Loading...
HomeMy WebLinkAboutO-09534r f' OPDINANCE NO. ��� � .-, °' ,' i' 4 AN EMERGENCY ORDINANCE MAKING APPROPRIATIONS FOR CAPITAL IMPROVEMENTS. CONTINUING PREVIOUSLY APPROVED CAPITAL IMPROVEMENT PROJECTS, AND ESTAB- LISHING NEW CAPITAL IMPROVEMENT PROJECTS TO BEGIN DURING FISCAL YEAR 1982-83; CONTAINING A. REPEALER PROVISION AND A SEVERABILITY CLAUSE . WHEREAS, in accordance with Section 2-136 of the Miami City Code (198C) the Planning Department has prepared and submitted to the City Commission a Capital Improvement Program, which identifies the sources of funding of all proposed capital projects valued at S20,OCO or more for the program period 1982-88; and WHEREAS, the administration has abstracted certain projects proposed to be undertaken in fiscal year 1982-83 with General Obliga- tion Dond Funds, Revenue Bond Funds, Enterprise Funds Retained Earnings, Florida Power and Light Franchise Revenues, and with some federal funds, and included them in this proposed appropriations ordinance, as required by Sections 30 and 34 of the Miami City Charter; and WHEREAS, Resolution No. 78-712, adopted by the City Commission on November 9, 1978, authorized the Planning Department to review and update the Capital Improvement Program annually; and WHEREAS, the Capital Improvement Program has been reviewed and, in some cases, project totals have been revised; and WHEREAS, this appropriations ordinance includes those projects selected to be continued during fiscal year 1982-83 and reappropriates the previously authorized project funding totals; and WHEREAS, this appropriations ordinance includes new projects scheduled to begin during fiscal year 1982-83 and appropriates the project funding totals; and WHEREAS, provisions have been duly made by the City Commission for a Public Hearing on the proposed ordinance hefore the Commission and said Hearing thereon has been held; and WHEREAS, the City Commission has reviewed (and amended) the Capital Improvement Program and Capital Budget and has approved appropriations as huruin spi forth: NOW, THEREFORE, BE IT ORDAINED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The following appropriations hereby made by fund and project title include previously authorized projects and fund appropriations for implementation of all 11unicir)a1 capital improve- ments of the City of Miami, Florida. The sources of revenue to support the herein appropriations are hereby identified by fund and project: I. 1970 Pollution Control and Incinerator Facilities General Obligation Bond Fund A. Resources: from Fund Balance TOTAL RESOURCES B. Continued Projects: 1. Estimated Current Year Indirect Cost Allocation (303012) TOTAL APPROPRIATED Appropriation (in thousands of �) -38-3-* 30.3 30.3 30.3 30.3 (*Note: For illustrative purposes only, past project appropriations are reflected by figure appearing in left hand column which has been stricken through.) II. 1970 and 1980 Highway General Obligation Bond Fund A. Resources: from Fund Balance 7,133.6 TOTAL RESOURCES 7,133.6 B. Continued Projects: 1. Estimated Current Year Indirect Cost Allocation (307089) -31-6- 31.6 2. Highway General Obligation Bond Projects - Assessment Roll Expenses (307077) --�.-9- 1.0 3. Establishment of Tree Nursery (307065) -28-9- 28.0 4. Rebuild Sidewalks and Streets (307069) -69979- 500.0 5. Belle Meade Island Bridge (307070) -23978- 230.0 6. Brickell Plaza Improve- ment (307076) -39979- 600.0 7. Wynwood CD Paving Projects (307083) -37679- 375.0 8. SE 4th Street Improve- ments (307084) -479:9- 170.0 9. Citywide Paving Improve- ments (307085) -25979- 312.0 C. New Projects: 1. San Marco Street Improvements (Transferred to Item IX.C.0)1.) 86.0 2. Bird Avenue Improvements (Transferred to Item IX.C.(i)2.) 800.0 -2- 9534 Appropriation (in Thousands of 5) 3. Little River Street Improve- ments (Transferred to Item IX. C.(i)3.) 11000.0 4. Brickell Avenue Service Road Improvements (Trans- ferred to Item IX. C.(i)4.) 400.0 5. Buena Vista Street Improve- ments - Phase I (Transferred to Item IX. C.(i)5.) 1,200.0 6. East Allapattah Street Improve- ments (Transferred to Item IX. C.(i)6.) 1,100.0 7. Manor Street Improvements - Phase III 50.0 8. Grand Avenue Improvements 250.0 TOTAL APPROPRIATED 7,133.6 III. 1976 Fire Fighting, Fire Prevention and Rescue Facilities General Obliga- tion Bond Fund A. Resources: from Fund Balance 4,374.6 from Anticipated Bond Sales 2,152.0 - TOTAL RESOURCES 6,526.E B. Continued Projects: 1. Estimated Current _ Year Indirect Cost - Allocation (309035) --- 31.8 - 2. Rescue Service Apparatus and Equipment (309022) --47779- 477.9 ' 3. Fire Apparatus Acquisition, Replacements and Modifica- tions (309023) -3399878- 3,908.8 4. Hose Towers, Fire Preven- tion Vehicles, Fire Pumps and Other Fire Equipment (309027) --48973- 189.3 5. Computer Aided Dispatch System (309024) -;339876- 1,308.6 6. Central Data Base Computer _ System (309028) --64972- 610.2 TOTAL APPROPRIATED 6,526.6 IV. 1975, 1976 and 1980 Sanitary Sewer - General Obligation Bond Fund A. Resources: - from Fund Balance 1,657.6 from Anticipated Bond Sales 12,711.0 TOTAL RESOURCES 145368.6 B. Continued Projects: T. Estimated Current - Year Indirect Cost Allocation (302053) ---39-6- 30.6 2. Sanitary Sewer General Obligation Bond Projects - Assessment Roll Expenses (302046) ----4-9- 4.0 3. Bicentennial Park Sanitary Sewers (302030) --12579- 150.0 ' 4. Citywide Sanitary Sewer Extensions Improvement (302031) --59979- 500.0 - 5. Auburn Sanitary Sewers (302041) -3;79979- 3,200.0 6. Kirkland Sanitary Sewers Improvement (302042) _4i79979- 1,677.0 - 7. Koubek Sanitary Sewers Improvement (302043) -1199979- 1,182.0 -3 9534 11 4 Appropriation (in Thousands of S) 8. Central Sanitary Sewer Ii,rprovement (302044) -1,2AA-9- 1,200.0 9. Kinloch Sanitary Sewer Improvement (302045) -.6740P-9- 1,700.0 _ 10 West Flagler Street Sanitary Sewer Improvement - Phase 11 (302050) -59-9- 100.0 11. Citywide Sanitary Sewer Lateral Modifications _ (302051) -25.9- 25.0 C. New Projects: 1. Lynwood Sanitary Sewer Improvement �,200.0 2. Durham Sanitary Sewer Improvement 1,400.0 - TOTAL APPROPRIATED 14,368).6 - V. 1970 and 1978 Storm Sewer - General Obligation Bond Fund A. Resources: from Fund Balance 11,466.6 TOTAL RESOURCES 11,466.6 B. Continued Projects: 1, Estimated Current - Year Indirect Cost _ Allocation (301057) -39-6- 30.6 - 2. Lawrence Pump Station = Modifications (301040) -4979- 100.0 - 3. Tamiami Storm Sewers (301042) -99979- 784.0 4. Orange Bowl Pump Station _ - Modifications (301043) -89:9- 80.0 5. Local Drainage Projects (301034) -1,63578- 1,254.0 6. Riverview Storm Sewers - - Phase I (301036) -5795279- 5,052.0 7. Grapeland Storm Sewers - (301048) -59979- 500.0 8. Latin Quarter Storm Sewers - Phase II (301056) -26979- 260.0 9. Shenandoah Storm Sewers (301054) -;2-9- 12.0 C. New Projects: 1. San Marco Street Improve- ments (Transferred to Item IX. C.(i)l.) 44.0 2. Bird Avenue Improvements (Transferred to Item IX. C.(i)2.) 350.0 3. Little River Street Improve- ments (Transferred to Item IX. C.(i)3.) 500.0 _ 4. Brickell Avenue Service Road Improvements (Trans- ferred to Item IX. C.(i)4.) 200.0 5. Buena Vista Street Improve- ments - Phase I (Transferred to Item IX. C.(i)5.) 600.0 6. East Allapattah Street - Improvements (Transferred - to Item IX. C. (i)6.) 600.0 - si"y .f s Appropriation - (in thousands of 20. FEC Park Acquisition (305003) -1911.73-9- 19,283.3 _ (a) $15,173.0 - 1972 Park and Recreation Faci- lities General Obli- gation Bond Fund Balance - (b) $4,000.0 - Capital Improve- ment Fund, FY 1983 Florida - Power and Light Franchise Earnings (Transferred from Item IX.B.(i)13.) (c) $110.3 - Capital Improve- ment Fund, FEC Boat - Dockage Revenues (Trans- ferred from Item IX.B. (i)14.) (d) From Capital Improvement Fund Proceeds of the Interama - Land Sale -47999.9- TOTAL APPROPRIATED 26,562.5 VII. 1970 Police Headquarters and Crime Prevention Facilities General Obligation Bond Fund _ A. Resources: from fund Balance TOTAL RESOURCES 4,214.0 4,214.0 B. Continued Projects: -_ 1. Estimated Current Year Indirect Costs Allocation (304031) -39.6- 30.6 2. Initial Facilities Occupation (304017) -45-2- 45.2 3. Police Phase IV Systen Expansion (304026) -1382478- 2,524.8 - 4. Police Parking Garage Improvement (304027) -279.9- 270.0 — 5. Central Data Base Computer System (304025) -443.4- 443.4 C. New Projects: 1. Purchase of Police - Helicopters 900.0 TOTAL APPROPRIATED 4,214.0 VIII. 1976 Housing General Obligation Bond Fund A. Resources: from Fund Balance 4,400.0 from Anticipated Bond Sales 10,200.0 from Accrued Interest Earnings 400.0 a loan from Capital Improve- ment Fund, FY 1982 Fund Balance 500.0 TOTAL RESOURCES 15,500.0 B. Continued Projects: 1. Housing Development Program (312004) -6;89979- 11,000.0 - 2. Land Acquisition and Site . Assembly for Affordable Rental Housing (312007) -47699:9- 4,500.0 TOTAL APPROPRIATED 15,500.0 -6- 9534 r 7. West End Storm Sewers - Phase II 8. West End Storm Sewers - Phase III 9. Wagner Creek Restoration TOTAL APPRCPRIATED V1. 1972 Park and Recreational Facilities General Obligation Bond Fund A. Resources: from Fund Balance from Capital Improvement Fund, FY 1983 Florida Power and Light Franchise Revenues from Capital Improvement Fund, FEC Boat Dockage Revenues TOTAL RESOURCES B. Continued Projects: 1. Estimated Current Year Indirect Cost Allocation (305166) 2. Bicentennial/Bayfront Park Acquisition and Development (305005) 3. African Square Park (305059) 4. Velodrome (305114) 5. Gibson Park Development (305136) 6. Lemon City Park (305140) 7. Melrose Park Acquisition and Development in Alla- pattah (305141) 8. Dorsey Park Development (305143) 9. Curtis Park Development (305147) 10. Fort Dallas Park Develop- ment (305148) 11. Riverside Park Development (305151) 12. Citywide Parks for People Contingency Fund (305137) 13. Remaining Parks for People District I Improvements (305152) 14. Remaining Parks for People District II Improvements (305153) 15. Remaining Parks for People District III Improvements (305154) 16. Remaining Parks for People District IV Improvements (305155) 17. Remaining Parks for People District VII Improvements (305138) 18. Remaining Parks for People District VIII Improvements (305139) 19. Maceo Park Fencing (305165) Appropriation (in thousands of $) 250.0 350.0 500.0 11,466.6 22,452.2 4,000.0 26,562.5 3T-6- 31.6 6; 8�-5- -46-9- -�4-9- -832-2- -76-1•- -22.5- -499-9- -399-9- -29-9- -76-3- -;99-4- 5,181.5 45.0 14.0 832.2 75.1 22.5 100.0 300.0 20.0 75.3 100.4 71.0 12.0 18.6 263.0 89.0 16.0 12.0 -5- v524 IX. Capital Improvement Fund A. Resources: from FY 1982 Fund Balance a loan from FY 1982 Fund Balance from 1970 and 1980 Highway General Obligation Bond Fund Balance from 1970 and 1978 Storm Sewer General Obligation Bond Fund Balance from 1976 Fire Fiqhting, Fire Prevention and Rescue Facilities General Obliga- tion Bond Fund Balance from Anticipated 1981 Fire Fighting, Fire Prevention and Rescue Facilities General Obligation Bond Fund Sale from 1970 Police Headquarters and Crime Prevention Faci- lities General Obligation Bond Fund Balance from 1972 Park and Recreational Facilities General Obligation Bond Fund Balance from FY 1983 Florida Power and Light Franchise Revenues from U.S. Department of Housing and Urban Development Open Space Land Program from U.S. Department of the Interior Urban Park and Recreation Recovery Fund from U.S. Department of the Interior Land and Water Conservation Fund from U.S. Department of the Interior Contingency Reserve Fund from U.S. Department of Transportation Urban Mass Transportation Administration Fund from U.S. Department of Commerce Economic Development Administra- tion Fund from Federal Revenue Sharing from National Endowment for the Arts from Florida Department of Natural Resources Land Acquisition Trust Fund from Florida Recreation Develop- ment Assistant Program from FY 1982 Florida Gas Tax Refund from Anticipated FY 1983 Florida Gas Tax Refund from Miley Property Rent a loan from Proceeds of the Interama Land Sale from Proceeds of Virginia Key Landfill Sale from Bayfront Park Bandshell Area Parking Revenues from FEC Boat Dockage Revenues frori FY 1979 Fund Balance - levolvinq Fund from FY 1983 Special Programs and Accounts TOTAL RESOURCES Appropriation (in thousands of S) 7,625.6 200.0 7,216.0 3,4d 5.0 2,140.2 1 ,967.0 10.0 3,414.5 5,300.0 250.0 1,427.7 721.7 600.0 30.0 4,380.4 150.0 50.0 500.0 700.0 60.0 60.0 134.0 150.0 375.0 75.0 110.3 25. o -7- `J 5 3 '- Appropriation (in thousand of S) B. Contts: (i) Projecl.s Funded with 11tiltk.le Sources of R�:vC.r j'?: 1 . Minor Street- Improve - runts - Phase I ( >1 SM0.0 - 19*70 N20 H i(jhviay General Ohl ic�a tion Bond Fund Ba 1 a'lce (bl $321 .0 - 1970 and _ 1978 Stor"1 Sewer' Ceneril Obligation Bond Fund D,_rlance 2. AllapAt.ah treeL' Iiiprove- ments - F'ha ,s T ( 50032) -1•;LF;O7f:- 1,200.0 (a) 5800.0 •- 1970 and 1980 h i ahvia l General Obligation Gond '-und Balance — (b) $400.0 - 1970 and 197:3 Storer Sek,,,er General OLligratio!i "bond FUnd ' Balance - 3. ('Manor Street Improvements - Phase IT (350033) -1720670- 1,200.0 (a) 5300.0- 1970 and 198C Highway Ceneral Ob1S- gation Bond Fund Balance _ (b) $1100.0 - 1970 and 1978 - Storm Sck�rer General Obligation Bond Fund Balance 4. Fire Training Facility and Close Circuit Television System (350076) -3;05'.2- 3,012.2 - (-)) S2.1.10.2 - 1976 Fire Fighting, Fire Prevon•- Lion and Rescuo Facili- uics Gr_neral Obligation - ►.end Fund Balance (b) $667.0- Anticipated 1';31 F'i)-e Fightirig, Fire Prevention and - R(;rcue Faci l i ties General Obligation Bond Fund Sale l,c) 5;100.0 - FY 1982 Fund Balance (d) $125.0 - a loan from FY 1982 Fund Balance 5. Buena Vista Street Improve- ments in N.S.A. (350084) -39670- 260.0 (a) $230.0 - 1970 and 1980 Highway General Obliga- tion Bond Fund Balance (b) $30.0 - 1970 and 1978 Storm Sewer General Obliga- tion Bond Fund Balance -8- 9 5 3 1- 4 6. 7. 8 9. 10. *11 *12. Appropriation (in thousands of S) Jose Marti Riverfront Park - Phase I (350036)-2765375- 2,334.0 (a) $1,364.3 -1972 Park and Recreational Facilities General Obligation Bond Fund Balance (b) $250.0 - U.S. Depart- ment of Housino and Urban Development Open Spare Land ProSram (c) $719.7 - U.S. Department of the Interior Urban Park and Recreation Recovery Fund Jose Marti Riverfront Park - Phase II (350101) 819.5 (a) $319.5-U.S. Department of the Interior Land and Water Conservation Fund (b) S500.0 - Florida Depart- ment of Natural Resources Land Acquisition Trust Fund Matson Island Development (350037)-94879- 948.9 (a) S497.9 - 1972 Park and Recreational Facilities General Obligation Bond Fund Balance (b) S451.0- FY 1982 Fund Balance Tacolcy Park (350041)-49€79- 456.9 (a) S446.9 - 1972 Park and Recreational Facilities General Obligation Bond Fund Balance (b) $10.0 -FY 1982 Fund Balance Blue Lagoon Park Develop- ment (350030)-1347879- 1,503.9 (a) $451 .7 - 1972 Park and Recreational Facilities General Obligation Bond Fund (b) S402.2 - U.S. Depart- ment of the Interior Land and Water Con- servation Fund (c) $175.0- Proceeds of Virginia Key Landfill Sale (d) 5450.0 - FY 1982 Fund Balance (e) `i25.0 - FY 1983 Special Programs and Accounts Bayfront Park Redevelop- ment (350031)-469--3- 504- 3 (a) $54.3 -1972 Park and Recreational Facili- ties General Obliga- tion Bond Fund Balance (b) $50.0 - National Endow- ment for the Arts (c) $75.0- Bayfront Park Bandshell area Park- ing Revenues (d) S325.0- FY 1982 Fund Balance Bayfront Park Baywalk (350055)-69879- 600.0 (a) S200.0 -Florida Recreation Development Assistance Program *11.-(Formally called Noguchi Earth Sculpture) *12.-(Formally called Bayfront Bulkhead Replacement) Pa 5 3 4 14. 16. *17 (b) $200.0- Proceeds of Virginia Key Land- fill Sale (c) $200.0 - FY 1982 Fund Balance Park Rehabilitation for Those With Special Needs (350040) (a) S303.5 - FY 1972 Park and Recreational Facilities General Obligation Bond Fund Balance (b) S708.0-U.S. Depart- ment of the Interior Urban Park and Recrea- tion Recovery Fund FEC Park Acquisition (350092) (a) S4,000.0 -FY 1983 Florida Power and Light Franchise Revenues (Transfer- red to Item VI.B.20.) (b) 5110.3 - FEC Boat Dockage Revenues (Transferred to Item VI.B.20.) Microwave Communication System (350068) (a) S10.0-1970 Police Headquarters and Crime Prevention Facilities General Obligation Bond Fund Balance (b) S10.0 - FY 1982 Fund Balance Coconut Grove Exhibition Center - Additional Work (350033) (a) S150.0 - Federal Revenue Sharing (b) S650.0 - FY 1982 Fund Balance (c) S400.0 - FY 1983 Florida Power and Light Fran- chise Revenues Downtown Component of Metro - rail ( 350034 ) - Less Credit for Conven- tion Center (420001; 420002) of: (a) $30.0 -U.S. Depart- ment of Transporta- tion Urban Mass Transportation Adi;,ini- stration Fund (b) $2,575.0 -FY 1982 Fund Balance Charlie Hadley Park Reno- vations (350048) (a) S500.0 - U.S. Depart- ment of the Interior Contingency Reserve Fund (b) $250.0 - Florida Recrea- tion Development Assis- tance Program (c) $250.0 -FY 1982 Fund Balance Appropriation (in thousands of S) -I;AII-S- 1,011.5 -19; 737e- 4,110.3 -29.9- 20.0 -888 -0 - 1 , 200.0 -2;695-9- 2,605.0 479970- (700.0) -;3A9A79- 1,000.0 -17.-(Formally called Downtown People Mover) (Formally called Manor Park -10- Renovations) 9 -5 *3 4 -- ,-,.: ,;i�.wm,��:.- 3nY ,.; .;a �„ :, ., .- .:•�; .... Ss ^�:.nr _...,�,®.r..�.��s-_.,�P.e,,».,..•P,..,a�,..,,»,.,.........o..,.�--- Appropriation (in thousands of S) IS. Gibson Park Ball Field Lighting (350049) -29979- 200.0 (a) $100.0 -U.S. Depart- ment of the Interior Contingency Reserve Fund (b) $50.0 -Florida Recrea- tion Development Assis- tance Program (c) S50.0 -FY 1982 Fund Balance 20. Miami River Walkway _ Development - Phase I (350087) -42279- 422.9 (a) $295.9 - 1972 Park and Recreational _ Facilities General - Obligation Bond Fund Balance (b) $127.0 -FY 1982 Fund Balance 21. Advanced Probeyes (350089) -29-9- 20.0 _ (a) S9.0 - Miley Property Rent (b) $11.0 - FY 1982 Fund Balance 22. Purchase of Asphalt (350091) 120.0 (a) S60.0 - FY 1982 Florida = Gas Tax Refund (b) S60.0 - Anticipated FY _ 1983 Florida Gas Tax Refund - 23. Virginia Key Recreation Area Development (350085) -25979- 450.0 -' (a) S200.0 -Florida Recrea- tion Development Assis- tance Program (b) $250.0 -FY 1982 Fund Balance (ii) Projects Funded with Single Sources of Revenue: - 1, Fire Garage and Station 13 Modification and Ex- pansion (350097) 1,000.0 (a) $1,000.0 -Anticipated = 1981 Fire Fighting, Fire Prevention and Rescue Facilities General Obligation Bond Sale 2. Renovation of Fire Sta- tions #1, #2, #5, and #8 (350098) -39979- 300.0 (a) $300.0 -Anticipated 1981 Fire Fighting, Fire Prevention and _ Rescue Facilities General Obligation Bond Sale 3. Swimming Pool Renovations (350054) -4497A- 440.0 (a) $440.0 - FY 1982 Fund Balance 4. Renovation of General " Accounting (350065) -42579- 425.0 (a) $425.0 - FY 1982 Fund - Balance 5. Acquisition of Miley Property (350019) -1.3�79- 125.0 (a) $125.0 - Miley Property Rent 6. City Hall Renovations (350042) -25-A- 25.0 (a) $25.0 -FY 1979 Fund 9534 V 7. 8 9 10 12. 13 14. 15 16. 17 on 19 20. 21. Appropriation (in thousands of S) Balance -Revolving Fund Latin Quarter Street Improvements (350032) -2;80q79- 2,000.0 (a) 52,000.0 - U.S. Department of Commerce Economic Development Admini- stration Fund Elizabeth Virrick Gym Renovations - Phase II (350050) -56-5- 56.5 (a) 556.5 -FY 1982 Fund Balance New City Administration Building Employee Park- ing (350052) -1537�- 153.1 (a) S153.1 -FY 1982 Fund Balance Bicentennial Park Parking Lot Lighting (350058) -29 4 - 20.0 (a) S20.0 -FY 1982 Fund Balance Fire Department Apparatus Replacement (350059) -9978- 50.0 (a) S50.0 -FY 1982 Fund Balance Major Maintenance - Miami Stadium (350060) -47579- 255.0 (a) 5255.0 - FY 1982 Fund Balance Coordinated Citywide Tele-Communications System (350062) -394- 35.0 (a) $35.0 - FY 1982 Fund Balance Citywide Tree Planting Program and Tree Bank (350063) -4979- 100.0 (a) $100.0 - FY 1982 Fund Balance Henderson Park Building Renovations (350064) -2.9- 2.0 (a) S2.0 - FY 1982 Fund Balance Overtown Neighborhood Shopping Center (350066) -;.58874- 1,580.4 (a) S1,580.4 - U.S. Depart- ment of Commerce Eco- nomic Development Administration Fund Watson Island Marinas (350081) -;9979- 150.0 (a) $150.0 -a loan from Proceeds of the Interama land Sale Communications Mainte- nance Shop Addition (350086) -99-9- 50.0 (a) $50.0 - FY 1982 Fund Balance Virrick Gym Boat Ramp Improvement (350088) -38.9- 38.9 (a) $ 38.9 - FY 1982 Fund Balance Parks Mechanization Program (350090) -28979- 280.0 (a) $280.0 - FY 1982 Fund Balance Bayfront Areas Master Plan and Model (350093) -394- 30.0 (a) S30.0- FY 1982 Fund Balance -12- 9 Appropriation (in thousands of S) ��. Fueling Facility - Additional Fuel Tanks (350099) (a) S11.1- FY 1982 Fund Balance 23. Gusman Cultural Center/ Olympia Building Renova- tion (350096) -75-A- 75.0 (a) S75.0-a loan from FY 1982 Fund Balance C. New Projects: (i) Projects Funded with Multiple Sources of Revenue: 1. San Marco Street Improve- ments 130.0 (a) $86. 0 -1970 and 1980 Highway General Obli- gation Bond Fund Ba- lance (Transferred from Item II.C.1.) (b) S44.0 - 1970 and 1978 Stor�rr Sewer General Obligation Bond Fund Balance (Transferred from Item V.C.1.) 2. Bird Avenue Improvements 1,150.0 (a) S800.0 -1970 and 1980 Highway General Obli- gation Bond Bund Ba- lance (Transferred from Item II.C.2.) (b) $350.0 - 1970 and 1978 Storm Sewer General Obligation Bond Fund Balance (Transferred from Item V.C.2.) 3. Little River Street Improve- ments 1,500.0 (a) S1,000.0 - 1970 and 1980 Highway General Obliga- tion Bond Fund Balance (Transferred from Item II.C.3. ) (b) $500.0 - 1970 and 1978 Storm Sewer General Obligation Bond Fund Balance (Transferred from Item V.C.3.) 4. Brickell Avenue Service Road Improvements 600.0 (a) $400.0- 1970 and 1980 Highway General Obliga- tion Bond Fund Balance (Transferred from Item I1.C.4.) (b) $200.0-1970 and 1978 Storm Sewer General Obligation Bond Fund Balance (Transferred from Item V.C.4.) 9,534 11 Buena Vista Street Improvements - Phase I (a) S1,200.0 - 1970 and 1980 Highway General Obliqation Bond Fund Balance (Transferred from Item II.C.5.) (b) $600.0 - 197U and 19/8 Storm Sewer General Obligation Bond Fund Balance (Transferred from Item V.C.5.) East Allapattah Street Improvements (a) $1,100.0 - 1970 and 1980 Highway General Obliga- tion Bond Fund Balance (Transferred from Item II.C.6.) (b) S600.0- 1970 and 1978 Storm Sewer General Obligation Bond Fund Balance (Transferred from Item V.C.6.) Model City Shopping Center (a) $800.0 - U.S. Depart- ment of Commerce Economic Development Administration Fund (b) 5400.0 - FY 1983 Florida Power and Light Fran- chise Revenues Projects Funded With Single Sources of Revenue: 1. Miami Stadium Concert Staqe (a) S220.0 - FY 1982 Fund Balance 2. Insurance Exchanqe (a) S500.0 - FY 1983 Florida Power and Light Franchise Revenues TOTAL APPPOPPIATEP Appropriation (in thousands of S) 1,800.0 1,700.0 1 ,200.0 220.0 500.0 41,142.4 X. James L. Knight Convention Center Enterprise Fund A. Resources: from Convention Center Revenue _ Bonds 42,007.0 from Convention Center Revenue Bonds Interest 7,001.0 from U.S. Department of Housing and Urban Development Urban Action Grant 4,994.0 from Dade Savings Escrow Account 4,854.0 from Capital Improvement Fund, Proceeds of the Interama Land r Sale-499979- 8,500.0 from Capital Improvement Fund, Credit from Downtown Component of Metrorail (350034) 700.0 from Capital Improvement Fund, FY 1982 Fund Balance 2,722.0 - from Capital Improvement Fund, FY 1983 Florida Power and Light _ Franchise Revenues 209.0 -ln- i) 5 3 4 ■ MIFF.,ik�R"`A•, 't �-. k C '��-Y: W., i .,aKy- .. Appropriation (in thousands of S) a loan from Capital Improve- ment Fund, FY 1982 fund Balance 750.0 a loan from Capital Improve- ment Fund, FY 1984 Florida Power and Light Franchise Revenues JAI 1.0 TOTAL RESOURCES 72,778.0 B. Continued Projects: 1. City of Miami/University of Miami - James L. Knight International Center and Parking Garage (420001, 420002 - Garage)-727778-0- 72,778.0 TOTAL APPROPRIATED 72,778.0 XI. Orange Bowl Stadium Enterprise Fund A. Resources: from Anticipated Resort Tax Revenues 1,125.0 from a loan from Capital Improvement Fund, FY 1982 Fund Balance 404.0 - TOTAL RESOURCES 1,529.0 = B. Continued Projects: 1. Orange Bowl Improvements: —_ Improvements to the Scoreboard System (404021) -1.7579- 175.0 2. Orange Bowl Improvements: Portable Bleachers for _ West End Zone (404022) -3070- 30.0 3. Orange Bowl Improvements: - First Aid Center (404023) -19979- 100.0 4. Orange Bowl Improvements: Stadium External Public Address System (404024) -579- 5.0 5. Orange Bowl Improvements: Sound System Improvements (404026) -5070- 50.0 6. Orange Bowl Improvements: Television Camera/Monitor Security System (404027) -5070- 50.0 7. Orange Bowl Improvements: Ride -on Floor Scrubber (404028) -20-0- 20.0 8. Orange Bowl Improvements: Concession Stand TV Monitors (404029) -1570 15.0 9. Grange Bowl Improvements: — Portable Sale Stands and Equipment for Orange Juice Sales (404030) -3570- 35.0 10. Orange Bowl Improvements: Protective Fence, Posts, _ and Field Lighting (404032) -37470- 374.0 C. New Projects: 1. Orange Bowl Improvements: - Structural Improvements 275.0 -15- 9534 Appropriation (in thousands of $) 2. Orange Bowl Improvements: Field Lighting Fixtures Replacement 3. Orange Bowl Improvements: Deteriorated Seating Repair and/or Replacement TOTAL APPROPRIATED XII. Government Center Parking Garage Enterprise Fund A. Resources: 1981 Parking Revenue Bond Fund TOTAL RESOURCES B. Continued Projects: 200.0 200.0 1,529.0 10,400.0 10,400.0 1. Government Center Parking Garage (425002)-1914994- 10,400.0 TOTAL APPROPRIATED 10,400.0 XIII. Parking Capital Projects Fund A. Resources: a loan from Capital Improve- ment Fund, Proceeds of the Interama Land Sale 60.0 a loan from Capital Improve- ment Fund, FY 1982 Balance 154.0 — TOTAL RESOURCES 214.0 B. Continued Projects: (i) Projects Funded with Multiple Sources of Revenue: 1. Core Area West Parking Garage (360003) -139:9- 154.0 (a) $30.0 - a loan from Capital Improvement Fund, Proceeds of the Interama Land Sale (b) $124.0 - a loan from Capital Fund, FY 1982 Fund Balance 00 Projects Funded with Single Sources of Revenue: ' 1. Parking Facility in Omni Area (360002) -39:9- 30.0 (a) $30.0 - a loan from Capital Improvement Fund, Proceeds of the Interama Land Sale -16- 9534 r .a Appropriation (in thousands of $) 2. Feasibility and Design Studies for Parking Structures in the Miami Design Plaza (360004) -39-9- 30.0 (a) $30.0 - a loan from Capital Improvement Fund, FY 1982 Fund Balance TOTAL APPROPRIATED 214.0 XIV. Miamarina Enterprise Fund A. Resources: Miamarina Retained Earnings 82.5 TOTAL RESOURCES 82.5 B. Continued Projects: 1. Miamarina and Watson Island Marinas - Major Maintenance -82-5- 82.5 ( 451003 ) TOTAL APPROPRIATED 82.5 XV. Dinner Key Marina Enterprise Fund A. Resources: Dinner Key Marina Retained Earnings 425.0 TOTAL RESOURCES 425.0 B. New Projects: 1. Major Maintenance - Dinner Key Marina 425.0 TOTAL APPROPRIATED 425.0 -17- _ 9 5 3 4 E, E Section 2. This ordinance is an ordinance of Drecedent and all other ordinances in conflict with it are hereby held null and void insofar as they pertain to these appropriations. The appropriations are the anticipated expenditure requirements for the City, but are not mandatory should unexpected difficulties arise in the planning, design, construction, and administration of projects, or if altered economic conditions indicate that a curtailment in certain expendi- tures is necessary or desirable for the general welfare of the City. The City Manager is specifically authorized to transfer between accounts within the same project and withhold any of these appropriated funds from encumbrance or expenditure should such action appear ad- vantageous to the City. Section 3. The City Manager is directed to file with the City Clerk and the County Clerk a statement of the proposed expendi- tures and estimated revenues for the fiscal year 1982-83, which shall be entitled "Capital Budget of the City of Niami, fiscal year October 1, 1982, through September 30, 1983." Section 4. The City Manager is hereby authorized to invite or advertise bids for the purchase of any material, equipment, or physical improvement embraced in the aforementioned appropriations or which may be provided for in accordance with the authority of Section 2, for which formal bidding is required; such bids to be returnable to the City Commission or City Manager in accordance with Charter or Code provi- sions. Section 5. If any section, part of section, paragraph, clause, phrase or word of this ordinance is declared invalid, the remaining provisions of the ordinance shall not be affected. Section 6. All ordinances or parts of ordinances, insofar as they are inconsistent or in conflict with the provisions of this ordinance, are hereby repealed. Section 7. This ordinance is hereby declared to be an emergency measure on the grounds of urgent public need for the preservation of peace, health, safety, and property of the City of Miami, and upon the further ground of the necessity to allow City Departments to proceed with capital projects in an expeditious manner. sm .9534 PASSED AND ADOPTED BY TITLE ONLY this )t 11 day of Decembur 1982. ATTEST'. Z«�� - "" _� Cam' ��,.•i ./j fc- RALCP6/G ONGIE, CITY CLERK PLANNING REVIEW: JOSEPiH W. MCMANUS, ACTING DIRECTOR PLANNING DEPARTMENT FINANCE REVIEW: CARLOS GARCIA, DIRECTOR FINANCE DEPARTMENT BUDGETARY REVIEW: MANOHAR S. SURANA," RECTOR ` MANAGEMENT AND BUD6FT DEPARTMENT LEGAL REVIEW: Lc ROBERT F. CLARK, DEPUTY CITY ATTORNEY Ilaur.ic�+ 11. MAURICE A. FERRE, M A Y O R APPROVED AS TO FORM AND CORRECTNESS: ;� 4czt ­/,eA� SE R. GARCIA-PEDROSA CITY ATTORNEY _19- 9534 TO Howard V. Gary City Manager FROM Aseph W. McManus Acting Director Planning Department CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM DATE November 23, 1982 FILE SUBJECT Changes to the Proposed FY ' 83 Capital Improvement Appropriatio Ordinance REFERENCES ENCLOSURES Please note the following changes to the proposed FY '83 Capital Improvement Appropriations Ordinance scheduled on the December 9, 1982, City Commission agenda. _ Grand Avenue Improvements (II.C.8.) has been added as a new project in the amount of $250,000 available from the 1970 and 1980 Highway General Obligation Bond Fund. Appropriations for Lynwood Sanitary Sewer Improvement (IV.C.1.) and Durham Sanitary Sewer Improvement (IV.C.2.) have been increased to $3,200,000 and $1,400,000, respectively, available from the Sanitary Sewer General Obligation Bond Fund Anticipated Bond Sales. Buena Vista Street Improvements in N.S.A. (IX.B.(i)5.) was inad- vertently deleted from the appropriations ordinance. The project now appears as a $260,000 appropriation available from 1970 and 1980 Highway Bond Funds and 1970 and 1978 Storm Sewer Bond Funds. Appropriations for Blue Lagoon Park Development (IX.B.(i)10.) has been increased by the amount of $25,000 available from FY 1983 Special Programs and Accounts. Enterprise Funds have been set up for Miamarina and Dinner Key Purina. The Miamarina and Watson Island Marinas - Major Maintenance (XIV.B.1.) capital project has been removed from the Capital Improvement Fund. The project appears in the Miamarina Enterprise Fund in the amount of $82,500 available from Miamarina Retained Earnings. Major Maintenance Dinner Key Marina (XV.B.1.) has been removed from the Capital Improve- ment Fund and set up as a new project in the Dinner Key Marina Enter- prise Fund in the amount of $425,000 available from Dinner Key Marina Retained Earnings. "II. 1970 and 1980 Highway General Obligation Bond Fund A. Resources: from Fund Balance -6 BB-3 6- 7,133.6 TOTAL RESOURCES-6;88376- 7,133.6 Page 1 of 5 9534 i CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM -6 TO Howard V . Gary DATE November 23, 1982 FILE City Manager SUBJECT Changes to the Proposed FY ' 83 Capital Improvement Appropriation_ Ordinance FROM Aseph W. McManus REFERENCES Acting Director Planning Department ENCLOSURES Please note the following changes to the proposed FY 183 Capital Improvement Appropriations Ordinance scheduled on the December 9, 1982, City Commission agenda. Grand Avenue Improvements (II.C.8.) has been added as a new project in the amount of $250,000 available from the 1970 and 1980 Highway General Obligation Bond Fund. Appropriations for Lynwood Sanitary Sewer Improvement (IV.C.1.) and Durham Sanitary Sewer Improvement (IV.C.2.) have been increased to $3,200,000 and $1,400,000, respectively, available from the Sanitary Sewer General Obligation Bond Fund Anticipated Bond Sales. Buena Vista Street Improvements in N.S.A. (IX.B.(i)5.) was inad- vertently deleted from the appropriations ordinance. The project now appears as a $260,000 appropriation available from 1970 and 1980 Highway Bond Funds and 1970 and 1978 Storm Sewer Bond Funds. Appropriations for Blue Lagoon Park Development (IX.B.(i)10.) has been increased by the amount of $25,000 available from FY 1983 Special Programs and Accounts. Enterprise Funds have been set up for Miamarina and Dinner Key Marina. The Miamarina and Watson Island Marinas - Major Maintenance (XIV.B.1.) capital project has been removed from the Capital Improvement Fund. The project appears in the Miamarina Enterprise Fund in the amount of $82,500 available from Miamarina Retained Earnings. Major Maintenance Dinner Key Marina (XV.B.1.) has been removed from the Capital Improve- ment Fund and set up as a new project in the Dinner Key Marina Enter- prise Fund in the amount of $425,000 available from Dinner Key Marina Retained Earnings. "II. 1970 and 1980 Highway General Obligation Bond Fund A. Resources: from Fund Balance-6788376- 7,133.6 TOTAL RESOURCES 6,8$376- 7,133.6 Page 1 of 5 9534 �F�i7£n'yS�.�a� xiM} :.•r .+ ,k .fix �' }�:P� �y�`5,�..:` .. _ _. „-_ .. �.•�,�r,��..�..�.��_ -w:r..z ifs.—..- Howard V. Gary November 23, 1982 C. New Projects: * * * * * * 8. Grand Avenue Improvements 250.0 * * TOTAL APPROPRIATED-6788376- 7,133.6 - * * IV. 1975, 1976 and 1980 Sanitary Sewer General Obligation Bond Fund A. Res nurrr-a x * from Anticipated Bond Sales-8-888-8- 12,711.0 TOTAL RESOURCES-18;�5�-6- 14,368.6 * C. New Projects: 1. Lynwood Sanitary Sewer Improvement -89-g- 3,200.0 2. Durham Sanitary Sewer Improvement-389-8- 1,400.0 * TOTAL APPROPRIATED 14,368.6 * IX. Capital Improvement Fund A. Resources: * Page 2 of 5 9534 Howard V. Gary November 23, 1982 from 1970 and 1980 High- way General Obligation Bond Fund Balance-67966-8•- 7,216.0 from 1970 and 1978 Storm Sewer General Obligation Bond Fund Balance-37415-9- 3,445.0 * * frem-Marinas-Retained Earnings * * from FY 1983 Special Programs and Accounts 25.0 * * TOTPZ RESOURCES-41736479- 41,142.4 B. Continued Projects: (i) Projects Funded With Multiple Sources of Revenue: * * S. Buena Vista Street Improvements in N.S.A. (350084) 260.0 (a) $230.0 - 1970 and --------------------- 1980 Highway General Obli ation Bond Fund Balance (b) $30.0 - 1970 and 1978 Storm Sewer General Obligation Bond Fund Balance * Page 3 of 5 * * * * 9534 al��.jw:,y31; �•'i.�1yY Howard V. Gary November 23, 1982 Howard V. Gary November 23, 1982 9. Blue Lagoon Park Development-174-78-9- 1,503.9 (e) $25.0 - FY 1983 Special Programs and Accounts (ii) Projects Funded with Single Sources of Revenue: 22---Miax�arina-anel-Watsen �91ane1-Marinas-- Ma�ar-Maintenanee �a}--$g2-5-Marinas-- Retained-Earnings C. New Projects: (ii) Projects Funded With Single Sources of Revenue 17--Ma7ar-Maintenanee-- 94:nner-Rep-Marina -4�5-6- 4a}--$425-A--- Marinas -- Retained -Earnings XIV. Miamarina Enterprise Fund A. Resources: Miamarina Retained Earnings 82.5 TOTAL RESOURCES 82.5 B. Continued Projects: 1. Miamarina and Watson Island Marinas - Major Maintenance -6-2 5- 82.5 451003 TOTAL APPROPRIATED 82.5 Page 4 of 5 9534 3 4 c Howard V. Gary November 23, 1982 XV. Dinner Key Marina Enterprise Fund A. Resources: Dinner Key Marina Retained Earnings 425.0 TOTAL RESOURCES 425.0 B. New Projects: - 1. flajor Maintenance - Dinner Key Marina 425.0 - TOTAL APPROPRIATED 425.0" The Departments of Planning, Public Works, Management and Budget, Finance, and Law have reviewed and approved these additions to the proposed ordinance. The original copy of the FY '83 Capital Improve- ments Appropriations Ordinance has been revised to reflect the afore- mentioned changes. JWM/AW/vb Attachment Page 5 of 5 9534 MIAMI REVIEW AND DAILY RECORD Published Daily except Saturday. Sunday and Legal Holidays Miami. Dade County, Florida STATE OF FLORIDA COUNTY OF DADE: Before the undersigned authority personally appeared Dianna Stuver, who on oath says that she is the Assistant to the Publisher of the Miami Review and Daily Record, a daily (except Saturday, Sunday and Legal Holidays) newspaper, published at Miami In Dade County, Florida; that the attached copy of advertisement, being a Legal Advertisement of Notice In the matter of CITY OF MIAMI RE: ORDINANCE NO. 9534 X X X In the ......................................... Court, was published in .:aid newspaper In the Issues of Dec.17, 1982 Athant further says that the said Miami Review and Daily Record is a newspaper published at Miami In said Dade County, Florida, and that the said newspaper has heretofore been continuously published In said Dade County, Florida, each day (except Saturday. Sunday and Legal Holidays) and has been entered as second class mall matter at the post office In Miami in said Dade County, Florida, for a period of one year next preceding the first publication of the attached copy of advertisement; and effieni further says that she has neither paid not promised any person, firm or corporation any discount. rebate, commission or refund for the purpose of securing this advertisement for publication 19,ths-said newspaper. Swofhy to' aqd subscribed before me this 17th day of = BG. 82 A.Di.19 "� i • ty J_Brooks fi,y, PLblip,�S)ale' of. Florida at Large (SEAL) My Commission expires June ri!i188W, MR 116 4 or MIAMI kAL NOTICE All interested will take notice that on the 9th day of December, 1982. the City Commission of Miami, Florida adopted the following titled ordinances: ORDINANCE NO.9528 AN ORDINANCE AMENDING THE CODE OF THE CITY OF MIAMI, AS AMENDED, BY AMENDING CHAPTER 62 OF SAID CODE ENTITLED "ZONING AND PLANNING," ARTICLE VI, ENTITLED "ZONING FEES," MORE PAR- TICULARLY BY AMENDING SUBSECTION 62.61(3), AND BY ADDING A NEW SUBSECTION (10) TO SAID SEC- TION 62.61; PROVIDING FOR LAND USE APPLICATION FEE REDUCTIONS UNDER CERTAIN CIRCUMSTANCES; AND CONTAINING A REPEALER PROVISION AND SEV- ERABILITY CLAUSE. ORDINANCE NO. 9529 AN ORDINANCE AMENDING CHAPTER 22, ENTITLED "GARBAGE, TRASH AND RUBBISH," OF THE CITY CODE OF THE CITY OF MIAMI, FLORIDA, AS AMENDED, BY AMENDING SECTIONS 22.1, 22.2, 22.5, 22.6, 22.7, 22.8, 22.9, 22.10, 22-13 AND 22.39 OF SAID CHAPTER 22 AND BY REPEALING IN ITS ENTIRETY EXISTING SECTION 22-11 OF SAID CHAPTER AND BY RENUMBERING EXISTING SECTION 22.12 AS NEW SEC- TION 22.11 AND BY RENUMBERING EXISTING SEC- TION 22.13 AS NEW SECTION 22.12 AND BY ADDING A NEW SECTION 22.13 PROVIDING BY SAID AMEND- MENTS THE FOLLOWING: A CHANGE IN THE CHAP- TER TITLE TO "GARBAGE AND TRASH"; NEW DEFINI- TIONS THEREIN FOR THE TERM "TRASH" AND DELETION OF THE TERM "RUBBISH" FROM EXISTING DEFINITIONS; THAT THE NAME FOR CONTAINERS USED BY THE PEDESTRIAN PUBLIC BE CHANGED FROM "TRASH" TO "LITTER" AND DEFINING SAID LATTER TERM; THAT ALL SINGLE FAMILY HOUSE- HOLDS AND DUPLEXES SHALL BE ENTITLED TO COL- LECTION OF ALL GARBAGE PLACED IN APPROVED CONTAINERS; COMMENCING JANUARY 1, 1983, THE FOLLOWING FEE INCREASES: AN INCREASE FROM SEVENTY CENTS ($0.70) TO ONE DOLLAR ($1.00) IN THE CHARGE FOR EACH CONTAINER IN EXCESS OF THE NUMBER OF CONTAINERS ALLOWED CERTAIN COMMERCIAL ESTABLISHMENTS FOR REGULAR SERV- ICE COLLECTIONS; AN INCREASE IN THE ANNUAL WASTE FEE FOR THE PURPOSE OF DEFRAYING THE COST OF WASTE COLLECTION AND DISPOSAL FROM $75.00 TO $100.00 FOR RESIDENTIAL UNITS, FROM $38,00 TO $50.00 FOR DWELLING UNITS IN AN APART- MENT BUILDING, FROM $145.00 TO $195,00 FOR ALL BUSINESSES NOT SERVICED BY PRIVATE SANITATION COMPANIES; THAT THE WASTE FEES AND DELIN- QUENT PENALTIES TO BE ASSESSED IN SAID CHAP- TER AND THOSE FEES WHICH HAVE BEEN ASSESSED SINCE JANUARY 1, 1981 CONSTITUTE SPECIAL ASSESS- MENT LIENS; CONTAINING A REPEALER PROVISION, AND A SEVERABILITY CLAUSE. ORDINANCE NO.9530 AN ORDINANCE AMENDING THE CODE OF THE CITY OF MIAMI, FLORIDA, BY ADDING A NEW SECTION 18.73 ENTITLED "MINORITY PROCUREMENT PROGRAM", PROVIDING A 50% SET -ASIDE FOR MINOR- ITY CONTRACTORS OF THE TOTAL DOLLAR VOLUME OF CONTRACTS FOR THE CONSTRUCTION AND OPERATION OF CERTAIN FACILITIES FINANCED BY PUBLIC FUNDS; DEFINING MINORITY PROCUREMENT COMPLIANCE BOARD; REQUIRING CERTAIN COW TRACT PROVISIONS; REPEALING ALL ORDINANCES IN CONFLICT; AND PROVIDING FOR SEVERABILITY AND AN EFFECTIVE DATE. nPntNANr,F NO. 9531 ou Z L Aq Miorl pe Apea&ejawe0 :Salvo uoou ZL Aq s;uawaiinbei aoedS JNIS013 .uled pue MMOJB LUBIVy 91141 01 ide 11iM 3seoa.lod oiwo6003 ayl :3a3HM enuer `Aepuow ejup 6uiysijgnd :N3HM 6 W 2 MPROVFMFNT PROGRAM 9 5 3 1z TO: Mayor Maurice A. Ferre Vice Mayor Joe Carollo Commissioner Miller J. Dawkins Commissioner Demetrio Perez, Jr. Commissioner JV1, LP ummer, Jr. FROM: Howard V. Gary City Manager RE: Miami Capital Improvement Program (CIP) Miami Capital Budget Enclosed herein is the proposed Miami Capital Improvement Program (CIP) for the fiscal period October 1, 1982 through September 30, 1988 and the proposed Miami Capital Budget for the fiscal period October 1, 1982 to September 30, 1983. The Miami Capital Improve- ment Program identifies all the physical projects valued at $20,000 or more that are proposed to be initiated after October 1, 1982 or that will be ongoing at that time. The Miami Capital Budget, which is the first year of the six year capital improvement program, iden- tifies proposed capital expenditures for Fiscal Year 1982-83. Recent Accomplishments During the past year, thirty projects representing $18,150,000 in . improvements were completed and removed from the Capital Improvement Program. In addition, sixty-two projects totaling $165,008,000 were either under contract or construction, in design, or being acquired during Fiscal Year 1981-82. Thus, more than $183 million worth of projects, representing 99% of all funded projects in the 1981-1987 CIP are complete or now in progress. Overview of the 1982-1988 Capital Improvement Program The proposed 1982-1988 CIP includes 188 projects valued at $645,732,000. Major emphasis is placed on the economic develop- ment program, receiving 38.5% of the total funding. In addition, relatively high levels of funding are allocated to the parking facilities, park facilities and street beautification, sanitary sewers and street improvements programs. C)Ii Of IIit t.iI ^.1y�Al.IR i�t'U i',�n ��n��vn.tr l��� f!,,r�1.