Rf:SOLUT'ION tit) , •" /' .
A RI:SOLU'fION AUTHORIZING AN INCREASE IN CONTRACT
A'WUNT NOT TO EXCEED $40,000 IN THE COtiT}:ACT BE-
1'WEI:i+ 1'llE CITY AND D.M.P. CORPORATION 1"OR THE,
COtiSTP,UCT{ON OE NORTHERN DRAIN\GE PROJECT E-52
WITH EUNUS FOIL THE. INCREASE BEING ALLOCATED FROM
STORM SEWER GENERAL OBLIGATION BOND FUNDS.
there
C;xists
a
contract dated Jill\, 9, 1982
between t}lc City
of
Miami
rend
D.'1.1'. Corporation in the
..1mollnt of S402,237.02
for
the
construct ion of Northern
Ur;1 ina c 1'ro ject E-52; rend
h'l11:R1:A1), the De{7rlrtIll e11t of Pohl is Works h;is prey iousIv
ailthorizecl 1).`1.1'. Corpora L1oil to proceed With emergency
extra work nt N.W. 05 Avenue and 2 Strc'eL to rr1 il'Ve pos
-
sihle floodin,(, in the areal hounded by 1'la ler and S.W. 8
Streets, and 60 and 07 Avenue's; and
I:HI:RF.AS, the Copt of the "Idditional work was S61,650,
t,'hiCh CClmpletcly depleted Lhe cash ;111o1Na11ce and caused the
1'uhl { l�c�rl:s UL IrLment to Bela\' Construction of four dr;I
�t1-11('t11 CIS lTl;ll1\' In tI1C' coil LYact to avoid all over—
_ rll(1 of CC�ntrUCt :1mi�llllt; alld
drainrl;;c or additional drain;lge is badly needed
at the locations where structures are heing delayed; and
lti'tl171'1:AS, the City ?tanager and the Director of the Public
;•:arks Department recommend an Increase in the contract amount
not to exceed S40,000 so that the four structures not yet
begun Call he included in Lhe contract; and
funds for t1W increase are available from Storm
SeWC'r General Obl igat ion Bond Funds;
N01.', 'I'll171"I:FOR1:, BE IT RESOLVED B1' THE COMMISSION 01' THE
CITY OF MAMI, VLORIDA:
Sc'(.t ion 1. An increase in contract amount not to exceed
S40,000 in Lhe contract between the City and 1).M.11. Corpora-
tion fur the construction of Northern Drainage Project E-52
I.-; herelhv auLhorized, with funds for the increase hereby
alloCatcd from Storm Sewer General ObI1gation Bond Funds.
ciTY COMMISSION
MEETING OF
OCT
t.
v
w
PISSED AND ADOPTF'1) tIli ti F4th day of October —__—__--' 1.982.
-_Mllurice_A. Ferre
-- - �t AY O R--------
A'I'TL:ST
RALP } c; . ONG T E
CITY CLERK
1'RF.PARED AND APPROVED BY:
RoB]:R'I F. CLARK
D l: l' 1" f l' C 11' 1'
Af'1'ROVED AS '1'0 FORM AND CORRECTNESS:
.I SI 7 R. CARC I A-1)1:DROS:1
CITY AT'IORINF1'
1-
lio,�ard V. Gar'v
City :Ianager
Donald [d. Cather
Director of/Publ' t�prks
f
Sept.el.,her 27 , 1982 B-5484
NOI:THEP.N DPL%I-.•.AGE PROJECT E-52
;:esolution for Increasing
Contract Amount
Resolution (For Commission
Meeting 10-14-82)
T:iE DEPART;IENT OF PUBLIC WORKS RECO:-;:•:ENDS THE
ADOPTION OF A RESOLUTION AUTHORIZING AN INCREASE
Ili THE CONTRACT BETWEEN THE CITY OF MIAMI AND
D.M.P. CORPORATION FOP. THE CONSTRUCTION OF
NORTHERN DRAINAGE PROJECT E-52 IN AN AMOUNT NOT
TO EXCEED $40 , 000. SAID FUNDS FOI: THE INCREASE TO
CO: iE FR0:1 STOP.:,! SEWER G.O. BOND FUNDS.
Early in the project we authorized the contractor to do emergency
extra ,cork nt N. 1-1. 65 Avenue and 2 Street to relieve possible
flooding conditions in the area bounded by Fla-ler Street, S. W.
S Street, 60 and 67 Avenues. The additional work consisted of
1,,odificcltions to an outf ill line servin the area and cost
$61, 650.
