Loading...
HomeMy WebLinkAboutBack-Up Documents9P plcgq, o`\ s 2023-24 Statewide Flooding and Sea Level Rise Resilience Plan ,oryA ProjectCounty Sponsor Funding Funding Funding Funding Total City of Cape Center Street Brevard Canaveral Drainage Basin $467,500 $467,500 Improvements Titusville Brevard Causeway County Multitrophic Brevard Natural Restoration and $670,856 $670,856 Resource Living Shoreline Management Resiliency Action Department Project Continuation City of Hollywood City of District 1 - Broward Hollywood Hollywood Lakes $3,255,000 $3,255,000 Neighborhood Exfiltration City of Dania Dania Beach Lift Broward Beach Station Mitigation - $2,164,000 $2,164,000 Phase III Broward City of Coastal Roadway $12,200,491 $12,200,491 Hollywood Resilient Sawgrass Broward City of Wastewater $8,375,000 $8,375,000 $16,750,000 Sunrise Treatment Plan Im rovements Pensacola Bay Living Shoreline Escambia around Naval Air Escambia County Station Pensacola $5,150,000 $5,150,000 along Sherman Inlet and White Island Escambia Bayou Grande Escambia County Villas Drainage $2,250,000 $2,250,000 Project Central Central County County Water Control Hendry Water District Resilient $4,050,000 $41050,000 Control Infrastructure District Lower Peninsula City of Stormwater Hillsborough Tampa Improvements — $12,500,000 $12,500,000 $25,000,000 Southeast Regional System City of Fellsmere Flood Indian River Fellsmere Resiliency Lift $1,500,000 $1,500,000 Station No. 3 Grand Ridge Town Jackson Town of Wide Stormwater $3,211,000 $3,211,000 Grand Ridge Flooding Resiliency Project Jackson City of Marianna WWTP $1,546,490 $1,546,490 Marianna Resilience CREW - Flint Pen/Kiker Preserve Lee Lee County Flow Collection $7,574,667 $7,574,667 $7,574,667 $22,724,000 Drainageway - Phase 1 Madison Town of Town of Greenville $4,968,000 $4,968,000 Greenville Flooding Mitigation City of Gulf Drive SLR Manatee Holmes Mitigation - Holmes Blvd to $1,064,900 $1,064,900 Beach Palm Dr Old Palm City Martin Martin North $3,242,500 $3,242,500 County Neighborhood Im rovements Martin MacArthur Martin County Boulevard $1,235,000 $1,235,000 Resilience Project Village of Central and South Miami- Dade Key Biscayne Basins Stormwater $885,626 $885,626 Improvements Biscayne Shores 1 Miami -Dade and 2 Stormwater Miami- Dade County Pump Stations $1,000,000 $1,000,000 Retrofit & Im rovements Design, Permitting & Construction of Miami- Dade City of Miami Melrose Flood $5,514,942 $5,514,942 Improvements Project City of Miami Middle Beach Miami- Dade Beach Seawalls and $1,802,955 $1,802,955 Living Shorelines Design, Permitting & Construction of Miami- Dade City of Miami 8th Street Flood $4,890,723 $4,890,723 Improvements Project Design, Permitting & Construction of Miami- Dade City of Miami Clemente Park $7,367,365 $7,367,365 Neighborhood Flood Im rovements Miami's Citywide Miami- Dade City of Miami Pump Stations $679,895 $679,895 Telemetry System Miami- Dade City of Miami Continuation of $2,500,000 $2,500,000 Beach Fire Station #1 Continuation of City of Miami First Street Flood Miami- Dade Beach Mitigation and Sea $5,000,000 $5,000,000 $5,000,000 $15,000,000 Level Rise Adaptation Biscayne Gardens N E 116 Street / Miami- Dade Miami -Dade Biscayne Shores 3 $1,000,000 $1,000,000 County Stormwater Pump Station Retrofit & Im rovements Miami -Dade City of Florida City Canal $1,000,000 $1,000,000 Florida City Culvert Project Monroe County Area 52-A Road Monroe Monroe County Elevation Resiliency and $8,240,870 $8,240,870 $8,240,870 $24,722,611 Adaptation Project #3 Monroe County Area 10 Road Monroe Monroe County Elevation Resiliency and $5,124,857 $5,124,857 $5,124,857 $15,374,570 Adaptation Project #1 Florida Keys Aqueduct Florida Keys Authority - Monroe Aqueduct q Marathon Potable $3,000,000 $3,000,000 Authority Water Pump Station Mitigation and Adaptation Project City of West West Palm Beach Palm Beach palm Beach Utilities Adaptation $1,000,000 $1,000,000 Project City of Coquina Cove Palm Beach Boynton Drainage $1,500,000 $1,500,000 Beach Improvements 10th and 13th Avenues North Palm Beach City of Lake Stormwater $352,500 $352,500 Worth Beach Improvements for Intracoastal Resilience Indian Trail East-West Canal Palm Beach Improvemen Conveyance $954,864 $723,244 $1,678,108 t District Basin C Resiliency Pinellas City of St. _ Salt Creek $10,675,000 $10,675,000 Petersburg Outfall Pump Station Basin C Resiliency Pinellas City of St. _ Salt Creek $900,000 $900,000 Petersburg Conveyance Im rovements City of St. Community Center Pinellas Pete Beach Shoreline $750,000 $750,000 Rehabilitation Southwest Operations and Pinellas City of St. Maintenance $4,760,000 $4,760,000 Petersburg Buildings Replacement Project Dunedin Pinellas Pinellas Causeway $600,000 $600,000 County Resiliency and Ada tation Plan Tarpon Center City of Drive Nature Sarasota Venice Based Flood $950,000 $950,000 Mitigation Pilot Project County Project•Federal Sponsor Funding Funding Request Total Funding Funding Alachua City of Glen Springs $239,758 $239,758 Gainesville Creek Restoration City of Hampton City of Stormwater Bradford Hampton Infrastructure, $225,950 $225,950 Flood/Drainage Mitigation Broward County Brevard Broward Canal Structure S- $850,000 $850,000 County 27 Resilience Im rovements City of Satellite City of Beach: Public Brevard Satellite Works/Fire $5,000,000 $5,000,000 Beach Station Construction Project Dixon Blvd. at Brevard City of Cocoa Indian River Drive Water Quality and $1,619,449 $1,619,449 Resiliency Project Progresso Stormwater Broward City of Fort Flooding $13,495,743 $13,495,743 Lauderdale Improvements - City of Fort Lauderdale Boulevard Broward Gardens Broward County Neighborhood $8,750,000 $8,750,000 Stormwater Im rovements Andrews Avenue Broward Broward Bridge (860319) $1,000,000 $1,000,000 County Over New River Scour Protection Broward FLL Edgewood Broward County Park Stormwater $178,650 $178,650 Project FLL System 1 Broward Basin B Broward County Stormwater $242,450 $242,450 Interconnection Project Dorsey Riverbend Broward City of Fort Stormwater $10,482,997 $10,482,997 Lauderdale Flooding Im rovements FLL System 1 Broward Basin A Broward County Stormwater $259,100 $259,100 Interconnection Project SW 7th Avenue Broward Broward Bridge (864072) $1,000,000 $1,000,000 County Over New River Scour Protection Broward County Broward Canal Pump Broward County Station (S-45) $600,000 $600,000 Resilience Im rovements Replacement of Broward Andrews Avenue Broward County Bridge (860159) $3,500,000 $3,500,000 Over Canal C- 13/Middle River North New River Broward Broward Canal Resilience: $1,500,000 $1,500,000 County Septic to Sewer Conversion SE 3rd Avenue Broward Broward Bridge (864071) $1,000,000 $1,000,000 County Over New River Scour Protection Dania Cut -Off Broward Broward Canal Resilience: $4,750,000 $4,750,000 County Septic to Sewer Conversion Wastewater Broward Master Pump Broward County Station (No. 300) $2,900,000 $2,900,000 Resilience Rehabilitation Replacement of Broward NE 56th Street Broward County Bridge (864065) $2,750,000 $2,750,000 Over Cypress Waterway City of Dania Dania Beach Lift Broward Beach Stations 4,11, and $2,005,500 $2,005,500 12 Mitigation Port Everglades Broward Broward Bulkhead $32,536,859 $32,536,859 County Replacement Project - Group 1 Groundwater Broward Broward Resilience: Septic $4,500,000 $4,500,000 County to Sewer Conversion McCoys Creek Duval City of Branches $5,177,094 $5,177,094 Jacksonville Restoration Construction City of Cavalla Road Lift Duval Atlantic Station Flood $184,250 $184,250 Beach Protection Eleven Mile Creek Escambia North Stream Escambia County Restoration and $2,656,000 $2,656,000 Stormwater Enhancement Escambia Moreno and R Escambia County Street Retention $177,388 $177,388 Pond Lamb Avenue Hillsborough City of Canal $5,000,000 $5,000,000 Tampa Rehabilitation for Flood Relief City of Bonifay Holmes City of Critical $2,500,000 $2,500,000 Bonifay Stormwater Infrastructure Jackson Charm Road Jackson County Drainage $380,500 $380,500 Im rovements Town of Alford Jackson Town of Critical $2,976,784 $2,976,784 Alford Stormwater Miti ation Project Orange/Meridian Placemaking Project East Leon City of Drainage Ditch $572,052 $572,052 Tallahassee Improvements Design, Permitting, and Land Acquisition John Henry Levy City of Celebration Park $834,179 $834,179 Williston Drainage Im rovements Peace River Peace River Manasota Regional Manatee Regional Reservoir No. 3 $7,500,000 $7,500,000 Water (PR3) Project - Supply Final Engineering Authority City of LS03 Expansion Manatee Bradenton and LS13 $2,937,875 $2,937,875 Demolition Stormwater Martin Backf