� 'il?1 �1 5:'9����-0 The 1982-1988 CIP is funded from several major sources. City revenue and general obligation bonds provide 72% of the total funding required for the six year capital improvement program. Capital Improvement Program funds provide 12% of the funding required. The remainder of the CIP is funded from Federal and State grants, site dedications and private funds. Funding for 6% of the program remains unidentified. Overview of the 1982-1983 Capital Budqet The proposed 1982-1983 Capital Budget includes forty-four projects valued at $85,818,000. Transportation projects receive approx- imately 41% of the budget, economic development projects-27%, marinas-12o and park facilities and street beautification-9a of the budget. The remaining allocations are divided among housing, sewers, stadiums, auditoriums and communications and computer / projects. The 1982-1983 Capital Budget is funded from nine major sources. The City will provide 820 of the required funds from five sources: revenue bonds, general obligation bonds, the Capital Improvement fund that includes Florida Power and Light Company (FP&L) franchise revenues, retained earnings and fees. Non -City sources provide 18% of the Capital Budget funds and include Federal, State and County grants. I request that you take the following actions regarding the proposed 1982-1988 Capital Improvement Program and the proposed 1982-1983 Capital Budget: 1. Adoption of a resolution approving, in principle, the Miami Capital Improvement Program 1982-1988. 2. Adoption of the ordinance appropriating funds for the Miami Capital Budget 1982-1983. THE CITY OF MIAMI COMMISSION Maurice A. Ferre, Mayor Joe Carollo Miller J. Dawkins Demetrio Perez, Jr. J. L. Plummer Howard V. Gary, City Manager Jim Reid, Assistant City Manager THE CITY OF MIAMI PLANNING ADVISORY BOARD Grace Rockafeliar, Chairperson 3 Lorenzo Luaces, Vice -Chairperson Eduardo Caiil Jose Correa Aaron Manes Arsenio Milian Cyril Smith Patricia Kolski THE CAPITAL IMPROVEMENT TECHNICAL COMMITTEE James Bledsoe, Management and Budget George Campbell, Public Works Mary Meynarez, Finance Wally Raasch, Building and Vehicle Maintenance Matthew Schwartz, Planning i The 1982-1988 Miami Capital Improvement Program and 1982-1983 Capital Budget was prepared by the City of Miami Planning Department: Joseph W. McManus, Acting Director Michael Levinson, Chief, Economic Planning Arleen Weintraub, Project Manager Richard Butler, Illustrator Debra Ann Ragin, Secretary Al Sanchez, Illustrator David Whittington, Computer Information System Manager and the City of Miami Operating Departments. �i 1� I I II PART II: CAPITAL BUDGET 1982-1983 Page Overview and Trends Overview 200 Allocation ofthe1982-1983*Capital*Budget to- Functional Programs . . . . . . . . . . . . . . . . 202 Funding the Capital Budget Sources of Funds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Availability of Funds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ?06 Projects and Funding Sources 1982-1983 Capital Budget • • • • . . . . • 208 16 Capital Improvement Fund (FP&L): Fund-ed and- Ilnfunded-Projects . . . . . . . . . . . . 216 Purpose and Benefits of Projects Funded from the Capital Improvement Fund (FP&L) . . . . . . . . . 219 INDEX J Index ................................................ 220 I CONTENTS INTRODUCTION Page Purpose of the Capital Improvement Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Legal Authority . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Development of the Capital Imrpovement Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . g Preparing the Capital Budget . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Locating a Specific Capital Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Reading the Program Schedules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 PART I: CAPITAL IMPROVEMENT PROGRAM 1982-1988 Overview and Trends Overview ......................................... 13 l} Capital Improvement Program Comparison . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Status of Funded Projects in the 1981-1987 Capital Improvement Program . . . . . . . . . . . . . . 23 Funding the Capital Improvement Program Sources of Funds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Availability of Funds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Implementing Miami Plans and Policies - Project Descriptionsand Funding Schedules Public Buildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 Stadiums ............................................. 51 Auditoriums . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EO Marinas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 Sanitary Sewers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78 Storm Sewers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89 Street Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100 Street Lighting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121 Transit Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129 Parking Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134 Economic Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144 Housing Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 158 Park Facilities and Street Beautification . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167 Communications and Computers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • • 192 10 PART II: CAPITAL BUC Page Overview and Trends Overview 200 Allocation of the 1982-i983 Capital Budget to Functional* Programs 202 Funding the Capital Budget Sources of Funds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 204 Availability of Funds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 206 Projects and Funding Sources 1982-1983 Capital Budget . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 208 Capital Improvement Fund (FP&L): Funded and Unfunded Projects . . . . . . 216 Purpose and Benefits of Projects Funded from the Capital Improvement Fund (FP&L1 . . . . . . . . . 219 INDEX Index. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 220 no LIST OF TABLES Table Page 1 1982-1988 Capital Improvement Program; Program and Functional Categories . . . . . . . . . 11 2 1982-1988 Capital Improvement Program; Summary by Program and Function . . . . . . . . . . 15 3 Status of Funded Projects in the 1981-1987 Capital Improvement Program . . . . . . . . . 25 4 1982-1988 Capital Improvement Program; Summary by Funding Source . . . . . . . . . . . . . . 29 5 Capital Budget Comparison . . ... . . . . . . . . . . . . . . . . . . . 201 6 1982-1983 Capital Budget; Sources of Funds Summary . . . . . . . . . . . . . . . . . . . . . 204 7 1982-1983 Capital Budget; Availability of Funds . . . . . . . . . . . . . . . . . . . . . . 207 8 City of Miami 1982-1983 Capital Budget . . . . . . . . . . . . . . . . . . . . . . . . . . . 208 LIST OF FIGURES Figure 1 Sample Funding Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 2 1982-1988 Capital Improvement Program; Allocation of Funds . . . . . . . . . . . . . . . . . 14 3 Capital Improvement Program Comparison . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 4 1982-1988 Capital Improvement Program; Sources of Funds . . . . . . . . . . . . . . . . . . 28 5 1982-1988 Capital Improvement Program; Availability of Funds . . . . . . . . . . . . . . . . 36 6 1982-1983 Capital Budget; Allocation of Funds . . . . . . . . . . . . . . . . . . . . . . . 203 7 1982-1983 Capital Budget; Sources of Funds . . . . . . . . . . . . . . . . . . . . . . . . . 205 LIST OF MAPS Map 1 City of Miami Public Buildings . . 39 2 Recent Accomplishments: Public Buildings . . . . . . . . . . . . . . . . . . . . . . . . . 41 3 Proposed Public Buildings Improvements 1982-1988 . . . . . . . . . . . . . . . . . . . . . . 43 4 City of Miami Stadiums . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53 5 Recent Accomplishments: Stadiums . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54 6 Proposed Stadiums Improvements 1982-1988 . . . . . . . . . . . . . . . . . . . . . . . • • . 56 7 City of Miami Auditoriums. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 8 Recent Accomplishments: Auditoriums . . . . . . . . . . . . . . . . . . . . . . . . 63 . . . . . . . . . . . 9 Proposed Auditoriums Improvements 1982-1988 . . . . . . . . . . . . . 65 0 rJ Page 10 City of Miami Marinas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71 11 Recent Accomplishments: Marinas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 12 Proposed Marinas Improvements 1982-1988 . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 13 Areas of the City with Sanitary Sewers . . . . . . . . . . . . . . . . . . . . . . . . . 80 14 Recent Accomplishments: Sanitary Sewers . . . . . . . . . . . . . . . . . . . . . . . . . 81 15 Proposed Sanitary Sewer Improvements 1982-1988 . . . . . . . . . . . . . . . . . . . . . . . 83 16 City of Miami Positive Drainage Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . 91 17 Recent Accomplishments: Storm Sewers . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92 18 Proposed Storm Sewer Improvements 1982-1988 . . . . . . . . . . . . . . . . . . . . . . . . . 94 19 City of Miami Street System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102 20 Recent Accomplishments: Street Improvements . . . . . . . . . . . . . . . . . . . . . . . . 103 21 Proposed Street Improvements 1982-1988 . . . . . . . . . . . . . . . . . . . . . . . . . . . 105 22 City of Miami Streets Lighted Above Minimum Standard . . . . . . . . . . . . . . . . . . . . 123 7 23 Recent Accomplishments: Street Lighting . . . . . . . . . . . . . . . . . . . . . . . . . . 124 24 City of Miami Rapid Transit System . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131 25 City of Miami Off -Street Parking Facilities . . . . . . . . . . . . . . . . . . . . . . . . . 136 26 Recent Accomplishments: Off -Street Facilities . . . . . . . . . . . . . . . . . . . . . . . 138 27 Proposed Parking Improvements 1982-1988 . . . . . . . . . . . . . . . . . . . . . . . 140 28 City of Miami, Median Household Income Estimate, 1980 . . . . . . . . . . . . . . . . . . . . 147 29 Recent Accomplishments: Economic Development . . . . . . . . . . . . . . . . . . . . . . . . 148 30 Proposed Economic Development Projects 1982-1988 . . . . . . . . . . . . . . . . . . . . . . 150 31 Change in Number of Housing Units, 1970-1980 . . . . . . . . . . . . . . . . . . . . . . . . 160 32 Recent Accomplishments: Housing Programs . . . . . . . . . . . . . . . . . . . . . . . . . . 161 33 Proposed Housing Programs 1982-1988 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163 34 City of Miami Parks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 170 35 Recent Accomplishments: Park Facilities and Street Beautification . . . . . . . . . . . . . 172 36 Proposed Park Facilities and Street Beautification Improvements 1982-1988 . . . . . . . . . . 174 37 City of Miami Radio Communications Facilities . . . . . . . . . . . . . . . . . . . . . . . . 194 38 Recent Accomplishments: Communications and Computers . . . . . . . . . . . . . . . . . . . . 195 it - INTRODUCTION PURPOSE OF THE CAPITAL IMPROVEMENT PROGRAM The Capital Improvement Program (CIP) is an official 4. The CIP process facilitates long - statement of public policy regarding long-range range financial planning by match - physical development in the City of Miami. A ing estimated revenue against capital improvement is defined as a capital or "in capital needs, establishing annual kind" expenditure of $20,000 or more, resulting in capital expenditures, and identify - the acquisition, improvement or addition to fixed ing the need for municipal borrowing assets in the form of land, buildings or improve- and indebtedness within a sound long- ments, more or less permanent in character, and range fiscal framework. The sound durable equipment with a life expectancy of at debt policy that results from this least twenty years. process will have a positive impact on the City's bond rating. The six -year Capital Improvement Program is updated $ annually to add new projects in the sixth year, to 5. The impact of capital projects on reevaluate program and project priorities in light the City's operating budget can be of unanticipated needs, and to revise recommenda- projected. tions to take account of new requirements and new sources of funding. The annual capital programming 6. The CIP serves as a source of infor- process provides the following benefits: mation about the City's development and capital expenditure plans for 1. The CIP is a tool for implementing the public; for Federal, State and Miami's Comprehensive Neighborhood other funding agencies; for private Development Plan and other neighbor- investors and financial institutions; hood plans. and City operating departments. 2. The CIP process provides a mechanism for coordination among projects with respect to function, location and timing. 3. The yearly evaluation of project priorities ensures that the most crucial projects are developed first. 9 LEGAL AUTHORITY Leqal requirements for preparing Miami's Capital Improvement Program are set forth in the City of Miami Code, the Metropolitan Dade County Code and the Florida Statutes, respectively. Specifi- cally, the Miami City Code (Section 2-66) requires that the Planning Department develop a capital improvement program. Section 2-11.8 of the Metropolitan Dade County Code requires the coordi- nation of municipal and county capital programming. A capital programming process to support the compre- hensive plan is required by the Local Government Comprehensive Planning Act of 1975, incorporated as Chapter 163.316 of the Florida Statutes. DEVELOPMENT OF THE CAPITAL IMPROVEMENT PROGRAM The City capital programming process began in April when operating departments were asked to supply information about each of the capital projects included in the 1981-1987 Capital Improvement Program and to prepare requests for proposed new capital projects. Project originators were asked to explain how the projects satisfied the following criteria: 1. Improves the City's financial condition. 2. Will assure a matching public or private investment. 3. Enhances City plans and policies. r] 4. Represents the Department's top priority in need and urgency. 5. Coordinates with other public and private actions in the area. In May, departmental project requests were sub- mitted to the Planning Department. The Economic Planning Department developed a computer program to prepare the six -year capital program reports. The reports included the funding schedules and summaries found in this document. In July, an interdepartmental technical review committee, appointed by the City Manager, met to review all projects for which funding from the Capital Improvement Fund was requested. The CIP Technical Committee consisted of a senior staff person from each of the following Departments: (1) Planning, (2) Finance, (3) Public Works, (4) Building and Vehicle Maintenance, and (5) Manage- ment and Budget. The Technical Committee rated each project in terms of the five criteria mentioned above. The Committee used the project ratings to prepare a series of recommendations for the Planning Department Director. These recommendations were used to determine the content and timing of the capital program. The program was submitted to the City Manager for approval prior to review by the Planning Advisory Board and the City Commission. PREPARING THE CAPITAL BUDGET The most important year of the six -year schedule of projects is the first year. It is called the Capital Budget and is adopted separately from the six -year program by means of an Appropriations Ordinance, which establishes a budget for each project. While the Capital Program is a proposed funding schedule for six years, t e Capital Budget represents a legal authorization to spend, during the coming year, funds from City sources and Federal and State funds that are reimbursed to the City. Part II of this document contains a detailed descrip- tion of the 1982-1983 Capital Budget. Miami's Capital Budget is distinct from the Operating 10 Budget. The Capital Budget authorizes capital expenditures, while the Operating Budget authorizes the expenditure, in the coming year, of funds for employee salaries and the purchase of supplies and equipment. Through the City's amendment process, changes can be made to the adopted Capital Budget during the fiscal year. A request for amendment is generated by an operating department based on an urgent need for a new capital facility or for additional funding for a previously approved project. The request is reviewed and approved by the Departments of Planning, Finance, Management and Budget,and the City Manager before presentation to the Commission. LOCATING A SPECIFIC CAPITAL PROJECT The Capital Improvement Program is divided into six program areas. Capital projects are organized by fourteen functional categories within these program areas. The complete schedule of programs and functions is listed in Table 1. Each project in the Capital Improvement Program has a unique, four -digit project number. This project number appears in parentheses at the end of the project title. The first digit in the number refers to the year in which the project first appeared in the City of Miami Capital Improvment Program. For example, project 7035 is Orange Bowl Improvements, which first appeared in the 1977-1983 Capital Improvement Program. Project 8055, Acouisition of Milev Property, first appeared in the 1978-1984 Capital Improvement Program. Project 2008, Overtown Steet Improvements, is a new project in the 1982-1988 Capital Improvement Program. Projects orfginating in the 1982-1988 CIP are identified by numbers beginning with 2. The final three digits of each project number serve as a discrete project identi- fier. Although the project title or scope may change, each project will carry its assigned project number through successive capital improve- ment programs until the project is completed or deleted from the program. u■ 11, I1I' 111 l The Index provides a list of all projects organized sequentially by CIP project number and the page on which the project's funding schedule is located. The index also includes the corresponding 1977-1983 CIP project number, and the corresponding FAMIS number when applicable. READING THE PROGRAM SCHEUDLES Detailed information about each capital project is presented in the last part of each functional sec- tion in Part I. The information incudes a descrip- tion of each project in the funding schedules. The funding schedules are based on the funding 11 needed to begin design, land acquisition, or con- struction of a project. The capital program is not an expenditure or cash flow plan. Although the funding for a particular project may be shown in one fiscal year, the actual cash flow may continue for several successive years depending on the development timetable. A sample funding schedule is shown on the following page for a project in the Culture/Recreation Program and the Park Facilities Function. All amounts are shown in thousands of dollars. When a project's funding schedule lists funding only in the prior years column, all funds necessary for the project have been appropriated, but the project has not been completed. An explanation of the major types of funding sources in the 1982-1988 Capital Improve- ment Program is found in "Funding the Capital Improvement Program" in Part I. 0 TABLE I 1982-1988 CAPITAL IMPROVEMENT PROGRAM PROGRAM AND FUNCTION CATEGORIES Public Buildinns and Facilities Public Buildings Stadiums Auditoriums Marinas Sewer Svstems Sanitary Sewers Storm Sewers Transportation Street Improvements Street Lighting Transit Systems Parking Facilities Culture and Recreation Park Facilities and Street Beautification Economic Development Economic Development Housing Programs Intragovernmental Services Communications and Computers FUNDS ALLOCATED TO PROJECT PRIOR PROJECT TITLE TO SEPT 30,1982 FUNDS TO BE PROJECT NUMBER TOTAL PROJECT COST APPROPRIATED FOR PROJECT SIX -YEAR FUNDING SCHEDULE -- DURING FY 1982-1983 (ALL AMOUNTS IN THOUSANDS OF DOLLARS) ITEM/ NO.J PRIOR FISCAL YEARS ALL AItIOUNTS IN THOUSANDS OF DOLLARS (000) FUND PROJECT TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 iE. \1168 7'02E. MIAMI F MKMT OEi-I 116a C c C 0 0 0 IEi. EECCr,0 rF co 120 12oi 0 0 0 C 0 T7 163. THFFE rF Co t5 25 c c C o 0 0 161. SEYEhIH VP Co 603 60C 0 c c' D a a 654. CAPITAL IMPS F05•FPL 127 127 0 0 1 0 2 c 12 964. AUTH PARK 8ON05 296 29E C 0 C 0 G 0 CODE NUMBERS TOTAL COST OF FOR FUNDING SOURCES PROJECT BY FUNDING SOURCE EXPLANATION OF FUNDING CODES USED IN THE FUNDING SCHEDULES SAMPLE FUNDING SCHEDULE FIGURE I • PART I: CAPITAL IMPROVEMENT PROGRAM 1982-1988 6 Overview and Trends This section presents an overview of the 1982- 1988 Capital Improvement Program and compares it with the previous five capital programs. It also describes the status of projects funded in the 1981-1987 Capital Improvement Program. Contents: - Overview - Capital Improvement Program Comparison - Status of Funded Projects in 1981-1987 Capital Improvement Program 0 OVERVIEW The 1982-1988 Capital Improvement Program (CIP) includes 188 projects in fourteen functional cate- gories with total value of $645,732,000. The per- centage of the total funding that is allocated to each functional category is displayed in Figure 2. Five functional programs account for more than 75% of the total 1982-1988 CIP funding. These are: Economic Development (38.5%), Park Facilities and Street Beautification (9.6%), Sanitary Sewers(7.2%), Street Improvements (8.1%), and Parking Facilities (12.8%). The remainder is divided among Street Lighting, Transit, Stadiums, Auditoriums, Marinas, Communications and Computers, Public 13 Buildings, Storm Sewers, and Housing Programs. Actual funding totals for these fourteen functional areas are summarized by each year of the six year program in Table 2. Approximately 27% of the entire six year program's cost has been allocated to pro- jects prior to September 30, 1982, as indicated by the total in the prior yearscolumn. Another 58% of the 1982-1988 CIP costs is allocated to the first three years of the program, while 15% of the funding is scheduled for the last three fiscal years of the program. 46 5 c:! a 3 c: 14 2.8% HOUSING PROGRAMS ECONOMIC DEVELOPMENT 38.5 % PARK FACILITIES AND STREET BEAUTIFICATION .9% COMMUNICATIONS AND COMPUTERS PUBLIC BUILDINGS 9.6% STADIUMS .7% 6.4% AUDITORIUMS .2% MARINAS 3A% 7.2% SANITARY SEWERS STORM SEWERS 1.4% 8.1% STREET IMPROVEMENTS 6.5% 12.8% STREET LIGHTING TRANSIT SYSTEMS 1.5% PARKING FACILITIES 1982 -1988 CAPITAL IMPROVEMENT PROGRAM ALLOCATION OF FUNDS FIGURE 2 i I i d. I i I I lh i FUNCTION PUBLIC BLOGS A FAC PUBLIC BUILDINGS STADIUMS AUDITORIUMS MARINAS SEWER SYSTEMS SANITARY SE4ERS STOFM SEWERS 15 TRANSPOPTATIC'N STREET IMPROiEMENTS STREET LIGHTING ThAhSIT SYSTEMS PARKING FACILITIES ECONOMIC DEVELOP ECONOMIC DEVELOP HOUSING PROGRAMS CULTURE AND AEC PARK FAC ST EEAUT INTFAGCV SERVJCES COMM AAO COMPUTERS TOTALS TABLE 2 1982-1988 CAPITAL IMPROVEMENT PROGRAM SUMMARY BY PROGRAM AND FUNCTION PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 68994 10383 13990 36245 10625 751 0 0 41044 5358 35 24275 10625 751 0 0 4654 3549 485 620 0 0 0 0 1378 800• 328 250 0 0 0 0 21918 676 10142 11100 0 0 0 O 55147 12649 2089 14136 9163 5385 11425 300 46259 9659 989 13336 8025 4225 LOG25 0 klePB 2990 1100 800 1138 1160 1400 333 187020 24950 42596 52084 22206 16374 17253 11560 5245e 7435 9542 6357 6565 6689 10150 3750 41768 4350 4850 5335 5868 6455 7100 T81a 9900 2605 700 3297 3298 0 0 0 e2E94 10593 27534 35095 6475 3233 0 C 266720 90377 24831 73326 4147@6 13200 11200 3300 248A47 78534 19631 731?6 48586 13000 13333 3000 17873 11873 5200 200 230 200 200 0 61964 31235 7866 15832 5449 787 625 200 61964 31235 T866 15802 5449 787 625 200 5887 2135 700 I M. 530 200 500 0 5887 2135 700 1822. 530 200 533 0 645,732 171,72.9 89,072 193,415 96,759 36,697 43,000 15,060 lE CAPITAL IMPROVEMENT PROGRAM COMPARISON The 1982-1988 Capital Improvement Program is the sixth program prepared as part of Miami's on- going capital programming process. The total program value has increased yearly in each of the previous five successive capital improvement programs. In this year's program, the 1982-1988 CIP, the number of projects has increased by 9, and the total program value has increased by $209,673,000 over last year's program. The 1977- 1983 CIP included 136 projects valued at $167,577,000; 170 projects with a value of $251,131,000 were included in the 1978-1984 CIP. The 1979-1985 CIP included 188 projects with an estimated cost of $358,616,000. The 1980-1986 CIP included 204 projects with a value of $408,974,000. The 1981-1987 CIP included 179 projects valued at $436,059,000. The 1982-1988 CIP has a total of 188 projects valued at $645,732,000. A comparison of the six capital programs is displayed in Figure 3. The total number of projects and total cost for each functional cate- gory used in the 1982-1988 CIP are compared for the six programs. The largest increase in the 1982-1988 CIP functional categories is in Parking Facilities which has increased by $56.7 million. The increase reflects the inclusion of the total funding required for Core Area West Parking Garage The Economic Development functional category also reflects a significant increase, $88.0 million, over last year's CIP. The increase is primarily due to the addition of Southeast Overtown/Park West Redevelopment as a new project in this category. The Street Improvements category also increased. Although the absolute number of projects remained the same, the greater costs of implementing these projects accounts for the $13.5 million increase shown for Street Improvements. The Street Lighting functional category shows a significant increase. It should be noted that this is due to a change in the method of presenting the funding level and not due to an actual increase in funding. The funding level in this years CIP represents the total funding required to carry out the entire operation of the street lighting program. Two functional categories showed a decrease from last years level. The Stadiums and Marinas catego- ries are two separate functional categories in this years CIP, They are presented in Figure 3 in one bar graph for the sake of comparison with previous CIP programs. The level decreased by $4.5 million primarily due to anticipated Resort Tax Revenues coming in to the Orange Bowl Improvements project not being projected past FY 1982-83. Thus, total project value extends only through next fiscal year. The other functional category to reflect a decrease is Storm Sewers. This category decreased by 6.2 million. The absolute number of projects increased by one, but the total cost of implementing these projects is relatively less. In addition, two storm sewer projects were completed last year at a cost of $5.7 million and deleted from the program. Cost of the remaining functional categories in the 1982-1988 CIP have remained relatively close to the 1981-1987 levels. 17 25 a) D: J 20 J 8 15 0 10 5 18 0 77-83 78-84 PUBLIC BUILDINGS CAPITAL IMPROVEMENT PROGRAM COMPARISON PUBLIC BUILDINGS AND FACILITIES 79-85 80-86 81-87 82-88 6 N 5 K 4 3 z 2 O � I 0 77-83 MARINAS 25 $ 23.6 3 20 $19.2 S 15 10.5 z0 10 Projects Projects J 6 $6.0 1.4 J $1.6 Projects 2 Projects 5 4 6 Auditoriums Projects Projects , 4 Z 4.6 ale Stadiums 0 77-83 78-84 79-85 80-86 81-8T 82-88 STADIUMS AND AUDITORIUMS *STADIUMS AND AUDITORIUMS ARE SEPARATE FUNCTIONAL CATEGORIES IN THE 1982-1988 C.I.P. k7l a t21.9 78.84 79-85 80-86 81-87 82-88 FIGURE 3 I I l i, r I .i 1 I 1 1 I I I I I I. 19 0 & CAPITAL IMPROVEMENT PROGRAM COMPARISON, 60 50 40 n 30 0 Ul Z 20 O_ _A 10 0 77-83 78.84 SANITARY SEWERS SEWER SYSTEMS 79-85 80-86 81-87 82-88 25 20 s LL 15 0 N 0JJ 10 J 5 0 77-83 78-64 79-85 80-86 81-87 82-88 FIGURE 3 CONT. STORM SEWERS 20 I J I I I Ili, I I I i,� , 11 1 CAPITAL IMPROVEMENT PROGRAM COMPARISON' 60 50 V) K 40 4 30 0 z 20 0 J J X 10 0 77-83 78-84 79-85 STREET IMPROVEMENTS 10 4 3 o� 2 $ 1.6 J _J I I 3 0.8 Project Project 0 77-83 78-84 TRANSIT SYSTEMS 80-86 81-87 TRANSPORTATION 41.6 �52.5 41 j 40 Entire j H tr Program i 39 ` w 0 3- rn z 0 2 46 � $ 0.4 $0.2 $0.03 'rojects I 8 3 1 Projects Projects Project NONE NONE 0 82-88 77-83 77-84 79-85 80-86 81-87 82-88 STREET LIGHTING +TOTAL AMOUNT REQUIRED FOR OPERATION OF ENTIRE PROGRAM INCLUDED IN 1982 -1988 C_I.P S 82.9 80 75 70 30 $10.0 $9.9 $9.9 25 n I �1/►� EO L J 20 O I� 15 0 m o .10 1 Project 5 0 79-85 80-86 81-87 82-88 77-83 78-84 PARKING FACILITIES FIGURE 3 CONT. 12.3 1 t Project Project I Project 79-85 80-86 81-87 82-88 CAPITAL IMPROVEMENT PROGRAM COMPARISON ECONOMIC DEVELOPMENT 21 30 25 ar 20 $ 179 $I6.8 8 U. 0 15 $ 13.7 10.6 z 10 0 3 # 7.8 14 12 8 4 2 $4.8 14 Projects Protects Projects Projects 5 y Projects Projects 0 77-83 78-84 79.85 80-86 81-87 82-88 HOUSING PROGRAMS 250 z9uts 230 210 190 170 160.8 $152.6 150 147.7 80 J O 60 0 8 8 I I 12 N $ 43.3 Projects Projects Projects Projects 0 40 $ 20.2 8 20 Projects 2 Projects 0 77-83 78-84 79-85 80-86 81-87 82-88 ECONOMIC DEVELOPMENT FIGURE 3 CONT 1mm1 I' 'I 1 1' 1 1 1 ' 111 I 1' 1 ENT PROGRAM COMPARISON CAPITAL IMPROVEMENT ,. CULTURE AND RECREATION 60 50 a� 22 a 40 0 0 30 0 20 J_ 5t 10 0 79.85 nu o0 0o T7-83 78-84 PARK FACILITIES AND STREET BEAUTIFICATION $62D I NTRAGOVERN MENTAL SERVICES 6 5 U) a: 4 3 z 2 0 J J � t 0 77-83 78-84 79-85 80-86 e1-ur 04-00 COMMUNICATIONS AND COMPUTERS FIGURE 3 CONT. 23 0 STATUS OF FUNDED PROJECTS IN THE 1981-1987 CAPITAL IMPROVEMENT PROGRAM One hundred -eight projects in the 1981-1987 Capital Improvement Program received funding during Fiscal Year 1981-82 or in earlier years. The status of these projects, valued at $185,542,000, is shown in Table 3. The projects in each program area were placed in one of four categories. 1. Completed - This category includes projects that were completed during FY 1981-82. 2. Under Contract/Construction - Projects in this category are either under construction or under contract for completion. 3. In Design/Site Acquisition - Two types of projects fall into this category. Some projects are in the design stage, while others are in the land acquisition phase. Those projects that involve land acquisi- tion only, such as Overtown Land Acquisi- tion, also are included in this category. 4. Pending - This column includes those pro- jects that are not yet under contract or construction, in design or site acquisi- tion. It is important to note that information regarding the status of projects in the 1981-87 Capital Improvement Program was collected from operating departments in July, 1982. Although departments estimated the status of projects as of September 30, 1982, some projects may have been completed earlier than expected or delayed because of unforeseen cir- cumstances. Thus, Table 3 presents the best infor- mation available in July, 1982. During FY 1981-82, thirty projects, representing $18,150,000 in improvements, were completed and removed from the Capital Improvement Program. Highlights of these recent accomplishments by the program areas used in the 1981-1987 Capital Improve- ment Program follow: Public Buildin4s and Facilities - completion of improvements to employee parking lot at the Solid Waste Operations Facility - construction of an additional 770 sq.ft. of usable space at each of the Shenandoah, Moore, and Eaton Day Care Centers - installation of a security fence, gates, and portable west end bleachers at the Orange Bowl 1 11 11 1 11 111 1 1 q 1 1 1 ' � • r I 1, q 24 Sewer Systems - installation of sanitary sewers in the Lyndaie project area in Little Havana - construction of the Lawrence storm sewer project - Phase I in Little Havana - construction of the Riverview storm sewer project - Phase I in Little Havana Transportation - improvements to local streets in Edison - Little River, Wynwood, Model City, Little Havana, Allapattah, and Downtown - upgrading of approximately 400 post top street lights to HPSV lighting in the Edgewater and Shenandoah neighborhoods Housing Programs and Economic Development - acquisition of land for single-family housing in Model City, Dorsey -Wheatley, and Coconut Grove Culture and Recreation - installation of fencing around Maceo Park - development of neighborhood parks (River- side, Dorsey, Melrose) in Little Havana, Overtown, and Allapattah - acquisition and development of Coconut Grove Mini -Park - boat ramp improvement behind Virrick Gym - acquisition of land for Blue Lagoon Park - development of a City tree nursery and tree bank for landscaping needs in Com- munity Development target areas Communications and Computers - relocation of TAC Receiver site from the Ryder Building to Fire Station #8 - construction of TAC Receiver sites at Fire Stations #4 and #12 - Upgrading of Communications Systems Coverage In addition to the thirty projects that were com- pleted last fiscal year, thirty-nine are under contract or construction and twenty-three are in design or site acquisition. Only sixteen pro- jects representing $2,384,000 in improvements are pending. Thus, more than $183 million dollars worth of projects, representing 99% of all funded projects in the 1981-1987 CIP, were completed or in progress during FY 1981-82. Proqram/Function PUBLIC BUILDINGS AND FACILITIES Public Buildings Stadiums Auditoriums Marinas SEWER SYSTEMS Sanitary Sewers 25 Storm Sewers TRANSPnRTATION Street Improvements Street Lighting Transit Systems Parking Facilities ECONOMIC DEVELOPMENT Economic Development Housing Proqrams CULFURE AND RECREATION Park Facilities and Street Beautification INTRAGOVERNMENTAL SERVICES Communications and Computers TOTAL TABLE 3 STATUS OF FUNDED PROJECTS IN THE 1981-1987 CAPITAL IMPROVEMENT PROGRAM SEPTEMBER 30, 1982 Under Contract/ In Desiqn/ Completed Construction Site Acquisition p No. of Appro- No. of A ending Projects ppr°- No- of Appro- No. of Appro- J priation Projects priation Projects priation Projects priation 2 482,000 1 205,000 1 2,996,000 2 5,703,000 8 4,809,000 2 38,000 3 986,000 5 $ 3,852,000 2 3,060,000 1 800,n00 2 526,000 6 7,784,n00 5 2,478,000 6 5,405,000 1 10,400,000 3 77,526,000 8 2,696,000 7 7,753,0nn 3 235,000 30 $18,150,000 1 2,080,000 39 $121,664,000 3 $ 1,481,000 1 475,000 1 17n0,OOO 1 500,OOn 1 2,605,000 1 130,000 1 729,000 3 11,873,OnO ll 23,851,000 23 S43,344,090 1 $ 25,000 , 1 14,000 1 150,000 2 175,000 2 512,000 1 300,000 2 60,000 1 949,000 3 144,00n 2 55,000 16 $2,384,000 Total No. of Appro- Pro,jects priation 11 $ 5,840,000 5 3,754,00 I 800,nnp 3 676.000 10 12,655,000 9 8,693,000 16 11,014,000 2 38,000 1 2,605,000 4 70,590,000 5 79.204,000 6 12,859,000 29 .34,444,000 6 2,370,000 108 4195,542,000 • 6 Funding the Capital Improvement Program The funding required for the 1982 -1988 Capital Improvement Program is summarized in this section. It describes the sources of funding and discusses the availability of those funds. Contents: - Sources of Funds - Availability of Funds Q41 FUNDING THE CAPITAL IMPROVEMENT PROGRAM SOURCES OF FUNDS The 1982-1988 Capital Improvement Program, with a dollar value of $645,732,000 is funded from five major sources: 1. Federal Grants (Funding Code: 100s except 0 -Funding Source Unknown): Federal grants may be used only for the purposes specified in Federal laws, such as community develop- ment. The amount of funding available from Federal grants is dictated by Federal prior- ities. 2. Capital Improvement Funds (Funding Code: 600s): These funds are collected from cur- rent revenues produced by miscellaneous county or city taxes, fees, or from the operation of City of Miami facilities. 3. Site Dedications/Private Funds (Funding Code: 700s : This funding source includes private - sector funds and the dedication or sale of land for City capital facilities. 4. State Grants (Funding Code: 800s): State grants may be used only for purposes defined by State laws. 5. City Bonds (Funding Code: 900s): The City may borrow money to construct capital faci- lities by issuing bonds. Two types of bonds may be used for capital improvements: (1) revenue bonds and (2) general obligation bonds. Revenue bonds are issued to finance revenue -producing facilities. The principal and interest payments of these loans are paid from the revenues of the facilities. General obligation bonds, which must be approved by City voters before the bonds can be issued, finance specific capital improve- ment programs presented to the electorate, such as highways or storm sewers. The City pledges its full faith and credit and finan- cial resources to pay the principal and interest of these bonds. The largest source of funds for general obligation debt is the property tax. The City Charter limits the amount of Miami's general obligation debt to 15% of the City's assessed property valuation. The pie chart in Figure 4 shows the portion of total funding for the six -year program that is received from each major funding source, while Table 4 contains a detailed summary of all funding sources in the 1982-1988 Capital Improvement Program. City revenue and general obligation bonds, the greatest sources of funds, account for 72% of the funding required for the 1982-1988 Capital Improvement Pro- gram. City capital improvement funds account for 12' of the total funding. As shown in Table 4, sources of capital improvement funds for the 1982-1988 Capi- tal Improvement Program include the Capital Improve- ment Fund (FP&L), retained earnings from City -owned facilities, the Dade County resort tax, and depart- mental operating budgets, which are part of the General Fund. The Capital Improvement Fund (FP&L) contains revenues received from the Florida Power and Light Company franchise. Federal grants provide 7% of the required funding for capital projects. Approximately two percent of the capital program is financed through site dedi- cations and private -sector funds. The source of funding for 6% of the program is unknown. Finally State grants fund less than 1% of the total pro- 27 gram. 28 STATE GRANTS <1 FEDERAL GRANTS SITE DEDICATIONS/PRIVATE FUP 2% SOURCE OF FUNDING • REVENUE BONDS • GENERAL OBLIGATION BONDS PITAL IMPROVEMENT FUNDS • CAPITAL IMPROVEMENT FUND iF P. & L.I' • GENERAL FUND • RETAINED EARNINGS • RESORT TAX 1982-1988 CAPITAL IMPROVENT PROGRAM SOURCES OF FUNDS FIGURE 4 TABLE 4 1982-1988 CAPITAL IMPROVEMENT PROGRAM SUMMARY BY FUNDING SOURCE FUNDING PRIOR FISCAL YEARS CODE FUNDING SOURCES TOTAL YEARS 1982-83 1983-84 FEDERAL GRANTS .4686e 18&52 11651 5545 123. CORPS OF ENGINEERS 2030 0 0 2000 123. CORPS-FEC DE4 PROC 6000 0 4000 2000 12°. NEA GRANT 50 50 0 a 130. LEAA GRANT 255 255 a 0 135. LAND-NATEF CONS GFT 722 402 320 0 131. TNT CEPT CONT RES FO 500 531 0 a 140. HUD (PEN SPACE GFANT 252 250 a 0 145. UPAFF CRANT 1PO2 1A02 0 0 146. UPARR GRANT -ANTIC 250 a 0 a 15C. FED FEY SHARING 150 150 0 0 151. 