The $61.650 co:-.t o the '.cori: more than dcr,let.ed the cash allowance
on the project, and caused us to delay con::truction of six struc-
ture- incl.,.ic:ed i1h the project to insure ti-int: t-:cre would not be an
over?"an OL the C01iltraCt a1110U11t, All other structures, and two of
t11,)Se IC ;'e1"L dE'l'1•Iin?'_ Ct�215trllCtlC)n C)11, have n� d be eIl Cilmpleted by
le left four t1e C710t 0 Ullenthe cc'nt2"<'1Cto1'. '�:e a
increase in contract 3I;i0urit is aULhori.:od.
then selecting the structures t:o delay construction oil, we were
forCetl to consider french drains only, because the contractor, by
the ti,rle %,7e authorized the extra %,7orl;, had already cast all of his
covered ditch slabs, and had we eliminated a covered ditch we would
nave been obli.l;at-ed to purchase the slabs from him. The end result
is th;1L of the £our structures we are unable to do within the con-
tract- aimount, three of then are french drains at locations where
drainage or additional drainas;e is critically needed.
The
rids wL
17C�Ceived
v11 Lids project, and for the
four structures
in
question,
are. con
,idered to he c .cellent, and
it is, v.e believe,
t:()
file Ci t_''
advent"I"C'
to authorize an increase
in contract and
huiLd
Lhe :,tl"i]Crllres
undLY' the C1-127rent contract.
i'�Ie Must do the:.1
nt)'.�:
or rover'
:Ind iL
`..C' de.'Lzl ' ';Ic' c;111 eXpect: a 10
to 15%, increase in
tle
cf'st: 0i
ri'e ':;or':•:.
He :ard V. Gary
City ?Tanager
Donald t•?. Cather
Director of Publ' t orl.s
�� 902 B-5484
Seht�r;�er i , 1
N0RTHERlI DR'iI;IAGE PROJECT E-52
Resolution for Increasin,a
Contract Amount
Resolution (For Co= -,fission
-1.1cetin` 10-14-82) - --- -
THE DEPART:IE:IT OF PU:'LIC i�10P.KS I.LCO: �:1:DS THE
ADOPTION OF A RESOLUTIO;` AUT11ORI7_I;'IG AN INCRE ASE
IN THE CONTRACT BET`�EEN THE CITY OF ;,IIA.NiI A;ID
D.:•l. P . CORPORATION FOR THE CONSTRUCTION OF
NORTHER;: DR%INAGE PROJECT E-52 IN AN NOT
TO EXCEED $40,000. SAID FUNDS FOR THE INCREASE TO
CO:1E FRO'-`: STORM SI11. G.O. BOND FUNDS.
Lrlr1': in t'r.e pr.oj ect ;ce authorized the contractor to do emer�cncv
at N. I•?. 65 Avenue and 2 Street to relieve possible
floo(iin:7 conditions in the area hounded b, Flac_ler Street, S.
S Street, 60 and 6 i Avenues. The additional orb consisted of
modii:iccltions to an outEn11 line serving; the Area and cost
$61, 65C).
il:.. S( , t') cos, of the :c?:''; ir'orc., th;ln den1.C'te�l the Casa allo-.:ance
OI1 Lill' ICI c'jeCt . '!I(' CaUSC(l US LO Bela': COnsLrucC ion of si% SLrUC-
1rL'.. i l-CIUC'Cd ill L.li 1)12)LCt t0 ill ;u re t.h:it tt1o1"C F:011lu I10t be all
o%,c'rrun Lhe aI:iOUnt:. All Other structures, and t,..o of
L1lC)Se W, '::ere del(I`.'1.11:', consn-ucLion oil, have nob: been completed by
the CC'n' r?CtOr. '':C' are 1L'# ? with 2-Ou that v.,e cannot do unless all
inc ea:;� in collLract is authori:.ed.
1.:11C'll , QJ,2Ct1.11tr the StrUCtUreS to delav constrLictlon oil, we were
forced Lo consider french drains onlv, because the contractor, by
t:lle tiille `::e authori:.ed the exLra :JhI"i�, had alre ldj' CLlst all Of his
co,,,7ered ditch slaps, and ilaLl ,•:e eliillinrlted a covered ditch �•:e would
nave boon obli�",aLed to purchase the slabs from hiin. The end result
i-S that Of the fOUr structures wo are unable to do within the con-
tract il:;eunt, three of theiii aru french drains at locations where
drai-na re or additional. draina;-,e is critically needed.
The bids v:k2. received on this project, and for the four structures
in cc�,sti.on, 12-0 Cc�n�idcre;l to he excellent, and it is, :e believe,
L(1 tile' Clt_'� ad`J(1nt;1},i' t�> auth )ri:'e an 1_nereaso ii COI1tr3Ct and
hlliiu; Lhc' ';LTI1Ct11rOS UlldeT' tlic' Current contract. ?e l:,,ust d0 them
_v di ia" ::0 c izl o::pect a 10 to 15", increase in
L11C CO.;L 01 tl:t' ;.��
C
Howard V. Gary September 27, 1932
City Manager
Accordingly, we have prepared a resolution authorizing the
necessary increase, and will request passage of it at the
October 14 Commission Meeting. Funds for the increase are
available from Storrs Sewer G.O. Bond funds.
. vh
tl Ii esolution Attached
CC: City lianager
1111re '' of 2