HomeMy WebLinkAboutR-83-0051,f-82-ly7 I RESOLUTION NO. A RESOLUTION ACCEPTING THE COMPLETED WORK PERFORMED BY D.M.P. CORPORATION AT A TOTAL COST OF $442,028.03 FOR NORTHERN DRAINAGE PROJECT E-52; AND AUTHORIZING A FINAL PAYMENT OF $11,128.71. WHEREAS, there exists a contract dated July 9, 1982 between the City of Miami and D.M.P. Corporation; and WHEREAS, the original contract was increased on October 14, 1982 by Resolution No. 82-963 in the amount of $40,000.00; and WHEREAS, the work has been satisfactorily completed, and D.M.P. Corporation has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and IMEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by D.M.P. Corporation at a total cost of $442,028.03 is hereby approved. Section 2. The proper officials of the City of Miami are herewith authorized to pay $11,128.71 to D.M.P. Corporation as full and final payment for all work performed and all materials furnished in connection with NORTHERN DRAINAGE PROJECT E-52. PASSED AND ADOPTED this 13 day of January , 1983. MAURICE A. FERRE __ATTEST: M A Y O R Qff ity Clerk PREPARED AND APPROVED BY: APPROVED AS TO FORM AND CORRECTNESS: Deputy City Attorney City Attorney 8 3-51 CITY OF MIAMI. FLORIDA 42 INTER -OFFICE MEMORANDUM TO Howard V. Gary DATE December 29, 1982 FILE B-5484 City Manager SUBJECT NORTHERN DRAINAGE E-52 - Resolution for Final Payment FROM Donald W. Cather REFERENCES (For Commission Meeting of January 13 , 1983 ) Director of._P blic orks ENZLOSURES The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $11,128.71 to D.M.P. Corporation for NORTHERN DRAINAGE PROJECT E-52. D.M.P. Corporation has completed the project consisting of constructing 45 drainage structures in the area bounded by the north.and west City limits, Biscayne Bay, North 36 Street, with 12 locations outside this area. The original contract amount was $402,237.02, and was increased by Resolution No. 82-963 in the amount of $40,000.00 on October 14, 1982. The completed amount is $442,028.03, and it was completed on time. It is now in order for the Commission to accept the com- pleted work and authorize final payment, after all conditions are met. :hc tj solution attached o N c� co � N O w w m 0 83-51 FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME Northern Drainage Project E-52 - B-5484 CONTRACTOR D.M.P. Corporation JOB SCOPE Construct 45 drainage structures in the area bounded by the north and west City limits, Biscayne Bay, and N. 36 Street, with 12 locations outside this area. REASON FOR WORK Eliminate storm drainage problems at locations of greatest need. SOURCE OF FUNDS Storm Sewer G. 0. Bond Fund PROJECT Bids Received: 5/13/82 HISTORY Contract Awarded: 6/17/82 Preconstruction Meeting: 7/16/82 CONTRACT TIME STARTED 7/13/82 CONTRACT TIME 150 Working days SCHEDULED COMPLETION DATE 2/16/83 ACTUAL COMPLETION DATE 12/27/82 BID AMOUNT $ 442,237.02 (Includes $40,000 increase in contract amount authorized by Reso. 82-963, 10/14/82: CONTRACT FINAL COST $ 442,028.03 CURRENT ITEM FOR Resolution to accept completed work and authorize CONSIDERATION final payment to the contractor. A 9?1a 1/1 P ; Z -