29 E04 GRANT 3796 2996 a 600 153. UMTA GRANT -ANTIC 30 30 0 a LEO. OAOE CC CO FUNDS 675 300 200 175 161. TENTH YR CO -ANTIC 570 0 a 0 1E2. SECOND YF CO 152 152 0 0 163. THIRO YR CO 662 662 G 0 164. FOURTH YR CD 1242 1242 0 0 1E5. FIFTF YR CO 1066 IC66 0 0 166. SIXTH YR CO 1441 1441 0 a 1E7. SEVENTH YR CO 2560 2560 0 0 16e. EIGHTH YF CO 361 C 361 0 165. NINTH YR CD -ANTIC 570 3 0 57C 17L. COAG GRAhl-ANTIC lOCOa 0 0 0 171. UDAG GRANT 4994 4994 a 0 175. J0Ih1 DELI GRI-ANTIC 6770 a 6770 a CAPITAL IMPROVEMENT FUNDS • 79173 34391 13449 7100 65C. CAPITAL INPR FOS-FPL 22885 17957 317P 1750 651. RE90L9ING FUND 53 53 0 3 652. FETAINEO EARNINGS 1160 526 642 0 653. PROC IhTERAHA SALE 8500 8500 0 0 654. LOAN-PROC INTEP SALE 150 150 0 a 65:. INCL DEPT OPEF BUOGT 41768 4350• 4850 5335 6EI. FARKING CAP FO-ANTIC 595 0 573 15 661. PARKING CAP PFOJ FO 214 191 24 0 670. AUTH RESORT TAX-AKTI 1125 640 485 a 671. AUTH RESCFT TAX 2325 2025 a 0 672. CREDIT FROM CCM 133 700 0 0• ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1984-85 1985-86 1986-87 1987-88 10820 a 0 a 0 o c 0 0 0 a 0 Q 0 0 0 0 0 0 0 0 a. Q 0 0 a Q a 0 a 0 250 p 0 0 0 a 0 a Q 0 0 0 0 C 0 0 a 0 a 573 p Q 0 0 0• a 0 0 Q 0 0 0 0 0 Q a 0 a 0 0 0 0 0 0 a 0 0 a Q a 0 0 0 0 0 1000G a 0 a 0 0 0 0 5868 •6455 713C 78IQ a o c Q 0 0 0 0 0 0 Q 0 0 a 0 Q 0 Q 0 SE6E 6455 .7100 781a a 0 C 0 p 0 0 0 0 a 0 a 0 0 0 Q 0 0 Q o TABLE 4 Cont. SITE DEDICATIONS[PRI'V. FDS 10213 436 2520 6642 363 52 0 0 702. SALE EXIS CITTY PFCP 4500- 0 0' 4500 0 0 0 p 73!- OEV CONTF16-ANTIC 250 0 0 0 250 0 3 0 706. PRI4 CONTRIB-ANTIC 4475 a 2250 2225 0 0 G 0 707. MILEY PFCPERTY FERT 407 0, 125 117 113 52. 0 0 73a. SALE VA KEY LANDFILL 375 375 0 0 a 0 0 709. BAYFFT BAND$HELL EKG 75 4C 35 0 0 0 0 0 71C. SP PFOG ACCTS LS FRO 21 21 0 G 0 a 0 0 711- FCC DOCKAGE FEES 112 0 Ito 0 0 0 0 0 'STATE GRANTS 1717 691 1026 a a 0 0 3 841. 51 CCNSEFY FUND 241 241 0 G 0 C 0 G 84f. FL FEC OEi ASSIS PRG 650 450 200 0 a 0 a 0 V50. 30 MOCC FUNDS 326 a 326 500 a G 0 0 0 0 0 0 0 a E5I- STATE OIFECT APPFOP 500 0 CITY BONDS 468075. 117359 63391 15263E 6535E 20004 34575 7050 927. REVENUE CONDS-ANTIC 260665 0 47610 131795 49330 15930 13000 3030 92t. FEVENUE SCNOS 52437 52407 0 0 0 a 0 0 929. INT FF REVENUE BCNOS 7001 7001 0 0 0 0 0 0 - *60. AUTH HOUSING 8ONCS 14600 9433 5200 0 0 0 0 0 yfi- INT FR HCUSTNG BCNDS 400 403 0 0 0 0 0. 91D. AUTH POLICE BONDS 2835 2105 73.0 0 0 0 3 0 974. AUTH FIRE BONOS 2140 2149 0 a 0 0 0 0 97.- AUTH FIRE 905-ANT SL 1967 1967 0 0 0 a 0 a 9C:. AUTH HIGHWAY BONDS 35E89 4690 549E 5474 5114 5113 7250 2750. 9P4. AUTH PAFK BONDS 18946 18946 0 0 a 0 0 0 985. AUTH CCNVEN BONDS 4E54 4054 0 0 0 a 0 2 Yf5- AUTH SAN SEW BONGS 4 625 9 9659 989 13336 P025 4225 10025 0 995. AUTH STORM SEW BONDS 171463 3790 2794 2033 2589 ZT36 2933 t021 996. NEW UNAUIH SIM BONDS 2279 G 600 0 C 0 1400 279 FUNDING SOURCE UNKNOWN 39686 0 35 21290 14650 2186 1325 240 101. UNKNOWN 39686 07 35 21293 14650 2186 1325 200 TOTALS 645,732 171,729 89,072 193.415 96,759 36,697 43,000 15,060 AVAILABILITY OF FUNDS Funds are not available currently to imple- ment every project proposed in the 1982-1988 Capital Improvement Program. In some cases, a source of funding for a particular project has not been identified to date; in others, the identified funding source is not yet available. The pie chart in Figure 5 shows which portions of the total funding required to implement the 1982- 1988 Capital Improvement Program are available and which are anticipated to be available in the future. $317,180,000 or 49% of the total funding is avail- able. 45% of all the funds, worth $288,866,000 are 31 anticipated. The source of funding for the remain- ing 6%, $39,686,000, of the capital program is unknown. The funding that is anticipated is described below by major type of funding. 1. Federal Grants: There are four types of federal grants for which the City has applied or plans to apply, but which have not been received yet. These grants, the total requested funding, and the projects that they are intended to fund are listed below: 0 Funding Source and Code Total Project(s) Urban Parks and Recreation $ 250,000 Brickell Transit Station Recovery Act Grant 146 Area - Southside Park Improvements (0036) Ninth Year Community Develop- $ 570,000 Overtown Transit Station ment Block Grant - 169 Area Redevelopment (1022) Urban Development Action 10,000,000 Watson Island Development Grant 170 (7033) Federal Joint Development 6,700,C00 Overtown Transit Station Grant 175 Area Redevelopment (1022) 32 2. Capital Improvement Funds: There are two sources of funding that are not currently available: a portion of the Dade County resort tax to be used for Orange Bowl Renovations and a portion of the Parking Capital Projects fund. Funding Source and Code Total Project(s) Parking Capital Projects $ 585,000 Little Havana Public Parking Fund 660 Facilities (0021) Parking Facility in Omni Area (0059) Authorized Resort Tax 670 1,125,000 Orange Bowl Improvements (7035) 3 3. Site Dedications/Private Funds: Two sources of funding from the private sector that are not available currently are listed below: Funding Source and Code Total Project(s) Developers Contributions 703 $ 250,000 Brickell Transit Station Area - Southside Park Improvements (0036) Private Contributions 706 $ 4,475,000 Fort Dallas Park Development (7055) Bayfrent Park Redevelopment 33 (9038 ) Model City Shopping Center (2039) 4. City Bonds: A portion of the revenue bonds proposed to fund capital projects are not available yet. In addition, one general obligation bond issue has been authorized, but not sold. Voter approval of new general obligation bond fund will be required to fully implement the 1982- 1988 Capital Improvement Program. 1 I, 0 .6 Funding Source and Code Total Project(s) Revenue Bonds 927 $260,665,000 City Administration Building - Phase II (1033) Watson Island Marinas (1008) Dinner Key Marina Expansion (9011) Little Havana Public Parking Facilities (0021) Parking Facility in Omni Area (0059) Core Area West Parking Garage 34 (1017) Miami Design Plaza Parking Garage (1020) Garment Center Parking Garage (2000) Southeast Overtown/Park West Redevelopment (2020) Watson Island Development (7033) 1 01 Fundina Source and Code Tntal Project(s Authorized Fire Bonds, Anticipated $ 1,967,000 Fire Garage and Station #3 Modi- Sale 975 fication and Expansion (2037) Renovation of Fire Stations #1, #2, #5, #8 (2038) Fire Training Facility and Closed Circuit Television System (7084) New Unauthorized Storm Sewer Bonds 2,279,000 Three Storm Sewers Projects 996 (1011, 7100, 9027) 35 East Allapattah Street Improve- ments (2014)-(storm sewers portion) I I. i i 1 1 I I 1 I I In HI1 I 11 1 1� 1 -1, 1 1 P.I I' I I I I 1� 36 FUNDS AVAILABLE S 517,180,000 SOURCE OF FUNDING UNKNOWN $39,686,000 FUNDS ANTICIPATED S288,8ro6,000 1982-1988 CAPITAL IMPROVEMENT PROGRAM AVAILABILITY OF FUNDS FIGURE 5 1 11 11 9 III. . 11 111 111 1 11 1 1 1 1 ° I I' 1' 1 2 Implementing Miami Plans and Policies Project Descriptions and Funding Schedules This section describes the City's activities in each of the Capital Improvement Program's fourteen functional categories. The information provided for each function includes the policies that guide Miami's investment, a map of existing capital facilities, a map and list of the City's recent accomplishments, and a map and list of the improvements proposed during Fiscal Year 1982-83 and for the remaining five years of the capital program. Finally, detailed descriptions and funding scedules are provided for each project. Contents: - Public Buildings - Stadiums and - Auditoriums - Marinas - Sanitary Sewers - Storm Sewers - Street Lighting - Transit Systems - Parking Facilities - Economic Development - Housing Programs - Park Facilities and Street Beautification - Communications and Computers Public Buildings PUBLIC BUILDINGS Capital projects in this functional category include improvements to Miami's municipal office buildings and its municipal operations facilities. The 1982-1988 Capital Improvement Program includes sixteen projects for improvements to public build- ings totaling $41,044,000. These improvements represent 6.4% of the 1982-1988 CIP. Policies Miami's investment in improvements to public buildings is based on the following policies: 37 - Provide easily accessible services to City of Miami residents at four central locations: the Downtown Government Center, the Municipal Justice Building, NW 20th Street and NW 14th Avenue, and Dinner Key. Build a new Fire training facility within an acceptable traveling distance to all compa- nies, large enough to accommodate expansion for additional regional training facilities and buffered adequately from incompatible land uses. (Source: Miami Fire Protection, Rescue and Emergency Services Master Pan 1977-1987, 977 Existing Facilities and Recent Accomplishments Map 1 shows the location of Miami's municipal office buildings, its municipal operations facili- 4 PUBLIC BUILDINGS PUBLIC BUILDINGS ties, and the City's fire stations. Improvements to public buildings completed since 1975 are displayed on Map 2. During Fiscal Year 1981-1982, the Solid Waste Operations Facility Employee Parking and Expansion of the Day Care Centers, totaling $482,000, were completed. Proposed Public Buildings Improvements 1982-1988 The sixteen public buildings projects proposed for the 1982-1988 Capital Improvement Program are shown on Map 3. Ten projects esti;:Iated to cost $35,543,000 are on -going or scheduled to begin dur- ing FY 1982-83. Six additional projects valued at $5,501,000 are scheduled for the remaining five years of the capital program. Detailed project descriptions and funding schedules follow Map 3. 1 -1111 1 I i i i u i t I I I I.,I I I 1 11 1 I 1 l l Funding A summary of all funding sources for improve- ments to public buildings is shown below. 19.2% or $7,891,000 of the funds are available. A source of funding for $5,686,000 or 13.9% of the program is unknown. $27,467,000 or 66.9% of the program is anticipated to become available from sale of revenue bonds and authorized Fire bonds. FUNDING CODE/SOIIRCE 101. UNKNOWN b5C. CAPITAL IMPR FOS-FPL 6!1. FEMVING FUND 702. SALE ExJS CITY PREP W . FEWO UE 80NUS•ANTIC 97C. AUTH POLICE BONDS 974. AUTH FIRE ams 97!. AUTH FIFE SOS -ANY SL TOTAL FUNDS AVAILABLE $7,894000 -__ 19.21L � 13.9% 86.9 % FUNDS ANTICIPATED $27,467,000 PRIOR IFISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 5686 0 35 4275 625 751 0• 0 928 928 0 a 0 1 a D a 0 a 0 53 53 0. 0 4500 0 0 0 0 0 25533 a a 15533 13330 0 0 D 270 2M 0 0 0 C a 0 0 2140 2i40 0 0 0 0 0 0 0 1967 1967 41044 5358 35 24275 10625 751 0 0 PUBLIC BUILDINGS PUBLIC BUILDINGS _ Aw ,asr ti ♦ 1�llt I, s,' ` MAP 1 i I. .,i •I X W 5• er i • •!• IV ' • 1• 1 I i (i(fii/( Y 21 CITY OF MIAMI .... PUBLIC BUILDINGS GS 2 AL OF FICES FlCE S t• - - -A. ,l,,.E CS"A_I MUNICIPAL 1-32 MUNICIPAL OPERATIONS FACILITIES AND FIRE 30 z STATIONS w211], 1 3 r 13 r21 2 T 11 r Z B.SC•,BE W IEAAC0 Q (� i 32 sl.wo sl.eo U '1° •` r 10 y i f C 7 w•rsae isEuro — 1 s, + s, tT 31 H 11 ( t 7 1 bq: ... ... 27 • iza t 28 i f ; 12 : _C :.swesr Yw' r,�•i' •� Ift -1 err}i.+i..�.20,._ i PK.I.e.CEE" Cswv i 71tj 7 .•rt r�-: if •.X 11. WPGIIx• tEr t •Ili , ,; � � >�, � � �,' slew en f,t } r t `� •• 11 15 t i i21 17N 1 E� I S CITY OF MIAMI PUB Municipal Offices A Operations Division, Public Works Depart- ment B Solid Waste Operations Facility C Treasury Management and Risk Management, Finance Department 0 Community Development Department, Human Resources Department, City Physician's Office E Miami City Hall F Planning Board Office, Fire Chief's Office, Fire Prevention Bureau, Public Works De- partment, Planning Department, Building and Zoning Department G Parks and Leisure Services Departments H Police Station and Parking Garage I Olympia Building Municipal Operations Facilities and Fire Stations 1 Coconut Grove Incinerator 2 Maintenance Building 3 Incinerator Storage Building 4 City Garage 5 Communications Maintenance Shop 6 Property Maintenance Shop 7 Motor Pool Building and Police Motorcycle Shop 8 Office and Storage for Operations Divi- sion, Public Works Department 9 Garage and Storage Building, Operations Division, Public Works Department 10 Offices, Stock Room, Carpenter Shop, Machine Shop and Storage Buildings, Truck Shelter, Greenhouse 11 Storage Building, City of Miami Cemetery Office, Restrooms and Shelter Area 12 Auditorium, Offices, and Community Center 13 Service Station 14 Warehouse Structure 15 CBS Structure 16 Pistol Range Building and Police Academy Building 17 Transmitter Building 18 Fire Station No. 1 19 Fire Station No. 2 20 Fire Station No. 4 21 Fire Station No. 5 22 Fire Station No. 6 23 Training Tower and Fire College Training Building 24 Fire Station No. 8 25 Fire Station No. 9 26 Fire Station No. 10 27 Fire Station No. 11 28 Fire Station No. 12 29 Fire Station No. 14 30 Fire Rescue Training Facility 31 Fire Department Maintenance Shop Building 32 Fire Department Underground Fuel Storage PUBLIC BUILDINGS I II I III' 1I1 IN 1Nu1I 11 1 II I I 1 111 1 1 1 1 11 111ig1 PUBLIC BUILDINGS e St rar.c,uu .v! a MAP 2 o RECENT m !ACCOMPLISHMENTS u<,. turn! csw, 1-18 PUBLIC BUILDINGS IMPROVEMENTS w COMPLETED SINCE 1975 = A—B PUBLIC BUILDINGS IMPROVEMENTS COMPLETED DURING a FY 1981--1982 usul„e 0 U w.rsor! s..wo _ m y�4 •� 42 RECENT ACCOMPLISHMENTS Public Buildings Improvements Completed Since 1975 1 Fire Station No. 5 2 Little Havana Community Center 3 City Cemetery Improvements 4 Incinerator No. 1 - Salvage and Demolition - Phase I 5 Incinerator No. 1 - Salvage and Demolition - Phase II 6 Auto Pound Under I-95 7 Little Havana Community Center - Building "C" Demolition 8 Station 10 Modifications 9 Heavy Equipment Service Facility 10 New City Administration Building and Furnishings 11 Station 9 12 Station 4 13 Station 14 14 Solid Waste Operations Facility 15 Fire Department Underground Fuel Storage 16 Renovation of Watson Building 17 Renovation of Public Works Department Operations Division Office and Assembly Room 18 Little Havana Community Center Public Buildings Improvements Completed During FY 1981-1982 Total Project Cost A Solid Waste Operations Facility Employee Parking $ 397,000 B Day Care Centers Expansion 85,000 $ 482,000 PUBLIC BUILDINGS • = _ - ' r U � ay PUBLIC BUILDINGS w )Y ST ! + YV CO�t• . (FI T I . , +4 o MAP 3 PROPOSED PUBLIC BUILDINGS `- IMPROVEMENTS 1982-1%8 Nw M St � .I ' + r �ut,a rUrrtF (:SwT i-0 PUBLIC BUILDINGS $ 4 W IMPROVEMENTS THAT ARE { f } I _ Z ONGOING OR SCHEDULED TO r r + t t I t . t ` tj y .: ; + > BE INITIATED DURING w sT FY I982-1983 f T YSGltNf LN Y1111C0 ? A—D PUBLIC BUILDINGS IMPROVEMENTS t13 5 SCHEDULED FOR FY 1983-1984 THROUGH FY 1987 —1988 .. ; .. +t Li* r - r - CtAUGNT10-51i I lO aRyo o• I' r. i i KFr�l +t„ t Ili :•• `�+.. f. VIPGINIl IIIr Sao w o° \�or fQNCI�N° AK ' 111 11 loll 11111 1 1 1 1 1 1' " 1 I. 1 11 '• PROPOSED PUBLIC BUILDINGS IMPROVEMENTS 1982-1988 Public Buildings Improvements That Are Ongoing Or Scheduled To Be Initiated During FY 1982-1988 Total Project Cost Public Buildings Improvements Scheduled for FY 1983- 1984 Throu4h FY 1987-1988 Total Project Cost 1 Police Parking Garage A Recreation Administra- Improvement (9021) $ 270,000 tive Offices Renovations 2 New City Administra- (1032) $ 50,000 tion Building Employee B Motor Pool Body Shop Parking (0026) 153,000 Addition (2018) 40,000 3 City Nall Renovations C Police Parking Garage (1014) 25,000 (2031) 2,500,000 4 Renovation of General D Police Building Expansion ��+ Accounting (8058) 425,000 (2028) 900,000 5 Fire Training Facility and Closed Circuit Projects That Are Not Mapped: Television System (7084) 3,032,000 Police Support Services 6 Fire Garage and Station Facility (2029) 1,300,000 #3 Modification and Expansion (2037) 1,000,000 Police Outdoor Firing 7 Renovation of Fire Range (2032) 711,000 Stations #1, #2, #5, $5,501,000 #8 (2038) 300,000 8 Gusman Cultural Center/ Olympia Building Renova- tion 75,000 9 Communications Mainte- nance Shop Addition (8051) 85,000 10 City Administration Building - Phase II (1033) 30,178,000 $35,543,000 PUBLIC BUILDINGS u 1 Police Parking Garage Improvement (9021) This project involves sealing all decks of the police parking garage. Cracks in the floor allow oil and grease seepage and buildup that causes ramp slippage. Subter- ranean drainage problems under the police parking lot have been corrected. 2 New City Administration Building Employee Parking (0026) This project involves the improvement of land for parking for employees of the recently -completed City Administra- tion Building in the Government Center. This project is in design. 3 City Hall Renovation (1014) This project provides miscellaneous or emergency renova- 45 tions to City Hall requested by the City Manager or City Commission. 4 Renovation of General Accounting (8058) This project involves the improvement of the section of City Hall where the General Accounting Division of the Finance Department is located. Construction will include the addition of storage space and improvement of the area's air conditioning. This project is under construction. 0 PUBLIC BUILDINGS 5 Fire Training Facility and Closed Circuit Television System (7084) The Coconut Grove Incinerator will be modified for use as the fire training facility. The new facility will replace the existing training center on NW 7th Avenue at 36th Street, which is inadequate in size and obsolete in design for training needs. One of the major components in the training facility will be a closed circuit television to fire stations scattered throughout the City. This project is under construction. 6 Fire Garage and Station #3 Modification and Expansion (2037) This project involves modification and expansion of the Fire Garage located at 1151 NW 7th Street to include more storage bays for spare apparatus, installation of a greater capacity lift for servicing fire apparatus, construction of an approved paint booth for painting and refurbishing of fire apparatus, installation of a pump and drafting test facility, and the pro- vision of offices for the Fire Rescue Division. Improvements at Fire Station #3, located adjacent to the Fire Garage, will include interior modifications and the addition of a hose tower and apparatus room for storage of the Amphibious Fireboat. 7 Renovation of Fire Stations #1, #2, #5, #8 (2038) This project involves renovation of existing Fire Stations #1, #2, #5, and #8. Improvements will include the redesign of dormitories to provide privacy for study and rest, restroom modifications to accommodate men and women, and installation of smoke detectors and security systems throughout the stations. Fire Station #1 services the Central Business District; Station #2 services Overtown and the Garment Center; Station #5 services the Civic Center; and Station #8 services Coconut Grove. ITEM/ NO./ FUND PROJECT 1 9V21. POLICE PARK GARAGE 970. AUTH POLICE BONDS 2 2E. CITY AOMN BLDG PAFKG b5G. CAPITAL INPR FOS-FPL 3 1314. CITY HALL PEN 651. FEMMG FUND 4 805E. FEN OF GENL ACCT 65C. CAPITAL INPR FOS-FPL 5 46 7084. FIRE TRAINING FAC 65G. CAPITAL IMPf? FOS-FPL A74. AUTH FIRE BONDS 97:. AUTH FIFE 8D5-Ah7 SL 6 2037. FIRE GAF ST 3 MCO-EI� 975. AUTH FIRE 80S-ANT SL 7 2038. PEN OF FIRE ST 12!8 979. AUTH FIFE 8DS-ANT SL TOTAL 270 270 270 153 153 153 25 25 25 425 425 425 3032 3032 225 2140 667 1000 1090 1000 300 333 300 PRIOR YEARS 270 270 270 153 153 153 Z5 25 25 4Z5 425 425 303Z 3032 225 2140 661 1000 1000 1000 300 300 30 C FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 0 0 0 0 0 0 0 0 C 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 C 0 0. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0 0 0 0 0 0 0 J 0 0 C 0 0 0 a 3 o a 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 c 0 0 0 0 0 0 Q 0 0 0 c a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 0 c C 0 PUBLIC BUILDINGS I 47 0 8 Gusman Cultural Center/ Olympia Building Renovation (2040) This project involves renovation of the Cultural Center and Olympia Building located at 174 E. Flagler Street. Construction will include emergency repair of the roof and the north wall that have deteriorated due to leaks and moisture. 9 Communications Maintenance Shop Addition (8051) This project involves the construction of an addition to the existing Communication Maintenance Shop at 1080 NW 20th Street. Because of the resulting increase in equip- ment repair work during the past five years, the current repair facility is operating in excess of capacity. The installation of shielded enclosures in the addition will protect communications systems in service while equipment is repaired. Interior modifications will also be under- taken to provide office space, partitions, and additional storage area for increased personnel. This project is under construction. 10 City Administration Building - Phase II (1033) This project involves construction of the second phase of the City Administration Building in the Downtown Govern- ment Center. This building will consolidate all City administrative offices as well as provide offices for the City Commission and the Commission Chambers. The 400,000 square foot building will provide 150,000 square feet for City offices and 250,000 square feet of lease space. This project is in design. 0 PUBLIC BUILDINGS 11 Police Building Expansion (2028) This project involves expansion of the Police Department build- ing to provide additional office space. The building was de- signed so that expansion could be accomplished by "filling -in" bays. Twelve bays, 625 square feet each, are available to be filled in. Construction of the bays will be phased with four bays being filled -in initially. 12 Recreation Administrative Offices Renovations (1032) Renovations to the Department of Recreation Administrative Offices will provide suitable office space as well as acces- sibility for the handicapped. Proposed improvements will in- clude a drop ceiling, covering of walls with particle board, partitions, construction of a handicapped ramp and door on the northern elevation, removal of the old stairway and construc- tion of a new one to the handicapped office in the rear, a fire alarm system, and signage. 13 Motor Pool Body Shop Addition (2018) This project involves construction of an addition to the Motor Pool complex located at 1901 N.W. 12th Avenue to provide essen- tial space required for repair of wrecked City motor vehicles. The proposed addition will also provide space for a new frame alignment rack. i i I i 1 1111 1 111 IN N 1111 11 1 1 11 1 t p 1 1 1 1 1 I. I I VI bill IT PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) NO./ TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987-83 I-UND PROJECT 75 75 0 0 0 0 0 0 0 0 0 40. 2040. GUSMAN CULT CENT FEN 75 75 0 0 a 0 0 0 0 65G. CAPITAL IMPR FOS-FPL 75 75 0 0 9 50 p 35 0 0 0 0 0 a051. COMM MAINT SHOP ACD 85 0 0 35 a 0 0 101. UNKNOWN 35 50 0 0 0 0 0 a 65G. CAPITAL IM.PR FOS-FPL 50 10 3017e 20 0 20150 10000 a 0 0 0 0 1333. CITY ADMIN BLDG-II 33178 28 0 23152 10000 0 0 0 0 a ICI. UNKhCWh 150 a 0 150 0 0 b51. FEfOLIING FUND 2E 28 0 0 a 0 0 0 702. SALE EXIS CITY PFCP 4530 0 0 4500 10000 0 0 0 927. FE4ENUE BONDS -ANTIC 25500 0 0 1550C 11 900 0 0 200 213 503 a 0 0 0 132a. POLICE BLDG EXPAN 930 0 0 233 290 200 200 500 500 c a 48 101. UNKNOWN 900 a 0 12 50 0 0 50 0 0 0 0 1332. FEC ADMIN OFF REh 50 0 a Sa 0 0 0 a 101. UNKNCWN 50 a 0 50 13 40 0 0 40 a a 00 0 iolt. MOTCF POCL BODY SHOP 40 0 a 43 0 0 0 0 a 101. UNKNOWN 40 a 0 40 0 PUBLIC BUILDINGS •an a �i i � I � � i � �, I, 4Q 0 / 14 Police Support Services Facility (2029) This project involves construction of a multi -functional facility to house Police Department Support Services. The proposed facility will house the Mounted Patrol Detail comprised of twenty horses and thirty officers, the K-9 Detail comprised of twenty dogs plus officers, the Marine Patrol that will consist of three boats and twenty officers, and the Helicopter Patrol Detail that will re- quire a heliport for two helicopters. The proposed faci- lity will be located on appropriate City property with water access. A site has not yet been selected. 15 Police Outdoor Firing Range Facility (2032) This project involves construction of a thirty -position, 100 yard outdoor firing range facility on an appropriate City-owned,five-acre site. The proposed facility will include a classroom building, ammunition bunker, control tower, storage building, and parking for forty vehicles. The site has not yet been selected. 16 Police Parking Garage (2031) This project involves the construction of a parking garage to accommodate an additional 300 spaces for Police build- ing employees and the remaining spaces to accommodate other City employees in the area. The existing Police parking garage is presently operating at capacity. The proposed garage will be constructed on the vacant lot south of the Police building. PUBLIC BUILDINGS ITEM/ PRIOR NO./ TOTAL YEARS FUND PROJECT 14 t 30 0 0 2029- POLICE SUPP SERi FAC 1300 1300 0 0 101. UNKNOWN 15 711 0 2032. POLICE FIRING RANGE 7!1 711 0 0 101. UNKhCUN �6 2500 0 0 2031. POLICE PARK GARAGE 2500 0 101. UNKNOWN 2530 41044 5358 50 FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS S7(000) 1987-88 1982-83 1983-84 1984-85 1985-86 0 0 1300 0 0 0 C 0 1 30 0 G 0 0 a 0 1300 35 425 251 0 0 0 35 425 251 0 0 0 0 35 425 251 0 0 0 0 2500 0 0 0 0 0 2500 0 0 0 0 0 2500 0 0 35 24275 10625 781 0 0 PUBLIC BUILDINGS I r �► Stadiums e 51 9 STADIUMS Capital projects in this functional category include improvements to Miami's stadiums; Miami Baseball Stadium, the Orange Bowl, and Marine Stadium. The 1982-1988 Capital Improvement Program includes six stadium projects valued at $4,654,000. These improvements represent .7% of the 1982-88 CIP. Existing Facilities and Recent Accomplishments The location of Miami's stadiums is shown on Map 4. Map 5 shows the improvements to these faci- lities completed since 1975 and during FY 1981-82. FY 1981-82 improvements, totaling $205,000, include installation of a security fence, gates, -and porta- ble west end bleachers at the Orange Bowl. Proposed Stadiums Improvements 1982-1988 The six stadiums projects proposed for the 1982-88 program are shown on Map 6, with the exception of the proposed Velodrome. A site has not been selected for this project. Four of the projects, estimated to cost $4,384,000 are on -going or scheduled to begin during FY 1982-83. The other two projects are scheduled for the remaining five years of the capital program and are estimated to cost $270,000. 6 STADIUMS m STADIUMS 52 Fundin The funding sources required to implement stadium projects are summarized below. Sixty-three percent or $2,909,000 of the funding is available, 24% or $1,125,000 is anticipated, and 13% or $620,000 is unknown. STADIUMS AVAILABILITY OF FUNDING 24% 63x FUNDS AVAILAe� S620,000 $2 909,000 SOURCE ax OF FUNDING► UNKNOWN FISCAL YEARS ALL AMOUNTS IN THOUSANDSOF DOLLLLAARSS -97 (000) 1987-88 PRIOR YEARS 1981-83 1983-84 1984-85 FUNDING CODE/SOURCE TOTAL O 620 0 .0 620 0 0 0 0 0 0 0 0 131. UNKNOWN CAPITAL TMPP FOS-FPL 849 849 0 485 � 0 0 p 0 0 0 650. 670. AUTH RESORT TAX -ANTI 1125 2021 640 2025 0 0 0 0 0 0 0 0 6T1. AUTH RESCPT TAX PFOG ACCTS LS PRO 2 21 0 0 C 0 0 0 0 0 I1C.' 984. SP AUTH PARK BONDS 14 14 620 0 0 0 TOTAL '4654 3549 485 STADIUMS - "'w 7e 47 I 4r CYwT 1j U17 .11 I 4 "w 11 ST MAP 4 ST t` CITY OF MIAMI STADIUMS ww M ST gf,� ruTTlf CSwT MIAMI BASEBALLSTADIUM "w m sr f -+-- - T 1 IC '1rf • f e.w."f Su, u.eco U 311 �� T ! q�l 7n I r i.r i,. rt, m w.T40w "w T ST -- y T 11 ORANGE BOWL STADIUM 1 -� ``•,,'`. . T { 1 .. . } l i r i . + 1 1 , •� ; ' . �• 1 ...- j - F - -� —ucurow 1x."o arm lit tAr..• l: Sw 22 S, -,MIAMI MARINE . er�f"e.c"fe mow.STADIUM Pp"GIUU SVf I 1111 1 IIIfII l I I I' I I I I'I I I' I'll ,I I STADIUMS 54 RAW" ,Odr —A WE i 7 1� ■W Tesr r fi r r a a MAP 5 a RECENT ACCOM PUSHMENTS -�=AQWw.,. TUTTIE CSW. 1-3 STADIUMS PROJECTS COMPLETED W SINCE 1975 z A STADIUMS p > PROJECTS COMPLETED DURING FY 1981-1982 esu.r.E s.r r.eco cn m 0 RECENT ACCOMPLISHMENTS Stadiums Projects Completed Since 1975 1 Orange Bowl Improvements - Roll Up Door Replacement - Spiral Ramp Deck Replacement - Water Main Improvements - Sound Reinforcement Improvements - Stadium Improvements - Step 1 - New Playing Surface and Turf Replacement - Structural Repairs Ticket Office Renovation Lower Press Box Refurbishing Painting and Maintenance Lower Press Box - Phase I 55 - New Scoreboard System Installation - Addition of 8 New Concession Stands and Renovation of 4 Stands on Upper Levels - Improvements to Walkways, Vomitories, Joists, Slabs, and Steel Decking Improvements to Restroom Floors and Third Level Press Box Replacement of Player Bench Artificial Turf Light Poles, Spiral Ramps, Steel Decking, Vomitory Landing Beams Restroom Floors, 3rd Level Press Box - Player Bench Area Artificial Turf - 36' Vomitory Ramp and Landings, Walkways Deteriorated Joists, Slabs at Upper Deck Front, Row of Steel Decking N 3 Marine Stadium - Barge Cover - Structural Repairs Miami Baseball Stadium - Renovation of Lighting System Stadiums Projects Completed During FY 1981-82 Total Project Cost A Orange Bowl Improvements - Security Fence and Cates - Portable West End Bleachers $ 175,000 30,000 $ 205,000 STADIUMS 11 1- 1 111, 11 1 1 1 11- I � 11 - I� i 11.1 ,, , i I r"' i 'I 1 '' Il11111il■® 11 i 11 11111 I I I i I I I I I I III 1 1 1 STADIUMS ' t ` AW IY ST 4 {- TM YT CSwT tt r t { i + u MAP 8 >r� M W N ST + PROPOSED STADIUMS { °° IMPROVEMENTS .W,. S, } 1982-1988 ri, 1-3 STADIUMS IMPROVEMENTS THAT ARE ONGOING OR i I SCHEDULED TO BE INITIATEDi` 1{ I� 1 1 Y . , DURING FY 1982-1983 A w }° S( t {, sul.f a A,B STADIUMS IMPROVEMENTS SCHEDULED FOR FY 1983 —1984 t i f• THROUGH FY 1987-1988 56 m -13 awesr �. l.1. 1 'i111 lii,j}tTT f j ! j ! � A,CAEMe•CAEA CSwr ' 21,+% ' e,Ao no JJ II l'HIlihI 1. 11 hiI fr n PROPOSED STADIUMS IMPROVEMENTS 1982-1988 Stadiums Improvements That Are Ongoing or Scheduled Stadiums Improvements Scheduled For FY 1983-1984 To Be Initiated During FY 1982-1983 Throu4h FY 1987-1988 Total Project Cost Total Project Cost 1 Major Maintenance - A Miami Stadium Miami Stadium (8069) $ 575,000 Concert Stage (2016) $220,000 2 Marine Stadium Boat Ramp Repairs (1035) 21,000 B Marine Stadium 3 Orange Bowl Improve- Improvements (2017) 50,000 ments (7035) 3,524,000 $270,000 Projects That Are Not Mapped: 57 Velodrome (7032) 264,000 $4,384,000 Note: Miami Stadium Concert Stage (2016) has been rescheduled for FY 1982-1983. Project 8069 has been decreased by $220,000 and funding transferred to Project 2016. STADIUMS a• Velodrome (7032) This facility will serve the needs of the bicycle racing enthusiasts in Dade County, whose number have increased significantly during the past decade. The proposed facility is also expected to attract bicycle racers and enthusiasts from all over the country and from South America, whose presence in Miami will help the local economy. 2 Major Maintenance - Miami Stadium (8069) This project involves replacing or renovating the press box, as part of the stadium maintenance. The field light- ing system was overhauled during FY 1980-81. Marine Stadium Boat Ramp Repairs (1035) This project involves repairing the boat ramp at Marine Stadium by grouting under the concrete slabs. The exist- ing ramp has had settlement of the fill under the concrete slabs. The settling has reached the stage where launching operations are affected and damage to boats has been occurring. This project is under contract. 4 Orange Bowl Improvements (7035) The original Orange Bowl was constructed in 1935-36. Although improvements have been made to this facility to increase the capacity from the original 22,000 seats to its current capacity of almost 80,000 seats, additional modifications are necessary to the structure including seating, parking and site improvements. These structural STADIUMS repairs, which are underway, will be funded from the Dade County resort tax. 5 Miami Stadium Concert Stage (2016) This project involves construction of a stage in the outfield wall of the stadium. the proposed stage will be eight feet above ground level, and will be capable of supporting heavy equipment. Power sources will be installed on-stage. The stage will further eliminate the need for temporary crowd con- trol barricades. 6 Marine stadium Improvements (2017) This project involves improvements to Marine Stadium that include installation of new speakers and wiring in the stadium grandstand, and replacement of the existing stage canopy that covers the stage portion of the stadiums barge. The stage canopy has deteriorated to the point where it can no longer successfully be repaired by spot patching. Will I I I II I I 111 I1 I I II I I I THIM M11 ITEM/ N0./ PRIOR FUND PROJECT TOTAL YEARS Z64 14 7332. 4ELOOROME 264 14 101. UNKNOWN 250 0 984. AUTH PARK BONDS 14 14 2 57 5 47 5 e069.. MAJ PAINT-MIAMI STAB 575 475 TOT. UNKNOWN 100 0 650. CAPITAL IMPR FOS•FPL 475 475 3 21 21 1035. MARINE STAB BOATPAMP 21 21 710. SP PFOG ACCTS LS PRO 21 21 4 3524 3039 7035. ORANGE 6CWL IMP 3524 3339 b50. CAPITAL IPPP FOS-FPL 374 374 59 670. AUTH RESCRT TAX -ANTI 1125 640 671. AUTH RESCPT TAX 2025 2325 5 220 0 2016. MIAMI STAB CONC SIG 220 0 101. UNKNOWN 223 0 6 50 a 2017. MARINE STADIUM TOP 50 a 101. UNKNOWN 50 0 46S4 3S49 Note: Funding for Project 8069 has been decreased by $220,000 and transferred to Project 2016. Project 2016 has been rescheduled for FY 1982-83. FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1982-83 1983-84 1984-85 1995-86 1986-37 1987-83 0 253 a 0 0 0 0 250 0 0 a 0 0 250 0 0 0 0 0 0 0 0 0 a 0 100 0 0 0 a 0 100 0 3 0 0 0 133 0 0 0 a 0 0 0 a a 0 0 0 0 0 0 a 0 0 0 0 B 0 0 0 0 0 0 05 0 0 0 0 0 485 0 0 0 0 0 0 0 0 C 0 0 4R5 0 0 C 0 a 0 3 0 0 0 0 0 220 0 0 0 0 0 220 0 0 0 0 0 220 0 0 a 0 0 50 0 0 0 0 0 50 a 0 0 0 0 50 0 0 0 0 48S 620 0 0 0 0 STADIUMS i91 IIIIIIIIIIIIIIIIII■II11111 111 II IIII II I IIII' III I II IIII IIIIIIIIIIIII�� I'' � 9 II I °'9° � it � Auditoriums 60 1 AUDITORIUMS Capital projects in this functional category include improvements to Miami's two auditoriums; Coconut Grove Exhibition Center, and Bayfront Park Auditorium. The 1982-88 Capital Improvement Pro- gram includes two auditoriums projects estimated to cost $1,378,000. These improvements represent .2% of the 1982-88 CIP. Existing Facilities and Recent Accomplishments The location of Miami's auditoriums is shown on Map 7. Map 8 shows improvements to these facilities completed since 1975. Proposed Auditoriums Improvements 1982-1988 Improvements at the Coconut Grove Exhibition Center are on -going and will be continued during FY 1982-1983. The total cost of this project is $1,128,000. Improvements at Bayfront Park Auddito- rium are scheduled to begin during FY 1983-84 at an estimated cost of $250,000. Map 9 show the proposed improvements. Detailed project descriptions and funding schedules follow Map 9. E1 I is AUDITORIUMS .2% AUDITORIUMS I 1 11 ■ 11 1 11 1, 1 1 AUDITORIUMS Fundi n AVAILABILITY OF FUNDS The funding sources required to implement audi- torium projects are summarized below. $1,128,000 or 81.9% is available for work at the Coconut Grove SOURCE OF Exhibition Center. The source of funds for $250,000 FUNUNG UN"OWN or 18.1% for maintenance at Bayfront Park Auditorium SM0001y is unknown. 61.9% FUNDS AVAILABLE S4128poo al PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) FUNDING CODEISOURCE TOTAL YEARS 1982-83 1983-84 1984-85 1995-86 1986-87 1987-88 loll UNKPICWh 253 0 G 250 0 0 151. FED Ki SHORING 150 150 0 a 0 0 650. CAPITAL IMPR F05-FPL 978 653 0 0 0 0 328 13 0 0 0 0 TOTAL 1378 800 328 2S0 0 0 0 0 ■ 1 E2 AUDITORIUMS It 1 f. 5• Nw )BST {N ue [Swr D MAP 7 Q CITY OF M IAMI AUDITORIUMS ,U,,,E CSw. W Z d Y Q B,SUrMf SW Y.nCD 151.ND SI^.BDy V till--J y \\SON ISI.ND m b I AUDITORIUMS NW)•sT � �� ,Q o MAP 8 o a RECENT ACCOMPUSHMENTS 1!2 AUDITORIUMS PROJECTS COMPLETED Lu SINCE 1975 D > a BiSUrNF YM Y.RCO suNo SUNo O \.rsw rsL wo y m 4A IVY RECENT ACCOMPLISHMENTS Auditoriums Projects Completed Since 1975 1 Bayfront Auditorium - Major Maintenance 2 Coconut Grove Exhibition Center - Purchase of auditorium chairs and tables - Demolition of barracks buildings - Renovation of vacated Print Shop area Z AUDITORIUM'S 0 AUDITORIUMS " a t 5� w lE sr ,""1 cs , � � _ j"i tt 3 f"w n sT = - T - �l�� MAP9 I.iLt- �4 "w N 6T t i - PROPOSED AUDITORIUMS a n 4' s` m IMPROVEMENTS J.' ' — 1982-1988 ;.. _ } 13 11EIE TITTLE CWT 5T , I AUDITORIUMS IMPROVEMENTS W THAT ARE ONGOING OR i z SCHEDULED TO BE INITIATED DURING FY 1982-1983 A AUDITORIUMS IMPROVEMENTS SCHEDULED FOR FY 1983 -1984 THROUGH FY 1987 m 1 i I i.t I Y !fitt t :1 f 1 I tt.urwTorfs sw.sr NiCnwN .FP CSW'/ WRO no 11 1 L fill I II I III �II11111 I I I I I� I I I'I" I I -Yulea 10 be Initiate PROPOSED AUDITORIUMS IMPROVEMENTS 7982-1988 Tota.1 Project Cost 7 Coconut Grove Exhibi- tion Center - Addi- tional Work /8080\ $l°l28,OOU Note: COCOOUt Grove Exhibition Center - Additional Work /8080\ has been increased to a total ' project cost Auditoriums Improvements Scheduled For FY 1983-84 A Bayfront Auditorium - Major Maintenance (OO5l) AUDITORIUMS 1 Coconut Grove Exhibition Center - Auditorium Work (8080) This project involves additional work needed to complete the Exhibition Center. Proposed improvements include construction of restrooms in the Courtyard Extension, purchase of additional folding chairs, and installation of a modern marquee on Bayshore Drive. 2 Bayfront Auditorium - Major Maintenance (0051) this project involves major renovation of Bayfront Audi- torium. Proposed improvements include replacement of the roof, replacement of folding partitions, replacement of the air conditioning system, and complete renovation of the restrooms. 67 AUDITORIUMS ITEM/ NO./ FUND PROJECT TOTAL 1 1128- �e0t0. CO GF EXHIB CEN-ACD 1128 150. FED PEV SHARING 150 650. CAPITAL IMPR FOS-FPL 970 2 250 51. BATFPT AUO-MAJ !TAINT 250 LO1. UNKNCMN 250 1378 Note_; Funding for Project 8080 has been increased to a total of $1,200,000. Funding for FY 1982,83 from Capital Improvement Funds (650) has been increased to $400,000. 68 D PRIOR YEARS 800 800 150 650 0 0 0 FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 328 0 a 0 a 0 328 0 0 0 0 0 0 0 0 0 0 0 328 Q Q 0 0 Q 0 253 0 0 0 0 0 250 0 0 0 0 0 250 0 0 0 0 800 328 250 0 0 0 0 AUDITORIUMS 9534 Marinas I C I' IIIII�I�I�IIII�I�iIl01l1�'' '' '' ' I� I 04 MARINAS Capital projects in this functional category provide improvements to City of Miami marinas. Five marinas projects, valued at $21,918,000, are included in the 1982-1988 Capital Improvement Pro- gram. These improvements represent 3.4% of the total program. Policies Miami's investment in improvements to City marinas is based on the following policies: - Provide a program for the comprehensive F9 development of marinas and marina -oriented projects in the City of Miami. - Program for secondary marina sites should be incorporated into the park and recreation program to provide or improve water access to indicated park or potential park areas. (Source: Comprehensive Marina Development Study, 979 Existing Facilities and Recent Accomplishments Miami's marinas and improvements completed since 1975 are shown on Maps 10 and 11, respectively. Piles and finger piers at Dinner Key Marina have been replaced. Approximately 40% of the piers at Miama- ri na have been repaired. MARINAS Proposed Marina Improvements 1982-1988 Five marinas projects are scheduled for the six year program. Map 12 shows the proposed improvements. Major maintenance at Dinner Key Marina and Miamarina pier repairs are on -going projects that will use $415,000 and $147,000, respectively, from marina retained earnings during FY 1982-83. The three re- maining projects involve enhancement of the River - front and Watson Island Marinas, and expansion of Dinner Key Marina. The projects are scheduled to begin during FY 1982-83. Detailed project descrip- tions and funding schedules follow Map 12. MARINAS 70 Funding A summary of funding sources for marina improve- ments is shown below. $1,318,000 or 6% is avail- able primarily from retained earnings. The revenue bonds are anticipated to be sold during FY's 82-83 and 83-84. Anticipated sale of revenue bonds account for $20,600,000 or 94% of the total funding needed to implement marinas capital projects. FUNDING CODE/SOURCE TOTAL 652. FETAINEO EARNINGS 1168 654. LOAN-PFOC INTER SALE 150 927. FEVEAUE 80N05-ANTIC 29600 TOTAL 21918 MARINAS AVAILABILITY OF FUNDING 6% FUNDS AVAILABLE S I,3I8,000 94% FUNDS ANTICIPATED 320,600,000 PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 526 642 0 0 0 0 0 150 0 0 0 0 0 0 0 9500 11100 0 0 0 0 676 10142 11100 0 0 0 0 MARINAS r d MM iast t T� Mw t, sr� i lr MAP 10 fit M � P CITY OF MIAM'I MARINAS . TTLE CS— LU Mw IO ST T L:3r • r — .Jy/' 15.lu etE • L it � 7 I j.41 AxC WATSON ISLAND MARINA MIAMARINA r . I Sw•a ST RIVERFRONT i:`.k id1 NUMB MARINAS i •7 � 4 � � �t, �l � �.. k... ktii ti Yt �# ! r aw 7E ST AICMEMMCNLR cs- 4 iL 1 Ti.. v�RGMM IMP J6+ __ �L DINNER KEY MARINA a, F: MARINAS - �. .