Loading...
HomeMy WebLinkAboutR-83-0134�j-83- 12 RESOLUTION NO. 83-13 A RESOLUTION ACCEPTING THE COMPLETED WORK OF P.N.M. CORPORATION AT A TOTAL COST OF $249,712.18 FOR ALLAPATTAH C014MUNITY DEVELOPMENT PAVING PROJECT - PHASE IV - (BID "A" - HIGHWAYS); AND AUTHORIZING A FINAL PAYMENT OF $31,244.52. WHEREAS, there exists a contract dated October 28, 1981 between the City of Miami and P.N.M. Corporation; and WHEREAS, the work has been satisfactorily completed, and P.N.M. Corporation has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City 17anager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COILMISSION OF THE CITY OF MIANII, FLORIDA: Section 1. The completed work performed by P.N.M. Corporation for ALLAPATTAH COMMUNITY DEVELOPMENT PAVING PROJECT - PHASE IV -(BID "A" - HIGHWAYS) at a total cost of $249,712.18 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $31,244.52 to P.N.M. Corporation as full and final payment for all work performed and all materials furnished in connection with ALLAPATTAH COMMUNITY DEVELOPMENT PAVING PROJECT - PHASE IV - (BID "A" - HIGHWAYS). 1983. PASSED AND ADOPTED this loth day of February , Maurice A. Ferre M A Y O R ATTEST: t er RED AND APPROVED BY: APPROVED AS TO FOR11 AND CORRECTNESS: Deputy City Attorney ity Attorney 441 F E B 10 1983 8 3-134 CITY OF MIAH.J. FLORIDA 74 INTER -OFFICE MFE 40RANDUm CITY MANAGER'S OFFICE �43PH59TO Howard V. Gary COTE January I� c B-4468-A City Manager FRom Donald W. Cather Director ofrPublic Works 5_eJECT ALLAPATTAH COMMUNITY DEVELOPMENT PAVING PROJECT - PHASE IV - (BID "A" HIGHWAYS) - Resolution for Final Payment REFERENCES ENCLOSURES (For Commission Meeting of February 10. 1983) The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $31,244.52 to P.N.M. Corporation for ALLAPATTAH COMMUNITY DEVELOPI1ENT PAVING PROJECT - PHASE IV - (BID "A" - HIGHWAYS) P.N.14. Corporation has completed the project consisting of constructing 0.5 mile of street, including asphaltic pavement, concrete sidewalk, concrete curbs and/or gutters, covered ditch drainage, and landscaping. The project is located in an area bounded by N.W. 28 - 32 Streets between N.17. 23 - 24 Avenues. The original contract amount was for $282,954.77, and the completed amount is $249,712.18. It was completed on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. .az esolution attached [is 83-134 FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAMIE1 Allapattah Community Development Paving Project Phase IV (Bid "A" - Highways) - B-4468 CONTRACTOR P.N.M. Corporation JOB SCOPE Construct 0.5 mile of street including asphaltic pavement, concrete sidewalk, concrete curbs and/or gutters, a covered ditch drainage system and land- scaping in area bounded by N. W. 28-32 Streets between N. W. 23-24 Avenues. REASON Streets out of grade, side parkways deteriorated FOR WORK from heavy on -street parking, and drainage problems. SOURCE OF FUNDS Federal Community Development Block Grant Fund PROJECT Bids Received: 9/17/81 HISTORY Contract Awarded: 10/7/81 Preconstruction Meeting: 11/12/81 CONTRACT TIME STARTED 11/30/81 CONTRACT 80 Working days plus 8 days delay from rain TIME and 18 days delay from utility companies relocation and clean-up work SCHEDULED COMPLETION DATE ACTUAL COMPLETION DATE BID AMOUNT CONTRACT FINAL COST CURRENT ITEM FOR CONSIDERATION 4/29/82 4/29/82 $ 282,954.77 $ 249,712.18 Resolution to accept completed work and authorize final payment to the contractor. I u ZY 43 14710 83--134