Loading...
HomeMy WebLinkAboutR-82-0798R.ZSOLUTION NO. 8 2- 7 9 8 A RESOLUTIO:; ACCEPTING THE CO:IPLETED WORK OF MET CO:;STRUCTION, INC. AT A TOTAL COST OF $147 , 6 50 .00 FOR AFRICA,N SQUARE RECREATION BUILDING - :•IODIF ICATIOZ'S ; AND AUTHORIZI,:G A FINIAL PAY".-IE::T OF $14, 765 .00. 1-tHEREAS, there exists a contract dated January 22, 19S2 between the Cit•, of ,•Iiami and VIET Construction, Inc. ; and MIEREAS, the :7ork has been satisfactorily completed, and ITET Construction, Inc. has furnished the required documents certifying that all bills for labor and Materials have been pair in full in connection with the aforesaid contract; and 14HE7REAS, t' e City Manager and the Depart.,.ent of Public Works recom.«end that the completed work be accepted and final payment :,lade to the contractor; NOv1 , THEREFO .E , BE IT RESOLVED BY THE CO:IIIISSIO11 1 OF THE CITY OF MIA,II , FLORIDA: Section 1. The completed ..7ork performed by MET Construction, Inc. for AFRICAN SQUAB: RECREATION( BUILDING - MODIFICATIONS ata total cost of $147,650.00 is hereby approved. Section 2. The proper offic:.als of the City of Miami are hereby authorized to pay $14,765.00 to MET Construction, Inc. as full and final pa-.-t:ent for all work performed and all materials furnished in connection with AFRICAN' SQUARE RECREATION BUILDING - MODIFICATIO:;S . PASSED AND ADOPTED this 9TH day of SEPTEMBER 1982. ATTEST: I: i -_ -Clerk PREPARED AND APPROVED BY: 4w,cuf " , mw( Deputy City Attorney MAURICE A. FERRE I Ill A Y 0 R e APPROVED AS`' TKO FOR11 AND CORRECTNESS: 4�1 04a, -P ZS�� // City Attorney MMISS[ON CITY CO MEETING OF S E P 91982 8 2 - '7 """DON NO ...................... n. C C { Howard V . Gary City Manager Donald W. Cather Director of PAST August 17, 1982 B-2825 _ AFRICAN SQUARE RECREATION BUILDI;'G - MODIFICATIONS - Resolution for Final Payment Works (For Commission Meeting — .-> of September 9, 1982) c� r The Department of Public Works recommends the adoption of the resolution accepting �s the completed work and authorizing a final payment of $14,765.00 to MET Construction, Inc. for AFRICAN SQUARE RECREATIO;: BUILDING - c-= MODIFICATIONS, MET Construction, Inc. has completed the project consisting of renovating an existing building at 1466 N.W. 62 Street, and included providing administrative offices, activity room, art, ceramics, and dry crafts rooms, restrooms and air conditioning. The original contract amount was for $147,661.00, and the completed amount is $147,650.00, It was completed on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. P:az solution attached —P 82-798 JOB NAME CONTRACTOR JOB SCOPE FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER African Square Recreation Building - Modifications B-2825B MET Construction, Inc. Renovate existing building at 1466 N. W. 62 Street including providing administrative offices, activity room, art, ceramics, and drycrafts rooms, restrooms and air conditioning. REASON FOR WORD: Expansion of recreational activities SOURCE OF FUNDS Federal Com-nunity Development Block Grant Fund PROJECT Bids Received: 1/13/82 HISTORY Contract Awarded: 1/14/82 Preconstruction Meeting: 1/18/82 CONTRACT TIME - STARTED 3/1/82 CONTRACT 90 Calendar days plus 38 calendar days for extra work TIME and delivery of materials SCHEDULED COMPLETION DATE 7/6/82 ACTUAL COMPLETION DATE 7/6/82 BID A14OUNT $ 147,661.00 CONTRACT FINAL COST $ 147,650.00 CURRENT ITEM FOR CONSIDERATION Resolution to accept completed work and authorize final payment to the Contractor. 82-798