� w ).ST Yr CSwr Jt£ t+Ti i! J3:{ Tf' t , f MAP11 o Mw SE Si 1 A } t t I o RECENT ACCOMPLISHMENTS M w le ST __ • MARINAS IMPROVEMENTS COMPLETED SINCE 1975 uj rriTtt t'� i t : _ w>a:. G I,. i a - - 72 a q aid S r } r 4• 4 -�. r ii T rI 4 ,j - \ w.rSJ. f�w� i ;; x mMill l•at� s till r . ' E 1 i i { t z tt POIMCI.n. A" 4 ` ` nL•wo �a y.yo Marinas Improvements Completed Since 1975 1 Dinner Key Marina - Major Maintenance 2 Miamarina - Pier Repairs 73 RECENT ACCOMPLISHMENTS MARINAS i g� i y i Illll lllrl li l l III�II I i! MARINAS 74 ST MI 51" 4 o MAP 12 } o Q PROPOSED MARINAS m IMPROVEMENTS )-�-. T.TTLE CSW 1982-1988 1-5 MARINAS IMPROVEMENTS W THAT ARE ONGOING OR z SCHEDULED TO BE p } INITIATED DURING FY 1982- 1983 .Su•.[ e. U. O a..o xx.r�w U AT 6.— cc PROPOSED MARINAS IMPROVEMENTS 1982-1988 Marinas Improvements That Are Ongoing or Scheduled To Be Initiated Durin FY 1982-1983 Total Project Cost 7 Major Maintenance - Dinner Key Marina (8068) $ 750,000 2 Miamarina Pier Repairs (1019) 338,000 3 Watson Island Marinas (1008) 15,550,000 4 Riverfront Marinas 75 Enhancement (1018) 80,000 5 Dinner Key Marina Expansion (9011) 5,200,000 $21,918,000 Note: Total project cost for Major Maintenance - Dinner Key Marina (8068) has been decreased to $635,000--$300,000 will be appropriated in FY 1982-1983. MARINAS di I I , Ili I I . Y Major Maintenance -Dinner Key tsarina (8068) This project involves major maintenance of Dinner Key Marina to be funded annually by retained earnings from the Marina. During Fiscal Year 1978-79, deteriorated piles were replaced. Improvements during FY 1981-82 consisted of replacement of additional piles and four finger piers. Improvements to be made during FY 8z-83 will consist of replacement of deteriorated piles, finger piers, decking, electrical work, expansion of the dock - masters office, and the establishment of a moorino area. 2 Miamarina Pier Repairs (1019) This project continues major repairs to Miamarina pier and Bicentennial dockage facilities. Since FY 1980-81, approximately 40% of Miamarina pier has been repaired. 3 Watson Island Marinas (1008) This project involves renovation of existing marinas and 7 6 development of additional ones on Watson Island. Fifty- eight existing slips will be renovated and 600-700 new ones will be developed. Development also includes approx- imately 630 parking spaces, 2 sit-down restaurants, 4,000 square feet of fast food restaurants, and approximately IU,DUO square feet of ships' stores. Development will be funded with revenue bonds. 4 Riverfront Marinas Enhancement (1018) This project involves improvements to City -owned marina facilities at four sites along the Miami River: 176 NW MARINAS North River Drive, the Miami Pioneers Club adjacent to Lumnus Park, Jose Marti Riverfront Park, and 150 NW North River Drive Improvements include replacement of piles and other unsafe structures, removal of sunken and derelict vessels, and renova- tion and replacement of deteriorated structures. 5 Dinner Key Marina Expansion (9011) This project involves expansion and major renovation of Dinner Key Marina, as recommended in the Comprehensive Marina Develop- ment Study. To be funded with revenue bonds, the Marina will be expanded to 550 slips. Support facilities for the Marina, including the dock master's offices, laundry services and rest - rooms, storage space, carry -out food facilities and sailboat rental areas will be improved. ®u ITEM/ PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS 1985-86 OF DOLLLAARS87(000) 1986- 1987-88 NO./ TOTAL YEARS 1982-83 1983-84 1984-85 FUND PROJECT 0 0 1 750 335. 415 0 0 0 0 C 0 p 0 0 0 1068. MAJ PAINT -DINNER KEY 750 750 335 335 415 415 0 7 0 652. FETAINED EARNINGS 0 0 0 0 2 338 191 147 0 0 0 0 0 0 0 p 1019. MIAMARINA PIER REP J3e 191 147 141 0 0 0 652• FETAINED EARNINGS 338 191 0 0 a 15550 150 7500 7900 0 0 0 0 0 0 3 100E. MATSON ISL MAFTNAS 15550 150, 7500 0 7900 O 0 0 0 0 0 654. LOAN-PROC INTER SALE 157 150' 0 7500 7900 0 C 927. FEIENUE BONDS-ANIIC 15400 0 0 a so a �D AO p � 0 o 0 2 o 0 a 101e. RIIEFFRT MAP EHHAI,C 80 BO 0 0 80 0 0 0 0 652. FETAINED EARNINGS 0 0 0 77 s 5200 0 2000 3240 3200 0 C 0 0 0 0 9011. DINNER KEY MAR EXP 5200 0 0 2000 2333 320C 0 0 0 0 927. REIE�UE BONDS-ANIIC 5200 11100 0 0 21918 676 10142 Note: $300,000 from Retained Earnings will be appropriated to Project 8068 for FY 1982-83, I total project funding is $635,000. MARINAS I� � � I � �� � � III I III Illlllllllllllllllllllllllllllllllllllllllllillllllll I I II I�1 I it li I "' 'I I ' "'" "' I' �'"°"' ' 'I� Sanitary Sewers 11 1 1 III 11 1 1 11 1 II I1 1I 1' 1 1111 11 ,iun,gj.,11l11 W 11 SANITARY SEWERS This section includes projects that will improve Miami's existing sanitary sewer system and provide sanitary sewers in areas of the City that do not have them. The-1982-1988 Capital Improvement program includes fifteen sanitary sewer projects estimated to cost $46,259,000. These sanitary sewer improvements represent 7.2% of the total capital program. Policies Miami's investment in sanitary sewers is guided by the following: - Extend sanitary sewer facilities to serve the remaining unsewered areas of Miami, permitting the phasing out of nearly 100 small private collection systems. (Source: Miami Comprehensive Neighborhood Plan 1976- 986, 976 Existing Facilities and Recent Accomplishments As shown in Map 13, most of the City of Miami has sanitary sewers. Twenty-two sanitary sewer projects, displayed in Map 14, have been completed since 1975. During FY 1981-82, $2,996,000 in sanitary sewer improvements were completed in the Lyndale area. Proposed Sanitary Sewer Improvements 1982-1988 The six -year program of sanitary sewer improve- ments is shown on Map 15. Eleven projects, worth $15,959,000 are ongoing or scheduled to begin during FY 1982-83. Four additional projects, plus continuation of the two citywide projects, valued at $30,300,000 are scheduled for the last five years of the capital program. SANITARY SEWERS 11 1 1 1 111 11111 !II 11 111 11111 11111 JII 79 Funding The schedule below summarizes the funding needed to implement the six -year program of sanitary sewer improvements. Currently, $46,259,000 or 100% of the total required funds are available from sanitary sewer bonds. This will deplete the bond fund and a new sanitary sewer bond issue must be approved by Miami's voters to extend the program. FUNDING CODE/SOURCE 9l9. AUTH SON SEW BONDS TOTAL SANITARY SEWERS AVAILABILITY OF FUNDING LE S46,259,000 PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 46259 9659 989 13336 8D251 4225 13325 0 46259 9659 989 13336 8025 4225 10025 0 SANITARY SEWERS N W t9 ST � iN »., CSw• 3 A Nw /1 SI }` tT... MAP 14 0 . v } IB t5 12 a RECENT 13 _ m ACCOMPUSHMENTS SANITARY SEWER PROJECTS 1-21 COMPLETED SINCE 1975 s W 0 SANITARY SEWER PROJECTS 3 z COMPLETED DURING A FY 1981-1982 1t4L nsc..»f vN r.»co 81 s q n'd 1 5SS to � rf HFUT ......... •i. L. -t I i .. ..... . - sw a sr : .i t i t t •,i1 ; g''Ne M w N 21 A 20 • � � ' t , ' I IU v a t7 11 B »tldwf» CSw, t8 BIND No w I• i i MNCtANA AV( I I I I I 1 11 1 1 11 1 11 RECENT ACCOMPLISHMENTS 1975 Sanitary Sewer Projects Completed During FY 1981- Sanitary Sewer Projects Com leted Since 1982 1 Liberty City Sanitary Sewer Improvement - Total Project Cost 2 Phase II Garden Sanitary Sewer Improvement Sewer Improvement A Lyndale Sanitary $2,996,000 3 East Braddock Sanitary Sewers 4 Tracy Sanitary Sewer Improvement $2,996,000 5 North Bayshore Drive Sanitary Sewer 6 Improvement Delaware Sanitary Sewer Improvement 7 West Grapeland Sanitary Sewer Improvement 8 Glenroyal Sanitary Sewer Improvement 9 Hammock Sanitary Sewer Improvement 10 Simpson Sanitary Sewer Improvement 82 11 Orange Bowl Sanitary Sewer Project 12 Columbia Sanitary Sewers 13 Manor Sanitary Sewers 14 Silver Bluff Sanitary Sewers 15 Crestwood Sanitary Sewers 16 Allapattah Sanitary Sewers 17 Pines Sanitary Sewers 18 Avalon Sanitary Sewers 19 South Bay Sanitary Sewers 20 Coral Sanitary Sewers 21 Englewood Sanitary Sewers SANITARY SEWERS 83 SANITARY SEWERS ii Sw }] 5T am N° Vb, — H 51 A, a. ST l r- 3 { { tt rt � _ a ° MAP 15 PROPOSED SANITARY SEWER MILT• Ti CSw. IMPROVEMENTS W 1982-1988 Z : J SANITARY SEWER PROJECTS 1-9 THAT ARE ONGOING OR a SCHEDULED TO BE INITIATED DURING FY 1982-1983 SANITARY SEWER PROJECTS \*A— -Stu _ A-D SCHEDULED FOR FY 1983-1984 m THROUGH FY 1987-1988 ILAUGIrr°N15L 1N°LSlMO J Y C ' PROPOSED SANITARY SEWER IMPROVEMENTS 1982-1938 Sanitary Sewer Projects That Are Ongoing Or Sche- Sanitary Sewer Projects That Are Scheduled For FY 1983-84 Through FY 1987-88 duled To Be Initiated During FY 1982-1983 Total Project Cost Total Project Cost 1 Auburn Sanitary Sewers A Flagler Sanitary Sewer Improvement (8049) 7,500,000 2 (burn Kirkland Sanitary $ 3,200,000 B Fairlawn Sanitary Sewer Improvement (8050) 7,500,000 Sewer Improvement (0011) 1,677,000 C Flagami Sanitary Sewer 3,700,000 3 Koubek Sanitary Sewer (0012) 1,182,000 Improvement (0013) 4 Improvement Central Sanitary Sewer D South Grove Sanitary Sewer Improvement (1016) 10,000,000 Improvement (8047) 1,200,000 5 Kinloch Sanitary Sewer (8048) 1,700,000 Projects That Are Not Mapped: Improvement 6 Bicentennial Park Sani- 150,000 Citywide Sanitary Sewer tary Sewers (7091) Extensions Improvement 1,500,000 7 West Flagler Street (7092) Sanitary Sewer Improve- II (1015) 800,000 Citywide Sanitary Sewer ment - Phase Lateral Modifications 100 8 Lynwood Sanitary Sewer (2001) 3,200,000 (1012) ,000 Improvement $30,300,000 9 Durham Sanitary Sewer Improvement (2002) 1,800,000 Projects That Are Not Mapped: Citywide Sanitary Sewer Extensions Improvement (7092) 1,000,000 Citywide Sanitary Sewer Lateral Modifications (1012) 50,000 $15,959,000 SANITARY SEWERS 11 , 11i . I �� I I I I Ili CM Auburn Sanitary Sewer Improvement (7U99) This project will provide sanitary sewers in the area bounded by NW 7th Street, NW 27th Avenue, W. Flagler Street and NW 37th Avenue. The zoning in this area is predominately R-1 and R-2 with commercial and multiple dwelling residential districts along arterial streets. Completion of this project, along with the Koubek and Kirkland projects, will result in the provision of sanitary sewers for the entire area east of W 37th Avenue with the exception of isolated pockets to be sewered as part of the Citywiae Improvements project. This project is under construction. 2 Kirkland Sanitary Sewers Improvement (0011) Kirkland Sanitary Sewers will provide sanitary sewers in the area bounded by SW 12na Avenue, W. Flagler Street, SW 37th Avenue, and SW 8th Street. The zoning in this area is predominately R-2 with commercial and multi -dwell- ing residential strips along the arterial streets. This project will activate sanitary sewers recently installed by the City in W. Flagler Street in conjunction with the rebuilding of Flagler Street by Metropolitan Dade County. This project is under construction. Koubek Sanitary Sewer Improvement (0012) The Koubek Sanitary Sewers project will provide sanitary sewers in the area bounded by SW ?7th Avenue, W. Flagler Street, SW 32nd Avenue, and SW 8th Street. The zoning in this area is predominately R-2 with commercial and multiple -dwelling residential strips along the arterial streets. This project will activate sanitary sewers SANITARY SEWERS recently installed by the City in W. Flagler in conjunction with the rebuilding of Flagler Street by Metropolitan Dade County. This project is under construction. 4 Central Sanitary Sewer Improvement (8047) This project will provide sanitary sewers in the area bounded by the East-West Expressway, LeJeune Road, NW 7th Street, and NW 37th Avenue. The zoning in this area is predominately R-1 and commercial. 5 Kinloch Sanitary Sewer Improvement (8048) This improvement will provide sanitary sewers for a portion of the area within the City of Miami bounded by NW 7th Street, N14 41th Avenue, N'J 3rd Street, NW. 42nd Avenue, and West Flagler Street. The zoning. in this area is predominately R-1 and R-2 with commercial and multiple -unit residential strips adjacent to the arterial streets. This project is in design. Bicentennial Park Sanitary Sewers (7091) This project is to provide sanitary sewers to the waterfront site proposed for dockage of large shios in Bicentennial Park, which in turn will generate additional public use of park facilities. The sewer line will attach to ship sewerage pump - out facilities and connect to sanitary sewers along Biscayne Boulevard. The proposed Watson Island development also will discharge into this system. FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1986-87 1987-88 ITEM/ NO./ PRIOR YEARS 1982-83 1983-84 1994-85 1985-86 FUND PROJECT TOTAL a 3230 3200 0. a 0 0 0 0 C C 0 0 0 AUBUFN SAN SEW 3200 3200 0 0 a 0 0 0 7099. 989. AUTH SAN SEW BONGS 3200 3200 0 0 C 0 1677 1677 0 0 0 0 0 0 a a 0 2 11. KIRKLAND SAN SEW IMP 1677 1677 1677 1677 0 0 0 0 0 989. AUTH SAN SEW BONDS a 0 c 0 1182 1182 0 0 0 0 C 0 0 0 a 3 12. KOUBEK SAN SEW IMP 1182 ilA2 1IS2 lle2 0 0 0 0 0 9l9. AUTH SAN SEW BONDS 0 0 0 a a 1200 1230 0 0 0 0 0 0 0 a 4 8047. CENTFAL SAN SEW IMP 1200 1200 1200 1200 a 0 0 0 0 0 9l9. AUTH SAN SEW BONDS 0 0 0 1700 1730 0 0 a 0 6 0 o 0 0 5 8G soie. KINLCCH SAN SEW IMP 1700 1700 170 0 1700 0 0 0 0 U 9t9. AUTH SAN SEN BONGS 0 0 0 0 150 125 25 0 0 0 0 0 a 0 0 6 BICENTENNIAL SAN SEW 150 125150 25 25 0 0 0 7091. 989. AUTH SAN SEW BONOS 125 SANITARY SEWERS 9534 7 West Flagler Sanitary Sewer Improvement - Phase I1 (1015) This project involves construction of a sanitary sewer collection system to serve properties abutting W. Flagler Street between W. 42nd Avenue and W. 72nd Avenue. Activa- tion of the system is scheduled for the years 1983 through 1986. This project will be coordinated with the rebuild- ing of W. Flagler Street in this area by Metropolitan Dade County. 8 City Wide Sanitary Sewer Extensions Improvement (7092) These extensions and modifications will provide sanitary sewers to unsewered pockets and provide for modifications to the existing sewer system where required. Because these are usually high priority projects, monies have been scheduled over five years of the Capital Improvement Program. 9 Citywide Sanitary Lateral Modifications (1012) 87 This project involves the construction of sanitary sewer laterals to properties abutting a sanitary sewer but with- out existing usable laterals. These funds would allow for the bidding of these miscellaneous laterals on an in- dividual basis as they are needed. 10 Lynwood Sanitary Sewer Improvement (2001) This project involves construction of a sanitary sewer collection system to serve properties within the area bounded by W. Flagler Street, Coral Gables City limits,and S.W. 47th Avenue. This project is in design. SANITARY SEWERS 11 Durham Sanitary Sewer Improvement (2002) This project involves construction of a sanitary sewer collec- tion system to serve properties within the area bounded by N.W. 7th Street, N.W. 37th Avenue, W. Flagler Street, and N.W. 42nd Avenue. This project is in design. 12 Flagler Sanitary Sewer Improvement (8049) This project will provide sanitary sewers in the area bounded by West 57th Avenue, S.W. 8th Street. West 47th Avenue, and the northern City limits. The zoning in this area is predomi- nately R-1 and R-2 with commercial and multiple unit residen- tial strips adjacent to the arterial streets. 13 Fairlawn Sanitary Sewer Improvement (8050) Sanitary sewers will be provided in the area bounded by West 67th Avenue, SW 8th Street, West 57th Avenue and the northern City limits. The zoning in this area is predominateiy R-1 with commercial and multi -unit residential strips adjacent to the arterial streets. 14 Flagami Sanitary Sewer Improvement_ (0013) The Fiagami Sanitary Sewers project will provide sewers in the area bounded by W. 67th Avenue, SW 8th Street, and the northern and western City limits. The zoning in this area is predomi- nately R-1 with commercial strips along W. Flagler Street, SW 8th Street and the SAL and FEC railroad tracks. 15 South Grove Sanitary Sewer Improvement (1016) Sanitary sewers will be constructed in the area bounded by Franklin Avenue. Charles Terrace, the western City limits, the southern City limits, and Biscayne Bay. Completion of this project will complete the sanitary sewer system in the City of Miami. ITEM/ NO.1 FUND PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS ALL 1983-84 AMOUNTS 1984-85 IN THOUSANDS OF 1985-86 DOLLARS (000) 1986-87 1987-88 7 800 50 50 700 0 0 0 0 101!. W FLAG ST SAN SEW -II 000 50 50 700 0 0 0 G 989. AUTH SAN SEW BONDS a32 50 50 700 0 0 0 0 8 2500 500 500 500 500 1530 0 0 7092. CITY-MIOE SAN SEW EX 2500 500 500 Soo 500 Soo a 0 989. AUTH SAN SEW BONDS 2500 530 500 500 530 500 0 0 9 15C 25 25 25 25 25 25 C 1012. CITY-WIOE SAN LAT MD 153 25 25 25 25 25 25 0 989. AUTH SAN SEW BONDS 150 25 25 25 25 25 25 0 i0 3Z00 0 89 3111 0 0 0 C 2331. LYNWCOD SAN SEW IMP 3230 a 89 9t9. AUTH SAN SEW BONDS 320C 0 09 3111 0 0 0 0 11 1800 0 330 1500 0 0 0 0. 2002. DURHAM SAN SEW IMP 1800 0 300 1533 C a 0 a 88 969. AUFH SAN SEW SONGS 1800 9 300 1500• 0 0, 0 0 12 7500 0 a 7500 0 0 0 0 P049. FLAGLER SAN SEW JMP 7533 0 0 7530 a o a 0 9a9. AUTH SAN SEW BONDS 7500 0 0 7500 0 0 0 0 13 7500 0 0 0 7500 0 0 a 8050. FAIRLAWh SAN SEW IMP 7530 0 0 0 750a 0 0 a 9E9. .AUTH SAN SEW BUNCS 7500 a 0 0 7530 0 0 a 14 370C 0 0 0 0 3700 0 0 13. FLAGAMI SAN SEW I►P 3732 0 0 0 0 370C 0 a 9PS. AUTH SAN SEW BONCS 3700 0 0 0 0 3700 a 0 15 loCo0 0 0 0 0 0 13303 0 1316. S GPOIE SAN SEW IMP 10000 0 0 0 a a 10000 0 pc9. AUTH SAN SEW BONC5 10000 0 a 0 0 0 100A0 0 462S9 9659 989 13336 8025 422S 10025 0 SANITARY SEWERS Storm Sewers e STORM SEWERS Storm sewer capital improvements provide storm water drainage within the City of Miami. Storm sewer improvements account for 1.4% of the 1982- 1988 Capital Improvement Program. The thirteen projects are estimated to cost $8,888,000. Policies Miami's investment in storm sewers is based on the following policies: - Provide adequate storm drainage as defined by Public Works Department standards for different types of areas of the City, such 89 as commercial,.single-family, multi -family or high intensity areas. (Source: City of Miami Department of Public Works Provide local drainage systems in low-lying areas of Miami identified by onsite inspec- tions and citizen participation. - Coordinate areawide storm sewer development with major street improvements. (Source: Miami Comprehensive Neighborhood Plan 1976-1986, 1976) Existing Facilities and Recent Accomplishments There are two types of storm water collection systems in operation in the City: (1) areawide 58,888,000 13 PROJECTS or positive storm sewers that drain directly into the ocean or the river, and (2) local drainage systems, which drain into underground holding basins in the surface limestone. The City's positive drainage system is shown on Map 16. flap 17 depicts the areawide and local drainage systems completed since 1975. Phase I of the Lawrence and Riverview storm sewers Froilacts were completed during 1981-19R2 at a cost of $5,703,000. STORM SEWERS Proposed Storm Sewer Improvements 1982-1988 The six -year storm sewer improvement program is shown on Map 18. Ten projects, valued at $4,428,000, are on -going or scheduled to begin during FY 1982-1983. Three additional projects, plus continuation of Local Drainage Projects, valued at $4,460,000 are scheduled for the remain- ing five years of the capital program. Funding Miami's storm sewer improvements will be funded with City storm sewer bonds. 81% of the bonds required to implement the six -year program have been authorized by the electorate and are available. 90 However, a new storm sewer bond issue must be approved by Miami voters to complete the funding of the program. STORM SEWERS AVAILABILITY OF FUNDING FUNDS ANTICIPATED .31,679,000 19% 81.0% FUNDS AVAILABLE S7,209,0D0 PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) FUNDING CODE/SOURCE TOTAL YEARS 1982-83 1983-84 1984-85 198S-86 1986-87 1987-88 99:. AUTH STORM SEW BUNGS 7209 2990 1133 800 1138 1160 0 21 996. NEW UNAUTH STN 90hOS 1679. a 0 0 0 .3 1400 279 TOTAL 5888 2990 1100 800 1138 1160 1400 300 STORM SEWERS �l PUIMGIMA AVE Kw s. ST MAP 16 D a m CITY OF MIAMI POSITIVE DRAINAGE TpT, E Cswr SYSTEMS W 2 � T .Is sw r.nca -•2 h w•TSOM ISIYq m i5L.M6 �ryY� P 9 34 v STORM SEWERS Mw 1i ST T f TN liq a, ... CSWt �- � � •ne f �� � T •':1 V � MAP 17 st y D < RECENT ACCOMPLISHMENTS MW ]6 sT 141 TUTTIE CS- • LOCAL DRAINS COMPLETED ♦,' • . �.L ; ;j�. i : SINCE 1975 W IIC M AREAWIQE STORM SEWER z 1-6 PROJECTS COMPLETED - SINCE 1975 GO AREAWIDE STORM SEWER �W Z:' . , • .,sC..N. su. Nu co A—B PROJECTS COMPLETED 1 : s r1• M ��,�.. ♦ I I .Sl+NO .Sl.NO t:J DURING FY 198t —1982 92 y m � . y n.wee s M� 4 - .y • � . .. , i •, ;7 � � .� 4 1 t{ 1 I� F TTT�i 5wa5T _i ij 1 �. L��a.�i•� :R 2 d S. Z2 sT i f _. . ••d �: . 1 I 11 . ♦ 1 lb: IHC.[NMC.fN Csw. r.� w..E. 1• t uno eo i t• ppNf:1.N. .VE _ 0 1 93 RECENT ACCOMPLISHMENTS Areawide Storm Sewer Projects Completed Since 1975 Areawide Storm Sewer Projects Completed Durin FY 9 -82 1 Delaware Storm Sewers Total Project Cost 2 Hammock Storm Sewers 3 Roads Storm Sewers 4 West End Storm Sewers A Lawrence Storm Sewers - Phase I $ 651,000 5 Riverview Storm Sewers - Phase II 6 Downtown Government Center Storm Sewer B Riverview Storm Modification Sewers - Phase I 5,052,000 $5,703,000 STORM SEWERS STORM SEWERS -4 ftwam ST sr rr- r Y. C=b. a MAP 18 Q PROPOSED STORM SEWER IMPROVEMENTS o a 1982-1988 02 STORM SEWER PROJECTS .��M„ rurrit SSW. 1-6 THAT ARE ONGOING OR SCHEDULED TO BE. INITIATED DURING FY 1982-1983 z D > 1=31 STORM SEWER PROJECTS A-C SCHEDULED FOR FY 1983-19yp8�4 THROUGH i—s—•No��x•n�o U FY 1 87-1[86 siwo N `\riu`r(sla. 95 i PROPOSED STORM SEWER IMPROVEMENTS 1982-1988 Storm Sewer Projects That Are Ongoing or Scheduled Storm Sewer Projects Scheduled For FY 1983-1984 To Be Initiated During FY 1982-1983 Through FY 1987-1988 Total Project Cost Total Project Cost 1 Lawrence Pump Station A Manor Storm Sewers Modifications (8079) $ 100,000 (8041) $ 360,000 2 Orange Bowl Pump B Avalon Storm Sewers Station Modifications (1011) 600,000 (9046) 80,000 C Belle Meade Storm 3 Tamiami Storm Sewers Sewers (9027) 300,000 (8039) 784,000 4 Grapeland Storm Sewers Projects That Are Not Mapped: (8040) 500,000 5 Latin Quarter Storm Local Drainage Projects Sewers - Phase II (1034) 260,000 (Northern, Central, 6 Shenandoah Storm Western, and Southern Sewers (8043) 350,000 Districts) (7100) 3,200,000 7 West End Storm Sewers - $4,460,000 Phase II (2003) 250,000 8 West End Storm Sewers - Phase III (2004) 350,000 9 Wagner Creek Restoration (2005) 500,000 Projects That Are Not Mapped: Local Drainage Projects (Northern, Central, Western, and Southern Districts) (7100) 1,254,000 $4,428,000 STORM SEWERS Lawrence Pump Station Modifications (8079) This project involves modifications to the five pumps and other equipment at the Lawrence pump station. Worn-out pumps will be overhauled or replaced and bar screens and metal decking may have to be replaced. This project is under construction. 2 Orange Bowl Pump Station Modifications (9046) This project involves improvements to the Orange Bowl pump station, which currently is operating at 40% capacity. The largest of the three pumps will be overhauled, grat- ing will be replaced, and a new roof will be constructed at this station located at NW 17th Place and NW 7th Street. This project is under construction. 3 Tamiami Storm Sewers (8039) This project will provide storm sewers in a portion of the area bounded by SW 8th Street, West 55th Avenue, NW 96 7th Street, and West 60th Avenue. Because of soil con- ditions in this area, seepage type drainage structures do not function efficiently. This project will be coordi- nated with Dade County's plans to drain a portion of this area with the rebuilding of West 57th Avenue. This project is under construction. 4 Grapeland Storm Sewers (8040) This project will provide storm sewers for a portion of the Grapeland Heights area between the Comfort and Tamiami Canals. The area is low in elevation with poor soil con- ditions and extensive ponding after moderate rains. Con- STORM SEWERS struction will include portions of the area bounded by NW 17th Street, NW 37th Avenue, the East-West Expressway, and NW 32nd Avenue. 5 Latin Quarter Storm Sewers - Phase II (1034) This project involves the design and construction of a new storm sewer system in conjunction with the rebuilding of streets in the area bounded by SW 8th Street, SW 12th Avenue, SW 5th Street, and SW 17th Avenue. 6 Local Drainage Projects (Northern, Central, Western, Southern) (7100) Each fiscal year, four contracts are awarded to build local drainage structures in four major areas, i.e., the Northern District, which includes the entire area north of 36th Street; the Central District, which includes the area between 36th Street, SW 8th Street, 27th Avenue and the Bay; the Western District, which includes the area west of 27th Avenue and north of SW 8th Street; and the Southern District, which encompasses the entire area south of SW 8th Street. Approximately $200,000 is budgeted for each District to build drainage structures, which are generally independent covered ditches and French drains. 7 Shenandoah Storm Sewers (RnA3) This project will nrovide sewers in an area adjacent to a section of Si•I 17th Avenue that will be rebuilt by Dade County. The City and County sewers will interconnect and will be constructed in conjunction with one another. Construction will include a nortion of the area adjacent to Sw 17th Avenue between Coral Warm and SH 8th Street. ITEM/ NO./ PRIOR ,FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) FUND PROJECT TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 1 1013 100 0 0 0 a 0 a a eu79. LAWRENCE PUMP STA 100 100 a 0 a 0 0 a 995. AUTH STORM SEW BONDS 100 1aa 0 0 0 a a 2 e0 e0 a a a Q 0 c 9046. OR4NG BOWL PUMP STA 80 80 0 a 0 0 0 0 995. AUTH STORM SEW 90ADS 80. 80 0 a 0. a a 3 lei 784 a 0 a 0 a 0 0 8039. TAMIAMI STORM SEW 784 7A4 0 0 0 0 0 0 99!. AUTH STORM SEW 60hOS 784 784 0 a 0 a 0 4 500 500 a 0 a 0 a 0 0 8040. GRAPELAMD STORM SEW 500 500 0 0 0 0 0 0 995. AUTH STORM SEW achOS 530 500 0 0 0 0 a 5 260 260 0 0. a 0 a 0 0 ^�1034. 97 LATIN CUAR-ST SEW-11 260 260 0 0 0 0 0 0 a a a 99!. AUTH SIOFM SEW BCNOS 263 260 0 0 6 4454 1254 0 P00 800 P130 PO 0 7100. LOCAL DRAINAGE PRCJ 4454 1254 a 830 800 032 800 0 0 995. AUTH SiGFM SEW BCNOS 365i 1254 0 800 800 8JC e0a a 996. NEW UNAUIH SIM OCNOS 890 0 0 a a a 0 7 150 12 0 a 338 a a 0 8343. SHENANDOAH STORM SEW 350 12 a 0 338 a 0 0 a 995. AUTH STORM SEW BOh05 350 12 0 0 338 0 0 STORM SEWERS 8 West End Storm Sewers - Phase II (2003) This project involves the design and construction of a new storm sewer outfall to provide additional capacity to an existing storm sewer system located on NW 64th Avenue at Tamiami Canal. 9 West End Storm Sewers - Phase III (2004) This project involves the design and construction of a new storm sewer extension to provide additional capacity to an existing storm sewer system. The extension will be constructed along W. 62nd Avenue between W. Flagler Street and NW Znd Street, and NW 2nd Street between NW 62nd Ave- nue and NW 64th Avenue. 10 Wagner Creek Restoration (2005) lhis project consists of dredging and clearing of Wagner Creek and Seybold Canal between NW 17th Avenue and the Miami River. Minor improvements to facilitate maintenance 9 along this 1.9 miles stretch will also be included as part of the project. 11 Manor Park Storm Sewers (8041) Storm sewers will be constructed in portions of the Model City area where extensive ponding occurs after moderate rains. The area is bounded by NW 54th Street, NW 7th Avenue, the Airport Expressway, and the western City limits. STORM SEWERS 12 Avalon Storm Sewers (1011) This oro.jectwiIIprovide a new storm sewer system to serve the area bounded by SW 26tn Street, SW 32nd Avenue, U.S. 1, and SW 37th Avenue. This system will consist of covered ditches with overflow to a positive drainage system. 13 Belle Meade Storm Sewer (9027) This project will provide a storm sewer for low-lying areas near the Little River. Extensive ponding occurs in these low areas after moderate rainfalls. Construction will include the area bounded by the Little River, Biscayne Boulevard, NE 70th Street ano Biscayne Bay. I ITEM/ NO./ FUND 8 20�Q 3. 995. 9 2004. 995. 10 2335. 11 ra5i. 995. 12 1311. 99 996: 13 9327. 995. 99E. I � , PROJECT PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL AMOUNTS 1984-85 IN THOUSANDS OF 1985-86 DOLLARS (000) 1986-87 1987-83 REST ENO ST SEW-11 253 Z50 0 0 Z50 252 0 Q 0 O Q AUTH STORM SEW BONDS 250 0 250 0 0 0 0 0 0 0 0 0 0 WEST END ST SEM-I11 353 ?50 0 O 350 350 0 0 0 0 0. AUTH STORM SEW BOLDS 350 0 350 0 0 Q 0 0 0 0 0 0 0 500 0 500 0 0 0 WAGNER CREEK RESTER 533 0 530 0 0 0 Q AUTH STORM SEW BONDS 500 0 500 0 0 0 0 0 0 0 0 MANOF STORM SEW 360 360 0 0 0 0 0 0 0 360 Q 0 AUTH STORM SEW BONDS 360 0 0 a 0 360 0 0 0 360 p 0 AiALCN STORM SEW 60C 600 0 0 0 0 0 p 0 0 600 p NEW UNAUTH STM 80NOS 600 0 0 0 0 0 600 0 . 0 Q 600 0 330 0 0 0 0 0 BELLE MEADE ST SEW 300 0 0 0 G 0 300 AUTH STORM SEW BONDS 21 0 0 0 p 0 a 300 NEW UNAUTH SIR 6Gh05 279 0 0 0 O Z1 0 0 279 8888 2990 1100 80O 1138 1160 1400 300 STORM SEWERS • 0 i• Street Improvements STREET IMPROVEMENTS The capital projects in this category provide reconstruction and major maintenance of Miami's street system. The forty-six street improvement projects in the 1982-1988 Capital Improvement Pro- gram are valued at $52,458,000 and represent 8.1% of the total six -year program. Policies Miami's investment in street improvements is based on the following policies: - Systematically provide local street improve- ments throughout the City based upon the 100 existing condition and age of the street, the cost of maintenance of the street, and requests from abutting property owners. (Source: City of Miami Department of Public Works) Provide local street improvements in commer- cial and residential areas to stimulate private investment and maintain citizen and business confidence in Miami's neighborhoods. (Source: Miami Comprehensive Neighborhood Plan, 1976-1986, 976 TH STREET IMPROVEMENTS Existing Facilities and Recent Accomplishments There are 725 miles of streets within the City limits as follows: (1) expressways - 20 miles, (2) metropolitan arterial streets - 110 miles, (3) City business and collector streets - 85 miles, and (4) local streets - 510 miles. The streets main- tained by the State of Florida and Dade County are outlined on Map 19. All other streets are main- tained by the City of Miami. Forty-six street improvement projects, shown on Map 20, have been completed since 1975. Eight of these projects, worth $4,809,000 were completed during FY 1981-82 in Buena Vista, Ailapattah, Wynwood, Manor, Model City -King Heights, and the Southeast section of the City. STREET IMPROVEMENTS 953 4 Proposed Street Improvements 1982-1988 Map 21 shows the street improvement projects proposed for the 1982-1988 Capital Improvement Program. Sixteen projects, valued at $20,047,000 are ongoing or scheduled to begin during Fiscal Year 1982-1983. $32,411,000 in street improve- ments are scheduled for the last five years of the CIP. Detailed project descriptions and funding schedules follow Map 21. Funding Street Improvement projects are funded from Federal grants and City highway bonds, as shown 101 in the schedule below. Storm sewer bonds pay for drainage improvements associated with the street improvement projects. $51,858,000 or 99% of the total funding needed is available. The remaining 1%, $600,000, is anticipated. STREET IMPROVEMENTS AVAILABILITY OF FUNDING r,. __ZFUNDS ANTICIPATED 5600,000 99% FUNDS AVAjLABLE S51, 658,0vvC PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1987-88 FUNDING CODE/SOURCE TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 151. FDA GRANT 1415 1415 0 a 0 0 0 3 0 0 167. 5EJEhTH YP CO 500 500 0 0 0 0 0 0 650. CAPITAL IMPP FOS-FPL AUTH HIGHWAY BONDS 3500 35789 0 4690 1750 51698 1750 5374 5114 a 5113 7250 3 2750 9ec. 995. AUTH STORM SEW BOhOS 13654 800 1644 1233 1451 157^ Z900 1000 99E. NEW UNAUTH STM BDNOS 600 0 600 0 0 TOTAL 52458 7405 9542 83S7 656S 6689 10150 3750 STREET IMPROVEMENTS _.Z. NW )G ST F 1.'.. f - 1 MAP 19 Nw s. sT CITY OF MIAMI _ - STREET SYSTEM NW 36 Si "'vw­. ""T" CSW, - - STREETS MAINTAINED BY IjP { THE STATE OF FLORIDA - Z STREETS MAINTAINED BY r+ f, I k f 11 DADE COUNTY Nw 5T `• ' + r t : _, ut: . ' ALL OTHER STREETS ARE _ a MAINTAINED BY THE CITY OF MIA!Vf i 102 W 4 '\ 1 +l� -�I I }r��l�1���• tt,.q .. �}' j iY•1 t "r y .Tsa.e.wo ( .. .. •.. - .1 j ; � .tlr u.urwroN,sE.No `"'ksm,�,q ;. t t t • � j.f, i tt 1 I- 1 � f \\�� P.C.ENBI�CRFP CSM t I 1 _ 1 4 •E. Tt IT' aino no ^, y � IJI.lI 1I 1I1 1 1.1 I I I iI II III I Ili I I I 'old il li 103 ft—t. STREETIMPROVEMENTS PUN[.•.• -t NW )e5T ), 16 * 17 N W 1! SI 12 s is ; B:; 46 C 33 6 �.U.r. e•. cSWv a MAP 20 U RECENT o ACCOMPLISHMENTS m STREET IMPROVEMENTS 1-48 COMPLETED SINCE 1975 �IUI.• !U!!iE CSWv STREET IMPROVEMENTS La A-H COMPLETED DURING FY 1981-1982 z D } a ersn..E su. r.Nco V .SI IN� ,wT50N ,S, •Np _ co yY.l� U .5!•Np �R� 104 Street Improvements Completed Since 1975 1 North Bayshore Drive Highway Improvement 2 Omni Paving Project 3 Biscayne West Highway Improvement 4 Flagler Street Highway Improvement 5 NE 59 Street Highway Improvement 6 SW 1 Street Paving Project 7 SW 22 Street Highway Improvement 8 NE 83 Street Paving Project 9 Wyndwood CD Paving Project 10 Model City CD Paving Project - Phase I 11 Edison Park -Little River CD Highway Project 12 Model City CD Paving Project - Phase II 13 Wyndwood CD Paving Project - Phase II 14 Allapattah Co Paving Project - Phase I 15 Model City CD Paving Project - Phase III 16 Little River CD Paving Project 17 NE 80 Terrace CD Paving Project 18 Culmer CD Paving Project - Phase I 19 Buena Vista CD Paving Project - Phase I 20 Buena Vista CD Paving Project - Phase II 21 Allapattah CO Paving Project - Phase II 22 Model City CD Paving Project - Phase IV 23 NW 23 Street CD Paving Project - Phase 1 24 Dixie Park Paving Project 25 NW 19 Avenue CD Paving Project 26 Wyndwood CD Paving Project - Phase III 27 Culmer CD Paving Project - Phase II 28 Wyndwood CD Pavinq Project - Phase IV 29 Allapattah NW 19 Avenue CD Paving Project - Phase I 30 Allapattan M14 3rd Year CD Paving Project - Phase I 31 Wyndwood NE 2 Avenue CD Street Beautifi- cation 32 Coconut Grove CD Paving Project - Phase 1 33 Design Plaza Street Improvements and Beautification 34 NW 20 Street Area Sidewalk Improvement 35 Coconut Grove Business Area Street Improvements 36 SW 22 Street Improvement - Phase III 37 Jefferson Street Pavinq Project RECENT ACCOMPLISHMEI Pedestrian Scale Street Lighting Project 39 Flagler Street Improvement and Extension 40 Point View Street Improvement 41 North 59 Street Improvement 42 West Trailview Street Improvements 43 Latin Quarter Paving Project - Phase I 44 Coconut Grove CD Street Improvements 45 Little Havana CD Street Improvements 46 Buena Vista Street Improvements in NSA 47 Allapattah CD Street Improvements in NSA 48 Wyndwood CD Paving Project Sidewalk Replacement Citywide* Downtown CD Handicapped Ramp Project* Street Improvements Completed During FY 1981-82 Total Project Cost A Model City -King Heights CD Street Improvements - Phase VI b 774,000 B Manor Street Improve- ments - Phase I 869,000 C Buena Vista CD Paving Project - Phase VI 546,000 D Allapattah NW 23 Street CD Paving Project - Phase II 611,000 E Allapattah CO Paving Project - Phase IV 452,000 F Wyndwood CO Paving Projects - Phases V and VI 1,058,000 G Dorsey -Wheatley CD Paving Projects 329,000 H SE 4 Street Paving Project 170,000 $4,809,000 STREET IMPROVEMENTS *Not Mapped STREET IMPROVEMENTS 22 ' o MiAP 21 18 2] > 2e PROPOSED STREET 1 F ' °° IMPROVEMENTS t • 1 ,p. JUII• TUT TIf CSW♦ 1982-1988 12 STREET IMPROVEMENTS i W A-N THAT ARE ONGOING OR Z SCHEDULED TO 8E INITIATED > DURING FY 1982-1983 17 --- STREET IMPROVEMENTS 105 51•»� I -30 SCHEDULED FOR FY 1983-1984 ._ ��� THROUGH FY 1987-1988 t'ft �� f I �,i�•� ii;.�11 25- -��` m ' ..... .... ... - .. 1It 1 t1 ss jj - �i� JJ ' 10 .21 roq_ ! j 1,30 21j k` ] i .t, jt 2 sw v sT J 28 -�+3 I, jI S 1 i »iC�E»eK.E» CSwv oleo eo {it ri �• 1/ 1 l 11 12 t 1 �20�\�, I we Street im rovements That Are Ongo�I or Scheduled o e n t ate ur ng ��1B8 Total Project Cost 1 I1110 J I I PROPOSED STREET IMPROVEMENTS Street Improvements Schedu Through Y 987- 98—� 8 A Latin Quarter Paving 1 Little Havana Street 19 west Little Havana Project - Phase II Improvements - Phase I Street Improvements (0005) $ 1.415,000 (0056) $ 1.500,000 (7021) 1,500,000 B Belle Meade Island 2 Vizcaya Transit Station 20 Coconut Grave Village Bridge (8016) 230,000 Area - Street Improve- p ove- Center Street Improve- C Garment Center CD ments (0034) 207,000 ments (8012) 926,000 Pavin Project 3 Coconut Grove Transit 21 Downtown Street Improve- (0045? 500,000 Station Area - Street ments - Phase II (7017) 1,000,000 D Allapattah Street Improvements (0037) 500,000 22 Morningside Street Improvements - Phase I 4 Design Plaza Street Improvements (9006) 900,000 (8008) 1,200.000 Improvements (0029) 500,000 23 North Baycrest Street E Manor Street Improve- 5 Overtown Street Improve- Improvements (9007) 1.000.000 ments - Phase II (8019) 1,200,000 ments (2008) 500,000 24 Allapattah Street F Brickell Plaza Improve- 6 SW 16th Street Improve- Improvements - Phase IT Pent (0062) 600.000 ment (2012) 1,300,000 (0010) 1.200.000 G San Marco Street Improve- 7 Allapattah Transit Sta- 25 Park West Street ments (7014) 130,000 tion Area - Street Improvements - Phase II H Bird Avenue Improvements Improvements (0039) 186,000 (1026) 800.000 (7016) 1,150.000 8 Brickell Transit Station 26 Manor Street Improve - I Little River Street Area - Street Improve- ments - Phase IV (2006) 1,500.000 Improvements (7018) 1,500,000 ments (0035) 483,000 27 Buena Vista Street J Brickell Avenue Service 9 SW 32nd Avenue Improve- Improvements - Phase III Road Improvements (1009) 600,000 ment (B020) 920,000 (2007) 1,500.000 K Buena Vista Street Im rove- 10 Downtown Street Improve- 28 East Shenandoah Street ments - Phase 1 (0007� 1,800,000 ments - Phase I (8013) 926,000 Improvements (2011) 1,500.000 L East Allapattah Street 11 Allapattah Industrial 29 Silver Bluff Street Improvements (2014) 1.700.000 Area Street Improvements Improvements (2010) 1.500,000 M Manor Street Improvements - (7023) 1.500,000 30 Little Havana Street Phase III (8014) 1,400,000 12 Edgewater Street Improve- Improvements - Phase I N 1-95 Bifurcated Ramps ments (0009) 1.200.000 (2013) 1,500,000 (2015) 3,500,000 13 North River Drive Street Improvements Projects That Are Not Mapped: Projects That Are Not Yapped: 14 (2009) Douglas Road Transit 600,000 Rebuild Sidewalks and Station Area - Street Streets (7024) 2.500,000 Sidewalks Rebuild Sidewalks and Improvements (0031) 500,000 Citywide Paving Improve - Streets S 2,810,000 15 Culmer Transit Station ments (1007) 1,250,000 Citywide Paving Projects (1007) 3T2,000 Area - Street Improve- ments (0047) 403.000 S 32.411,000 S 20,047,000 16 Park West Street Improve- ments - Phase I (0040) 800,000 17 Santa Clara Transit Station Area - Street Improvements (0046) 310.000 Note: N I-95 Bifurcated Ramps (2015) has been 18 Buena Vista Street rescheduled for FY 1983-84. Improvements - Phase II (0008) 1.500,000 STREET IMPROVEMENTS 1 Latin Quarter Paving Project - Phase II (0005) Phase II improvements to the interior streets of the Latin Quarter include asphaltic concrete pavements, concrete curbs and gutters, brick sidewalks, landscaping, street lights, and street furniture. Streets to be improved during this phase are SW 7th and 6th Streets from SW 12th to SW 17th Avenues and SW 13th, 14th, 15th, and 16th Ave- nues between SW 8th and 6th Streets. This project, which is in design is a combination of projects 0005 and 0006 in the 1980-1986 CIP. 2 Belle Meade Island Bridge (8016) This project involves replacement of the existing wooden bridge that connects Belle Meade Island with the mainland. This bridge is in very deteriorated condition and the load limit has been drastically reduced. The Florida Depart- ment of Transportation is desiqning this project and will reimburse the City from State Off -System Bridge funds. 