney - 2 - MAURICE A. FERRE M A Y O R 82-803, C 95 Howard V. Gary City t1anager Donald W. Cather Director of Public Works August 23, 1982 B-4472 WYNDWOOD COMMUNITY DEVELOPMENT PAVING PROJECT - PHASE VI_ (BID "B" - DRAINAGE) - Resolution for Final Payment (For Commission Meeting of September 9, 1982) The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $8,952.46 to Joe Reinertson Equipment Company for WYNDWOOD COMMUNITY DEVELOPMENT PAVING PROJECT - PHASE VI (BID "B" - DRAINAGE). Joe Reinertson Equipment Company has completed the project consisting of constructing a covered ditch drainage system in the area bounded by N. 14. 29-32 Streets between N. Miami Avenue and N. W. 2 Avenue. The original contract amount was for $98,401.25, and the completed amount is $81,898.36. It was completed on time. It is now -in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. /0=lution L:hc � attached $2-80)... JOB NAME CONTRACTOR JOB SCOPE REASON SOURCE OF FUNDS PROJECT HISTORY FINAL CONSTRUCTION FACT SHEET Wyndwood Community Development Paving Project Phase VI (Bid "B" - Drainage) - B-4472 Joe Reinertson Equipment Co. Construct covered ditch drainage system in area bounded by N. W. 29-32 Streets between N. Miami Avenue and N. W. 2 Avenue In conjunction with highway rebuilding. Highway G. 0. Bond Fund Bids Received: 11/12/81 Contract Awarded: 12/10/81 Preconstruction Meeting: 12/23/81 CONTRACT TIME STARTED 2/4/82 CONTRACT TIME 60 Working days SCHEDULED COMPLETION DATE 4/29/82 ACTUAL COMPLETION DATE 2/25/82 BID AMOUNT $ 98,401.25 CONTRACT FINAL COST $ 81,898.36 CURRENT ITEM FOR Resolution to accept completed work and authorize CONSIDERATION final payment to the contractor.