Loading...
HomeMy WebLinkAboutR-82-0962RESOLUTION NO.'�AZ .f6 A RESOLUTION AUTHORIZING AN INCREASE IN THE CONTRACT AMOUNT NOT TO EXCEED $30,000 IN THE CONTRACT BETWEEN THE CITY OF MIAMI. AND INTER - COUNTY CONSTRUCTION CORPORATION FOR THE CON- STRUCTION OF RIVERVIEW STOR11 SEWER PROJECT, PHASE I (2ND BIDDING) BID "B" - (PUMP STATION) FOR THE ADDITION OF MODIFICATIONS TO THE BAR SCREEN TO PROVIDE BYPASS FLOW CAPABILITY AND OTHER MISCELLANEOUS EXTRA WORK; SAID FUNDS FOR THE INCREASE TO BE PROVIDED FROM UNUSED BID ITEM MONIES AVAILABLE FROM BID "A" OF RIVERVIEW STORIM SEWER PROJECT, PHASE I (2ND BIDDING) WHEREAS, there exists a contract dated August 14, 1980 between the City of Miami and Intercounty Construction Corporation in the amount of $2,146,000 for the construction of Riverview Storm Sewer Project (2nd Bidding) Bid "B" (Pump Station), and WHEREAS, Resolution No. 82-321 passed April 1, 1982 authorized an increase in the contract amount not to exceed $12,000, thereby increasing the contract amount to $2,158,000, and WHEREAS, modifications to the bar screen are needed to provide bypass flow capability that will lessen the possibility of flooding in the area served by the station in the event of a bar screen or electrical power failure; and WHEREAS, the cost of the modifications is $19,238, and WHEREAS, additional funds are required to pay a legitimate claim filed by the electrical subcontractor, to reimburse the contractor for diesel fuel he was directed to purchase by the City, to make corrections to a failed wall footing and a transformer enclosure cover, and to purchase a high intensity drop light for the station; and WHEREAS, the total additional funds required accomplish all of the above mentioned work is less than $30,000; and WHEREAS, the City Manager and the Director of the Depart- ment of Public Works recommend an increase in the contract amount not to exceed $30,000 to cover the additional work; and WHEREAS, funds to cover the additional work are available from unused bid item monies allocated to Bid "A" of the same project; NOW, THEREFORE, BE IT RESOLVED BY THE C011DIISSION OF THE CITY OF MIAMI, FLORIDA: CITY COMMISSION MEETING OF U 1" T 1 4 1982 A,-`j(f Section 1. An increase in an amount not to exceed $30,000 is herebv authorized in the contract between the City of Miami and Intercounty Construction Corporation for the construction of Riverview Storm Sewer Project Phase I (2nd Bidding) Bid "B" (Pump Station) for the modification of the bar screen and other work with funds therefor to be provided from unused bid item monies previously allocated to Bid "A" of Riverview Storm Sewer Project Phase I (2nd Bidding). PASSED AND ADOPTED this 1401 day of October , 1982. Maurice A. Furre %M A Y 0 R ATTEST: Cit Cl-(2rk _ PREPARED AND APPROVED BY: r' Deputy City Attorney APPROVED AS TO FORM AND CORRECTNESS: Ci v Attornev S*" pp(/ { �11 .. w `7, k 0 63 Howard V. Gary City Manager tTY OF MIAMI, F LOR,�_:- INTEROFFICE MEMORAND'-IM Donald W. Cather Director of, Zub is gorks p L� " -47 L September 28, 1982 r._E B-5441 RIVERVIEW STORM SEVER PROJECT, PHASE I (BID "B" - PUMP STATIO; Resolution for Increase in Contract FE cc FE'. E`• Resolution (For Oct. 14, 1982 Commission rItg. ) THE PUBLIC WORKS DEPARTMENT RECOM,IENDS THE ADOPTION OF A RESOLUTION AUTHORIZING AN INCREASE IN CONTRACT AMOUNT NOT TO EXCEED $30,000 IN THE CONTRACT BETIEEN THE CITY OF MIAMI AND INTER - COUNTY CONSTRUCTION CORPORATION FOR THE CONSTRUC- TION OF RIVERVIET,' STORM SEIZR PROJECT, PHASE I, (2ND BIDDING) , (BID "B" - Pt7`1P STATION) FOR THE ADDITION OF IMODIFICATIONS TO THE BAR SCREEN TO PROVIDE BYPASS FLOW CAPABILITY AND OTHER MISCELLANEOUS EXTRA WORK; SAID FUNDS FOR THE INCREASE TO BE PROVIDED FROM UNUSED BID ITEIM MONIES AVAILABLE FRO:•I BID "A" OF RIVERVIEW STORM SFVER PROJECT, PHASE I (21NID BIDDING) Since the Riverview Pump Station, located at N. W. 13 Avenue and 6 Street, was put into operation, we have had numerous and fre- quent problems with the mechanical bar screen malfunctioning or breaking down. The contractor and the bar screen manufacturer are making modifications to the bar screen at no cost to the City that will make it perform satisfactorily, but the bar screen's frequent failures have pointed out to us the need for bypass capability in the event the bar screen becomes clogged or inopera- tive because of electrical power failure. Additionallv, funds are needed to: Reimburse the electrical contractor for permit fees he had to pay, but had no opportunity to include them in his bid. Reimburse the contractor for Diesel fuel we instructed him to purchase. Make corrections to a settled wall footing around the transformer pad. Page 1 of 2 S106d S I Howard V. Gary September 28, 1982 City Manager Sake modifications to the woven wire cover over the transformer pad. (Neighborhood children are using it as a trampoline). Purchase a high intensity drop light to become a part of the station equipment. The total of all the work above is estimated to be less than $30,000. We will request an increase in contract not tc exceed $30,000 for the October 14, 1982 Commission Meeting. Funds for the increase are available from the $100,000+ underrun we had on Bid "A" of the Riverview Storm Sewer project. L:vh Resolution Attached Page 2 of 9