107 Garment Center CD Paving Project (0045) These improvements in the Garment Center will improve street conditions within the existing industrial/commercial area and modify the street system in the proposed area to better accommodate industrial expansion. The following streets will be improved: NW 22nd Lane between NW 5th and 2nd Avenues, NW ?1st Terrace between NW 6th and 5th Avenues, NW 22nd Street between NW 5th and 2nd Avenues, and NW 22nd Street between NW 6th Avenue and 5th Avenue. The follow- ing streets will be closed: NW 3rd Court between NW 22nd Street and 22nd Lane, W 3rd Avenue between Nil 22nd Street and 22nd Terrace, Nil 4th Avenue between NW 22nd Street and NW 22nd Terrace, NW 5th Court between NW 21st Terrace and NW 22nd Street, NW 5th Place between NW 21st Terrace STREET IMPROVEMENTS and NW 22nd Street, and NV) 22nd Terrace between NW 5th Avenue and NW 2nd Avenue. A lapattah Street Improvements - Phase I (8P08) Street improvements will be made to selected streets in the residential area between NW 17th Avenue and 2?nd Avenue, from N14 ?8th Street to NW 32nd Streets. Elements of this project will include new asphaltic pavement, concrete sidewalks, curbs, gutters, drainage and landscaping. These improvements should complement street improvements that have recently been made in the Allapattah area with Community Development funds. 5 Manor Street Improvements - Phase II (8019) This project is the continuation of street improvements in the Plodel City area. Construction will include sidewalks, valley gutters, asphaltic concrete pavement, drainage and landscaping. BBrickell Plaza Improvement (0062) Tnis project involves the extension of Brickell Plaza oetween SE 6th and 8th Streets to improve traffic flow in the area. Rebuild Sidewalks and Streets (7024) Highway bond funds will be used to systematically resurface local streets where asphalt has begun to deteriorate. Resurfac- inq helps protect the base, improves the riding surface and improves the visual appearance of local streets. 0 0 ITEM/ NO � NO. 1= PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL AMOUNTS 1984-85 IN THOUSANDS OF 1985-86 DOLLARS (000 1986-87 1987-88 1415 14f5 0 0 a c 0 0 0 0 Q 50 LATIS GUAR PAVING-11 1415 1415 0 0 0 0 0 0 151. EGA GRANT 1415 1415 0 0 Q 2 230 230 0 0 0 0 O 0 Q folE. BELLE NEADE ISL BPOG 230 P30 0 0 0 0 a a 0 940. AUTH HIGHWAY BONDS 230 230 0 0 C g 300 Sao 0 c ° 0 0 45. GARPTNT CENT CO PAt 500 500 0 0 0 0 0 v 0 167. SEVEITH 1P CD 500 500 0 0 C 4 1200 1230 0 0 C 0 a 0• Q a fact. ALLATATTAH ST IMP-11 123C 120C o 0 0 a 0 a 0 9fc- AUTH HIGHWAY BONDS a00 Soo 0 Q O 0 0 Q 995. AUTH STOPN SEW BOk05 400 430 0 a O pp$ 1200 t200 0 0 0 c 0 0 Q 0 1oo fO1S. HANGS ST IMP-I1 1200 121C 0 0 c C 0 0 0 9f0. AUTH HIGHWAY BONDS eac e00 0 0 0 0 a 0 995. AUTH STOP% SEW 80OS 430 40C 0 O 6 600 309 300 a 0 0 0 0 62. BFICKELL PLAZA INP 610 330 300 0 0 a c0 0 9a0. AUTH HIGHWAY 80NOS 69C 330 330 0 Q 7 531C 2310 500 50C 530 500 50c 500 T024. PESUILO SIDEVLK 1 ST 5310 2310 500 500 500 500 500 530 530 533 500 9lC. AUTH HIGHWAY BONGS 5310 2310 530 500 50C STREET IMPROVEMENTS 109 s Citywide Paving Improvements (1007) These improvements involve small paving or drainage pro- jects that demand immediate attention, such as the paving of alleys, the widening of intersections, and paving im- provements done in conjunction with subdivision or building improvements. 9 San Marco Street Improvements (7014) Several streets on San Marco Island will be improved, namely, NE 12th Place, NE 12th Court and NE 13th Place from North Venetian Way to South Venetian Way. Construc- tion will include mountable curbs and gutters, asphaltic concrete pavement, drainage and landscaping. 10 Bird Avenue Improvements (7016) This project involves rebuilding Bird Avenue from SW 27th Avenue to U.S. 1. The project is designed to provide simple amenities as well as basic street improvements to a busy and rapidly -developing commercial center for neigh- borhood retail activity. This project consists of new sidewalks, curbs and gutters, local storm sewers, and street trees. 11 Little River Street Improvements (7018) This project involves the rebuilding of selected streets within the Little River area bounded by the Little River, west City limits, N. 71st Street, and the FEC Railroad tracks. Improvements will include new asphaltic pavement, concrete sidewalks, concrete curbs and/or gutters, storm drainage, and landscaping. STREET IMPROVEMENTS 12 Brickell Avenue Service Road Improvements (1009) This project involves the construction of a seventy-foot wide service road on the eastern side of Brickell Avenue between SE 15th Road and SE 25th Road. The road will function as a collector street for the large developments along Brickell Avenue. 13 Buena Vista Street Improvements - Phase 1 (0007) This project is a continuation of street improvements in the Buena Vista NSA of the Edison -Little River Target Area, an area bordered by NW 2nd Avenue, Nit 6th Avenue, NW 46th Street, and NW 54th Street. Improvements will include new asphaltic pavement, concrete sidewalk, concrete curbs and/or gutters, storm drainage, and landscaping. 14 East Allapattah Street Improvements (2014) This project involves the rebuilding of selected streets within the eastern portion of the Allapattah area bounded by NW 23rd Street, NW 36tn Street, NW 7th Avenue, and NW 17th Avenue. Improvements will include new asphaltic pavement, concrete sidewalks, concrete curbs and/or gutters, storm drainage, and landscaping. 15 Manor Street Improvements - Phase III (8014) This project involves the rebuildina of streets in a predomin- ately single family residential area of Model City Improvements will be made to selected streets in the area from NW 49th to NW 46th Streets between NW 7th and NW 12th Avenues. Construc- tion will include sidewalks, curbs and gutters and/or valley gutters, asphaltic concrete pavement, drainage and landscaping. 4 ITEM/ NO./ FUND PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL AMOUNTS 1984-SS IN THOUSANDS 1985-86 OF DOLLARS (000) 1986-87 1987-88 8 1562 250 62 250 250 250 25C 250 1007. CITTWIOE PAVING TrP 1562 250 62 250 250 250 250 25C 9eC. AUTH HIGHWAY BONDS 1562 250 62 25C 250 250 250 250 9 13C 0 130 0 0 0 a 7014. SAN MARCO ST IAP 130 0 130 0 0 0 a a 98C. AUTH HIGHWAY BONDS 86 0 86 Q 0 0 0 0• 995. AUTH STORN SIN BCNOS 44 0 44 Q .0 0 Q 0 10 1150 0 1150 0 O 0 0 0 T016. BIRO AVE INP 1150 0 1150 0 0 0 0 0 980. AUTH HIGHWAY BONDS 800 0 800 0 a 0 0 0 995. AUTH STORK SEW BOLDS 350 G 350 0 a G a g 11_ 1500 0 1500 a 0 0 a ° ?Olt. IITTtE UVER ST IMP 1500 0 1500 0 0 0 0 0 980. AUTH HIGHWAY BONDS 100E 0 103C 0 G 9 Q a 99!. AUTH STORK SEW BENDS 500 0 5na a O 0 0 C 12 630 0 E00 a a a C 0 NHIGHWAY 110'9ro_ AUTH BONCS' 400 0 410 C 0 0 C 0 995. AUTH S70RM SEW BONDS 204 0 200 0 0 0 a 0 13 le00 0 1630 O 0 a 0 0 7. PUENA9ISTA ST TNP-I 1800 0 1000 a 0 0 C 0 900. AUTH HIGHWAY BONDS 1230 0 1200 0 a a a C 995. AUTH STCPN SEW BtA05 6nG 0 630 0 0 C 0 0 14 170C 0 1700 9 a a 0 0 2014. E AttAP471AH ST TOP 1700 0 170C 0 0 0 C a get. AUTH HIGHWAY BONDS 110E 0 i100 0 a q Q 996. NEW UNAU7H SIN BONDS 60C 0 600 G 0 0 15 1430 0 50 1350 0 0 a a eQ14. PANOF ST IMP-111 141)C 0 50 1350 a 0' a 0 980. AUTH HIGHWAY BONDS 900 0 50 850 0 0. G 0 99:. AUTH STOFM SEW BENDS 500 C 0 510 0 0 C 0 STREET IMPROVEMENTS 16 1-95 Bifurcated Ramps (2015) This project involves the rebuilding of S.R. 854, the Downtown Distributor, between S.W. 2nd Avenue and Biscayne Boulevard. Construction will include twin elevated road- way structuresbifurcating around DuPont Plaza, with an exit ramp onto Biscayne Boulevard Way and an entrance ramp from S.E. 2nd Street. Entrance and exit ramps will also be constructed at S.E. 2nd Avenue. Another exit ramp will be provided at Miami Avenue. 17 Little Havana Street Improvements - Phase I (0056) This project involves the rebuilding of selected streets in the Little Havana area including the continuation of improvements in Latin Quarter. The project is bounded by UJI. 7th Street, 14. 17th Avenue, S.W. 8th Street, and on the east by the Miami River and S.W. 1st Avenue between the Miami River and S.W. 8th Street. Improvements will include new pavement, sidewalks, curbs and/or gutters, storm drainage and landscaping. 18 11 1 Vizcaya Transit Station Area - Street Improvements (0034) This project involves the construction of four street closures on local streets in the vicinity of the Vizcaya Transit Station, rolled curbs and a ten to twenty -foot grass and sidewalk buffer. Adjacent to these street closures on SW 32nd Road, S14 31st Road, Sid 22nd Avenue, and S.W. 22nd Terrace and throughout the area, the curb and gutter location will he modified to provide turn -around space, pedestrian crosswalk peninsulas, and wider sidewalks. Street trees will be planted in the grassy areas between sidewalks and curbs. These improvements, recommended in the Vizcaya Station Area Design and Development Plan STREET IMPROVEMENTS adopted by the City Commission, will protect surrounding low - density residential neighborhoods from traffic impacts and potential speculative expansion of high density development. It also will facilitate pedestrian movement, regulate on -street parking, and eliminate unnecessary expanses of pavement within the redevelopment area. 19 Coconut Grove Transit Station Area --Street Improvements (0037) This project, recommended in the Coconut Grove Station Area Design and Development Plan adopted by the City Commission, has four elements as follows: SW 27th Lane improvements will facilitate access to the Coconut Grove Transit Station from SW 32nd Avenue. The project includes curbs, gutters, drainage, and repaving of SW 27th Lane between SW 32nd Avenue and SW 29th Avenue; realignment of the intersection at SW 27th Lane and SW 30th Avenue; and a street closure on SW 30th Avenue adjacent to S14 27th Lane. The street closure will protect adjacent low density residential neighborhoods from transit station traffic infiltration. 2, SW 28th Street improvements are intended to alleviate exist- ing parking/traffic conflicts that may be aggrevated Dy station access traffic. This project consists of the con- struction of paved parking lanes, curbs and gutters, and drainage, and the installation of street trees on SW 28th Street between SW 24th and 27th Avenues. Industrial District Street improvements will eliminate serious traffic hazards and establish a character suitable to attract orivate redevelopment. This project will recon- struct local curbs, gutters, sidewalks, drainage, and land- scaping on SM 28th Lane, SW 28th Street, SW 31st Avenue, and SW 30th Avenue. ITEM/ NO./ FUND PROJECT PRIOR FISCAL. YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) TOTAL YEARS 1982-83 1983-84 1984-8S 198S-86 1986-87 1987-88 16 3500 0 1150 175a 0 0 + C 0 2015. 1-95 STFURCATEO RAMP 3500 0 1750 1750 0 0 0 b 0 a 650. CAPITAL INPR FOS-FPL 3500 0 i75C 1750 0 17 1500 C 0 1500 a 0 0 a O S6. LITTLE "$#ANA IMP-1 150C O a 153C 150C a 0 Q 0 0 0 9e3. AUTH HIGHWAY BONDS 150C 0 0 1834. 207 0 0 207 a O C 0 a 0 0 V11CAYA TF STA IMP 20Y 0 0 211 207 0 0 0 D 0 112980. AUTH HIGHWAY BONOS 207 0 0 19 500 a a 530 a a 37. CO 6901E TR STA IMP 50C 0 G. O D 0 a 9EC. AUTH HIGHWAY 00N0S 350 0 C 350 0 995. AUTH STOFM SEW BONDS 150 C 0• 15C C 0 0 0 Note: Project 201S has been rescheduled for FY 1983-84. STREET IMPROVEMENTS SW 27th Avenue sidewalk and landscaping improvements involve sidewalk paving, street furniture, and land- scaping along SW 27th Avenue from SW 27th Street to U.S. 1. Coordinated with the transit station site and programmed improvements south of U.S. 1, these improvements are intended to create an image that will attract private redevelopment of higher quality and intensity than would otherwise occur and to create a unifying character between the station area and Coconut Grove. Highway general obligation bond funds will be used to con- struct a portion of these improvements. Other sources of funding will be found to complete the improvements. Design Plaza Street Improvements (0029) This project involves beautification of the Miami Design Plaza. Construction will include street pavement, curbs and gutters, landscaping, and sidewalks where required in the area bounded by SR-195, NE 42nd Street, North Miami Avenue, and the FEC Railroad. 113 21 Overtown Street Improvements (2008) This project involves the rebuilding of selected streets in the area bounded by NW 7th Street, NW 22nd Street, the FEC Railroad, and Interstate 95. Improvements will include asphaltic pavement, concrete sidewalks, concrete curbs and/ or gutters, storm drainage, and landscaping. 22 SW 16th Street Improvement (2012) This project involves the rebuilding of SW 16th Street STREET IMPROVEMENTS between NW 17th and 37th Avenues. Construction will include asphaltic pavement, a concrete sidewalk, a concrete curb and/or gutter, storm drainage, and landscaping. 23 Allapattah Transit Station Area - Street Improvements (0039) This project consists of street and island trees along NW 12th Avenue and NW 36th Street, closure of NW 33rd Street between - NW llth Court and Nld filth Avenue, and the construction of two corner plazas and a plaza under the rapid transit guideway on NW 12th Avenue and NW 36th Street. Recommended in the Allanat- tah Station Area Design and Development plan, these improvements will tie the surrounding neighborhood and commercial area to the Allapattah Transit Station. In addition, these improvements, part of an overall effort to revitalize commercial activities through private and public plans, will increase the desirability of the area for reinvestment. 24 Brickell Transit Station Area --Street Improvements (0035) This project includes new expanded sidewalks on major pedestrian access routes to the Brickell Transit Station (SE/SW loth Street and SW llth Street), decorative sidewalks and street furniture on South Miami Avenue, and street tree landscaping throughout the area bounded by SW 8th Street, SW 13th Street, SW 3rd Ave- nue, and Brickell Avenue. Recommended in the Brickell Station Area Design and Development Plan, these improvements will faci- litate pedestrian access to the transit station and encourage high quality redevelopment. S`W532nd Avenue Improvement (8020) This project involves the rebuilding of SW 32nd Avenue from Bird Road to Grand Avenue. Construction will include sidewalks, curbs and gutters, and/or valley gutters, asphaltic concrete pavement, storm sewers, and landscaping. I'll 1� 11 , 11, I I, is ITEM/ NO./ FUND PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL AMOUNTS 1984-85 IN THOUSANDS OF 198S-86 DOLLARS (000) 1986-87 1987-88 20 500 0 0 500 0 a 0 0 0 29. DESIGN PLAZA ST IPP 500 0 a 500 0 0 0 d 920. AUTH HIGHWAY BONDS 500 0 0 500 C a 0 21 500 0 500 0 0 0 0 2001. 04ERTOWN ST IMF 500 0 a 500 O O 0 D 0 0 0 9150. AUTH HIGHWAY BONDS 350 0 0 350 0 d 0 0 99!. AUTH STORK SEW SENDS 150 0 0 150 0 22 130D 0 0 130 0 a 0 d 0 0 2012. SW 14 ST IMP 130C 0 0 130C 0 0 D 0 C O 9t0. AUTH HIGHWAY BONDS 86T 0 a !'6I a 0 3 d 9950 AUTH STORK SEW BONDS 433 433 23 186 A v D d a is6 v a D a 39. ALLAPATTAH TP ST INP 186 0 0 0 lr6 p C C 11`l` goc. AUTH HIGHWAY SOND•S 186 0 0 0 186 0 C 24 4013 0 0 0 463 0 0 Q 35. BRICNELL TR ST6 IPP 483 0 0 a 4p3 483 0 D C 0 0 91C. AUTH HIGHWAY OUNCE 483 0 0 0 0 o a a 2cJ 920 0 920 0 d 902C. SW 32 AfE IMP 920 0 0 0 0 920 690 0 0 a a 0 980. AUTH HIGHWAY BONCS 690 0 0 0 a 232 0 0 99!. AUTH STOFM S,EW BCNOS 23C 0 STREET IMPROVEMENTS 26 Downtown Street Improvements - Phase I (8013) This project involves the improvement and beautification of streets in the Central Business District. Emphasis will be placed on improving the pedestrian environment to help strengthen and enhance Miami's commercial core. Studies of methods for improving the pedestrian environ- ment are currently underway. This project will implement specific recommendations in those studies. 27 Allapattah Industrial Area Street Improvements (7023) This project involves street improvements in the industrial area of Allapattah. The improvements will include curbs and gutters, asphaltic concrete pavement, necessary drain- age, and landscaping in the area bounded by NW 20th to 23rd Streets and NW 7th and 27th Avenues. 28 Edgewater Street Improvements (0009) This project involves the building of selected streets in 115 the Edgewater portion of the Wynwood Community Development Target Area. Improvements will include asphaltic concrete pavement, curbs and gutters, sidewalks, street trees, and necessary drainage in the area bounded by NE 17th Terrace, NE 35th Street, Biscayne Boulevard, and Biscayne Bay. 29 North River Drive Street Improvements (2009) This project involves the rebuilding of North River Drive between SW 2nd Avenue and NW 7th Avenue. Improvements will include asphaltic pavement, a concrete sidewalk, concrete curbs and/or gutters, storm drainage, and landscaping. STREET IMPROVEMENTS 30 Douglas Road Transit Station Area - Street Improvements (0031) These improvements, which are an important component of the Douglas Road Station Area Design and Development plan, are necessary to eliminate serious traffic and parking conflicts that will impair access to the transit station and will help attract private redevelopment in this blighted industrial area. The project includes reconstruction of SW 39tn Avenue, SW 38th Court, SW 37th Court, Shipping Avenue and Orange Street, includ- ing two traffic lanes with turning lanes at major intersections, on -street parking where possible, curbs and gutters, drainage, sidewalks, and landscaping. This project will also provide landscaping, where needed, on streets to be improved by Dade County (Bird Avenue, SW 38th Avenue, and Peacock Avenue). In addition, the project includes a pedestrian overpass across Dixie Highway to provide transit access to the Coconut Grove Community, particularly the elderly housing and Human Resource Center. 31 Culmer Transit Station Area --Street Improvements (D047) This project involves street improvements to improve oeaestrian circulation around the Culmer Transit Station and the develop- ment of a plaza for commercial redevelopment. The pedestrian circulation improvements, recommended in the Culmer Station Area Design and Development Plan, will complement the major public investment for transit, and housing in the Hignland Park area. The circulation improvements will encourage redevel- opment of the area as an inner-city living alternative by facilitating pedestrian access to station and enhancing the neighborhood. Improvements will include widening existing, inadequate sidewalks from 4 feet to 10 feet, new curbs and gut- ters, and street trees every 30 linear feet on the sidewalk in the area bounded by NW 14th Street, NW 7th Avenue, NW llth Street, and NW loth Avenue. ITEM/ NO./ I=UND I PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL AMOUNTS 1984-85 IN THOUSANDS OF 1985-86 DOLLARS (000) 1986-87 1987-88 26 426 0 _ 0 0 926 0 C Y 8013. DOWNTOWN ST IMP 926 0 0 926 0 a 0 Me AUTH HIGHWAY BONDS ao5• a 0 0 805 0 0 0 995. AUTH STORM SEW BONDS 121 0 0 0 121 0 9 a 27 1500 0 0 153a o a 0 7023. ALLAVATTAH INDUS OR 1531 a 0 p 1500 0 a 0 91'0. AUTN HIGHWAY BONGS 1000 0 a 0 1000 0 0 0 995. AUTH STORM SEW BONDS 50C 0 0 p 500 0 a 0 28 1230 0 0 p 1211 O a 0 S. EDGEWATER ST INP 1200 0 0 p 1200 0 a a 9r0. AUTH HIGHWAI BONGS e0C 0 0 a ea0 0 a 0 995. AUTH STOFM SEW SCADS 400 a a a 40C 0 a C 29 600 0 a Q 600 0 0 0 61980. WHIGHWAY ER OF TBDNOS C AUTH 400 0 0 p 40C 0 C 995. AUTH STORM SEW BONDS 20C 0 0 0 200 a a Q 30. Saa a p a a 500 0 0 31. DOUGIAS FO TP STA AR 50C 0 a 0 0 590 a O 9e0. AUTH HIGHMAT BONDS 350 0 0 0 0 350 a a 99�. AUTH SICPM SEW BONDS 150 a 0 a p 15C C 0 31 403 0 0 0 a 403 0 0 A?. CULMER TF STA AP IMP 403 0 0 0 0 403 0 Q. 9TG. AUTH HIGHWAY BONDS 403 0 p a 0 403 C a STREETIMPROVEMENTS TS 32 Park West Street Improvements - Phase I (0040) This project involves improvements to local streets in the Park West area as recommended in the Park West Redevelop- ment Plan. Improvements will include the rebuilding and realignment of selected local streets including curbs and gutters, sidewalks, trees, and landscaping. Park West lies in the area bounded by I-395, Biscayne Boulevard, NW 7th Street, and the FEC Railroad right-of-way. 33 Santa Clara Transit Station Area - Street Improvements (0046) This project involves improvements to make circulation through the Santa Clara Transit Station Area more effi- cient, thereby attracting new industry to the area. Side- walks will be expanded and street trees planted along NW 12th Avenue between NW 20th Street and NW 21st Terrace. Sidewalks, drainage, and parkway paving are programmed for NW 21st Terrace bewteen loth and 14th Avenues, NW 22nd Street between NW 10th and 15th Avenues, NW 23rd Street between NW loth and 15th Avenues, NW 15th Avenue between NW 21st Terrace and NW 22nd Street, NW 14th Avenue between 117 NW 'list Terrace and 23rd Street, NW 13th Avenue between NW 21st Terrace and Nw 23rd Street, and NW llth Avenue near the intersection with NW 22nd Street. 34 Buena Vista Street Improvements - Phase 11 (000B) This project is a continuation of street improvements in the Buena Vista area bordered by the FEC Railroad, NW 2nd Ave., the Airport Expressway, and NIA! 54 Street. Improvements will include new asphaltic pavement, concrete sidewalk, concrete curbs and/or gutters, storm drainage, and land- scaping. STREET IMPROVEMENTS 35 west Little Havana Street Improvements (7021) This project involves street improvements in the area bounded by NW 7th Street, SH 16th Street, NW 17th Avenue, and NW 27th Avenue. Construction will include street pavement, curbs and gutters, sidewalk improvements, storm and sanitary sewers (where required), landscaping, and street furntiture. These improvements will complement private efforts to upgrade the low -density residential neighborhood. 36 Coconut Grove Village Center Street Improvements (8012) This project involves redevelopment and beautification of streets in the Coconut Grove Village Center. Improvements will be made to Virginia Street, Rice Street, Florida Avenue, and McFarlane Road. Construction, which will vary with the indivi- dual street, will include decorative brick sidewalks,curbs and gutters, ant/or valley gutters, asphaltic concrete pavement, necessary drainage, and landscaping. 37 Downtown Street Improvements - Phase II (7017) This is a continuation of Phase I street improvements in the Downtown area. The streets to be improved will{ be selected at a later date. 38 Morningside Street Improvements (9006) This project involves improvements to deteriorated and substan- dard streets in an older section of Morningside that has single- family and multi -family dwelling units. Construction will include sidewalks, curbs and gutters and/or valley gutters, asphaltic concrete pavement, necessary drainage, and landscaping in an area bounded by NE 550 Terrace, NE 61st Street, Biscayne Boulevard, and Biscayne Bay. ITEM/ NO./ FUND PROJECT 32 0. PARK NEST ST IMP-1 9rc. AUTH HIGHWAY BONDS 995. AUTH STOFF SEW 8000S 33 1E. SANTA CLAAA TR ST AP 9t0. AUTH HIGHWAY BONDS 34 e. BUENAVISTA ST INP-II 9fc. AUTH HIGHWA• 80NCS 995. AUTH SIOAN SEW BOA05 35 11 8 7021. W LITTLE HAVANA INP 960. AUTH HIGHWAY BONDS 995. AUTH ST^FH SEW B0*OS 36 t012. CO GT VILL CENT IMP 9e0. AUTH HIGHWAY BONDS 995. AUTH STOPH SEW BGAOS 37 7317. DOWNTOWN ST IMP -II 900. AUTH HIGHWAY BORCS 99!. AUTH STORM SEW BONDS 38 9006. POMNINGSIOE ST INP 9tc. AUTH HIGHWAY BONOS 995. AUTH STORM SEW BCwOS TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL AMOUNTS 1984-85 IN THOUSANDS OF 1985-86 DOLLARS (000) 1986-87 1987-83 400 0 0 0 r floc 0 0 800 0 0 0 0 80O 0 0 602 0 0 0 0 600 0 C 200 0 0 0 0 2130 C p 310 0 0 0 0 ]to C 0 J1 a 0 Q O 0 310 o c 310 0 0 0 0 3l0 0 Z 1500 0 0 0 0 1500 0 0 150C G 0 p 0 1500 0 0 109c 0 0 0 0 1000 p 0 500 C 0 0 0 500 Q 0 1530 0 0 0 0 1500 0 p 1500 0 0 0 0 1530 C 0 1600 0 0 0 0 1000 0 0 50C 0 0 0 0 500 0 0 926 0 0 0 0 926 0 0 926 0 Q 9 0 426 0 0 i0 Q 0 0 p 0 iO: C C 226 0 0 0 0 2Z6 0 0 IZ30 0 0 0 0 0 1000 0 1000 0 0 0 0 C Iccc 0 150 c 0 0 0 C 153 G 25C 0 0 Q 0 0 250 c 90C 0 0 0 0 3 91cc C 900 0 0 0 p c 9ne 0 600 0 C 0 0 0 600 c 300 0 0 C 0 C 313 C p STREET IMPROVEMENTS 119 39 North Baycrest Street Improvements (9007) Improvements will be made to deterioratinq and substandard streets in the area bounded by NE 83rd Terrace, the north- ern City limits, Biscayne Boulevard and Biscayne Bay. Construction will include sidewalks, curbs and gutters, and/or valley gutters, asphaltic concrete pavement, neces- sary drainage, and landscaping. 40 Allapattah Street Improvements - Phase II (0010) This project is a continuation of street improvements in the Allapattah area bounded by N14 23th Street, NW 36th Street, NW 17th Avenue, and NW 27th Avenue. Improvements will include new asphaltic pavement, concrete sidewalks, concrete curbs and/or gutters, storm drainage, and land- scaping. 41 Park west Street Improvements - Phase II (1026) This project is a continuation of improvements to local street in the Park West area as recommended in the Park West Redevelopment Plan. 42 Manor Street Improvements - Phase IV (2006) This project is a continuation of street rebuilding in the Manor Park area bounded by the Airport Expressway, NW 54th Street. NW 7th Avenue, and NU 17th Avenue. Construc- tion will include asphaltic pavement, concrete curbs and/ or gutters, concrete sidewalks, storm drainage, and land- scaping. STREET IMPROVEMENTS 43 Buena Vista Street Improvements - Phase III (2007) This project is a continuation of street rebuilding in the Buena Vista area bounded by the Airnort fxoressway,Nw 2nd Ave.,N1J 54th Street, and the FEC Railroad right-of-way. Improvements will include asphaltic pavement, concrete sidewalks, concrete curbs and/or gutters, storm drainage, and landscaping. 44 East Shenandoah Street Improvements (2011) This project involves rebuildinq approximately two miles of residential streets in the area bounded by SW 8th Street, SW 22nd Street, Sw 12th Avenue, and SW 17th Avenue. Improvements will include asphaltic pavement, concrete sidewalks, concrete curbs and/or gutters, storm drainage, and landscapinq. 45 Silver Bluff Street Improvements (2010) This project involves the rebuilding of streets in the area bounded by S. Dixie Highway, Coral Way, SW 17th Avenue, and SW 27th Avenue. Improvements will include asphaltic pavement, concrete sidewalks, concrete curbs and/or gutters, storm drain- aqe, and landscaping. 46 Little Havana Street Improvements - Phase II (2013) This project is a continuation of street rebuilding in the Little Havana area bounded by NW 7th Street, SW. UP Street, W. 17th Avenue, and the Miami River/SW. 1st Avenue. Improvements will include aspahltic pavement, concrete sidewalks, concrete curbs and/or gutter, storm drainage, and landscapino. ITEM/ NO. / FUND 39 90C). i 9fC. 99'_. 40 10. 9t6. 99!. 41 1026. 9f6. 995. 42 120`Oct920. 43 200. 9f0. 99'. 44 2011. 9t0. 995. 45 2310. 46 2013. 900. 995. PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL AMOUNTS 1984-8S IN THOUSANDS OF 1985-86 DOLLARS (000) 1986-87 1987-88 L�dO 0 0 O 0 II 1000 0 N BATCPEST ST IMP 1000 0 0 0 0 0 1000 C AUTH HIGHWAY BONDS 750 0 0 O 0• G 750 0 AUTH STORM SEW BONDS 250 p 0 0 0. II 250 C 1200 p 0 0 0• Q 1200 0 ALLAPAITAH 51 IMP -II 120C Q 0 0 G. 0 1200 0 AUTH HIGNWAT BONGS Boo 0 0 0 0 0 C90 II AUTH STORM SEW BONDS 400 p 0 9 II 0 400 0 too 0 0 0 0 0 f00 0 PARK WEST ST INP-11 Boo 0 0 0 0 0 200 0 AUTH HIGNW4Y BONDS 60C 0 0 0 0 0 630 0 AUTH STORM SEW BONDS 200 0 C p 0 0 200 0 1500 p 0 0 0 0 1510 c PAN" ST IMP-11 1500 p 0 0 0 0 1500 C AUTH HIGHWAY BONDS IC00 0 II 0 0 C ICOU AUTH STGPM SEW SOROS 500 0 0 0 0 0 500 0 1530 0 O C O 0 t500 a BUENA 41STA ST IMP 1504 0 0 0 0 0 1530 a AUTH HIGHWAY BONCS 1000 0 0 0 0 IC0G c AUTH STORM SEW BONGS 50C O O 0 C 0 Soo 0 t500 0 0 0 0 0 1500 G E SHENANDOAH ST ItP 150C 0 0 0 0 C 1500 0 AUTH HIGHWAY BONDS 1000 0 C 0 0 0 too0 C AUTH STORM SEW BONDS 50C 0 0 0 0 0 50C C 150C 0 0 C 0 0. C 1500 SILYEA BLUFF ST IPP 1530 0 0 0 0 C 0 1500 AUTH HIGHWAY BONCS 100C C 0 0 0 0 0 160C AUTH STOOK SEW 80AOS 500 0 0 p C C 0 SOQ 150:, 0 p 0 0 C 0 1500 LITTLE HAVANA ST IMP 1500 p 0 0 Q C 0 150C AUTH HIGHWAY BONDS 101C 0 0 0 II C p I�lc AUTH STGFM SEW BOA05 531. 0 0 0 0 0 C 593_ 52458 7405 9542 83S7 6565 6689 10150 3750 STREET IMPROVEMENTS IN I i . I I I. 1�. i I I, .I 1 I Street Lighting 121 STREET LIGHTING The capital projects in this functional cate- gory provide for operation and improvements to the street lighting system on the approximately 672 of streets for which the City has responsibility. The City leases the lighting system from the Florida Power and Light Company. The on -going project included in the 1982-1988 Capital Improvement Program encompasses the entire operation of the street lighting system. The program accounts for 6.5% of the total CIP program and is valued at $41,768,000. Policies Miami's street lighting program is guided by the following policy: - Upgrade existing mecury vapor street lights to a higher intensity, high pressure sodium vapor (HPSV) light source. This conversion will result in a slight increase in overall light output with a small reduction in our future electrical consumption. (Source: City of Miami Public Works Department Existing Facilities and Recent Accomplishments Map 22 shows the areas of the City that are lighted above minimum standard with high intensity lighting. Thirty-one street lighting "projects have been completed since 1975. This includes two STREET LIGHTING post top HPSV relighting districts in the Edgewater and Shenandoah areas completed during FY 1981-82 at a total cost of $38,000. This amount reflects a $3,300 increase over the amount spent for removal of existing facilities in these project areas. Proposed Street Lighting Improvements 1982-1988 Upgrading to sodium vapor lighting will be accomplished over the next three vears in project areas determined as citizen requests are received or per Public Works departmental investigation of the areas. Operation of the street lighting system throughout the City will continue at its present level of service. The on -going Citywide Street Lighting Program is valued at $41,768,000 in the six -year capital program. STREET LIGHTING Funding The funding schedule below summarizes the source of funding for the City's street lighting program. One hundred percent of the Funding is available and represents the total amount required for annual opera- tion of the entire street lighting system. In prior Capital Improvement Programs, the full operational cost was not included. For this reason, its inclusion in this years program shows a large increase in total funding amount. 122 STREET LIGHTING AVAILABIUTY OF FUNDING FUNDS AVAILABLE I00 % 241,768,000 - PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) FUNDING CODE/SOURCE TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 655. INCL DEFT OPER BUDGI 4176@ 4350 4850 5335 5860 6455 7100 7810 TOTAL 41768 4350 4850 5335 5868 6455 7100 7810 %7�ll1 Ed �/ 125 RECENT ACCOMPLISHMENTS Street Lighting Projects Completed Since 1975 1 North Bayshore 2 North Bayshore 3 Buena Vista 4 Model City South 5 Garment District 6 CRB 7 Biscayne Island 8 Herald Plaza 9 Comstock HPSV Street Lighting Project 10 Civic Center West HPSV Street Lighting Project 11 Riverside-Brickell 12 Roads Area HPSV Street Lighting Project 13 Bay Heights 14 Grove North 15 Grosse Lawn HPSV Street Lighting Project 16 LeJeune Gardens 17 Flagler Street 18 NE 4 Court 19 NW 43 Avenue/NW 3 Street 20 Pan American Drive 21 Virginia Key 22 Grapeland Mercury Vapor District 23 Citrus Grove Mercury Vapor District 24 Woodlawn Mercury Vapor District 25 Douglas Mercury Vapor District 26 LeJeune Mercury Vapor District 27 Bay Point HPSV Street Lighting Project 28 Fairlawn Mercury Vapor District 29 West Flagler Mercury Vapor District Street Lighting Projects Completed During FY 1981- 1982 Total Project Cost A Edgewater Post Top HPSV Relighting District $15,000 B Shenandoah Post Top HPSV Relighting District - Phase I 23,000 $38,000 STREET LIGHTING STREET LIGHTING PROPOSED STREET LIGHTING IMPROVEMENTS 1982-1988 Street Lighting Projects That Are Ongoing Total Project Cost Projects That Are Not Mapped: Citywide Street Lighting Program (9023) $ 41,768,000 $ 41 ,768,000 126 a i Citywide Street Lighting Program (9023) The Citywide street lighting system consists of approxi- mately 25,200 street lights plus various poles and cables the City leases the lighting system from the Florida Power and Light Company. Energy costs account for approxi- mately 25% of the total project cost. Upgrading all exist- ing mercury vapor (MV) lights to high pressure sodium vapor (HPSV) lights is planned to be accomplished over the next three years. there are approximately 296 miles of streets in the City where this could be accomplished. The conver- sion will result in a slight increase in overall light output with a small reduction in our future electrical (kilowatt hour) consumption. 127 STREET LIGHTING ITEM/ NO.1 FUND PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1983-84 1984-85 1985-86 1986-87 1987-88 1 41768 4350 4850 5335 5868 6455 7133 tole 9023. CITYWIDE ST LIGHTING 41768 4350 4e50 5335 5868 6455 7140 7810 655. INCL DEPT OPEN BUCGT 41768 4353 4853 5335 5868 6455 710e 781C. 41768 43SO 48SO 5335 5868 645S 7100 7slio STREET LIGHTNING Transit Systems M 129 TRANSIT SYSTEMS This functional category includes improvements to Miami's public transportation system. Public transportation within the City is provided by Metro- politan Dade County. Projects within this section include commitments made by the City to support major public transportation projects. Transit system improvements represent 1.5% of the proposed 1982-1988 Capital Improvement Program. One project worth $9,900,000 is programmed in this category. Policies Miami's investment in transit systems is based on the following: - Provide improved distribution - circulation systems for Downtown Miami to interface with the rapid transit system and activity concentrations north and south of Downtown. - Establish a metropolitan system of bikeways to link important local facilities, such as parks, shopping centers, and educational facilities. (Source: Miami Comprehensive Neighborhood Plan 1976-1986, 1976 Proposed Transit System Improvements 1982-1988 Map 24, shows the portion of the proposed Metro- politan Dade County rapid transit system, Metrorail, 0 TRANSIT SYSTEMS that lies within, the City of Miami. The rapid transit line with its ten City stations will con- nect with the Downtown Component of Metrorail (DCM'), also shown on Map 24. The DCM will facilitate the movement of pedestrians from transit stations to their destinations. The City of Miami is committed to finance 6% of the total cost of the DCM. The single transit project in the 1982-1988 Capital Improvement Program will cover thie City's share of the estimated cost of the Downtown Component of Metrorail. TRANSIT SYSTEMS Funding A summary of the funding needed for the Down- town Component of Metrorail, is shown below. Of the total $9,900,000 cost, $3,275,000 or 33% is available, $30,000 or.3% is anticipated, and the remaining 66.7% is unknown. 130 I.n TRANSIT SYSTEMS r AVAILABILITY OF FUNDING NDS AVAILABLE 33% S3,2T5,000 66. %% i6,595,000 SOURCE OF FUNDING UNKNOWN .3% FUNDS ANTICIPATED 530,000 PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) FUNDING CODE/SOIIRCE TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1981-98 101. UNKNOWN 6595 0 0 3297 329E 0 0 0 153. UMTA GRANT -ANTIC 30 30 a 0 0 0 0 0 650. CAPITAL IMPR FOS-FPL 3275 2575 70C 0 0 0 0 � TOTAL 9900 2605 700 3297 3298 0 0 0 11. 11 TRANSIT SYSTEMS 13i ^—EN 1111111111L=m�=� ii NW S.ST d 6. o MAP 24 CITY OF MIAMI RAPID TRANSIT SYSTEM ' �— 00000= A •urr.[ cSW �■ METRORAIL W ---- DOWNTOWN COMPONENT z OF METRORAIL D > 615G.�NE YN Y.»CL• `W.TSOM i5, .»0 m �•I h� Downtown Component of Metrorail (7031) As part of the rapid transit system, a people mover system is proposed for Downtown Miami to facilitate the movement of pedestrians from transit stations to their destinations and vice versa. Based on an estimated $ 75 million total project cost for the Downtown Component of Metrorail, the City's 6% commitment in financing this project is considered critical in supporting the rapid transit system and in helping to revitalize the Central Business District. 132 TRANSIT SYSTEMS ITEM/ NO. PRIOR FUND PROJECT TOTAL YEARS 9900 2605 7331. DCH 9900 2605 101. UNKNCMN 6595 0 153. UNTA GRANT•ANTIC 30 30 650. CAPITAL IMPR FOS-FPL 3275 2575 9900 2605 Note: Funding for FY 1982-83 has been deleted. Current funding amount is sufficient for the City's FY 1982-83 funding commitment. 133 16 FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 700 3297 329A. 0 0 0 700 3297 329E o 0 0 0 3297 329E 0 0 G 0 0 0 0 0 a Too 0 0 0 0 0 700 3297 3298 0 0 n TRANSIT SYSTEMS Parking Facilities an i I I I i I I I I I1 1111111 111 11 111 111 1, 1 134 6 PARKING FACILITIES This section includes improvements to Miami's parking system. The 1982-1988 Capital Improvement Program includes eight parking facilities projects valued at $82,894,000. These projects account for 12.8% of the six year program. Policies Parking improvements in the City of Miami are based on the following policies: - Provide improved and expanded parking facilities in selected commercial areas, especially in the CBD along SW 8th Street, SW list Street, in the Design Plaza, Coconut Grove Business District and Little River. (Source: Miami Comprehensive Neighborhood Plan 1976-1986, 1976 - Provide additional off-street parking for both shoppers and employees of the Garment Center. (Source: Garment Center/Fashion District Re evelo ment Plan, July 1979 Existing Facilities and Recent Accomplishments Miami's parking system consists of more than 11,000 parking spaces in three types of facilities: (1) on -street parking meters, (2) parking lots, and PARKING FACILITIES PARKING FACILITIES (3) parking garages. The City's off-street parking facilities are shown on Map 25. Eleven of these facilities, shown on Map 26, have been completed since 1975. Proposed Parking Facilities Improvements 1982-1988 Four of the eight parking facilities improvements in the 1982-1988 Capital Improvement Program are ongoing or scheduled to begin during FY 1982-1983. These projects, shown on Map 27, are estimated to cost $77,279,000. The remaining four projects, also shown on Map 29, are programmed during the final five years of the CIP and are valued at $5,615,000. Detailed project descriptions and funding schedule follow Map 27. I 1 , I I i u, i m III.n 1inu nil nu I w 1 11 i J Fundin A summary of the funding required to implement the parking facilities projects follows. Of the total funding, 12.8% is available, and 85.3% of the projects are anticipated to be funded primarily with revenue bonds during the six -year program. A source of funding is unknown for 1.9% of the parking facilities. 