HomeMy WebLinkAboutR-82-0962RESOLUTION NO.'�AZ .f6
A RESOLUTION AUTHORIZING AN INCREASE IN THE
CONTRACT AMOUNT NOT TO EXCEED $30,000 IN THE
CONTRACT BETWEEN THE CITY OF MIAMI. AND INTER -
COUNTY CONSTRUCTION CORPORATION FOR THE CON-
STRUCTION OF RIVERVIEW STOR11 SEWER PROJECT,
PHASE I (2ND BIDDING) BID "B" - (PUMP STATION)
FOR THE ADDITION OF MODIFICATIONS TO THE BAR
SCREEN TO PROVIDE BYPASS FLOW CAPABILITY AND
OTHER MISCELLANEOUS EXTRA WORK; SAID FUNDS
FOR THE INCREASE TO BE PROVIDED FROM UNUSED
BID ITEM MONIES AVAILABLE FROM BID "A" OF
RIVERVIEW STORIM SEWER PROJECT, PHASE I (2ND
BIDDING)
WHEREAS, there exists a contract dated August 14, 1980
between the City of Miami and Intercounty Construction Corporation
in the amount of $2,146,000 for the construction of Riverview
Storm Sewer Project (2nd Bidding) Bid "B" (Pump Station), and
WHEREAS, Resolution No. 82-321 passed April 1, 1982
authorized an increase in the contract amount not to exceed $12,000,
thereby increasing the contract amount to $2,158,000, and
WHEREAS, modifications to the bar screen are needed to
provide bypass flow capability that will lessen the possibility
of flooding in the area served by the station in the event of a
bar screen or electrical power failure; and
WHEREAS, the cost of the modifications is $19,238, and
WHEREAS, additional funds are required to pay a legitimate
claim filed by the electrical subcontractor, to reimburse the
contractor for diesel fuel he was directed to purchase by the City,
to make corrections to a failed wall footing and a transformer
enclosure cover, and to purchase a high intensity drop light for
the station; and
WHEREAS, the total additional funds required accomplish
all of the above mentioned work is less than $30,000; and
WHEREAS, the City Manager and the Director of the Depart-
ment of Public Works recommend an increase in the contract amount
not to exceed $30,000 to cover the additional work; and
WHEREAS, funds to cover the additional work are available
from unused bid item monies allocated to Bid "A" of the same project;
NOW, THEREFORE, BE IT RESOLVED BY THE C011DIISSION OF THE
CITY OF MIAMI, FLORIDA: CITY COMMISSION
MEETING OF
U 1" T 1 4 1982
A,-`j(f
Section 1. An increase in an amount not to exceed
$30,000 is herebv authorized in the contract between the City
of Miami and Intercounty Construction Corporation for the
construction of Riverview Storm Sewer Project Phase I (2nd Bidding)
Bid "B" (Pump Station) for the modification of the bar screen and
other work with funds therefor to be provided from unused bid item
monies previously allocated to Bid "A" of Riverview Storm Sewer
Project Phase I (2nd Bidding).
PASSED AND ADOPTED this 1401 day of October , 1982.
Maurice A. Furre
%M A Y 0 R
ATTEST:
Cit Cl-(2rk _
PREPARED AND APPROVED BY:
r'
Deputy City Attorney
APPROVED AS TO FORM AND CORRECTNESS:
Ci v Attornev
S*" pp(/ { �11 ..
w
`7,
k
0
63
Howard V. Gary
City Manager
tTY OF MIAMI, F LOR,�_:-
INTEROFFICE MEMORAND'-IM
Donald W. Cather
Director of, Zub is gorks
p
L�
" -47 L September 28, 1982 r._E B-5441
RIVERVIEW STORM SEVER PROJECT,
PHASE I (BID "B" - PUMP STATIO;
Resolution for Increase in
Contract
FE cc FE'. E`•
Resolution (For Oct. 14, 1982
Commission rItg. )
THE PUBLIC WORKS DEPARTMENT RECOM,IENDS THE
ADOPTION OF A RESOLUTION AUTHORIZING AN INCREASE
IN CONTRACT AMOUNT NOT TO EXCEED $30,000 IN THE
CONTRACT BETIEEN THE CITY OF MIAMI AND INTER -
COUNTY CONSTRUCTION CORPORATION FOR THE CONSTRUC-
TION OF RIVERVIET,' STORM SEIZR PROJECT, PHASE I,
(2ND BIDDING) , (BID "B" - Pt7`1P STATION) FOR THE
ADDITION OF IMODIFICATIONS TO THE BAR SCREEN TO
PROVIDE BYPASS FLOW CAPABILITY AND OTHER
MISCELLANEOUS EXTRA WORK; SAID FUNDS FOR THE
INCREASE TO BE PROVIDED FROM UNUSED BID ITEIM
MONIES AVAILABLE FRO:•I BID "A" OF RIVERVIEW STORM
SFVER PROJECT, PHASE I (21NID BIDDING)
Since the Riverview Pump Station, located at N. W. 13 Avenue and
6 Street, was put into operation, we have had numerous and fre-
quent problems with the mechanical bar screen malfunctioning or
breaking down. The contractor and the bar screen manufacturer
are making modifications to the bar screen at no cost to the City
that will make it perform satisfactorily, but the bar screen's
frequent failures have pointed out to us the need for bypass
capability in the event the bar screen becomes clogged or inopera-
tive because of electrical power failure.
Additionallv, funds are needed to:
Reimburse the electrical contractor for permit fees
he had to pay, but had no opportunity to include them
in his bid.
Reimburse the contractor for Diesel fuel we instructed
him to purchase.
Make corrections to a settled wall footing around the
transformer pad.
Page 1 of 2
S106d
S
I
Howard V. Gary September 28, 1982
City Manager
Sake modifications to the woven wire cover over the
transformer pad. (Neighborhood children are using it
as a trampoline).
Purchase a high intensity drop light to become a part
of the station equipment.
The total of all the work above is estimated to be less than
$30,000.
We will request an increase in contract not tc exceed $30,000 for
the October 14, 1982 Commission Meeting. Funds for the increase
are available from the $100,000+ underrun we had on Bid "A" of
the Riverview Storm Sewer project.
L:vh