low Martin County Preventer $198,380 $198,380 Installation Program Phase II Martin Cypress Creek Martin County Restoration $750,000 $750,000 Project SW Mockingbird Martin Martin Lane Flood $1,807,000 $1,807,000 County Mitigation Town of South Sewall's Martin SewaII's Point Road Phase $2,900,000 $2,900,000 Point 2 South Town of Town of Sewall's Point Martin SewaII's Septic to Sewer $8,400,000 $8,400,000 Point (area south of SR A1A West Avenue Miami -Dade City of Miami Neighborhood $10,000,000 $10,000,000 Beach Adaptation Project Protecting a Coastal Regional Wastewater Miami -Dade Miami -Dade Treatment Plant $10,000,000 $10,000,000 County Vulnerable to Sea Level Rise and Strom Surge Flooding Raising Canal Bank Elevation in Miami -Dade Secondary Canals Miami -Dade County of the C-8 Basin $4,225,000 $4,225,000 to Protect against Flooding and Sea Level Rise Construction of Miami -Dade City of Miami Auburndale Flood $9,149,197 $9,149,197 Improvements Full Restoration of the Environmentally Miami -Dade Endangered Miami -Dade County Lands Program $2,500,000 $2,500,000 Managed Habitat located at Matheson Hammock City of Miami Bayshore Park Miami -Dade Beach Retention Lake $3,029,472 $3,029,472 Resiliency Project Storm Water Miami -Dade Miami -Dade Improvements - $250,000 $250,000 County West Transfer Station Shoreline 1 Long Monroe Key Living Monroe County Shoreline $900,000 $900,000 Adaptation Project Shoreline 3 Duck Monroe Key Living Monroe County Shoreline $3,327,266 $3,327,266 Adaptation Project Monroe County Area 26 Road Monroe Monroe Elevation $3,566,825 $3,566,825 County Resiliency and Adaptation Project #2 Nassau Nassau Thomas Creek $1,400,000 $1,400,000 Cou nty Land Acquisition Okaloosa Town of Glenwood Stream $500,000 $500,000 Cinco Bayou Restoration Okeechobee Okeechobee Berman Road $1,557,522 $1,557,522 Cou nty Drainage Buena Ventura Tohopekaliga Lakes Water Osceola Water Treatment Plant $1,529,187 $1,529,187 Authority (BVL WTP) Flood Mitigation Im rovements Corbett WMA Levee Upgrade to Protect ITID from Palm Beach Overtopping and Palm Beach County Breaching and $7,705,000 $7,705,000 Provide Southeast Corbett with Improved Recession Rates Thomas Street Palm Beach City of Stormwater Pump $2,500,000 $2,5001000 Delray Beach Station Improvement City of Boca Palm Beach City of Boca Raton Lake $700,000 $700,000 Raton Wyman Living Shoreline Project City of Boca Raton Old Floresta Palm Beach City of Boca Innovative $627,500 $627,500 Raton Sustainable Stormwater Infrastructure Project Historic Marine City of Way Seawall, Palm Beach Delray Beach Roadway and $10,000,000 $10,000,000 Drainage Im rovement South Florida Coastal Structures Palm Beach Water Enhancement and $6,290,625 $6,290,625 Management Self -Preservation District Mode Hardening of S-2, S-3, S-4, S-7, S-8 South Florida Engine Control Water Panels - Building Palm Beach Management Resiliency in $8,500,000 $8,500,000 District Water Management South of Lake Okeechobee South Florida L8 FEB / G-539 Palm Beach Water Pump Resiliency $4,000,000 $4,000,000 Management Upgrades District Wastewater Town of System Palm Beach palm Beach Resilience: A-39 $435,000 $435,000 Pump Station Dry Flood roofin West Palm Beach Palm Beach West Palm Tidal Valve $800,000 $800,000 Beach Adaptation Project Indian Trail M-0 Canal Palm Beach Improvemen Control Structure $397,110 $397,110 t District Shore Acre Pinellas City of St. Resiliency $7,874,335 $7,874,335 Petersburg Infrastructure Project Floridatown Living Santa Rosa Santa Rosa Shoreline $94,501 $94,501 County Implementation Project City of Sarasota Bay Sarasota Sarasota Resiliency $2,588,000 $2,588,000 Initiative St. Johns Coastal Groves St. Johns County Park Shoreline $450,000 $450,000 Restoration San Julian St. Johns St. Johns Secondary Outfall $421,950 $421,950 County (Drainage System Upgrade) Ft. Pierce Utilities St. Lucie City of Fort Authority Resilient $15,000,000 $15,000,000 Pierce Wastewater Adaptation City of Port St. Lucie Force Main St. Lucie City of Port Interconnect for $8,762,155 $8,762,155 St. Lucie Wastewater Treatment Resiliency Installation of Volusia Flood Mitigation Volusia County Measures to $800,000 $800,000 Daytona Regional Library City of New North Atlantic Volusia Smyrna Avenue Drainage $837,500 $837,500 Beach Improvements $46.8M $494,410,132