135 PRIOR FUNDING CODE/SOURCE TOTAL YEARS 101. UNKNOWN 1130 0 0 6EC. PARKING CAP FO-ANIIC 585 1900 661. PARKING CAP PROJ FO 214 927. PEVENUE BONDS -ANTIC 70565 10430 921. REVENUE BONDS 10430 TOTAL 82894 10590 AVAILABIUTY OF FUNDING 1.9 % 91, 00,000 SOURCE OF FUNDING UNKNOWN _FUNDS AVAILABLE IL$% 6513% FUNDS ANTICIPATED S 71.180.000 FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1986-87 1487-88 1982-83 1983-84 1984-85 198S-86 0 430 400 300 0 0 570 15 0 0 00 0 24 0 0 0 0 0 26910 34650 6075 2930 0 0 0 0 0 0 27504 35095 6475 3230 0 PARKING FACILITIES A �T 33 PARKING11P, FACILITIES F77 29 44 45 JIKia —It. csl -t-4 - LU W* m st I. msc—e sewrExo U..0 Is'.w 42 I IL 39 34 4 136 35 is 8 1 4 13 "ts6- �T .wl p -121 27 +ti t. 20 28 2— 3 15 24 37 cW, SIM go AW MAP 25 CITY OF MIAMI OFF-STREET PARKING FACILITIES 1 1 II I I, I i I I �_, I 1 Garage No. 1 2 Garage No. 3 3 Garage No. 4 4 Garage No. 5 5 Government Center Lot No. 2 6 Central Business District Lot No. 9 7 Central Business District Lot No. 10 8 Central Business District �37 Lot No. 19 9 Bayfront Park Lot No. 1 10 Bayfront Park Lot No. 7 11 Bayfront Park Lot No. 20 12 Bayfront Park Lot No. 21 13 Bayfront Park Lot No. 24 14 Expressway Lot #11 15 Expressway Lot #12 16 Expressway Lot #13 17 Expressway Lot #14 18 Expressway Lot #15 19 Expressway Lot #16 20 Expressway Lot #17 21 Expressway Lot #32 22 Expressway Lot #33 23 Expressway Lot #34 24 Expressway Lot #36 25 Expressway Lot #37 26 Expressway Lot #38 27 Expressway Lot #38B 28 Expressway Lot #39 CITY OF MIAMI OFF-STR No. of Spaces 515 490 696 756 40 223 222 300 155 108 90 326 595 98 67 68 191 230 90 123 69 185 20 18 22 127 28 73 29 Outlyina Lot #52 62 30 outlying Lot #3 166 31 Outlying Lot #4 28 32 Outlying Lot #4B 24 33 Outlying Lot #5 25 34 llutlyinq Lot #8 95 35 Outlying Lot #18 357 36 Outlying Lot #22 92 37 Outlying Lot #23 55 38 Outlying Lot #25 182 39 Outlying Lot #25B 78 40 Outlying Lot #26 264 41 Outlying Lot#27 150 42 Outlying Lot #49 94 43 Outlying Lot #51 28 44 Outlying Lot #53 33 45 Outlying Lot #54 32 PARKING FACILITIES S d PARKING FACILITIES f RW /p ST 41M YT CSWT if j N w n sT �h, Q MAP 26 I tf NW S. ST ' Ir RECENT ACCOMPLISHMENTS Nw>esT k J —A TNTTLE CSW. 1-11 OFF-STREET PARKING FACILITIES ESCOMPLETED ' ' t SINCE ff •1' �f1 t NSUTYE LNYWCO f I -1 - � 1 \11 r • • , j :' ,,,.Rp ,s..Np � ... 138 d42 i fA :{ �� ��' { i { V 1 . • �'� w.r5a� slow _ NW15 O to R; .pLa G ST _ .. 1 r •y 1 i t - - - ' I - " F `- t { �r 4 l 1 +} t{ }}!{} t}Y Y4r ew i] IT g T r .. R,CRERp.CRER [SWv l- I _ 1 / Jy` r- MlnCunE M _, RECENT ACCOMI Off -Street Parking Facilities Completed Since 1975 1 Parking Garage No. 4 2 Expressway Lot No. 49 3 Expressway Lot No. 51 4 Expressway Lot No. 53 5 Expressway Lot No. 54 6 Lot No. 25 7 Central Business District Lot No. 9 8 Outlying Lot No. 8 9 Outlying Lot No. 23 10 Bayfront Park Lot No. 24 11 Government Center Lot No. 2 139 PARKING FACILITIES 14� � s f PARKING FACILITIES «W TY 5! t [( �y _ ' s - .� f _ z «w n sr . , , � Nllfl RU� J5, rp« —A AVE OR 6. ENWMMT« YV cS PC- 11, p MAP 27 T p a PROPOSED PARKING FACILITIES 1982-1988 1-4 PARKING FACILITIES PROJECTS � IA T"TT`E `sW' SCHEDULED TO 8E INITIATED DURING FY 1982-83 W z A-D PARKING FACILITIES PROJECTS o Y SCHEDULED FOR FY 1983-84 THROUGH FY 1987-88 a eiwr«E sw ruco V isT «o si•«o N wTsO« iLYU — _ m »t� 1�f \Y4Y�vn( Sl1«O ��MO , I1 11 1I 1 11 1 ug1111 11 1 11 ilmui, I III ll� III PROPOSED PARKING IMPROVEMENTS 1982-1988 Parking Improvements That Are Ongoing or Scheduled Parking Improvements Scheduled For FY 1983-1984 To Be Initiated During FY 1982-1983 Through FY 1987- 988 Total Project Cost Total Project Cost 1 Downtown Government A Little Havana Public Center Parking Parking Facilities Garage (8071) $10,400,000 (0021) $2,485,000 2 Core Area West Park- ing Garage (1017) 48,112,000 B Allapattah Industrial 3 Parking Facility in Area Parking Facili- Omni Area (0059) 15,000,000 ties (1010) 630,000 4 Miami Design Plaza Parking Garage (1020) 3,767,000 C Model City Public 141 $77, 2 79,000 Parking Facilities (2019) 500,000 D Garment Center Park- ing Garage (9010) 2,000,000 $5,615,000 PARKING FACILITIES 1 __ 011111 II I III 1 Downtown Government Center Parking Garage (8071) This parking facility, which is located between N14 lst and 'Ind Street at NW 3rd Avenue, will serve the general public and visitors of the City Administration Building and nearby Metropolitan Dade County buildings. The faci- lity will contain space for 983 cars combined with 27,850 square feet of retail space. This project is under construction. 2 Core Area West Parking Garage (1017) This project will provide parking for visitors to the Central Business District. A consultant study has been completed that determined the financial feasibility of a parking facility with related mixed use development in the area bounded by the Miami River, the I-95 Expressway exit ramp into DuPont Plaza, NW 1st Avenue, and the rapid tran- sit right-of-way. This project is in design. 3 Parking Facility in Omni Area 149 (UO59) This project involves the development of a parking facility located in the immediate vicinity of the Downtown Component of Metrorail station in the Omni area. The proposed park- ing facility, containing approximately 1000 spaces combined with a mixed -use development to be leased to the private sector, will serve as an interceptor of automobile traffic into the Central Business District and will tend to promote ridership on the mass transit system. 4 Miami Design Plaza Parking Garage (1020) This project involves construction of a parking garage for 300 employees anu visitors to the Miami Design Plaza. The proposed facility also will include 20,000 square feet of retail retail space with air space lease in exchange for ground lease. 0 PARKING FACILITIES 5 Little Havana Public Parking Facilities (0021) This project involves the development of public parking facili- ties in the commercial areas of Little Havana. Such facilities could stimulate private reinvestment in the commercial areas, which have a serious deficiency in public parking. The location of these facilities would depend upon the result of a feasibi- lity study. 6 Allapattah Industrial Area Parking Facilities (1010) This project involves land acquisition and development of public parking facilities to serve the Allapattah Garment/Industrial District in the area bounded by NW 19th Terrace and NW 24th Street and NW 11th and NW 27th Avenues. This area is experienc- ing rapid development of garment -related businesses and these parking improvements will attract further businesses and clients to the area as well as complement other public improvements in the area. 7 Model City Public Parking Facilities (2919) This project involves the development of off-street parking facilities within the Edison Business Center located along NW 7th Avenue between NW 55th and NW 64th Streets. A Planning Department study will be conducted to determine the location and feasibility of constructing the parking facilities. It is recom- mended that a Community Based Organization manage and operate the proposed facilities. S Garment Center Parking Garage (9010) The parking garage will serve employees and visitors in the Garment Center, where there is a deficiency of approxi- mately 700 parking spaces. This project involves construc- tion of a multi -level, ramp -type, self -park garage on land owned by the Off-street Parking Authority at hW 27th Street between NW 5th and 6th Avenues. This project, to be funded With revenue bonds, is essential for the continued growth of the Garment Center and will complement other Community Development activities in the area. I I I III I I III !I 111 111111111 I11 III 11 111 11 Ill unll 11 I111 ITEM/ NO./ FUND PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 1 10430 10400 0 0 0071. ONTN GQf CENT GARAGE 10400 10400 0 0 92a. REIEliUE BONDS 10400 10400 0 0 2 48112 L30 22391 25891 1017. CORE AREA W GARAGE 48112 133 22091 25891 661. PARKING CAP PPOJ FO 154 130 24 0 921. REIEKUE BONOS-ANTIC 47958 0 22067 25a91 3 15000 30 4970 5000 59. PARKING FAC IN GMKI 1500a 30 4970 5333 660. PARKING CAP FD-ANTIC 570 O 570 0 661. PARKING CAP PROJ FO 30 33 a 0 921. FEVEAUE BONOS-ANTIC 14400 0 4400 5330 4 3767 30 1643 3019 1020. 143 661. XIAMI DESIGN PL GAR PARKING CAP PROJ FO 3767 30 643 3019 30 30 a a 927. REfEAUE BONDS -ANTIC 3737 0 i43 3019 5 2485 0 O 755 21. LITTLE HAVANA PAP$ 2485 0 0 755 660. PARKING CAP FO-ANTIC 15 0 a 15 W. RU ENUE BONDS -ANTIC 2470 0 0 740 6 630 0 0 30 I01G. ALLA 1KOU5 AP PAPK 630 0 0 30 101. UNKNOWN 630 0 0 30 7 510 0 a 400 2019. MODEL CITY PARK FAC 500 0 0 400 101. UNKNCNN 500 0. 0 400 8 2000 0 a 0 9010. GARMENT CENT PARKING 2000 a 0 0 927. FEVENUE 90NOS-ANTIC 2003 0 0 a 82894 10590 27504 35095 ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1984-85 1985-86 1986-87 19R7-s8 o a a a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 o a a 0 0 0 0 5330 0 a 0 5000 a 0 0 0 0 0 0 0 0 0 0 50-10 0 0 a 275 0 0 275 0 a a 0 0 0 O 275 0 0 0 830 930 a C Soo 933 0 a a a 0 a 833 930 a 0 300 333 0 0 300 37G 0 0 333 300 a 0 100 a 0 0 190 0 G a 100 0 a 0 a 2C00 0 a 0 2000 0 a 0 2000 a 0 6475 3230 0 0 PARKING FACILITIES 0 Z* Economic Development Economic Development The economic development functional category includes physical improvements that can initiate and encourage long-term economic growth in Miami, encourage industrial and commercial expansion in certain areas of the City, and encourage the creation of full-time permanent jobs for the unemployed in redevelopment areas of the City. The 1982-1988 Capital Improvement Program includes twelve projects estimated to cost $248,847,000, accounting for 38.5% of the six year program. Pol icies 14� The policies that guide Miami's investment in economic development projects include objectives for Citywide economic growth as well as neighbor- hood commercial revitalization and area industrial expansion. - Foster a public/private development partnership directly responsive to the economic needs of local businesses and residents. Develop and help maintain self -supportive business opportunities; promote retail, service employment and public/private investment responsive to neighborhood plans. Nurture and preserve existing economic activities; capture appropriate shares of projected regional gains by exploiting the City's comparative advantages. ECONOMIC DEVELOPMENT ECONOMIC DEVELOPMENT $248,847,000 12 PROJECTS Support economic growth within the Miami economy which generates new jobs for City residents, upgrades the quality of employ- ment opportunities and increases personal income levels for Miami residents. - Equalize the opportunities for employment and career advancement, business develop- ment and expansion for segments of Miami's population facing the greatest institu- tional barriers to economic achievement and success. M IG Existin Conditions Map 28 shows the median household income esti- mate for 1980 for the City of Miami. The map dis- plays those areas where the estimate is less than or greater than the City average of $12,796. Map 29 shows economic development projects completed since 1975. Pro osed Economic Develo ment Projects 1982-1988 Nine economic development projects, shown on Map 30, are ongoing or scheduled to be initiated during Fiscal Year 1982-83 at a cost of $243,547,000. Three projects are scheduled for the remaining years of the program and are valued 145 at $5,300,000. Detailed project descriptions and a funding schedule follow Map 30. Funding The funding schedule below shows the sources of funding for economic development projects. Of the total amount, $81,240,000 or 32% is available. A source of funding for $5,322,000 or 2.1% of the program is unknown. The remaining funds, $162,285,000 or 65.2% are anticipated to become available during the six -year program. AVAILABILITY OF FUNOING GBZ% rABLE 32.TX FUNDS AN71clrla 162.286.006 2.1% 35.322 ,000 SOURCE OF FUNDING UNKNOWN ECONOMIC DEVELOPMENT FUNDING CODE/SOURCE TOTAL 101. UNKNOWN 5322 151. E04 GRANT 2381 160. DADE CO CD FUNDS 315 161. TENTH VP CO -ANTIC 570 164. FOURTH YP CO 179 165., FIFTH VF CO 633 1E6. SIXTH YF CO 770 167. SEVENTH VP CO 1141 16l. EIGHTH YP CO 361 169. NINTH YR CO -ANTIC 5TO 170. U046 GRANT -ANTIC 10000 17I. U04G GRANT 4994 Me JOINT DE4 GRT-ANTIC 6770 650. CAPIIAL IMPR FD5-FPL 10173 65�. PPOC INTEFAMA SALE 4500 672. CREDIT FPO" DCN 731 706. PPI�f CONTFIB-ANTIC 375 927. PEf1ENUE 80N05-ANTIC 144000 928. FEYEAUE BONDS 42337 INT 7031 146 980. AUTHFHIGHWAYUBONDS05 100 984. AUTH PAPK BONDS 492 9l5. AUTH CONiEN BONDS 4@54 E" #ONOMIC DEVELOPMENT PR1UK FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) YEARS 1982-83 1983-84 1984-BS 198S-86 1986-87 1987-98 Q 0 561 4761. 0 0 a L581. 0 800 0 0 0 0 0 zoo 175 0 0 0 a 0 0 0 570, 0 0 0 7T9 Q 0 0, Q 2 0 600 0 0 0 0 Q 0 770 0 0 0 0 0 0 1147 a 0 0 0 C. 361 4 0 0 0 570 0 0 Q 0 0 2 0 10000 Q 9 0 4994 0 0 0 0 0 0 0 67TO 0 0 0 0 0 9773 403 0 0 0 a 0 4533 0 0 0 0 0 0 0 700, 0 0 0 0 0 0 0 375 0 0 0 1 a 112CQ 70545 33255 13000 13090 3000 4 200 7 0 0 Q 0 0 0 7001 0 0 0 0 0 0 I a soo 0 498 0 0 � o a. Q 4854 0 0 0_ 0 Q 1 TOTAL 248847 78504 19631 73126 48586 13000 13000 3000 goods ECONOMIC DEVELOPMENT 11 ,i r: - a» or cs.n Itfit l MAP 29 TS RECENT +'' iI�1. W ACCOMPLISHMENTS } ! 1 i 7,I t z I ECONOMIC DEVELOPMENT PROJECTS COMPLETED SINCE 1975 UGH 148 IS- � zIY'1 {T , 1},{ .! vino no 't �� f ` 11111 mi . ECONOMIC DEVELOPMENT s �1- M 4. CSIt/ i I 4 LL MW n SI m W xo sr I 1 ?� • , i I �j �1 i .j I �•t �t� T NSU.Mt i.MY.IICO ` + : �r\—r-•rt-� ' I jj j i 4 � i ,� r , ; ..tso» Ix.w 's4':iT ' t -f sW as sr (} 111 [ 1 lip i• i+�1 WAO PO � 1 / � d c%— ' W.uw. .t. r MAP 29 RECENT ACCOMPLISHMENTS I ECONOMIC DEVELOPMENT PROJECTS COMPLETED SINCE 1975 149 RECENT ACCOMPLISHMENTS Economic Develo ment Projects Completed Since 1975 1 Little River Commercial Center Beautifica- tion ECONOMIC DEVELOPMENT ■�� Ill�il ' ' I I i �� I � ' I s' AL ECONOMIC DEVELOPMENT Nw IY Sr 7Ak MAP 30 a PROPOSED ECONOMIC DEVELOPMENT PROJECTS Nw Te sr , �uEi. rurTiE csw. 1982-1988 I-6 ECONOMIC DEVELOPMENT a PROJECTS THAT ARE ONGOING rr, , ; ; Z OR PROPOSED TO BE » W ZU 51 t . i , ; : r t '" > INITIATED DURING (� C '' a FY 1982 —1983 } . ' 1 (i ; t - . c� . ? i .., "; •»� 'u-»° A—C ECONOMIC DEVELOPMENT 15�J aq ss C ' m PROJECTS SCHEDULED --o FOR FY 1983 1984 THROUGH _ FY 1987-1988 •r \Yd ER Sl - tt _ LL sw�s sr CEAWNro»�SE+No ? t t l t} : I T n:C»E»YC.En CSvn WMU»i. .ET BIRO O RAf $t} 151 PROPOSED ECONOMIC DEVELOPMENT PROJECTS 1982-1988 Economic Development Projects That Are Ongoing Or Economic Development Projects Scheduled For FY 1983- Scheduled To Be Initiated During FY 1982-1983 1984 Through FY 1987-1988 Total Project Cost Total Project Cost 1 Overtown Land Acqui- A Furniture Park Land sition (8032) $ 729,000 Acquisition (1030) $1,000,000 2 Overtown Neighborhood B Brickell Transit Sta- Shopping Center (1013) 1,826,000 tion Area - SW loth 3 Garment Center/Fashion Street Pedestrian/ District Expansion Transit Mall (0038) 500,000 (8034) 2,322,000 C Recycle Incinerator 4 Watson Island Develop- No. 1 (9024) 3,800,000 ment (7033) 65,949,000 $5,300,000 5 City of Miami/Univer- sity of Miami - James L. Knight International Center and Parking Garage (7034) 73,378,000 6 Model City Shopping Center (2039) 1,700,000 7 Overtown Transit Sta- tion Area Redevelop- ment (1022) 8,460,000 8 Southeast Overtown/ Park West Redevelop- ment (2020) 89,000,000 Projects That Are Not Mapped: Commercial District Signage (1023) 183,000 R243,547,000 ECONOMIC DEVELOPMENT 152 Overtown Land Acquisition (8032) This project involves the acquisition of land for residen- tial and commercial redevelopment within the portion of Overtown south of NW 14th Street. Acquisition is underway. 2 Overtown Neighborhood Shopping Center (1013) Located at NW 15th Street and 3rd Avenue, the Overtown Shopping Center will provide approximately 32,000 square feet of retail space for the Overtown Community. It is anticipated that this neighborhood -oriented shopping center will include a supermarket. The facility is being developed jointly by the City of Miami and a community - based organization. 3 Garment Center/Fashion District Expansion (8034) This project involves land acquisition, demolition, and relocation in the Garment Center district. In addition, the project will remove existing slums and blight and will separate incompatible land uses. This will encourage expansion of the Wynwood Garment Center in the area from NW 2nd Avenue to I-95 between NW 22nd Lane and 2uth Street Other components of the project include the establishment of a garment manufacturing -related employment training program in the area, the expansion of public facilities, and the construction of a mini -park in the area. Land acquisition for this project has begun. 4 Watson Island Development (7033) This project involves the development of Watson Island, a 65-acre island located at a bend in McArthur Causeway, ECONOMIC DEVELOPMENT midway between Downtown Miami and Miami Beach. Development is expected to be funded through revenue bonds and an Urban Devel- opment Action Grant. A major visitor center, which takes advan- tage of and emphasizes Miami's unique cultural, climatic and aquatic characteristics is expected as the focal point of this recreational and amusement complex. Once complete, Watson Island Development is expected to generate a significant increase in tourism, benefiting the local economy dramatically. It will also provide additional recreational opportunities for area residents and the boating community. 5 City of Miami/University of Miami -James L. Knight International Center and Parking Garage (7034) the international Convention Center is located on a four -acre, City -owned downtown site on the Miami River. It is a mixed use facility with a university of Miami Conference Center and a privately developed Hyatt Regency Hotel. The full service con- vention center is programmed to function for conventions, con- ferences, sports activities, musical concerts and maximum utili- zation by the community. This project is under construction. A 1450-space parking garage is also under construction at the former site of the Oailas Park Hotel. This parking garage will serve the City's Conference/Convention Center, the University of Miami's Conference Center, and the Hyatt Regency Hotel. A proposed Downtown Component of Metrorail station will be accommodated in the parking garage. The air space over the garage will be privately developed for a Trade Center office building. The added cost of base construction in the office tower is being paid from an Urban Development Action Grant. ITEM/ NO./ FUND PROJECT PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (DUO) TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987_88 1 729 729 0 l032. OVERTOMN LAND ACC 729 129 0 164. FOURTH TO CD 529 529 0 165• FIFTH TO CO 200 230 0 2 1826 1826 0 1313. O/ERTOMN SHOP CENT 1a26 192E 0 151. EDA GRANT 1581 1581 0 167. SEVENTH YR CO 245 243 0 3 2322 2322 0 8034. GARMENT CENT EXPAN 2322 2322 0 164. FOURTH TO CO 250 250 0 165. FIFTH YR CO 400 400 0 166. SIXTH YR CD 770 770 O 167. SEVENTH TR CO 902 902 0 1534 65949 949 7200 7033. WATSON ISLAND OEi 65949 949 7200 170. VDAG GRANT_ANTIC 10300 0 0 650. CAPITAL IMPR FOS-FPL 451 451 0 927. F U ENUE BONDS -ANTIC 55000 0 7200 9l4. AUTH PARK BONDS 189E 498 0 5 73370 7267E 100 7034. J L KNIGHT CONI CENT 73378 72678 700 Ill. MG GRANT 4994 4994 0 650. CAPITAL IMPR FOS-FPL 9322 9322 0 653. PROC INTERAMA SALE 4500 4533 0 672. CREDIT FFOM OCM 70C 0 700 920. FE4EhUE BONDS 42007 42007 0 929. INT FR FEVENUE BChOS loot 733L 0 9 ? 5 . AUTH CCNVEN BONDS 4054 4854 0 Note: Source of funds for City of Miami/University of Miami --James L. Knight International Center (7034) from Capital Improvement Funds (FP&L) has been changed to Proceeds of Interama Sale. p 0 D 0 0 0 0 0 0 0 p 0 0 C 0 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 0 0 G 0 0 0 0 0 C 0 p 0 0 0 0 a o a o 0 0 0 0 C 0 0 0 p 0 p 0 0 0 0 0 G C O 36545 21255 0 0 36545 21255 0 0 0 0 10000 0 C G 0 7 0 0 4 36545 11255 0 0 0 0 0 0 C 0 0 p 0 Q 0 0 0 0 p 0 p 0 0 C 0 0 0 0 0 0 0 0 G 0 0 0 0 0 0 0 0 0 C 0 0 p G 0 C 0 0 0 0 0 ECONOMIC DEVELOPMENT 154 0 6 Model City Shopping Center (2039) This project involves the acquisition, design, and devel- opment of the vacant 70,000 square feet Pantry Pride supermarket located at 639-655 Martin Luther King Boule- vard into a neighborhood shopping center. The shopping center will contain a medium size supermarket and B-10 smaller, service oriented shops for the Model City commu- nity. The existing parking area will also be improved. It is anticipated that this facility will serve as a major anchor and commercial generator for the entire Edi- son Business Center. 7 Overtown Transit Station Area Redevelopment (1U22) This project involves acquisition, clearance, and reloca- tion activities associated with the redevelopment of the four -block area directly west of the Overtown Transit Sta- tion. This area is bounded by NW 1st Court, NW 3rd Avenue NW 6th Street, and NW 8th Street. The land will be rede- veloped for residential and commercial activities and will play a significant role in the revitalization of the Over - town community. The Environmental Impact Statement has recently been completed. This project is in accordance with the adopted Overtown Redevelopment Plan. 8 Southeast Overtown/Park West Redevelopment (2020) This project involves redevelopment of the Southeast Over - town and Park West areas bounded by I-395, NEW 5th Street, I-95, and Biscayne Boulevard. The implementation of the proposed redevelopment program for the Park West and Southeast Overtown subareas will result in the total con- struction of approximately 4,000 new residential units, 600,000 sq.ft. of new office space, 500,000 sq.ft. of WRONOMIC DEVELOPMENT retail space, 400-500 hotel rooms and the rehabilitation of 1000 units of housing. It will result in the removal of over 700 occupied units of generally substandard housing, marginal notels and rooming houses and will necessitate the relocation of over 110 businesses. It is anticipated that over $650,000,000 in private reinvestment will be generated alone in the Park West area. Major public investment will be through the the establishment of a Tax Increment Finance District. Addi- tional public support will be directed to Overtown through the Community Development Block Grant Program and other Federal and local resources. 9 Commercial District Signane (1023) This project will provide fnr the placement of distinctive, decorative identification signage and directories within com- mercial areas of the City of Miami to enhance commercial revi- talization and economic development activities currently under- way. 10 Furniture Park Land Acquisition (1030) This project involves the assembly of land and site improvements for redevelopment into industrial development related to the interior design industry. The land is located on NW 71st Street from NW 2nd to NW 5th Avenues. ITEM/ NO./ PRIOR FUND PROJECT TOTAL YEARS 6 1700 0 2039. MODEL CITY SHOP CENT 1700 a 151. EOA GRANT 800 0 160. DADE CO CO FUNDS 125 0 650. CAPITAL IMPR FOS-FPL 400 0 706. PRII CONTRIB-ANTIC 375 0 8460 0 1022. CiERTORN TR ST REM 8460 C 160. CADE CO CO FUNDS 250 0 161. TENTH YR CO -ANTIC 57C 0 168. EIGHTH YF CO 300 0 169. NINTH YR CO -ANTIC 570 0 175. JOINT OEd GRT-ANTIC 6770 0 9 8v000 0 155 2020. SE OVERTN-PK N REDEW 89000 0 927. FEtENUE 80NOS-ANTIC 89000 0 9 183 0 1023. COMP DIST SIGNAGE 183 0 131. UNKNOWN 122 0 168. EIGHTH YF CO 61 0 10 1333 0 103C. FURN PARK LAND ACC 1030' 0 101. UNKNOWN 1000 0 Note: Model City Shopping Center (2039) will receive $800,000 from an EDA Grant during FY 1982-1983 and $400,000 from FP&L funds, total appropriation for FY 1982-1983 is $1,200,000. FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1982-83 1983-84 1984-8S 198S-86 1986-87 1987-88 475 122 5 0 0 0 475 1225 0 0 0 0 0 80C 0 0 0 0 75• 50 0 C 0 0 00• 0 0 0 0 0 0 375 0 0 0 0 7195 695 573 C 0 0 7195 695 570 0 0 0 125 125 0 0 0 0 0 0 570 0 0 0 300 0 C 0 0 II 0 570 0 0 0 0 6770 0 0 0 0 0 4000 34000 22000 13000 13000 3000 4000 34333 22000 13330 13033 3000 4007 34000 22000 13000 13000 3000 61 61 61 0 0 0 61 61 61 0. C 0 0 61 61 0 C 0 61 0 0 0 0 0 0 500 500 0 0 0 500 533 0 0 0 0 500 500 0 0 C ECONOMIC DEVELOPMENT 'tCONOMIC DEVELOPMENT B 1 ckell Transit Station Area - SW loth Street Pedestrian/ Transit Mall (003B) This project involves the construction of a landscaped mall on SW loth Street between SW lst Avenue and Miami Avenue. The mall will accommodate pedestrians, a shuttle bus lane,the Downtown People Mover guideway, and sidewalk retail activities. The project, which is recommended in the Brickell Station Area Design and Development Plan, will serve as a catalyst for intensive private redevelop- ment, will encourage transit ridership, and will create an active pedestrian environment at the street level. This project is in design. 12 Recycle Incinerator No. 1 (9U24) This project involves the reuse of the City's Incinerator No. 1 as a mixed use building that would cater to the needs of the Jackson Memorial Hospital - Civic Center complex as well as the users of the Santa Clara rapid transit station. the building could include medical offices, nursery center, 15 6 retail facilities, cardiovascular fitness facilities, and service establishments. 157 ITEM/ NO,/ FUND PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL ADIOUNTS IN 1984-85 THOUSANDS 1985-36 OF DOLLARS (000) 1986-87 1987-88 11 soa o 0 100 400 0 0 0 38. BRIC%ELL PIED 10 HALL 500 0 0 100 40000 0 a 101. UNKNOWN 400 0 0 0 0 0 9ta. 4UTH HIGHW4Y BONDS 100 0 0 100 0 0 12 3800 a 0 0 3P90 0 0 0 9024. RECYCLE INCIN NO 1 31100 0 0 0 3000 a 0 0 0 0 101. UNKNOWN 3830 0 0 0 3800 0 248847 78504 19631 73126 48586 13000 13000 3000 ECONOMIC DEVELOPMENT I I. I I III , I I I I. f, ! l I I I I I I . II I I I , i t I i Housing Programs L ._ HOUSING PROGRAMS This functional category includes programs dedicated to the preservation of Miami's existing housing resources and the development of additional housing opportunities for the City's low and moder- ate income citizens. Housing programs, which account for 2.8% of the 1982-1988 Capital Improve- ment Program, include four projects valued at $17,873,000. Policies Miami's investment in housing programs is guided by the following policies: 158 - Upgrade selected residential areas through the provision of low -interest home improve- ment loans to qualified low and moderate income families in combination with improve- ments to street and neighborhood facilities. - Facilitate rehabilitation of multi -family rental housing with private funds for occu- pancy by families of low and moderate income. - Provide homeownership opportunities for low and moderate income families through the construction of single family homes financed through a tandem mortgage plan. - Provide housing for low and moderate income renter families. (Source: Housing Division, City of Miami Communit Development Department HOUSING PROGRAMS Z8% Existinq Conditions and Recent Accomplishments Map 31 shows the change in number of housing units from 1970-1980 in Miami. Map 32 shows the public housing and land acquisition projects com- pleted during FY 1981-1982. Last Year, land was acquired for housing in Model City and Coconut Grove. Land acquisition for Dorsey/14heatley re- development was also completed during FY 1981-82. Accomplishments during FY 1981-82 totaled $986,000. HOUSING PROGRAMS HOUSING PROGRAMS Proposed Housing Programs 1982-1988 AVAILABILITY OF FUNDING The 1982-1988 Capital Improvement Program SOURCE OF FUNDING UWNOWN includes three housing projects, totaling 800,000 $17,073,000 that are ongoing or scheduled to begin during FY 1982-83. One additional project is programmed to begin in FY 1983-84 at a cost of $800,000. These projects are shown on Map 33. Project descriptions and a funding schedule follow Map 33. Funding 915% FUNDSAVAlLABLE S 17 073,000 Of the total amount, $17,073,000 or 95.5% is available for housing programs. Funding for $800,000 or 4.5% is unknown. The housing projects 159 are funded with Community Development monies and City housing bonds, as shown in the funding summary below. PRIOR FISCAL YEARS ALL AMOUNTS 1984-85 IN THOUSANDS OF 1985-86 DOLLARS (000) 1986-87 1987-80 FUNDING CODE/SOURCE TOTAL YEARS 1982-83 1983-84 101. UNKNOWN 600 0 0 230 200 200 200 0 160. CADE CC CO FUNDS' 332 300 0 0 0 0 C 0 0 0 162. SECOKO VP CO 32 32 0 0 0 ? 0 0 163. THIPC YR CO 50 50 0 0 0 0 0 0 1E4. FOURTH YP CO 251 250 0 0 0 0 165. FIFTH YR CO 275 275 0 0 0 0 0 0 166. SIX1P TP CO 391 391 0 0 0 0 3 0 0 167. SEVE►TH YR CO 275 275 0 0 0 0 0 650. CAPITAL IMPR FOS-FPL 530 500 0 0 0 0 0 C 96C. AUTH HOUSING 80NCS 14600 9400 5230 0 0 0 0 0 9E2. TNT FR HOUSING BONDS 400 400 0 0 0 0 0 3 TOTAL 17873 11873 5200 200 200 200 200 0 Ap HOUSING PROGRAMS- t i' s F t t �-t a i MAP 32 - � t 5 ,. RECENT m ACCOMPLISHMENTS 1-13 PUBLIC HOUSING PROJECTS 9 axr° rurr,e csrr COMPLETED SINCE 1975 ■w 76 5, i•::. -12 A-C HOUSING PROJECTS t z COMPLETED DURING { 1 FY 1981 -1982 r , } B NSUIME siYr YUKO 1 r cn lEl Hr jr�f l 3 I14 1ro r s 11 11 t ' �°'6 . t. � •� t.I 11: i r < — -t�L'_y_I`:� - - -_ 11 - � - cuwnrow�s...o °r�+o _ iw iT Y } i v sw n s, f � } 1 I � _ { ♦ - � � l / P.CRENdw=°E° CSM^ L1,• ergo °o yy�. 7 /gYC,1uu wE �� '� 162 RECENT ACCOMPLISHMENTS Housing Projects Completed Since 1975 1 Orr Plaza 2 Musa Isle 3 Culmer Place 4 Lemon City Apartments 5 Edison Park 6 Highland Park 7 Stirrup Plaza 8 Land Acquisition for Housing in Coconut Grove 9 Land Acquisition for Housing in Wyndwood - Phase I 10 EDCOM Land Acquisition for Mixed Used Devel- opment in Downtown 11 Land Acquisition for Housing in Little Havana 12 Land Acquisition for Housing for the Elderly - Phase II 13 Overtown Rehabilitation Demonstration Project rJ Housing Projects Completed During FY 1981-82 Total Project Cost A Model City Land Acquisition for Infill Housing - Phase I $286,000 B Dorsey/Wheatley Redevelopment 500,000 C Coconut Grove Land Acquisition 200,000 $986,000 HOUSING PROGRAMS 534 " 1 HOUSING PROGRAMS Nw ,9 s f N p•v CSw, ..• •i t1-�11 _ MAP 33 ' PROPOSED HOUSING PROGRAMS 1982-1988 _ D a Q HOUSING PROGRAMS THAT I ARE ONGOING OR SCHEDULED TO BE INITIATED DURING FY 1982 -1983 r . --- -= �� W OW HOUSING PROGRAMS z A SCHEDULED FOR FY 1983 -1984 THROUGH • FY 1987 -1988 ••1 � a 1 . .I � � � I /I /�\j - — _ _. L p•SC.,Xf LX X•NCU ISLAND �sl •Xo („) (A m .. ......." .. it .{, �.• l 1 44 E1.4\•M sl e . . i • ri `� .. i •i Cl♦WOX ISLAND sw�s s, i . •� w I .d / 4 XICNENNKwfP CSw♦ pINU NU 1 1 i i t u1 l 1_ I II r If IIIII III ' li i .i. ilia li�ili ii i.l l PROPOSED HOUSING PROGRAMS 1982-1988 Housing Programs That Are Ongoing or Scheduled To Be Initiated During FY 1982-1983 Total Project Cost 1 Model City - King Heights Land Acqui- sition/Redevelopment- Phase I (8028) $ 991,000 Projects That Are Not Mapped: Demolition of Sub- standard Buildings 164 Citywide (7071) 582,000 Housing Development Program (9020) 15,500,000 $17,073,000 Housing Programs Scheduled For FY 1983-1984 Throuc A Model City Land Acqui- sition for Infill Hous- ing - Phase II (0044) Total Project Cost $800,000 $800,000 HOUSING PROGRAMS 1 Demolition of Substandard Buildings City -Wide (7071) The City of Miami Building Department is committed to the demolition of at least 50 dilapidated and abandoned struc- tures per year, either commercial or residential in nature 0f proposed demolition projects, 75% will be accomplished within Community Development designated target areas. 2 Model City - King Heights Land Acquisition/Redevelopment - Phase I (8028) This project, which is underway, provides for land acqui- sition, demolition, and relocation in the King Heights area of Model City. King Heights is bounded by NW 12th Avenue, NW 170 Avenue, NW 58th Terrace, and NW 62nd Street. The acquired land will be made available for redevelopment. The project will improve the general character of this neighborhood by eliminating slum and blight conditions, increasing the supply of decent housing and providing an incentive for reinvestment. To aate,three sites have been acquired, nine families relocated, and two deteriorated structures demolished. This project is in accordance with 165 the King Heights Redevelopment Plan. 3 Housing Development Program (9020) (here are three components in this program that involve the developing of low and moderate income housing financed by City Housing Bonds that were approved by Miami Voters in 1976. The first invloves the use of $3 million in housing bond proceeds as a capital contribution to Dade County to assist in the financing of Section 8 housing projects. The second involves the use of $4 million in housing bond proceeds to acquire scattered sites through- HOUSING PROGRAMS out the City for the development of 360 units of low and mod- erate income public housing. Land Acquisition is underway. The third component involves the use of $8 milion in housing bond proceeds to acquire sites throughout the City for the construction of approximately 1,000 units of moderate income housing. The remaining housinq bond proceeds, to be appropri- ated during Fiscal Years 1993-86, have not been earmarked for specific projects as of this date. 4 Model City Land Acquisition for Infill Housing - Phase lI (U044) This project involves the acquisition of land in the King Heights area of Model City oounded by NW 55th Street, NW 62nd Street, NW 7th Avenue, and N11 12th Avenue. ihis project is a continuation of Phase I land acquisition and demolition of deteriorated structures in the area. The acquired land will be made available for new single family, infill housing devel- opment. Acquisition is underway. ITEW NO./ MIND PROJECT I 7071. OEM CF SU95T0 GLOSS 1EF. SECCID TF CO 163. THTFO TF CO 165- FIFTH TP CC 1E6. SIXTY TV Co 167. SEIESTH TR CO 2 102l. MOO CITW-KG HGTS /CO 16C. 01DE CO CO FUNDS 164. FOURTH YR CO IEE. SIXTY In CO 167. SEIE*TH TO CO 3 9020. HOUSING OEV PRBGFPM 166 65C. CAPITAL INPR FOS-FPL 960. IUTH HOUSING BONCS 9f2. TNT FA HCUSING BONDS 4 44. MOO CITY LAND ACa 101. UNKNBNM TOTAL 502 562 32 50 Z75 200 25 991 991 300 250 191 250 15500 15500 5n0 14600 Ati0 800 eoo 830 17873 PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL AMOUNTS 1984-8S IN THOUSANDS OF 1985-86 DOLLARS (000) 1986-87 1987-88 582 p 0 32 p C a 0 a 0 50 0 0 C 0 6 a Z75 0 0 0 0 C 230 0 0 0 a 0 0 Z5 0 0 II a 0 Q 991 0 0 0 0 0 0 991 0 0 0 0 0 0 300 0 0 0 C 0 0 250 0 p 0 0 Q 0 191 0 a 0 C a G 250 0 0 a 0 0 0 10300 5200 0 0 a 0 0 103CC 5200 C 0 0 0 0 500 0 a a a a a 940C S20C p 0 a 0 c 400 0 II a . a 0 a o' 0 201 200 204 zoo 0 0 0 230 200 20C 200 0 0 0 200 200 200 20C 0 11873 S200 200 200 200 200 0 HOUSING PROGRAMS 0 11 Pa rk Facilities and Street Beautification 1.67 0 PARK FACILITIES AND STREET BEAUTIFICATION This section includes improvements to Miami's park system and recreational facilities as well as beautification projects for City streets. There are fifty-three parks and street beautification projects in the 1982-1988 Capital Improvement Pro- gram. These projects total $61,964,000 represent- ing 9.6% of the CIP Policies Miami's investment in improvements to the City park system and beautification of City streets is based on the following policies: Park Facilities Goal: Increase recreational opportunities - Improve and enhance the quality of inner City facilities - Adapt facilities so that they better reflect user populations - Eliminate physical barriers to the aged and handicapped - Adapt facilities for more hours of use per day - Provide better signage and improved public communications 11* PARK FACILITIES AND STREET BEAUTIFICATION - Involve quasi -public and private agencies in the delivery of recreational services to the citizen - Improve accessibility of park facilities through the provision of pedestrian walk- ways and bicycle trails. Goal: Increase Safety Standards - Eliminate overlapping and conflicting uses of facilities - Replace dangerous equipment - Eliminate visual barriers to reduce opportuni- ties for crime - Employ vandal resistant equipment and facili- ties PARK FACILITIES AND STREET BEAUTIFICATION PARK FACILITIES AND STREET BEAUTIFICATION Goal: Preserve and enhance open space with historic or environmental impact - Protect and preserve environmentally sensitive land and water areas - Develop a plan for renovation or resiting of historical structures endangered by develop- ment - Enhance the Miami Riverfront and Bayfront - Increase the utility of existing open space owned by the City - Preserve significant trees on existing park sites (Source: The City of Miami's Preliminary Action Program for the Urban Parks and Recrea- tion Program, 1 79 Street Beautification - Establish a tree planting program for streets throughout Miami, with particular emphasis on streets near public improvements and facili- ties (Source: Miami Comprehensive Neighborhood Plan 1976-1986, 976 Existing Facilities and Recent Accomplishments There are 101 parks, totaling nearly 3,000 acres of open space, in the City of Miami park system. The park system, shown on Map 34, includes 40 mini -parks, 33 neighborhood parks, 20 community parks, 6 picnic islands, and 2 golf courses. Sixty-seven parks and street beautification projects have been completed since 1975. Shown on Map 35, these projects include eight that were completed during FY 1981-82. Last year's completed projects total $2,696,000 and include development and improvement of parks in several neighborhoods throughout the City. Proposed Park Facilities and Street Beautification Improvements 98.- 988 More than half of the park projects in the 1982- 1988 Capital Improvement Program are either ongoing or scheduled to begin during Fiscal Year 1982-83. These twenty-nine projects valued at $57,201,000 are displayed on Map 36. The map also shows the twenty-four projects scheduled for later years of the program. These projects are estimated to cost $4,763,000. Detailed project descriptions and a funding schedule follow Map 36. 121 0 169 s 6 Funding There are numerous sources of funding for the parks and street beautification improvements, as seen in the funding summary below. $41,133,000 or 66.4% of the funds are available. $4,600,000 or 7.4 0 of tht: totcil funds are expected to become available during the six year program, while a source of funding for the remaining $16,231,000 or 25.2% is unknown. PRIOR FISCAL YEARS FUNDING CODE/SOURCE TOTAL YEARS 1982-83 1983-84 AVAILABILITY OF FUNDING S I6,231,000 SOURCE OF FUNDING \UNKNOWN 26.2% 66.4% FUNDS AVAILABLE 7.4x FUNDS S41,133,000 ANTICIPATED $4,600,000 ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1984-85 1985-86 1986-87 1987-88 101. UNKNCNN 16231 0 0 9815 4836 >35 625. 232 12C. CORPS OF ENGINEEFS 2000 0 0 2330 0 0 0 G 12.8. CORPS-PEC OEt PROG 6000 0 4000 2000 a 0 0 0 125. REA GRANT 50 50 a 0 0 0 0 0 135. LANO-WATER CONS GFT 722 402 320 0 0 a 0 0 131. TNT DEPT CONT RES FD 500 500 0 0 0 0 0 0 14C. HUD (PEN SPACE GFANT 25C 250 0 0 a 0 Q 0 14se UPAPF GFANT 1P02 1r02 0 0 0 0 0 0 146. UPARP GRANT -ANTIC 250 0 0 0 250 0 0 Q IE2. SECOND TP CO 120 .120 0 0 a 0 0 0 163. THIRD YR CO 612 612 0 0 0 0. 0 a 164. FOUFIH TA Co 213 213 0 a 0 0. 0 0 16:e FIFTH YF CO 191 191 0 0 0 0• 0 Q 1F6. SIXTH YR CO 28O 200 0 0 0 0 0 0 161. SEiENTH YR CD 638 638 0 0 0 0 0 0 650. CAPITAL TYPR FOS-FPL . 2637 2637 0 0 Q 0 0 0 653. PROC INTERAMA SALE 433C 4000 0 0 G Q 0 C 703. DE4 CONTFIB-ANTIC 250 0 0 0 250 0 0 0 706. PRIf CONTRTO-ANTIC 4100 0 2250 1850 0 0 0 0 ?a?. MILEY PFCPERTY PENT 407 0 125 111 113 52 0 0 TOE. SALE JA KEY LANDFILL 375 375 C' 0 0 0 0 0 709. BAYFRT BANDSHELL PKG 75 40 35 0 0 0 0 0• File FEC DOCKAGE FEES 110 0 110 0 a 0 0 Cl 841. ST CCNSEFf FUND 241 241 0 0 0 0 0 0 846. FL FEC OEY ASSTS PRG 650 453 200 a 0 a 0 0 950e MOCC FUNDS 326 0 326 0 0 0 a Q 851. STATE DIFECT APPPCP 500 0 500 0 0 0 0 a 914. AUTH PARK BONDS 18434 15434 0 0 0 0 0 0 TOTAL 61964 31235 7866 15802 5449 787 625 200 PARK' FACILITIES ARID STREET BEAUTIFICATION �5 3 11 PARK FACILITIES AND 2 STREET BEAUTIFICATION NW,osr T f ' ra e.r csw. i 951'ii it 1 �+}�t 3 MW M1 ST , j Ir 12 r p 10 # 13 MAP 34 NW s•sr 25 IT' •.'. 11: •! j 11 11 19 + 17 18 Y M 23 16 15 a CITY OF M IAM I PARKS 50 126 _ t I 34 27 m �Uli• TUrTIE CSwr 29 21 �L56' is 1 1y� j .