HomeMy WebLinkAboutR-82-0961ml 0 R FSOIXT ION NO. A RFSOIXT ION ACCEPTING 'I'llF; COMPLETE D WORK 017 BIG "C" LTTTI.I: "O" PAVING AND F.O[1TPMENL T RENTAL CO. FOR CONSTR[!CTTON OF CI'L?11:1: C.D. PAVING PRO.II:CT - PHASE TV AT A TOTAL COST OF S296,976.63; AUTHORIZING AN INCREASF IN THE CONTRACT IN THE NET AMOUNT OF $5,249.13; ASSi:SSING S5,500.00 AS LIOU I - DATED DAMAGES FOR 1.1 DAYS OVERRUN OF CONTRACT TTME: AND AUTHORIZING A FINAL PAYMENT OF $29,176.72. WHEREAS, there exists n contract dated September 21, 19,91 hetween the City of Miami rand I;ig "C" Little "O" raving and Fcluipment Rental CO.; and hIIFREAS, the Or if, innI contract wns increased on October 7, 1 98 1 by Resollit ioil No. 81-897 in the amount of 517,000; and WifF:Ri:AS, tIic work has been sat 1 S f nctori lv completed, and l;ig "C" Li'ttic' "W' 1,nving rand 1:(1itIpment IZontnl Co. tans furn- ishecl the rc,cluircd documcnts c•ertif ,in that :II1 11111s for lnhor ;and materinl!,' have peen paid in full in connection With the :lfc,rc";;1 id cont r;lc•t ; and 1;1lI:RFAS, there ;an overrun Of the contract ;amount for e:;tra Wo1,1c autIlot-Izccl by the Citv ',Iona r, I,? c11 rewulted in can incren-,e in the contract; ;and ttiHI:RF:1S, ] icluidntc(I damn�;es for I l days overrun of contract time should he deducted from the final pnvment due the contrac- t or; and hH17R,EAS, the City �tanas;er and the 1)irector of the Depart- mcnt of Pub is t:orks recommend that the completed work be ac- ('.pied ;and f innl 1) IVMent made to the contractor; '1'111.71," 17F011 R1: 11' RI?S0LVEll 131' THE COMMISSION OF THE CITI' OF MIAMI, FLORIDA: Section 1. The completed Mork performed by Big "C" Little "O" PnV111" ;and F(luipment 1il`ntaI Co. for construction of CULMER C.D. PAVIN'(; PROJECT - PIiASF IV is hereby accepted at a total cast of S290,970.03. Section 2. The ;amount of the contract is herebv increased in the amount of 55,249.13. CITY COMMISSION MEETING OF � 0' 1 4 i(A8 22, RfSOLUT10m Mo., N ,:.,!;j j (! W Section 3. The liquidated damages in the amount of ti5,500.00 for 11 days overrun of the contract time shall he deductod from the balance clue the contractor. Section 4. The proper officials of the City of Miami are herebv authorized to pav l;ig "C" Little "0" Paving and Equipment Rental Co., after all. adjustments are made, a balance of $29,176.72 as full and final pavment for all work performed and all material-, furnished i-n connection with said Project. PASSED AND ADOPTED this 14th day of October 1982. ?laurice \. Perre M A Y 0 1: ATT17ST 1":1LIj?N (, 6,11 mac;ITY C:1.F11K c 1)kl:P\RI.1) AN1) APPhOVE1) BY: R0L' EI'T F . C1,AKK DEPUTY CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: .li( is 11. CARCIA—PLI)ROSA t,ITY ATTORNEY V ram/ _• J �) .& M. I 62 FRJ%. CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM F MR, 'POO Howard V. Gary DATE September 28, 1982 CITE B-4464 City Manager SU6.E CT CULMER C.D. PAVING PROJECT, - PHASE IV - Resolution to Increase Contract, Assess Donald W. Cather REFERENCES Liquidated Damages, and Director of i orks Final Payment ENCLOSURES n p (For Commission_Meeting The Department of Public Works recommends the adoption of a resolution accepting the completed work performed by Big "C" Little 0" Paving and Equipment Rental Co. in the amount of $296,976.63; authorizing and increase in the contract in the net amount of $5,249.13; assessing $5,500.00 as liquidated damages for 11 days overrun of contract time; and authorizing a final payment of $29,176.72 for CULMER C.D. PAVING PROJECT - PHASE IV. Big "C" Little "0" Paving and Equipment Rental Co. has completed the project consisting of constructing 0.5 mile of street, including asphaltic pavement, concrete sidewalk, concrete curb and gutter, a French drain drainage system, landscaping, and sanitary sewer replacement. The project is located in an area bounded by N. W. 17-20 Streets between N. W. 2 Court and N. W. 3 Avenue. The original contract amount was $274,727.50, and was increased by Resolution No. 81-897 in the amount of $17,000.00 on October 7, 1981. This was a unit price contract. The contractor exceed the contract time by an overrun of 11 days, which resulted in an assessment of $5,500.00 as liquidated damages. Also, during the construction an unforeseen concrete slab was encountered and had to be removed. This extra work caused us to exceed the increased contract amount by $5,249.13. It is now in order for the Commission to accept the com- pleted work and authorize final payment, after all condi- tions are met. I� : h c ,A esolution attached iA t0 FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME Culmer Community Development Paving Project - Phase IV B-4464 CONTRACTOR Big "C" Little "0" Paving and Equipment Rental Co. JOB SCOPE Construct 0.5 mile of street including asphaltic pave- ment, concrete sidewalk, concrete CMG, French drain drainage, landscaping, and sanitary sewer replacement in an area bounded by N. W. 2 Court to N. W. 3 Avenue between N. W. 17-20 Streets. REASON Existing streets out of grade, side parkways deteriorated FOR WORK from extensive on -street parking eliminate drainage problems. SOURCE OF FUNDS Federal Community Development Block Grant Fund PROJECT Bids Received: 6/9/81 HISTORY Contract Awarded: 6/25/81 Preconstruction Meeting: 8/6/81 CONTRACT TIME gTARTPn CONTRACT TIME SCHEDULED COMPLETION DATE 11/23/81 60 Working days plus 13 days delay from rain 20 days for extra work* and 41 days delay from utility companies clean up work 6/3/82 ACTUAL COMPLETION DATE 6/14/82 BID AMOUNT $ 291,727.50 (*Includes $17,000.00 Increase in contract authorized by Commission Reso. 81-897 dated 10/7/81) CONTRACT $ 296,976.63 (Less $5,500.00 Liquidated Damages for ZAI FINAL COST 11 calendar days at $500.00/Calendar day) CURRENT Resolution to accept completed work, Increase contract .:.: ITEM FOR amount $5,249.13, assess $5,500.00 Liquidated Damages, CONSIDERATION and authorize final payment to the contractor. 1J y/z ?/1f v