$5 j W '30 z L % w w sr 61 { S9 57 91 33 P 32 a 51 e,surNE s•N r.Ncn 1/ O , t + ' , j u•No .suno :Nwe5° .t I1 R35 m } t 60 1 + 100 36 W.rsoN ia,No 12 10.K39 31 NW 15T 1 l 14r I I t, 71 + m 6.4 / �62. } j Iit n .Ir 1 1'I1 i t ili { 76 t tl+l Imt /5 77 65 4 ,{r j i fir 11 i 11M1F• ST - - jIf i'} 7046 66 i i i f }69 ',; i 89 67% �l ifi � + �F 97- a.ur roN,sL.Na '�"r4ai swasr I '1f +i 75 f68 t.17� evo -j `y ly+ 18 77_ III , 71 5 W tT sT j> 7e 81 �f ili�f' 19Tt� T79 93 JS 190 94 - << 13 9, 86 85 {{ fe5 92 1 11 111numn I i I 'I' ,I" I'' 1 '1 v 1'1111, 11 11 vp a CITY OF MIAMI PARKS 1 Biscayne Heights Park 35 Henry -Reeves Park 69 Riverside Park 2 Oakland Grove Mini Park 36 'New World Center Bicentennial -Park 70 Little Havana Community 3 Belle Meade Park 37 Bayfront Park Center Mini Park 4 Little River Park .38 Watson Island 71 Henderson Park 5 Legion Picnic Islands 39 2nd Avenue Mini -Park 72 Orange Bowl Playground 6 Legion Memorial Park 40 Range Park #1 73 Maceo Mini Park 7 Edison Park 41 Gibson Park 74 Shenandoah Park 8 Eaton Park 42 Central Miami Park 75 Bryan Park 9 Lemon City Park 43 Highland Circle Park 76 Glen Royal Park 10 Tacoicy Center 44 Lummus Park 77 Coral Gate Park 11 12 Avenue Mini Park 45 Paul S. Walker Mini Park 78 Wainwright Park 12 African Square Park .46 Fort Dallas Mini -Park 79 Elizabeth Steele Park 13 Morningside Picnic Isle 47 Brickell Park 80 Siiver Bluff Park 17 1 14 Morningside Picnic Isle 48 Southside Park 81 Douglas Park 15 Morningside Picnic Isle 49 Simpson Park 82 David Kennedy Park 16 Morningside Park 50 Moore Park 83 Dinner Key 17 Pullman Mini -Park .51 Broward Circle Park 84 Coconut Grove Mini Park 18 Buena Vista Park 52 Grove Mini Park 85 Dinner Key Picnic Islands 19 North Bay Vista Park 53 Sewell Park 86 Peacock Park 20 South Bay Vista Park 54 Allapattah Mini Park 87 Coconut Grove Tennis Courts 21 East Bay Vista Park 55 Allapattah Comstock Park 88 Blanche Park 22 Crestwood Park 56 Melrose Park 89 Kirk Munroe Park 23 West Buena Vista Park 57 Curtis Park 90 Elizabeth Virrick Park 24 Charlie Hadley Park 58 Fern Isle 91 Grand Avenue Park 25 Mini -Park 59 Paradise Point 92 Merrie Christmas Park 26 Magnolia Park 60 Grapeland Park 93 Virginia Key 27 Stearns Park 61 Melreese Golf Course A4 Williams Park 28 Martell Park 62 Kinloch Park 95 Range Park #2 29 Roberto Clemente Park 63 Flagler Terrace Mini Park 96 Biscayne 30 Robert E. Lee Park 64 West End Park 97 Brickell Plaza Mini Park 31 Pace Picnic Islands 65 Robert King High Park 98 Rainbow Village 32 Pace Park 66 Flagami Park 99 Cuban Memorial Plaza 33 Dorsey Park 67 Latid Riverf'ont Park 100 Blue Lagoon 34 Woodson Park 68 Trianqle Park 101 Coconut Grove Mini Park PARK FACILITIES AND STREET BEAUTIFICATION J 1I 1 � � Il! III, PARK FACILITIES AND STREET BEAUTIFICATION 54 f ...�s.. 46 .t MAP 35 439 Y RECENT ACCOMPLISHMENTS "" '""" ``• * PARK FACILITIES PROJECTS 1-58 COMPLETED SINCE 1975 W ® PARK FACILITIES PROJECTS z A-G COMPLETED DURING p Y FY 1981-1982 a wsc—f 5.« Ywo V TiJ y — 55 — m uc«ra«u.«o �4 qyo w 1 11 -111111 Ili ilia II'l a iI �.11 1 173 RECENT ACCOMPLISHMENTS Park Facilities and Street Beautification Projects Completed Since 9 Park Acquisition: 1 Commerce Plaza 2 Ft. Dallas Park 3 Latin Riverfront Park 4 Lemon City Park 5 Little River Commerce Mini Park 6 Tacolcy Park Expansion Park Acquisition and Development: 7 ATrlcan Square Park 8 Fern Isle -South Fork Park 9 Henry Reeves Park 10 Maceo Park 11 Wainwright Park 12 Tacolcy Park Limited Acquisition and Redevelopment: 13 Gibson Park, Phase I 14 Eaton Park 15 Elizabeth Virrick Park 16 Kirk Munroe Park Development: 17 Bayfront Park of the Americas, Phase I 18 Cuban Memorial Boulevard 19 Kennedy Park 20 Miami Riverfront Walkway 21 New World Center - Bicentennial Park 22 Paul S. Walker Mini Park 23 Robert E. Lee Park 24 Silver Bluff Park 25 Lemon City Park Reaeve I opmenr: 26 Allapattah - Comstock Park 27 Blanche Park 28 Bryan Park 29 Curtis Park 30 Dorsey Park 31 Douglas Park 32 Edison Park 33 Grapeland Park 34 Henderson Park 35 Kinloch Park 36 Legion Park 37 Manor Park 38 Moore Park 39 Morningside Park 40 Robert King High Park 41 Roberto Clemente Park 42 Shenandoah Park 43 Gibson Park 44 Pullman flini Park PARK FACILITIES AND STREET BEAUTIFICATION Street Beautification: 45 Little Havana Street Tree Planting Project 46 Biscayne Boulevard Beautification Historic Preservation: 47 Dr. Jackson's Office Park Improvements: 48 Northwestern High School Lighting Improve- ments 49 Henderson Park Development of Tot Lot 50 Robert E. Lee Jr. High School Playground Improvements 51 Grand Avenue Park Development 52 Buena Vista Neighborhood Park Development in Edison -Little River 53 Allapattah Mini -Park in Residential Area 54 Little River Commerce Park Development 55 Bicentennial Park Parking Lot Lighting 56 Elizabeth Virrick Gym Reroofing 57 Gibson Park Ballfield Lighting 58 Legion Park Boating Improvements 59 Miami Springs Renovation of Greens* Park Facilities and Street Beautification Projects Completed During FY T98 -8 Total Project Cost A Maceo Park Fencing S 12,000 B Riverside Park Devel- opment 467,000 C Virrick Gym Boat Ramp Improvement 50,000 0 Dorsey Park Develop- ment 282,000 E Melrose Park Acquisi- tion and Development in Allapattah 225,000 F Coconut Grove Mini - Park Plaza Acquisition and Development 208,000 G Blue Lagoon Park Acqui- sition 1,004,000 H Community Development Street Trees and Tree Bank* 448,000 $2,696,000 PARK FACILITIES AND STREET BEAUTIFICATION • w b ST J� s,y 174 •.>s 13 w awe. ST Z 'n IST « F MAP 36 PROPOSED PARK FACILITIES AND STREET BEAUTI FI CATION W IMPROVEMENTS 1982 -1988 r * PARK IMPROVEMENTS AND 1-21 STREET BEAUTIFICATION PROJECTS THAT ARE ONGOING OR SCHEDULED TO BE INITIATED DURING FY 1982-1983 A—R PARK IMPROVEMENTS AND O° STREET BEAUTIFICATION PROJECTS SCHEDULED FOR 4,I , o lz rru • 1. zi �'' 4 4.,'� FY l983 - l984 THROUGH f FY 1987 1988 r .H f t, i I to t,! ,• s i f 1 itt {rr' .. ♦ acaewda Cnn !� III}j�'h•I �lt�� .C• alE 17 2 . urw w �' • •is .. ' 7 lU r ;•- TTl[ CS«• i I I 1 11 1 1. 11111 ni minim°i 1 III 1 1 1 ill i t I 1 pmll 1��, Vi�i �.I I'i I I, I , ! 11 1 175 • & PROPOSED PARK FACILITIES AND STREET BEAUTIFICATION Ii1PROVErENTS 1982-1988 Park Imrovements and Street Beautification Pro- ects sThat Are Ongoing ar Sc�hedu ed To Be Intl - ate urina Y 98[-83 Total Project Cost K Downtown Tree Grates 1 Curtis Park Develop- Remaining Parks for People (1029) 100.000 vent (7054) $ 416,000 District I Improvements L West Island (9016) 801,000 2 West End Park Devel- (7058) 71,000 opment (7053) 449,000 Remaining Parks for People 3 FEC Park Acquisition District II improvements N Overtown Underex P ress- 4 (7056) Allapattah Mini -Park 19.283.000 (7059) Remaining Parks for People 12,000 way NW 3rd Avenue Beau - for Public Housing District IIi Improvements N Cuban Memorial Plaza Site 16 (9018 42,000 19,000 5 Lummus Park Dee velop- Remaining ing Parks for People and Memorial Boulevard (2026) 15o,000 ment (7043) 93,000 District IV improvements 0 West Fla ier Terrace 6 Manor Park Renovations (0053) 1,000.Onn (7061) Remaining Parks for People 263,000 Beautification cation (race) BeautiCulmer 1,000,000 7 Elizabeth Virrick Gym District VII Improvements P Transit Station Renovations - Phase 1i (7062) 89,000 Area - Acquisition and Acquisition (0025) 57,000 Remaining Parks for People Development of Neighbor- t 8 Henderson Park Building District VIII Improvements hood Park Renovations (9014) 2,000 (7063) 16,000 Q Civic Center Transit 9 Miami River Walkway $57.201,000 Station Area -- Street Trees (0049) 35,000 Development - Phase I (7028) 1,168.000 R Brickell Transit Station 10 Coconut Grove Street Park Improvements and Street Beautification Projects Area - Southside Park Improvements Improvements and Beau- S<he u e or 81--l-ONnrough FY1 9ET-_n8-- (0036) 500,000 11 tification (1021) Lummus Park Area Beau- 38,000 Total Project Cost Projects That Are Not Mapped: 12 tification (102 Jose Marti Riverfront 180,000 A Fla9 ami Park Recrea- Miami Spring Golf Course Park (7057) 4,223,000 tion Buildin Reno- Perimeter Fencing (8056) 50,000 13 Blue Lagoon (9017) 1.629,000 vation (10M $ 96,000 Staging Platform and Trailer (9012) 21,000 14 Bayfront Park Redevel- opment (9038) 19,a00,000 B Lummus Park Card Build- ing Renovation (1025) 120,000 Citywide Gateway Beauti- 15 Acquisition, of Miley C West End Park Ballfield fication Program (9008) 100,000 Property (8055) 843,000 Lighting System (0019) 150,000 Melreese Clubhouse Renova- tions (2024) 120,000 16 Swimming Pool Renova- D Douglas Park Ballfield tions (0023) 1,410,000 Lighting System (0018) 200,000 Miami Springs Electric 17 Virginia Key Recreation E Curtis Park Ballfield Golf Cort Storage Facility (2035) Area Development (7036) 2.700,000 Lighting System (2025) 550,000 Parks Lighting System 63,000 18 Ft. Dallas Park Devel- F Tennis Courts Lighting (2021) 50,000 opment (7055) 920,000 System Conversion - 19 Downtown Tree Planting Douglas and Grapeland $ 4.763.000 (0058) 240,000 Parks (9013) 55.000 7n Bicentennial Park Sports G Wainwright Park Envi- Fields (8053) 326,000 ronmental Study Center 21 Bayfront Park Baywalk (0003) 600,000 (8023) 99,000 H Moore Park Tennis/Raquet- That Are Not Ma Projects TAped ball Court Conversion Park Rehabilitation for (2036) 60,000 Those With Special Needs I Wainwright Park Seawall (0061) 1,012,000 Reinforcement (2022) 50,000 Citywide Tree Planting J African Square Park Program and Tree Bank Recreation Annex Renova- (9034) 700,000 tion (2023) 50,000 PARK FACILITIES AND STREET BEAUTIFICATION PARK FACILITIES AND STREET BEAUTIFICATION Curtis Park Development (7054) This park is located at NW 20th Street and NW 24th Avenue, along the banks of the Miami River. Almost $250,000 in improvements have already been made to this site, and an additional $166,000 is programmed for the redevelopment of the existing facilities. Funding from the federal Urban Parks and Recreational Recovery Act will be used to replaced the existing community building and improve access for the handicapped. West End Park Development (7053) This 9.3 acre park, located at SW 3rd Street and 60th Ave- nue, is one of the major recreational areas in the Flagami area. Improvements to this park include replacement of the existing community building, and pool equipment, installation of a handicapped ramp in the pool, and the designation of handicapped parking spaces. 3 17 FEC Park Acquisition (7056) This project involves the acquisition of the FEC/P30 pro- perty between Bayfront and Bicentennial Parks. During Fiscal Year 1977-78, the City initiated a quick -take ac- tion against the property. The court decision in the City's favor was appealed to the Florida Supreme Court by the property owner. The court ruled in the City's favor and during Fiscal Year 1980-81 set the value of the land at $23 million. The City has appealed the property valua- tion. 4 Allapattah Mini -Park for Public Housing Site 16 (9018) This project involves the acquisition and development of a mini -park at Public Housing Site 16 on NW 21st Avenue and 19th Terrace. Improvements may include a lighted basketball court, landscaping, and irrigation. The project will provide recrea- tional opportunities for this housing project that is deficient in open space. Acquisition of the site is underway. 5-7 Remaining Parks for People District Improvements (7058-7060) These dollar amounts reflect the estimated Parks for People balances for each Park District, not including specific Parks for People projects previously identified in the Funding Schedules. The figure shown results from taking the $1.4 million overrun, which has occured in District IX (Coconut Grove-Brickell) from District VI (Downtown). since the Downtown District received almost 70 percent of the original $39 million bond allocation. i i I I I III III IIIIIIIII I I I ' III ' 1' 1 f ITEM/ NO./ FUND PROJECT PRIOR TOTAL YEARS 1 416 416 7054. CURTIS PARK OEd 416 416 116 L65. FIFTH TF CO 116 Me AUTH PARK BONDS 300 300 2 449 449 7053. WEST ENO PARK DEi 449 449 374 145. UPARF GRANT 314 75 165. FIFTH TR CO 75 3 19283 19173 105E. EEC PARK ACO 19283 191T3 4330 65_. PROC INTERAMA SALE 4000 C 177 FEC its 15173 914. AUTHDPARKGBONDSS 15173 M 42 d 9018. ALLA MINI PARK 42 0 0 101. UNKNEWN 42. J 71 71 705E. PFP-CIST I IMP 71 71 9e4. AUTH PARK BONDS 71 71 6 12 12 7055. PFP-GIST II IMP 12 12 12 984. AUTH PARK BONDS 12 7 19 19 7060. PFP-CISI III IMP 19 19 984. AUTH PARK BONDS 19 19 Note: Source of funds for FEC Park Acquisition (7056) from Proceeds of Interama Sale has been changed to Capital Improvement Funds (FP&Q . C� FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1982-83 1983-84 1984-85 1985-86 1986-87 1987-R9 a a 0 a a Q 0 0 0 ° 0 a 0 0 0 0 0 O 0 C a G 0 0 0 a 0 0 a a 0 0 a a a 0 O C a 0 0 a 11C 0 a a a Q 110 a 0 C a 0 0 I C 0 0 a 110 0 42 a 0 0 0 0 42 a a 9 O a 42 0 0 0 0 a 0 0 ° a Q 0 0 a a a 0 C 0 0 0 0 0 0 0 Q O a Q 0 a a 0 Q a c a ° ° ° a 0 0 0 a a 0 a a 0 0 0 C 0 0 a a 0 PARK FACILITIES AND STREET BEAUTIFICATION I II 1 911 I- I I I !1I 1 11riI 178 PARK FACILITIES AND STREET BEAUTIFICATION 8-10 Remaining Parks for People District Improvements (7061 - 7063) These dollar amounts reflect the estimated Parks for People balances for each Park District, not including specific Parks for People projects previously identified in the Funding Schedules. The figure shown results from taking the $1.4 million overrun, which has occured in District IX (Coconut Grove-Brickell) from District VI (Downtown), since the Downtown District recei•.ed almost 70 percent of the original $39 million bond allocation. 11 Lummus Park Development (7043) This project involves restoration of the Wagner Homestead that was relocated to Lummus Park, and minor improvements to Lummus Park. Restoration of the Wagner Homestead is underway. A proposal recommending the development of an entry plaza into the park, lighting, site furniture, land- scaping, and other amenities has been developed by the Department of Parks. Park Rehabilitation for Those with Special Needs (0061) A federal Urban Parks and Recreation Recovery Act grant will be used for renovations to eighteen parks to increase accessibility to handicapped and elderly park users. This project is in design. 13 Manor Park Renovations (0053) This project involves major renovations in Manor Park, located in Model City. Improvements will include renova- tion of the community pool and softball field, development of a picnic area and playground, landscaping, and site amenities. Construction will begin during Fiscal Year 1982-83. 14 Elizabeth Virrick Gym Renovations - Phase II (0025) This project involves repairs to the Elizabeth Virrick Gym. In addition to general repairs, the renovation will include an air circulation system and roll -away bleachers for spectators. These improvements are under contract and are partially completed. 15 Henderson Park Building Renovations (9014) This project involves the renovation of the existing building at Henderson Park for office space and special activities. Improvements would include air conditioning, a dropped ceiling, and security windows and doors. This project is pending due to reductions in staff. * Note: Manor Park has been named Charl e 7ad ey Park ITEM/ NO./ FUND PROJECT 11 PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 8 263 263 0 7061. PFP-9151 IV IMP 263 263 0 yE4. AUTH PARK BONDS 263 263 0 9 09 59 a 7062. PFP-0I51 wit IMP 89 89 0 9l4. AUTH PARK BONDS 69 89 0 10 16 16 ° 7063. PFP-2157 Will IMP 16 16 C 9a4. AUTH PARK BONDS 16 16 0 11 93 93 a 7343. LUMMUS PAFK OE1 93 93 0 163. THIRD YR CO 73 73 0 164. FOURTH IF CO 20 20 0 12 1012 14312 0 179 EI. PK REHAB -SPECIAL MOS 1012 1312 C 145. UPAFF GRANT 708 70E 0 M.- AUTH PORK BONDS 304 304 0 13 1030 1333 a 53. MANOF PARK REM * 1000 1000 0 137. JAT CEPT CONT RES FO 50d 500 0 65C. CAPITAL IMPS FOS-fPL 250 25a 0 E46. FL FEC DEd ASSI� FRG 250 250 0 14 57 57 0 2!. YIRFICK GYM FEN 57 57 a 65C. CAPITAL IMPR FOS-FPL 57 51 a 15 2 2 0 9314. HENDERSON SLOG REA 2 2 a 65C. CAPITAL IMPR F DS-FPL 2 2 0 *Note: Manor Park has been renamed Charlie Hadley Park. 0 a 0 C 0 p a 0 p a G. 0 a D 0 0 0 0 0 a 0 0 0 ° 0 o Q 0 a 0 p C 0 Q ° 0 0 0 C D 0 0 D 0 0 0 p ° D C C a D 3 a a a a 0 p D 0 Q 0 q p 0 0 a 0 0 0 0 0 0 O 0 0 a 0 q a 0 Q 0 0 Q a a 0 0 a a 0 0 a 0 O D C 0 a O 0 0 C p c 0 0 0 0 a 0 PARK FACILITIES AND STREET BEAUTIFICATION PARK FACILITIES AND STREET BEAUTIFICATION 16 Miami River Walkway Development - Phase I (7028) This project involves the acquisition and development of a linear park -walkway along the north bank of the Miami River. This walkway will complement other public improvements proposed along the Riverfront, including the James L. Knight Convention Center and Fort Dallas Park. Specifically, future development will consist of a linear walkway, a foot bridge to Fort Dallas Park, landscaping, replacement of deteriorating bulkheading, boat dnrkana, emergency telephones, lighting. irrigation, walk- way furniture and pedestrian -protection rails. When finally completed, the walkway is expected to continue from the Brickell Avenue Bridge to South Miami Avenue. Much of the development west of Fort Dallas Park will probably be done in conjunction with private investment activities. 17 Coconut Grove Street Improvements and Beautification (1021) The streetscape of one block on Grand Avenue from Douglas Road to Plaza Street will be beautified with new sidewalks, planter reconstruction, landscaping, crosswalks. street furniture, drainage, lighting, and artwork. 18 Lummus Park Area Beautification (1027) This project involves improvements to the Lummus Park area to reinforce the neighborhood character and enhance its physical appearance while emphasizing the area's focal points: the Miami River, Lummus Park, and a linkage to the Government Center. Improvements will include general park upgrading, bulkhead repair along Miami River, and local street improvements. 14 Jose Marti Riverfront Park (7057) This site is proposed to be a major active and passive recreation facility and cultural attraction for the Little Havana population of Miami. Activities in the park will include playground equipment for children; basketball and volleyball courts; shelter to play dominoes and chess; a competition swimming pool with diving board, bath house, bleachers and related facilities; miniature or partial vita course; a ballfield; areas for music, cultural activi- ties and display exhibits; an area for fishing and a boat ramp. Other improvement will include administrative A 11 -offices, toilet rooms, storage space, concession areas, and picnic areas. The City has been involved in land acouisition and condemnation proceedings since 1972 because this site is one of the last large, undeveloped sites in the densely populated Little Havana community. This area has the highest open space deficiency in Miami. The first construction phase is underway. 20 Blue Lagoon Park Development (9017) A 3-acre park site, located on NW lth Street between NW 51st and NW 57th Avenues, has been acquired by the City for Blue Lagoon Park development. The site will be developed 3s a passive resource based recreation area with boating faci- lities. The proposed park will provide access to waterfront recreation, primarily for the citizens of the Flagami area. a I,, I N ik . I . I I I I it , id III I, J C ITEM/ NO./ FUND PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL AMOUNTS 1984-85 IN THOUSANDS OF 1985-86 DOLLARS (000) 1996-87 1987-83 16 116E 1168 a a 0 0 0 0 I028. MIAMI R MKWT DE4'1 1168 1168 C 0 0 0 0 0 1E2. SECGtD VF CO 120 120 0 0 a 0 a 0 163. THIRO TN CO 25 25 a 0 0 0 0 a 167. SEYEXTH TR CO 60,1 600 a C a 0 a a 65Q. CAPITAL IMPS FOS-FPL 127 127 p 0 0 a 0 0 984. AUTH, PARK BONDS 296 296 a 0 a 0 0 17 38 38 0 0 C a 0 a 1021. CO GF ST IMP BEAUT 38 38 0 0 0 C 0 0 167. SE4EATH TR CO 38 38 C a 0 0 0 0' 18 180 180 0 0 0 G a 0 1021. LUMMUS PK AR BEAUT 180 I R 0 0 0 a a 0 0 1E6. SIXTH TB CO 180 180 0 a p 3 0 0 19 4223 3203 820 200 a G a a 7101. PARK 420C 23 327a d2a 181 CNKMCMKRTI 230 0 a 0 0 135. LAND -WATER CONS GIFT 320 0 322 a C 0 0 a 0 140. HUD CPEN SPACE GRANT 250 250 0 0 G a a a a 145. LPAFF GRANT 720 72C C 0 0 0 0 lE_. THIAO TF co 435 435 a 0 0 C a 0 164. FOURTH TF CO 193 193 0 C 0 0 a 0 PA1. ST CCNSEFY FUND 241 241 0 0 C 0 a C 851. STATE OIRLCT APPFCP 534 0 530 0 0 0 0 984. AUTH PARK BONGS 1364 1364 0 C 0 0 a a 20 1629 1479 C 15a a 0 0 0 gull. BLUE LAGCGN DE11 1629 1479 a 153 a 0 a 0 101. UNKNCMK 150 0 G 15C 0 0 0 a a 135. LAND -WATER CONS GFT 402 402 0 C C 0 0 65G. CAPITAL TMPR FOS-FPL 45C 450 a 0 0 C 0 0 708. SALE 40 KEY LANDFILL 175 175 G 0 a a a a a a 9E4. AUTH PAFK BDN05 452 452 0 O 0 0 PARK FACILITIES AND STREET BEAUTIFICATION 182 PARK FACILITIES AND STREET BEAUTIFICATION 21 Bayfront Park Redevelopment (9038) This project involves the redesign and improvement of Bayfront Park by Sculptor Isamu Noguchi. Mr. Noguchi has developed the primary design, and the firm of Fuller and Sadao along with their consultants, will develop the plans. 22 Acquisition of the Miley Property (8055) This project involves the purchase of the Miley Property by the City. The property is located on South Bayshore Drive. 23 Swimming Pool Renovations (0023) Seven of the City's swimming pools will be renovated over a four - five year period. Constructed many years ago, these swimming pools are deteriorating rapidly to the point where routine main- tenance cannot alleviate the problems. Necessary improvements to the pools include new lines, holding tanks, pumps, and fil- ters. During Fiscal Year 1981-82, the pool at Gibson Park was renovated. The pools at Curtis and Morningside Parks are under contract for renovation. During Fiscal Year 82-83, it is pro- posed that the pools at Edison and Virrick, Parks be improved. Additional pools to be renovated include Shenandoah and West End. 24 Virginia Key Recreation Area Development (7036) Virginia Key is a 1005-acre barrier island in Biscayne Bay off the Rickenbacker Causeway. Development proposed for the Key will protect the fragile environment while facilitating beach access and allowing bicycling, canoe- ing. fishing, environmental studies, wild life observation, camping, and similar resource based activities. Facili- ties to be constructed include boardwalks, restrooms, food concessions, picnic areas, shelters, nature trails, an environmental study center, and parking areas. The Sche- matic Development Plan for Virginia Key was approved by the City Commission in December of 1981. 25 Fort Dallas Park Development (7055) This 1/2-acre park site is located along the downtown Miami Riverwalk immediately west of Bauder Fashion College. Park design construction will be coordinated with develop- ment of the adjoining section of the Riverwalk. Park deve- lopment will include restoration of the relocated Butler Building. Funding will be utilized as seed money to gener- ate private contributions for the proposed development of Fort Dallas Park. Li lb ITEM! NO./ FUND PROJECT TOTAL PRIOR YEARS FISCAL 1982-83 YEARS 1983-84 ALL AMOUNTS 1984-85 IN THOUSANDS OF 1985-86 DOLLARS (000) I986-87 1937-88 21 1940C 570 6285 7897 4648 a 0 a 903E. BAYFFONI PARK REOE4 19400 570 62A5 T297 i648 C C a 101. bNKNaWA 9295' 0 a 4647 4640 0 0 0 122. COAP5-AEC OEY PRCG 6UIC a 4030 2030 0 0 0 a 125. NEA GRANT 50 50 a C 0 a C a 1E6. SIXIN TR CD too 100 0 0 a 0 a a 650. CAPITAL IMPR FOS-fPL 325 325 a C 0 a p 0 70E. PRIM CONTRIO-ANTIC 3530 C 2250 1250 t a 0 0 7Cf. BAYFFT BANOSHELL FKG 75 40 35 a a 0 a 2 904. AUTH PORK BONDS 55 55 0 0 9 0 0 0 22 a43 436 125 It 113 52 0 0 l055. ACO OF NILEY PROP 843 436 125 117 -113 52 0 a 659. CAPITAL IMPR FOS-FPL 436 436 0 0 0 a 0 a 707. MILEY PROPERTY A(AT 437 C 125 117 113 52 0 0 23 1410 i40 0 970 a a a a 183 23. SWINPIA6 POOL PER tilo i43 0 970 0 0 0 0 101. UNKNOWN 970 0 c 97C 0 0 a a 650. CAPITAL IMPR FOS-fPL 440 440 0 p a a 0 II 24 7730 250 232 2250 0 a a 0 7336. VA KEY AEC AREA DE4 2790 250 200 2250 a c a 0 101. UNKNOWN 250 C 0 250 C a a a 12C. CORPS OF ENGINEEFS 2C00 a 0 2000 0 C a a 650. CAPITAL IMP)9 FOS-FPL 250 250 C 0 0 a a 646. FL AEC OE4 ASSIS FOG 200 0 200 0 0 0 a a 25 920 20 a 933 0 a C 0 7355. FI DALLAS PARK DEd 920 20 C 900 0 0 a 0 101. UNKNOWN 300 0 p 3DC 0 0 C a lot. PRII CON18I8-ANTIC 600 a p too 0 0 0 0 9l4. AUTH P06K BONDS 20 20 a C C a 0 0 PARK FACILITIES AND STREET BEAUTIFICATION . 953 III ICI i I - ill I II Iii I1 11 n 111 01 184 PARK FACILITIES AND STREET BEAUTIFICATION 26 Citywide Tree Planting Program and Tree Bank (9034) Recommended in the Miami Comprehensive Neighborhood Plan, this project will estab -is a tree bank an a tree p ant- ing program in areas of the City outside the Community Development Target Areas. The program will support efforts to improve residential and commercial districts throughout the City. 27 Downtown Tree Planting (0058) This project consists of the installation of street trees, tree grates, new signs, and street furniture in the Downtown area bounded by the East-West Expressway, I-95, the off -ramp from I-95 to Biscayne Boulevard, and Biscayne Boulevard. The cost of this project will be shared between the City and Downtown property owners and businesses. This project is expected to improve the physical environment of Downtown Miami, by provid- ing green areas, shade, and better environmental balance. This project is under contract. 28 Bicentennial Park Sports Fields (8053) This project will provide additional active recreational oppor- tunities for the Downtown area. Construction will include a baseball and softball field. Funding will be provided by Miami - Dade Community College with the understanding that these facili- ties will be available for physical education classes of the Downtown Campus. The addition of these facilities is expected to increase the use of Bicentennial Park. 29 Flagami Park Recreation Building Renovation (1024) The recreation building at Flagami Park will be renovated to provide an indoor facility for the Recreation Depart- ment's programs for the handicapped. The renovations may include a drop ceiling , lighting, vandal -proof doors, terrazzo flooring, portable folding partitions, an accessible bathroom, accessible water fountains, and handi- capped signage. 30 Lummus Park Card Building Renovation (1025) The Card Building at Lummus Park will be renovated to provide an indoor facility for the Recreation Department's program for the handicapped. The renovations may include vandal -proof doors, air conditioning, a drop ceiling and lighting, accessible bathrooms and handicapped signage. 31 Miami Springs Golf Course Perimeter Fencing (8056) This project involves the installation of fencing in the form of trees or ledge around certain areas of the Miami Springs Golf Course where unauthorized vehicles enter the course and damage the greens. The City -owned Miami Springs Golf Course is located at 650 Curtiss Parkway in Miami Springs. 32 West End Park Ballfield Lighting (0019) This project involves the installation of a lighting sys- tem for the ballfields at West End Park. 33 Douglas Park Ballfield Lighting System (0018) This project involves the installation of a lighting system for the Douglas Park baseball field. ITEM/ NO./ PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1:UND PROJECT TOTAL YEARS 1982-83 1983-84 1984-85 1985-86 1986-87 1987-38 26 700 100 0 100 100 100 100 230 9634. CITYMIOE TREE PL FOG 100 100 133 100 ilia too 210 101. UNKNOWN 13a' Q Q 100 100 130 100 200 656. CAPITAL IMPR FOS-FPL 100 100 0 a 9 a a 0 27 240 79 0 50 50 61 0 a 58. DOWNTOWN TREE PLA&T 24C 79 0 50 50 61 G 0 101. UNKNOWN 161 0 0 50 50 61 a a 163. THIRD TR CO 79 79 G 0 a 0 O 0 28 326 0 326 0 0 0 0 0 f053. BICENTENNIAL SP FLOS 326 0 326 C 0 0 a " C50. NDCC FUNOS 326 G 326 a 0 C 0 a 29 96 0 0 96 0 C a 0 3024. FLAGAMI REC BLDG PEN 96 0 0 96 0 0 a 0 101. UNKRCWN 96 0 p 96 O Q 0 0 185 12C 0 a 0 a a 1025. LUMPUS CARD SLOG PEN 120 G 0 122 C 0 0 1C1. UNKNCMN 120 a 0 12C C a 0 0 31 50 0 0 50 0 0 a a lD56. MIAMI SPGS FENCING 50 Q. a 50 0 0 0 0 101. UNKNOWN 50 a C 50 0 0 0 32 I50 o c 15C 0 a a a 19. NEST ENO PK LIGHTING 150 a p 150 0 a 0 0 101. UNKNOWN 15C 0 a 150 0 a 0 0 33 20C a o 290 0 0 0 0 le. COUGLAS PKLIGHTING 230 0 a 200 0 G 0 0 101. UNKNOWN 20C 6 0 200 0 C 0 0 PARK FACILITIES AND STREET BEAUTIFICATION WS PARK FACILITIES AND STREET BEAUTIFICATION 34 Curtis Park Ballfield Lighting System (2025) This project involves the installation of a lighting system for the ballfield at Curtis Park. 35 Tennis Courts Lighting System Conversion -Douglas and Grapeland Parks (9013) This project involves the replacement of the current timer system for the tennis court lights at Douglas and Grapeland Parks with a manually -operated system with meter control. Such a system would conserve energy and generate revenue at these courts. 36 Staging Platform and Trailer (9012) This project involves the purchase of a portable staging plat- form and trailer to replace the showmobiles currently used by .the Department of Recreation. The use of a portable staging platform would reduce the amount of manpower needed to transport and assemble the showmobiles. 37 Wainwright Park Environmental Study Center (8023) This project involves the construction and installation of permanent exhibits in the existing nature pavillions and along the hammock trails in Wainwright Park. Wain- wight Park was purchased to preserve one of the only re- maining natural hammocks in South Florida. .Aiding the development of the park's educational and cultural poten- tial, the nature exhibits will contain bilingual written and graphic information concerning the natural history and ecology of the hammock and shoreline as well as the effects of man on this environment. The exhibits have been designed to be self -guiding, vandal -proof, and weather-proof. 38 Citywide Gateway Beautification Program (9008) This project involves the development of distinctive land- scaped entryways into the City of Miami along major arte- rials. Improvements will include signage, lighting, land- scaping, paving and right-of-way acquisitions. Entryways will be designed to protect the international character of the City and to reflect the distinct character of the area of the City in which they are located. Moor Park Tennis/Racquetball Court Conversion (2036) This project involves the conversion of two tennis courts at the Moore Park Tennis Center into racquetball courts. The Tennis Center is located at 765 NW 36th Street. 40 Melreese Clubhouse Renovations (2024) This project involves renovation of the Clubhouse at Melreese Golf Course located at 1802 NW 37th Avenue. Proposed improve- ments include new shower and locker room facilities, replace- ment of antiquated bathroom fixtures, and construction of an enclosed walkway to allow entrance to the facilities from with- in the Clubhouse. Miami Springs Electric Golf Cart Storage Facility (2035) This project involves construction of an open roofed facility with perimeter fencing, gates at each end, and appropriate electric needs to provide storage for up to eighty golf carts at Miami Springs Golf Course. The storage.facility will elimi- nate the potential fire hazard of the present indoor facility. 42 Parks Lighting System (2021) This project will involve the Purchase and installation of a centralized lighting control dhd monitoring system for football, baseball, and softball fields. and tennis courts. The system will reduce the present costly, labor intensive method of con- trolling the lights by giving control to one person at a cen- tralized location. This person would compile reservations to use ballfields and courts and activate the lighting at the requested parks at designated times for the length of time needed. II IN 41 pill 11111 p I i i r 11 1gliI I 14lyln 1i 11 illu i" ITEM/ NO./ FUND PROJECT 34, 2325. CURTIS PK LIGHTING 1C1. UNKNOWN 35 9313. TENNIS CIS LIGHT CON 101. UNKNCMN 36 9012. STAGING PLATFORN 101. UNKNQWN 37 8023. WAINWRIGHT ENdIP CEN 101. UNKNCMN 38 187 9CITY ATEWAY BEAUT 101. UNKNOWN 39 2036. POOP[ TENNIS CIS CON 101. UNKNCMN 40 2G24. PELPEESE CLUB PEN 101. UNKNOWN 41 2935. NIANI SPGS GOLF CIS tale UNKNOWN 42 2021. PARKS LIGHING SYS 101. UNKNOWN TOTAL 55C 552 55C 55 55 55 21. 21 21 99 99 99 130 to o' too 6a 60 60 120 120 120 63 63 63 50 5o 56 AV PRIOR YEARS FISCAL 1932-83 YEARS 1983-84 ALL AMOUNTS 1984-85 IN THOUSANDS 198S-86 OF DOLLARS (000) 1986-87 1987-83 0 a 550 0 0 a a 0 0 550 a a a a C 0 55 0 a a a C c a 55 0 0 0 c C a 55 a a a 0 0 0 55 0 C a c 0 a 21 0 a a 0 0 a 21 0 0 a a 0 a 21 0 0 0 G 0 99 0 0 0 0 0 0 99 a a a ° 0 a 99 a a a a a 0 100 C. C too 0 ° 0 0 0 0 Lao a 0 a a a a 60 ° a a 0 c 0 60 0 a 0 0 a 0 6C 0 0 0 Q a a 120 a ° a a a a o o a 120 8 a a o 0 a 63 0 0 a C 0 0 63 a c a a a c 63 a 2 C a a O 50 a 0 0 0 0 0 50 0 a 0 0 a 0 5C a a 0 a PARK FACILITIES AND STREET BEAUTIFICATION PARK FACILITIES AND STREET BEAUTIFICATION 43 Wainwright Park Seawall Reinforcement (2022) This project involves repair and reinforcement of the sea- wall at Wainwright Park. Portions of the seawall have collapsed, and the entire seawall has been judged to be structurally unsound by the Department of Public Works. Rip -rap at the base of the bulkhead will be replaced. The rip -rap will serve to further reinforce the seawall and improve the adjacent marine habitat. 44 African Square Park Recreation Annex Renovation (2023) This project involves renovation of the west side of an existing building formerly occupied by a private business enterprise in African Square Park located at NW 62nd Street and NW 14th Avenue. Improvements will include new floor- ino, ceilings, partitions, air conditioning, lighting, painting, and bathroom facilities. The annex will be used for recreational programs. 45 1 88 Downtown Tree Grates (1029) The purchase of 100 tree grates would complement the down- town tree planting program. These grates are needed to serve the planter areas around the trees that have been planted downtown during the past four years. 46 West Island (9016) Improvementson City -owned West Island near Dinner Key would provide greater access to active and passive waterfront recreation for residents in the Coconut Grove area. Pro- posed improvements to the 7-acre spoil island include board- walks, a fishing pier, bathing areas, picnic areas, and a con- nection to the mainland. 47 Overtown Underexpressway NW 3rd Avenue Beautification (1028) This project will provide street beautification in the area adjacent to the Overtown Neighborhood Shopping Center, currently under construction. Also, included in the project are lighting under the expressway and barriers to restrict and control access for pedestrians and automobiles. 48 Cuban Memorial Plaza and Memorial Boulevard (2026) This project involves erecting a wall with the faces of Cuban Independent war heroes along SW 13th Avenue between SW Bth and SW loth Streets, and closing off the intersection at SW loth Street and SW 13th Avenue to create a plaza that includes a monument of the Cuban Independent Nero, General Antonio Maceo. Other proposed improvements include providing street furniture and landscaping in the Plaza and along the.Boulevard. 49 West Flagler Terrace Beautification (2027) This project involves beautification within the Latin Quarter area along West Flagler Terrace from SW 12th Avenue to SW 17th Avenue. Proposed improvements include creation of small plaza areas, decorative lighting and street furniture, installation of new street surface paving materials, and laa dscaping. It is recommended that vehicular traffic be prohibited from West Flagler Terrace to encourage its use as a pedestrian corridor and promote the Latin Quarter area as a tourist attraction. 0 ITL-M/ NO./ FUND PROJECT TOTAL 43 50 2022. WATNWRIGHT SEAWALL 50 lot. UNKNOWN 50 44 50 2023. AF SC PEC ANNEX PEN 50 tole UNKNOWN 50 45 100 1029. DOWNTOWN TPEE GPAIES 100 tole UNKNEW& 130 46 eo l 901E. WEST ISLAND 831 101. UNKNOWN 801 47 IGO 102e. OVEPTOWN XWAT 3 $WE 130 101. UNKNCMN 19a 189 48 150 2326. CUBAN MEP PLAZA BLd0 ISO 101. UNKNOWN 15C 49 1000 :027. M FLAGLEF TEPP BEAUT 1c00 101. UNKNOWN 1000 u PRIOR FISCAL. YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) YEARS 1982-83 1983-84 1984-8S 1985-86 1986-87 1987-88 C 0 50 0 0 0 0 0 0 50 0 a ¢ 0 0 0 50 0 0 0 0 0 0 50 0 0 0 0 0 0 50 0 0 0 ¢ ¢ a 50 0 a 0 a 0 0 100 0 C 0 a 0 0 130 p ¢ a a a 0 100 0 0 a 0 0 0 eoI a C a 0 C c eat 0 a 0 a o a e01 c a a 0 0 0 loc 0 a. C a 0 0 Ina 0 0 O 0 0 0 100 0 0 0 0 c c e a 134 a a a 3 e e 134 0 0 0 C e e 134 a a 30 440 525 0 0 0 0 a 5. 5 30 440 5z5 p. a 0 5 3C «a 5z: 0 PARK FACILITIES AND STREET BEAUTIFICATION 190 PARK FACILITIES AND STREET BEAUTIFICATION 50 Culmar Transit Station Area -Land Acquisition and Develop- ment of Neighborhood Park (0050) This project involves the acquisition of canal waterfront property near the Culver transit station and development of the parcel into a neighborhood park. Improvements will include bulkhead repairs, lighting,picnic tables and a shelter, and a boardwalk with railing. The park, which is recommended in the Culver Station Area Design and Develop- ment Plan, wi:l encourage increased residential and commer- cial activities in the area and provide public access to the waterfront. 51 Brickell Transit Station Area-Southside Park Improvements (0036) This project involves upgrading Southside Park to provide a range of active/passive activities for the high -density, urban population projected for the neighborhood around the Brickell Transit station. Park development will be expanded into the adjacent rapid transit right-of-way. Suggested improvements include a vita course, tennis, and racquetball couts, night lighting, a day care center, and a plaza entrance adjacent to the transit station. These improvements, which are recommended in the proposed Bric- kell Station Area Design and Development Plan, are needed to enhance amenities in the neighborhood to attract new private housing development. 52 Civic Center Transit Station Area -Street Trees (0049) Street trees will be planted along NW 12th Avenue after right-of-way expansion for the Civic Center transit station occurs. These trees will enhance pedestrian movement around the station and along the medical facilities on NW 12th Avenue. They will create a visual link of the Civic Cen- ter to the Santa Clara industrial area and the City incinerator, which is to be adapted for mixed -use development. 53 Bayfront Park Baywalk (0003) This project involves the eastern perimeter of the marina. Elements,of the landscaping. construction of a baywalk along the park between Chopin Plaza and the Mia- baywalk include benches, lighting, and t ITEM/ NO./ FUND PROJECT PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) vkY TOTAL YEARS 1982-83 1983-84 1984-BS 198S-86 1986-87 1987-88 50 243 0 0 243 0 a 0 SQ. CULMER TF ST ACG-DEW 243 a Q 243 0 0 0 C 101. UNKNOWN 243 0 a 243 0 a 0 0 51 35 C C 35 0 0 0 Q 49. CIVIC CENT TO ST IRS 35 0 a 35 0 0 0 a 101. UNKNOWN 35 C 0 35 a a 0 Q 52 500 a 0 0 500 0 Q Q 36. BRICNELL TO ST PAFK 533 0 0 0 500 0 0 Q 146. LPARP &PANT -ANTIC 250 0 0 0 253 a a 0 703. OE1 CONTRIS-ANTIC 250 0 0 0 250 0 0 Q 53 600 600 a 0 0 0 a 0 3. BATFAONT PK SAYWALK 600 600 0 C 0 0 0 0 650. CAPITAL INFO FOS-FPL 20C 2130 0 0 0 0 0 3 708. SALE iA KEY LANDFILL 200 200 0 a 0 0 Q 0 E46. FL REC DEW ASSIS PR& 200 210 0 0 0 0 II 0 1 191 61964 31235 7866 15802 5449 787 625 200 PARK FACILITIES AND STREET BEAUTIFICATION II II III I i I IIl Communications and Computers II 1 IIII . 1 IY 1 1 I I. I I I C I CCMMUNICAI _3NS AND COMPUTERS COMMUNICATIONS AND COMPUTERS Improvements to Miami's communications system and its data processing and data management system are included in this functional category. 0.9% of the 1982-1988 Capital Improvement Program is devoted to communications and computers improvements. There are six projects totaling $5,887,000 in this cate- gory. Policies Policies guiding Miami's investment in communi- cations and computers projects are the following: - Improve Citywide radio communications 192 capabilities for Police, Fire and other Miami departments. (Source: Final Report - Miami, Florida Communication Study, 977 - Develop computerized information systems for the Modern Miami Police Department consisting of seven subsystems: 1) Records 2.) Dispatch 3) Field Support 4) Analysis and Planning 5) Investigation and Intelligence 6) Management Support 7) System Development Support COMMUNICATIONS AND COMPUTERS .9 % (Source: Miami Modern Police, 1973) - Miami should maintain control of and modern- ize its communications and dispatch functions. (Source: Miami Fire Protection, Rescue and Emergency Services Master Plan 977- 987, 1977 1 11 ■i 1 11 1 1i 1Ilw 1 1 IIIIPII I I I III Existing Facilities and Recent Accomplishments The location of Miami's radio communication facilities is shown on Map 37. These facilities are total area coverage receiver sites. Fourteen communications projects have been completed since 1975, including three projects valued at $235,000 during FY 1981-82. Map 38 shows the communications projects completed during FY 1981-82. Proposed Communications and Computers Improvements 1982-1988 Three communications and computers projects, totaling $4,874,000, are ongoing or scheduled to begin during FY 1982-83. Another three projects 193 valued at $1,013,000 are scheduled to begin during FY 1983-84 through FY 1987-88. These projects do not lend themselves to mapping. Detailed project descriptions and a funding schedule are included at the end of this section. Funding Funding sources for communications and computer improvements are summarized below. A source of funding is unknown for $3,052,000 or 51.8% of the total improvements. The remaining funds, $2,835,000 or 48.2%, are available from a Federal grant, Capital Improvement Funds (FPL), and Police and Crime Preven- tion bonds. PRIOR FISCAL YEARS FUNDING CODE/SOURCE TOTAL YEARS 1982-83 1983-84 48.2% 51.8 % FUNDS SOURCE OF AVAILABLE FUNDING $2,835,000 UNKNOWN s 3,os2,oao ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1984-85 1985-86 1986-87 1987-88 lal. UNKNCHN 3352 0 0 1822 530 232 Soo 0 13C. LEAA GAUNT 255 255 0 0 0 0 0 0 650. CAPITAL 1MPR FOS-FPL 45 45 0 0 0 0 0 0 Me AUTH POLICE SONGS 2535 1835 700 0 0 0 Q 0 TOTAL 5887 2135 700 1822 S30 200 Soo 0 COMMUN.CATIONS AND COMPUTERS I Existing Facilities and Recent Accomplishments The location of Miami's radio communication facilities is shown on Map 37. These facilities are total area coverage receiver sites. Fourteen communications projects have been completed since 1975, including three projects valued at $235,000 during FY 1981-82. Map 38 shows the communications projects completed during FY 1981-82. Proaosed Communications and Computers Improvements 1982-1988 Three communications and computers projects, totaling $4,874,000, are ongoing or scheduled to begin during FY 1982-83. Another three projects 193 valued at $1,013,0u"0 are scheduled to begin during FY 1983-84 through FY 1987-88. These projects do not lend themselves to mapping. Detailed project descriptions and a funding schedule are included at the end of this section. Funding Funding sources for communications and computer improvements are summarized below. A source of funding is unknown for 13,052,000 or 51.8% of the total improvements. The remaining funds, $2,835,000 or 48.2%, are available from a Federal grant, Capital Improvement Funds (FPL), and Police and Crime Preven- tion bonds. 48.2% 51.8 % FUNDS SOURCE OF AVAILABLE FUNDING 32,835,000 UNKNOWN 3 3,052 ,000 PRIOR FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) FUNDING CODE/SOURCE TOTAL YEARS 1982-83 1983-84 1984-8S 198S-86 1986-87 1987-88 101. UNKNOWN 3352 0 0 1822 530 233 500 O 13C. LEAA GRANT 255 255 45 0 0 0 0 O O 0 0 0 0 0 0 650. CAPITAL IMPR FOS-FPL 45 1135 700 O 31 0 0 a 97C. AUTH POLICE BONDS 2535 TOTAL S887 2135 700 1822 530 200 S00 0 CCMMUN.4."o`AT1ONS AND COMPUTERS I I 1 11 '1111 11 1 11 1 '' 1 I I I 11 ' 1' 1 1 J. II COMMUNICATIONS �w GA BUILDING ::- ~" YYcs— AND COMPUTERS ,.rfr EIzfi t� • 1 MAP 37 r FIRE STATION NO.12! } ' i.4 f I o CITY OF MIAM I RADIO COMMUNICATIONS JAI ALAI _ - .w]Ei, FACILITIES w ... MARINE~ STADIUM:.'. ' t1t� a - t- eisu,.E u.u.a o r t isr..o si..o U MARRIOTT J -asa. isr..o FEDERAL BUILDING -.ORANGE BOWL - �I T FEDERAL WEST FLAGLER AND ` i FIRS v MILAM ROAD Sw 'sT tj �.• FIRE STATION NO.4 r rf 1v r i : � •S • i � � sw ]] S, RYDER BUILDING i II nns 11111 r 1-1' 1 1 11 11 1 105 ft Gf. II i COMMUNICATIONS AND COMPUTERS wnru•...v[ MW ,DST 1; YCSw MAP 38 Q RECENT ACCOMPLISHMENTS D A,B COMMUNICATIONS PROJECTS COMPLETED DURING FY 1981-1982 D -4=�Nll• TUTTIF C$WT Q m W asu.re sw rolco Z Isuro su+o �sw Is.uro Q m 1, k I I I I I I I I IC I .I 1I L. I � 1I i I,, I III I i 196 ft • COMMUNICATIONS AND COMPUTERS RECENT ACCOMPLISHMENTS Computers and Communications Projects Completed Since 1975* 1 Replaced All Mobile Radios in the Fire Department Radio Service 2 Upgraded the Citywide Paging System 3 Installed Communications Console for the Police Computer -Aided Dispatch System 4 Installed First 80OMHZ Radio System 5 New Radio System for the Fire Tractical Channel 6 New Radio System for the Building Depart- ment 7 New Radio System for the Sanitation Depart- ment 8 Upgraded the Police Surveillance Channel to Cover North Dade and South Broward Counties and South Dade County 9 Central Database Computer System 10 Automatic Fingerprint ID System 11 Computer Aided Dispatch System *Not Mapped Computers and Communications Projects Completed During FY 1981-1982 Total Project Cost A Ryder Building and Fire Station 12 - TAC Receiver Site $ 22,000 B TAC Receiver Site - Fire Station 4 26,000 C Upgrade Systems Coverage* 187,000 $235,000 i r 11 111 1 � q 11 197 PROPOSED COMMUNICATIONS AND COMPUTERS IMPROVEMENTS 1982-1988 Communications and Computers Projects That Are On- going or Scheduled To Be Initiated During FY 1982- 1983 Projects That Are Not Mapped: Total Project Cost Communications and Computers Projects Scheduled For FY 1983-19II4 Through FY 1987-1988 Projects That Are Not Mapped: Total Project Cost Police Phase IV System Police Computer Expansion (7075) $2,780,000 System Expansion (2030) $ 748,000 Microwave Communication System (9019) 259,000 Locai Government Radio Network (2034) 190,000 Coordinated Citywide Telecommunication System Human Resources Optical (9033) 1,835,000 Scanner and Computer $4,874,000 Center (2033) 75,000 $1,013,000 COMMUNICATIONS AND COMPUTER'S Police Phase IV System Expansion (7075) Police Phase IV represents the acquisition and development of the Police Department's computerized ooerations and field support information systems. Mobile display termi- nals will continue to be installed in patrol cars as the fleet expands to give officers direct access to criminal information bases. Phase IV refinement involves addi- tional computer software and services as well as a second mobile phone channel. 2 Microwave Communication System (9019) A substantial cost savings can be realized by replacing the City's lease telephone lines with a microwave system This project involves the design and implementation or a microwave system that can be expanded to include data communications, remote video, voice privacy, and City - owned telephone switching. A feasibility study is underway. 3 198 Coordinated Citywide Telecommunication System (9033) This project involves implementation of a new Citywide communications system for telephone and data services. The proposed project will provide a higher quality of telephone services while reducing the city's annual telephone expenses. A feasibility study is underway. 4 Police Computer System Expansion (2030) This project involves expansion of computer equipment needed to meet the immediate data processing requirements COMMUNICATIONS AND COMPUTERS of the Miami Police Department. Existing equipment will be ex- panded or refurbished and the necessary initial computer pro- gramminn modifications needed to support new equipment installa- tion will be made. 5 Local Government Radio Network (2n34) This project involves the installation of a Citywide base station radio network to be used by all local government functions. This network will be a 5 channel, 800 MHz trunking radio system that provides private dial -up radio telephone service, independent communications for all departments, and cross fleet communications between local novernment departments, Fire, and Police during emergencies. 6 Human Resources Optical Scanner and Computer Center (2033) This project involves the purchase of an Optical Scanner and the establishment of a computer center within the Department of Human Resources. The Opticai Scanner and hardware will be used to computerize Police Department testing for entry-level and promo- tional examinations. The scanner will perform computerized test scoring, test validation, and eligible register production. The University of Chicago has performed these services for the City in the past, but as of July 1, 198Z, will no longer be able to do SO. ,III I i 1. i it 199 ITEM/ NO./ FUND 1 7075. 13C. 970. 2 9019. is1. 650. 97C. 3 9033. 101. 65G. 4 2030. 131. 5 2034. 101. 6 2U'-3. 101. PROJECT POLICE PH Il SYS EYP LEAA GPANT AUTH POLICE SOROS PICNemodc COMM SYS UNKNEWA CAPITAL IMPR fOS-fPL AUTH POLICE BONCS COOP CITY TELECOPP UNKNOkA CAPITAL IMPR f OS-FPL POLI,CE CONP SYS EVP UNKNOWN LOCAL GOfT RADIO 4ET UNKNOWA HR C*TICAL SCANNEF UNKNOWN TOTAL 278C 278a 255 252` 259 259 239 IQ 10 IE35 1835 1880 35 74a 748 74 C 190 190 190 75 75 75 5887 PRIOR YEARS 7080 20P0 255 1825 20 2C a 10 10 35 35 C 35 0 0 0 0 a 0 0 0 a 2135 FISCAL YEARS ALL AMOUNTS IN THOUSANDS OF DOLLARS (000) 1982-83 1983-84 1984-85 1985-86 1986-87 1987-83 Too 0 G C 0 a 700 0 0 0 0 0 0 0 G 0 0 C 730 0 O C 0 0 0 239 0 C 0 0 0 239 0 0 0 0 0 239 0 a 0 0 0 0 0 a a o 0 0 0 0 0 0 0 570 53C 200 500 0 0 570 530 29C 500 i Q 570 53C 200 500 a 0 0 0 C 0 0 0 74 E 0 0 0 0 Q 748 Q. 0 a a 0 748 G a ° G 0 190 0 c a G 190 0 a G 0 0 190 0 0 0 0 75 C 0 G 0 0 75 0 a G 0 a 75 Q a 0 0 700 1822 530 200 500 0 COMMUNICATIONS AND COMPUTERS i II III II' I I I I ' I I I iI'I II II I I I II. I I I. PART II: CAPITAL BUDGET 1982-1983 Overview and Trends An overview of the proposed 1982-83 Capital Budget is presented in this section. The summary includes a comparison of the FY 1982-83 Capital Budget with the FY 1981-82 Capital Budget and a description of the allocation of the Capital Budget to functional programs. Contents: - Overview - Allocation of the 1982-83 Capital Budget to Functional Programs 200 L� OVERVIEW The first year of the Capital Improvement Pro- gram is the Capital Budget, a plan of proposed capital expenditures and the means of financing them. Funds for the Capital Budget are appropriated by an Appropriations Ordinance. The proposed 1982-83 Capital Budget, presented in Table 8, includes 44 projects in eleven functional categories. The total proposed capital budget is valued at $85,818,000. This proposed budget for FY 1982-83 represents an increase of nearly $28 mil- lion over the 1981-82 Capital Budget. As shown in Table 5, proposed expenditures for 1982-83 are greater in eight of the functional categories. The largest increase is in the Economic Development category, $15,089,000. This is attributable to additional funding for the City of Miami/University of Miami -James L. Knight International Center, fund- ing for the Model City Shopping Center, funding for the Insurance Exchaage, and funding for Southeast Overtown/Park West Redevelopment being included in the 1982-83 Capital Budget. The other category show- ing a significant increase from last years level, $16,504,000, is Parking Facilities. The large increase is due to including anticipated funding from revenue bonds for the Core Area West Parking Garage in the budget. Proposed expenditures for 1982-83 are less in the remaining three functional categories. There are no public building projects being funded in this years budget. In addition, the Transit System category is not receiving funding this year because Ll funds appropriated for the transit project, the Downtown Component of Metrorail, sufficiently cover the City's funding commitment through FY 1982-83. Funding for the Sanitary Sewers functional category has decreased by $6,936,000. Projects receiving funding in this years capital budget require signi- ficantly lesser amounts of funds to implement. 9534 Function Public Buildings Stadiums and Auditoriums* Marinas Sanitary Sewers Storm Sewers Street Improvements Street Lighting Transit Systems Parking Facilities Economic Development Housing Programs Parking Facilities and Street Beautification Communications and Computers TABLE 5 CAPITAL BUDGET COMPARISON No. of Projects Cost 81-82 82-83 81-82 82-83 1 - $ 50,000 $ - 1 485,000 2 1 792,000 400,000 4 5 9,880,000 10,142,000 5 6 7,925,000 989,000 5 3 1,634,000 1,100,000 11 10 6,142,000 7,792,000 i - 3,013,000 - 2 3 11,000,000 27,504,000 4 7 8,551,000 23,640,000 3 1 4,275,000 5,200,000 12 6 4,522,000 7,866,000 1 1 50,000 700,000 51 44 $57,834,000 $85,818,000 *Stadiums and Auditoriums are separate functional categories in the 1982-1988 Capital Improvement Program and 1982- 1983 Capital Budget. L 11. 'I I III III loollI I I I Ii I i I I i a 0% ALLOCATION OF THE 1982-83 CAPITAL BUDGET TO FUNCTIONAL PROGRAMS Miami 1982-83 Capital Budget is allocated to eleven functional categories. Figure 6 shows that the funds are divided among Parking Facilities (32.0%), Economic Development (27.5%) Marinas (11.8%), Park Facilities and Street Beautification (9.2%), Street Improvements (9.1%), Housing Pro- grams (6.1%), Storm Sewers (1.3%), Sanitary Sewers (1.1%), Communications and Computers (0.8%), Stadiums (0.6%), and Auditoriums (0.5%). 202 q MARINAS �a �s SANITARY SEWERS I.I % 0.5% AUDITORIUMS STORM SEWERS 1.3% _s 0.6% STADIUMS STREET IMPROVEMENTS 0.8% COMMUNICATIONS & COMPUTERS 11.8% 91% PARK FACILITIES STREET BEAUTIFICATION 9.2% PARKING FACILITIES 6.1 % 32.0% HOUSING PROGRAMS 203 - 27.5% ECONOMIC DEVELOPMENT 1982 -1983 CAPITAL BUDGET ALLOCATION OF FUNDS FIGURE 6 Ail Funding the Capital Budget This section discusses the funding required for the 1982-83 Capital Budget. It includes the sources of funds as well as the availability of funding. Contents: - Sources of Funds - Availability of Funds 204 FUNDING THE CAPITAL BUDGET SOURCES OF FUNDS The 1982-83 Capital Budget is funded from nine major sources as shown in Table 6 and the pie chart in Figure 7. The City will provide 82% of the re- quired funds from five sources: revenue bonds, general obligation bonds, Capital Improvement Funds, the Capital Improvement Fund that includes Florida Power and Light (FP&L) Company franchise revenues, and retained earnings and fees. Revenue bonds fund 55.5% of the total budget and general obligation bonds fund 18.4%. Capital Improvement Funds provide only .7% of the budget, while FP&L funds account for 6.4% of the total. Retafied earnings and fees fund 1.1% of the capital budget. Providing 13.3% of the total budget, the Federal government is the principal source of non -City funds. State and County sources combined fund 2% of the capital budget. Anticipated private contri- butions provide 2.6% of the total budget. CJ TABLE 6 1982-1983 CAPITAL BUDGET SOURCES OF FUNDS SUMMARY City Sources Revenue Bonds $47,610,000 General Obligation Bonds 15,781,000 Capital Improvement Funds 594,000 Capital Improvement Funds - FP&L 5,509,000 Retained Earnings and Fees 912,000 Total City Sources $70,406,000 Non -City Sources Federal $11,451,000 State 1,026,000 County 685,000 Private Contributions 2,250,000 Total Non -City Sources 15,412,000 TOTAL ALL SOURCES $85,818,000 w REVENUE BONDS = CITY SOURCES =3 NON -CITY SOURCES 1982-1983 CAPITAL BUDGET SOURCES OF FUNDS FIGURE 7 GENERAL OBLIGATION BONDS CAPITAL IMPROVEMENT FUNDS 0.7% CAPITAL IMPROVEMENT FUND - FPaL RETAINED EARNING AND FEES 1. 1 % FEDERAL 13.3% COUNTY 0.8% STATE 1.2% 206 AVATLAOILITY OF FUNDS Although the 1982-83 Capital Budget includes proposed expenditures of $85,818,000, only $26,891,000 or 31.3% is currently available. Table 7 shows the total funds needed for capital budget projects in each functional category, the amount of funds currently available, and the funds that are anticipated to be available during Fiscal Year 1982-83. The funds that are anticipated total $58,927,000 and are needed for projects in Six functional cate- gories. These projects, the anticipated sources of funding, and amounts are listed below: 1. Stadiums Orange Bowl Improvements Authorized Resort E 485,000 (7035) Tax 2. Marinas Major Maintenance --Dinner Retained Earnings 415,000 Key Marina (8068) Miamarina Pier Repairs Retained Earnings 147,000 (1019) Watson Island Marinas Revenue Bonds 7,500,000 (1008) Riverfront Marinas Retained Earnings 80,000 Enhancement (1018) Dinner Key Marina Revenue Bonds 2,000,000 Expansion (9011) 3. Street Improvements East Allapattah Street New Unauthorized 600,000 Improvements (2014) Storm Sewer Bonds 4. Parking Facilities Core Area West Parking Revenue Bonds 22.067,000 Garage (1017) Parking Facility in Parking Capital 570,000 Omni Area (0059) Projects Fund Revenue Bonds 4,400,000 Miami Design Plaza Revenue Bonds 443,000 Parking Garage (1020) 5. Economic Development Watson Island Development Revenue Bonds 7,200,000 (7033) Overtown Transit Station Joint Development 6,770,000 Redevelopment (1022) Grant Southeast Overtown/Park Revenue Bonds 4,000.000 West Redevelopment (2020) 6. Park Facilities and Street Beautification. Bayfront Park Redevelop- Private Contribu- 2,250,000 ment (9038) tions TOTAL FUNDS ANTICIPATED S 58,927,000 lit I I i I 1 Jh I' I III I, I III 1i I, II III I 1_I 207 Program/Function PUBLIC BUILDINGS AND FACILITIES Public Buildings Stadiums Auditoriums Marinas SEWER SYSTEMS Sanitary Sewers Storm Sewers TRANSPORTATION Street Improvements Street Lighting Transit Systems Parking Facilities ECONOMIC DEVELOPMENT Economic Development Housing Programs CULTURE AND RECREATION Park Facilities and Street Beautification INTRAGOVERNMENTAL SERVICES Communications and Computers TOTAL TABLE 7 1982-83 CAPITAL BUDGET AVAILABILITY OF FUNDS Total Funds Needed Funds Available Funds Anticipated 485,000 485,000 400,000 400,000 10,142,000 -0- 10,142,000 989,000 989,000 1,100,000 1,100,000 7,792,000 7,192,000 600,000 27,504,000 24,000 27,480,000 23,640,000 5,670,000 17,970,000 5 ,200 ,000 5,200,000 7,866,000 5,616,000 2,250,000 700,000 700,000 85,818,000 '6,891 ,000 $58,927,000 0 Projects and Funding Sources The proposed 1982-83 Capital Budget is pre- sented in this section. The projects proposed to be funded from the Capital Improvement Fund (FP&L) are discussed, as well. Contents: - 1982-83 Capital Budget - Capital Improvement Fund (FP&L): Funded and Unfunded Projects - Purpose and Benefits of Projects Funded from the Capital Improvement Fund (FP&L) 1' I� J Ill, PROGRAM/FUNCTION PROJECT PUBLIC BUILDINGS AND FACILITIES Stadiums - $485,000 Orange Bowl Improvements (7035) Auditoriums - $400,000 Coconut Grove Exhibition Center - Additional Work (8080) Marinas - $10,142,000 Major Maintenance - Dinner Key Marina (8068) Miamarina Pier Repairs (1019) Watson Island Marinas (1008) TABLE 8 CITY OF MIAMI 1982-83 CAPITAL BUDGET PREVIOUS TOTAL FY 198 -1983 APPROPRIATION FUNDING CODE SOURCE OF FUNDING $ 3,039,000 $ 485,000 670 Authorized Resort Tax (Anticipated) FY 1982-83 TOTAL $ 485,000 $ 800,000 $ 400,000 650 Capital Improve- ment Fund (FP&L) FY 1982-63 TOTAL $ 400,000 $ 335,000 $ 300,000 652 Retainea Earnings Retained Earnings 191,000 147,000 652 (Anticipated) 150 ,000 7,500,000 927 Revenue Bonds (Anticipated) j. i iI I I I II J[mi�,,,, I I I, I � I 1 11 1 PROGRAM/FUNCTION PROJECT PREVIOUS TOTAL APPROPRIATION FY 1982-1983 APPROPRIATION FUNDING CODE SOURCE OF FUNDING PUBLIC BUILDINGS AND FACILITIES (Cont'd) Marinas - $10,142,000 (Cont'd) Riverfront Marinas Enhancement Retained Earnings (1018) $ 80,000 652 (Anticipated) Dinner Key Marina Expansion Revenue Bonds (9011) 2,000,000 927 (Anticipated) FY 1982-83 TOTAL $10,142,000 SEWER SYSTEMS 209 Sanitary Sewers - $989,000 Bicentennial Park Sanitary Authorized Sanitary Sewers (7091) $ 125,000 $ 25,000 989 Sewer Bonds West Flagler Street Sanitary Sewer Improvement - Phase II Authorized Sanitary (1015) 50,000 50,000 989 Sewer Bonds Citywide Sanitary Sewer Extensions Improvement Authorized Sanitary (7092) 500,000 500,000 989 Sewer Bonds Citywide Sanitary Sewer Lateral Modifications Authorized Sanitary (1012) 25,000 25,000 989 Sewer Bonds Lynwood Sanitary Sewer Authorized Sanitary Improvement (2001) 89,000 989 Sewer Bonds Durham Sanitary Sewer Authorized Sanitary Improvement (2002) 300,000 989 Sewer Bonds FY 1982-83 TOTAL $ 9891000 III! 210 PROGRAM/FUNCTION PROJECT SEWER SYSTEMS (Cont'd) Storm Sewers - $1,100,000 West End Storm Sewers - Phase II (2003) West End Storm Sewers - Phase III (2004) Wagner Creek Restoration (2005) TRANSPORTATION Street Improvements - $7,792,000 Brickell Plaza Improvement (0062) Rebuild Sidewalks and Streets (7024) Citywide Paving Improvements (1007) San Marco Street Improvements (7014) PREVIOUS TOTAL FY 1982-1983 FUNDING APPROPRIATION APPROPRIATION CODE SOURCE OF FUNDING Authorized Storm $ 250,000 995 Sewer Bonds Authorized Storm 350,000 995 Sewer Bonds Authorized Storm 500,000 995 Sewer Bonds FY 1982-83 TOTAL $ 1,100,000 Authorized Highway $ 300,000 $ 300,000 980 Bonds Authorized Higiiiway 2,310,000 500,000 980 Bonds Authorized Highway 250,000 62,000 980 Bonds Authorized Highway 86,000 980 Bonds Authorized Storm 44,000 995 Sewer Bonds PROGRAM/FUNCTION PROGRAM PREVIOUS TOTAL APPROPRIATION FY 1982-1983 FUNDING APPROPRIATION CODE SOURCE OF FUNDING TRANSPORTATION (Cont'd) Street Improvements - $7,792,000 (Cont'd) Bird Avenue Improvements Authorized Highway (7016) $ 800,000 980 Bonds Authorized Storm 350,000 995 Sewer Bonds Little River Street Authorized Highway Improvements (7018) 1,000,000 980 Bonds Authorized Storm 500,000 995 Sewer Bonds 211 Brickell Avenue Service Authorized Highway Road Improvements (1009) 400,000 980 Bonds Authorized Storm 200,000 995 Sewer Bonds Buena Vista Street Authorized Highway Improvements -Phase I (0007) 1,200,000 980 Bonds Authorized Storm 600,000 995 Sewer Bonds East Allapattah Street Authorized Highway Improvements (2014) 1,100,000 980 Bonds New, Unauthorized 600,000 996 Storm Sewer Bonds Manor Street Improvements - Authorized Highway Phase III (8014) 50,000 980 Bonds FY 1982-83 TOTAL $ 7,792,000 212 PROGRAM/FUNCTION PROJECT TRANSPORTATION (Cont'd) Parking Facilities - $27,504,000 Core Area West Parking Garage (1017) PREVIOUS TOTAL APPROPRIATION $ 130,000 FY 1982-1983 APPROPRIATION $ 24,000 22,067,000 30,000 570,000 4,400,000 Miami Design Plaza Parking Garage (1020) 30,000 443,000 FY 1982-83 TOTAL $ 27,504,000 ECONOMIC DEVELOPMENT Economic Development - $23,640,000 Watson Island Development (7033) $ 949,000 City of Miami/University of Miami -James L. Knight International Center and Parking Garage (7034) 68,000,000 *Transferred from FEC Park Acquisition project to reflect change in funding resource. Parking Facility in Omni Area (0059) $ 7,200,000 209,000 4,000,000 FUNDING CODE SOURCE OF FUNDING Parking Capital 661 Projects Fund Revenue Bonds - 927 Anticipated Parking Capital Projects Fund - 660 Anticipated Revenue Bonds - 927 Anticipated Revenue Bonds - 927 Anticipated Revenue Bonds - 927 Anticipated Capital Improvement 650 Fund (FPRL) b53 Proceeds from Interama Land Sale* 9534 213 J PROGRAM/FUNCTION PREVIOUS TOTAL PROJECT APPROPRIATION ECONOMIC DEVELOPMENT (Cont'd) Economic Development - $23,640,000 (Cont'd) Model City Shopping Center (2039) Overtown Transit Station Redevelopment (1022) Southeast Overtown/Park West Redevelopment (2020) Commercial District Signage (1023) Insurance Exchange Housing - $5,200,000 Housing Development Program (9020) FY 1982-1983 APPROPRIATION $ 800,000 400,000 125,000 300,000 6,700,000 4,000,000 61,000 500,000 FY 1982-83 TOTAL $23,640,000 $10,300,000 $ 5,200,000 FY 1982-83 TOTAL $ 5,200,000 FUNDING CODE SOURCE OF FUNDING Economic Development 151 Administration Grant Capital Improvement 650 Fund (FP&L) Dade County CD 160 Funds 168 Eighth Year CD Funds Joint Development 175 Grant - Anticipated Revenue Bonds - 927 Anticipated Eighth Year CD 168 Funds 650 Capital Improvement Fund (FP&L) Authorized Housing 960 Bonds PROGRAM/FUNCTION PROJECT PREVIOUS TOTAL APPROPRIATION FY 1982-1983 APPROPRIATION CULTURE AND RECREATION Park Facilities and Street Beautification - $7,866,000 FEC Park Acquisition (7056) $19,173,000* $ 110,000 Jose Marti Riverfront Park (7057) 3,203,000 320,000 500,000 Bayfront Park Redevelopment 214 (9038) 4,000,000 2,250,000 35,000 Acquisition of Miley Property (8055) 436,000 125,000 Virginia Key Recreation Area Development (7036) 250,000 200,000 Bicentennial Park Sports Fields (8053) 326,000 FY 1982-83 TOTAL $ 7,866,000 *Includes $4,000,000 from FP&L funds transferred from City of Miami/University of Miami --James L. Knight International Center project to reflect change in funding resource. FUNDING CODE 711 135 851 123 706 709 707 846 850 SOURCE OF FUNDING FEC Dockage Fees Land -Water Conser- vation Grant State Direct Appro- priation Corps -Recreation Development Program (in -kind) Private Contributions Anticipated Bayfront Bandshell Parking Revenues Miley Property Rent Florida Recreation Development Assis- tance Program Miami Dade Community College Funds PROGRAM/FUNCTION PREVIOUS TOTAL FY 1982-1983 PROJECT APPROPRIATION APPROPRIATION INTRAGOVERNMENTAL SERVICES Communications and Computers - $700,000 Police Phase IV System Expansion (7075) $ 2,080,000 $ 700,000 FY 1982-83 TOTAL $ 700,000 PROPOSED 1982-83 CAPITAL BUDGET TOTAL �R5_RiR nnn 215 FUNDING CODE SOHRCF OF F11NnTN9 Authorized Police 970 Bonds 216 lJ CAPITAL IMPROVEMENT FUND (FP&L): FUNDED AND UNFUNDED PROJECTS The revenues from the Florida Power and Light Company franchise tax represent the primary source of funding in the Capital Bud- get that is not allocated to specific types of projects. The following table displays the current fund balance of this fund and indicates suggested priorities for project funding. CAPITAL IMPROVEMENT FUND PROPOSED FY 1982-83 EXPENDITURES FY 1981-82 Fund Balance FY 1982-83 FP&L Franchise Revenues and Payments to Fund Balance TOTAL BALANCE Proposed Fund Allocation TOTAL FUND BALANCE $ 4,525,319 Transfer to General Fund to Support FY 1981-82 Operating Budget 125,000 Acquisition of Miley Property (8055) City of Miami/University of Miami --James L. Knight International 209,053 Center and Parking Garage (7034)* 4,000,000 FEC Park Acquisition (7056)* 500,000 Insurance Exchange 400,000 Coconut Grove Exhibition Center --Patio Roof (8080) 400,000 Model City Shopping Center at Pantry Pride Site (2039) $ 712,652 9,446,720 $10,159,372 Cumulative Balance $10,159,372 5,634,053 5,509,053 5,300,000 1,300,000 800,000 400,000 -0- *Use of Interama funds previously allocated to fund FEC Park Acquisition will limit use of the property to that described in Sec. 125.0104 (a)(1), of the Florida Statutes, in accordance with the agreement between the City and State. FY 1982-83 Capital Improvement Funds (FP&L) may be used for this purpose and conversely, the amount of $4,000,000 in Interama funds may be used to fund expenses related to the International Center. 217 Unfunded Projects from the Capital Improvement Fund (FP&L) Proposed Fund Allocation 50,000 Wainwright Park Seawall Reinforcement (2022) 250,000 Bayfront Auditorium - Major Maintenance (0051) 50,000 Marine Stadium Improvements (2017) 970,000 Swimming Pool Renovations (0023) 35,000 Communications Maintenance Shop Addition (8051) 50,000 African Square Park Recreation Annex (2023) 21,000 Staging Platform and Trailer (9012) 50,000 Parks Lighting System (2012) 50,000 Recreation Administrative Offices Renovations (1032) 40,000 Motor Pool Body Shop Addition (2018) 150,000 Blue Lagoon Park Development (9017) 570,000 Coordinated Citywide Telecommunications System (9033) 55,000 Moore Park Tennis/Racquetball Court Conversion (2036) 63,000 Miami Springs Electric Golf Cart Storage Facility (2035) 150,000 West End Park Ballfield Lighting (0019, 190,000 Local Government Radio Network (2034) 300,000 Fort Dallas Park Development (7055) 200,000 Jose Marti Riverfront Park (7057) 250,000 Virginia Key Recreation Area Development (7036) 500,000 Bayfront Park Redevelopment (9038) 100,000 Downtown Tree Grates (1029) 550,000 Curtis Park Lighting System (2025) 200,000 Douglas Park Ballfield Lighting (0018) 50,000 Miami Springs Golf Course Perimeter Fencing (2035) 35,000 Police Outdoor Firing Range Facility (2032) 30,000 Allapattah Industrial Area Parking Facilities (1010) 250,000 Velodrome (7032) 120,000 Melreese Clubhouse Renovations (2024) 55,000 Tennis Court Lighting Conversion - Douglas and Grapeland 99,000 Wainwright Park Environmental Study Center (2039) 96,000 Flagami Park Recreation Building Renovations(1024) 60,000 Lummus Park Card Building Renovations (1025) Parks (9013) 9 I lih idi�1�1��I I . Is I I ii'II 46 0 Unfunded Projects from the Capital Improvement Fund (FP&L) (cont'd) Proposed Fund Allocation $ 100,000 Citywide Gateway Beautification (9008) 400,000 Fire Training Facility and Closed Circuit Television System (7084) 748,000 Police Computer Systems Expansion (2030) 1,300,000 Police Support Services Facility (2029) 75,000 Human Resources Optical Scanner and Computer Center (2033} $ 8,262,000 Total Unfunded Projects 218 PURPOSE AND BENEFITS OF PROJECTS FUNDED FROM THE CAPITAL IMPROVEMENT FUND This section provides a short narrative explanation of the purpose and presumed benefits of the projects proposed to be funded from the Capital Improvement Fund. Project Title Acquisition of Miley Property (8055) City of Miami/University of Miami-- 21g James L. Knight International Center and Parking Garage (7034) Insurance Exchange Coconut Grove Exhibition Center -- Patio Roof (8080) Model City Shopping Center at the Pantry Pride Site (2039) FEC Park Acquisition (7056) Purpose and Benefits Implements the purchase of the Miley Property on Dinner Key as authorized in City Commission Resolution No. 78-4.34. Provides additional funding to cover the increased costs of construction of the multi -use facility. Provides start-up capital for a centralized marketplace for insurance and reinsurance of primarily high risk capital ventures. Provides additional funding to cover the increased costs of constructing a roof over the patio area of the Coconut Grove Exhibition Center. Provides City funding portion for land acquisition that will be combined with a Federal Economic Development Administration Grant, a loan from the Ford Foundation, and loans from the Metro and the Greater Miami Chamber of Commerce Business Assistance Center for development of the shopping center. Provides funding to replace funding from Interama funds previously identified for acquisition of the FEC property between Bayfront and Bicentennial Parks. INDEX 220 CIP Project Number FAMIS Project Number INDEX Project Title Page 0003 350055 Bayfront Park Baywalk 190 0005 350032 Latin Quarter Paving Project - Phase II 107 0007 350047 Buena Vista Street Improvements - Phase I 109 0008 Buena Vista Street Improvements - Phase II 117 0009 Edgewater Street Improvements 115 0010 Allapattah Street Improvements - Phase II 119 0011 302042 Kirkland Sanitary Sewer Improvement 85 0012 302043 Koubek Sanitary Sewer Improvement 85 0013 Flagami Sanitary Sewer Improvement 87 184 0018 Douglas Park Ballfield Lighting System 0019 West End Park Ballfield Lighting 184 142 0021 Little Havana Public Parking Facilities 182 0023 350054 Swimming Pool Renovations 178 0025 350050 Elizabeth Virrick Gym Renovations - Phase II 45 0026 350052 New City Administration Building Employee Parking 113 0029 Design Plaza Street Improvements 115 0031 Douglas Road Transit Station Area - Street Improvements ill 0034 Vizcaya Transit Station Area - Street Improvements 113 0035 Brickell Transit Station Area - Street Improvements 190 0036 Brickell Transit Station Area - Southside Park Improvements Ill 0037 Coconut Grove Transit Station Area - Street Improvements 0038 Brickell Transit Station Area - SW loth Street Pedestrian 1 56 Transit Mall 11133 0039 Allapattah Transit Station Area - Street Improvements 117 0040 Park West Street Improvements - Phase I 65 107 0044 Model City Land Acquisition for Infill Housing - Phase II 117 0045 Garment Center CD Paving Project 115 0046 Santa Clara Transit Station Area - Street Improvements 115 0047 Culmer Transit Station Area - Street Improvements 220 P CIP FAMIS Project Project Number Number Project Title 0003 0005 0007 0008 0009 0010 0011 0012 0013 0018 0019 0021 0023 0025 0026 0029 0031 0034 0035 0036 0037 0038 0039 0040 0044 0045 0046 0047 350055 350032 350047 302042 302043 350054 350050 350052 INDEX Bayfront Park Baywalk Latin Quarter Paving Project - P Buena Vista Street Improvements - Phase I Buena Vista Street Improvements - Phase II Edgewater Street Improvements Allapattah Street Improvements - Phase II Kirkland Sanitary Sewer Improvement Koubek Sanitary Sewer Improvement Fiagami Sanitary Sewer Improvement Douglas Park Ballfield Lighting System West End Park Ballfield Lighting Little Havana Public Parking Facilities Swimming Pool Renovations Elizabeth Virrick Gym Renovations - Phase II New City Administration Building Employee Parking Design Plaza Street Improvements Douglas Road Transit Station Area - Street Improvements Vizcaya Transit Station Area - Street Improvements Brickell Transit Station Area - Street Improvements Brickell Transit Station Area - Southside Park Improvements Coconut Grove Transit Station Area - Street Improvements Brickell Transit Station Area - SW loth Street Pedestrian Transit Mall Allapattah Transit Station Area - Street Improvements Park West Street Improvements - Phase I Model City Land Acquisition for Infiil Housing - Phase II Garment Center CD Paving Project Santa Clara Transit Station Area - Street Improvements Culmer Transit Station Area - Street Improvements 109 117 115 119 85 85 87 184 184 142 182 178 45 113 115 ill 113 190 ill 156 113 117 165 107 117 115 _.I illI i i 11- I I I 11 III 1III0IN 11 1 . i. 1 ,I, 1 .,I 1 1 1 1 1�' li 221 INDEX CIP Project Number FAMIS Project Number Project Title 77-83 Project No. Page 0049 Civic Center Transit Station Area - Street Trees 190 0050 Culmer Transit Station Area - Land Acquisition and Development of Neighborhood Park 190 0051 Bayfront Auditorium - Major Maintenance 67 67 0053 350048 Charlie Hadley Park Renovations 178 0056 Little Havana Street Improvements - Phase I III 111 0058 Downtown Tree Planting 84 142 0059 360002 Parking Facility in Omni Area 178 0061 350040 Park Rehabilitation for Those With Special Needs 107 0062 307076 Brickell Plaza Improvement 109 7014 301047 San Marco Street Improvements 41.23 109 7016 Bird Avenue Improvements 41.26 107 7017 Downtown Street Improvements - Phase II 41.27 109 7018 Little River Street Improvements 41.28 117 7021 best Little Havana Street Improvements 41.31 15 7023 Allapattah Industrial Area Street Improvements 41.33 107 7024 307069 Rebuild Sidewalks and Streets 41.34 180 7028 350087 Miami P.iver Walkway Development - Phase I 46.61 7031 350034 Downtown Component of Metrorail 46.64 1132 7032 305114 Velodrome 72.51 58 58 152 7033 350037 Watson Island Development 72.52 7034 420001, City of Miami/University of Miami -James L. Knight l5 420002 International Center and Parking Garage 73.52 58 7035 404020- Orange Bowl Improvements 73.53 7036 404032 350085 Virginia Key Recreation Area Development 72.54 182 17 7043 Lummus Park Development 75.58 176 7053 West End Park Development 75.71 176 7054 305147 Curtis Park Development 75.72 1 7055 305148 Fort Dallas Park Development 75.73 176 7056 350092 FEC Park Acquisition 75.75 I IIIIIIII I I ! I I11 I' 'I' ""mlll 1I1111111 nail I al 1, CIP FAMIS Project Project Number Number INDEX Project Title 7057 350036 Jose Marti Riverfront Park 75.77 180 7058 305152 Remaining Parks for People District I Improvements 75.81 176 7059 305153 Remaining Parks for People District II Improvements 75.82 176 7060 305154 Remaining Parks for People District III Improvements 75.83 176 7061 305155 Remaining Parks for People District IV Improvements 75.84 178 7062 305138 Remaining Parks for People District VII 75.85 178 7063 305139 Remaining Parks for People District VIII 75.86 178 7071 304019 Demolition of Substandard Buildings City -Wide 51.7 165 7075 304026 Police Phase IV System Expansion 21.52, 21.53 198 7084 350076 Fire Training Facility and Close Circuit Television System 22.59 45 222 7091 302030 Bicentennial Park Sanitary Sewers 84.54 85 7092 302031 City -Wide Sanitary Sewer Extensions Improvement 84.55 87 7099 302041 Auburn Sanitary Sewer Improvement 84.62 85 7100 301034 Local Drainage Projects (Northern, Central, Western and Southern Districts) 84.84 96 8008 350082 Allapattah Street Improvements - Phase I 107 8012 Coconut Grove Village Center Street Improvements 117 8013 Downtown Street Improvements - Phase I 115 8014 Manor Street Improvements - Phase III 109 8016 307070 Belle Meade Island Bridge 107 8019 350083 Manor Street Improvements - Phase II 107 8020 SW 32nd Avenue Improvement 113 8023 Wainwright Park Environmental Study Center 186 8028 Model City -King Heights Land Acquisition/ Redevelopment - Phase I 165 8032 Overtown Land Acquisition 152 8034 Garment Center/Fashion District Expansion 152 8039 301042 Tamiami Storm Sewers 96 8040 301048 Grapeland Storm Sewers 96 8041 Manor Storm Sewers 98 8043 301054 Shenandoah Storm Sewers 96 95 � I � 1 I I I I I II I I I I III lil llliu d u i in lul ICI ( INDEX CIP Project Number FAMIS Project Number Project Title 8047 302044 Central Sanitary Sewer Improvement 8048 302045 Kinloch Sanitary Sewer Improvement 8049 Flagler Sanitary Sewer Improvement 8050 Fairlawn Sanitary Sewer Improvement 8051 350086 Communications Maintenance Shop Addition 8053 Bicentennial Park Sports Fields 8055 350019 Acquisition of Miley Propertv 8056 Niami Springs Golf Course Perimeter Fencing 8058 350065 Renovation of General Accounting 8068 Major Maintenance - Dinner Key Marina 8069 350060 Major Maintenance - Miami Stadium 223 8071 360001 Downtown Government Center Parking Garage 8079 301040 Lawrence Pump Station Modifications 8080 350033 Coconut Grove Exhibition Center - Additional Work 9006 Morningside Street Improvements 9007 North Baycrest Street Improvements 9008 Citywide Gateway Beautification Program 9010 Garment Center Parking Garage 9011 Dinner Key Marina Expansion 9012 Staging Platform and Trailer 9013 Tennis Courts Lighting System Conversion - Douglas and Grapeland Parks 9014 350064 Henderson Park Building Renovations 9016 West Island 9017 350030 Blue Lagoon Park Development 9018 Allapattah Mini -Park for Public Housing Site 16 9019 350068 Microwave Communication System 9020 312003 Housing Development Program 9021 304027 Police Parking Garage Improvement 9023 Citywide Street Lighting Program 9024 Recycle Incinerator No. 1 9027 Belle Meade Storm Sewers Page 85 85 87 87 47 184 182 184 45 76 58 142 96 67 117 119 186 142 76 186 186 178 188 180 176 198 165 45 127 156 98 INDEX CIP Project Number FAMIS Project Number Project Title Page 9033 350062 Coordinated Citywide Telecommunication System 198 9034 350063 Citywide Tree Planting Program and Tree Bank 184 9038 350031 Bayfront Park Redevelopment 182 9046 301043 Orange Bowl Pump Station Modifications 96 1007 307085 Citywide Paving Improvements 109 1008 350081 Watson Island Marinas 76 1009 Brickell Avenue Service Road Improvements 109 1010 Allapattah Industrial Area Public Parking Facilities 142 1011 Avalon Storm Sewers 98 1012 302051 Citywide Sanitary Sewer Lateral Modifications 87 1013 350066 Overtown Neighborhood Shopping Center 152 22 4 1014 350042 City Hall Renovations 45 87 1015 302050 West Flagler Street Sanitary Sewer Improvement - Phase II 1016 South Grove Sanitary Sewer Improvement 87 142 1017 360003 Core Area West Parking Garage 76 1018 Riverfront Marinas Enhancement 76 1019 Mi.amarina Pier Repairs 142 1020 360004 Miami Design Plaza Parking Garage 180 1021 Coconut Grove Street Improvements and Beautification 154 1022 Overtown Transit Station Area Redevelopment 154 1023 Commercial District Signage 184 1024 Flagami Park Recreation Building Renovation 184 1025 Lummus Park Card Building Renovation 119 1026 Park West Street Improvements - Phase II 180 1027 Lummus Park Area Beautification 188 1028 Overtown Underexpressway NW 3rd Avenue Beautification 188 1029 Downtown Tree Grates 154 1030 Furniture Park Land Acquisition 47 1032 Leisure Services Administrative Offices Renovations 47 1033 350044 City Administration Building - Phase II 96 1034 301056 Latin Quarter Storm Sewers - Phase II 225 INDEX CIP Project Number FAMIS Project Number Project Title Page 1035 350094 Marine Stadium Boatramp Repairs 58 87 2001 Lynwood Sanitary Sewer Improvement 87 2002 Durham Sanitary Sewer Improvement 98 2003 West End Storm Sewers - Phase II 98 2004 West End Storm Sewers - Phase III 98 2005 Wagner Creek Restoration 119 2006 Manor Street Improvements - Phase IV 11 2007 Buena Vista Street Improvements - Phase III 113 2008 Overtown Street Improvements 115 2009 North River Drive Street Improvements 119 2010 Silver Bluff Street Improvements 113 2011 East Shenandoah Street Improvements 11 2012 SW 16th Street Improvement 1199 2013 Little Havana Street Improvements - Phase II 109 2014 East Allapattah Street Improvements 111 ill 2015 I-95 Bifurcated Ramps 58 2016 Miami Stadium Concert Stage 58 2017 Marine Stadium Improvements 47 2018 Motor Pool Body Shop Addition 142 2019 Model City Public Parking Facilities 154 2020 Southeast Overtown/Park West Redevelopment 86 188 2021 Parks Lighting System 188 2022 Wainwright Park Seawall Reinforcement 18 2023 African Square Park Recreation Annex Renovation 186 2024 Melreese Clubhouse Renovations 186 2025 Curtis Park Lighting System 188 2026 Cuban Memorial Plaza and Memorial Boulevard 1 2027 West Flagler Terrace Beautification 47 47 2028 Police Building Expansion 49 2029 Police Support Services Facility 198 2030 Police Computer Systems Expansion INDEX CIP FAMIS Page Project Project project Title 49 Number Number 49 2031 Police Parking Garage Police Outdoor Firing Range Facility and Computer Center 198 198 2032 Human Resources Optical Scanner Radio Network 186 2033 Local Government Golf Cart Storage Facility 186 2034 Miami Springs Electric Courts Conversion 45 45 2035 2036 Moore Park Tennis/Racquetball and Station #3 Modification and Expansion 154 2037 350 097 Fire Garage Renovation of Fire Station # , 47 2038 350098 Model City Shopping Center Center/Olympia Building Renovation 2039 350096 Gusman Cultural 2040 226