RESOLUTION NO. 83-13
A RESOLUTION ACCEPTING THE COMPLETED WORK
OF P.N.M. CORPORATION AT A TOTAL COST OF
$249,712.18 FOR ALLAPATTAH C014MUNITY
DEVELOPMENT PAVING PROJECT - PHASE IV -
(BID "A" - HIGHWAYS); AND AUTHORIZING A
FINAL PAYMENT OF $31,244.52.
WHEREAS, there exists a contract dated October 28,
1981 between the City of Miami and P.N.M. Corporation; and
WHEREAS, the work has been satisfactorily completed,
and P.N.M. Corporation has furnished the required documents
certifying that all bills for labor and materials have been
paid in full in connection with the aforesaid contract; and
WHEREAS, the City 17anager and the Department of
Public Works recommend that the completed work be accepted
and final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COILMISSION OF
THE CITY OF MIANII, FLORIDA:
Section 1. The completed work performed by P.N.M.
Corporation for ALLAPATTAH COMMUNITY DEVELOPMENT PAVING PROJECT -
PHASE IV -(BID "A" - HIGHWAYS) at a total cost of $249,712.18
is hereby approved.
Section 2. The proper officials of the City of Miami
are hereby authorized to pay $31,244.52 to P.N.M. Corporation
as full and final payment for all work performed and all
materials furnished in connection with ALLAPATTAH COMMUNITY
DEVELOPMENT PAVING PROJECT - PHASE IV - (BID "A" - HIGHWAYS).
1983.
PASSED AND ADOPTED this loth day of February ,
Maurice A. Ferre
M A Y O R
ATTEST:
t
er RED AND APPROVED BY: APPROVED AS TO FOR11 AND CORRECTNESS:
Deputy City Attorney ity Attorney
441
F E B 10 1983
8 3-134
CITY OF MIAH.J. FLORIDA
74 INTER -OFFICE MFE 40RANDUm
CITY MANAGER'S OFFICE
�43PH59TO Howard V. Gary COTE January I� c B-4468-A
City Manager
FRom Donald W. Cather
Director ofrPublic Works
5_eJECT ALLAPATTAH COMMUNITY DEVELOPMENT
PAVING PROJECT - PHASE IV -
(BID "A" HIGHWAYS) - Resolution
for Final Payment
REFERENCES
ENCLOSURES (For Commission Meeting of
February 10. 1983)
The Department of Public Works recommends
the adoption of the resolution accepting
the completed work and authorizing a final
payment of $31,244.52 to P.N.M. Corporation
for ALLAPATTAH COMMUNITY DEVELOPI1ENT
PAVING PROJECT - PHASE IV - (BID "A" -
HIGHWAYS)
P.N.14. Corporation has completed the project consisting of
constructing 0.5 mile of street, including asphaltic pavement,
concrete sidewalk, concrete curbs and/or gutters, covered
ditch drainage, and landscaping. The project is located in
an area bounded by N.W. 28 - 32 Streets between N.17. 23 - 24
Avenues. The original contract amount was for $282,954.77,
and the completed amount is $249,712.18. It was completed
on time.
It is now in order for the Commission to accept the completed
work and authorize final payment, after all conditions are met.
.az
esolution attached
[is
83-134
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NAMIE1 Allapattah Community Development Paving Project
Phase IV (Bid "A" - Highways) - B-4468
CONTRACTOR P.N.M. Corporation
JOB SCOPE Construct 0.5 mile of street including asphaltic
pavement, concrete sidewalk, concrete curbs and/or
gutters, a covered ditch drainage system and land-
scaping in area bounded by N. W. 28-32 Streets
between N. W. 23-24 Avenues.
REASON Streets out of grade, side parkways deteriorated
FOR WORK from heavy on -street parking, and drainage problems.
SOURCE
OF FUNDS Federal Community Development Block Grant Fund
PROJECT Bids Received: 9/17/81
HISTORY Contract Awarded: 10/7/81
Preconstruction Meeting: 11/12/81
CONTRACT
TIME
STARTED 11/30/81
CONTRACT 80 Working days plus 8 days delay from rain
TIME and 18 days delay from utility companies
relocation and clean-up work
SCHEDULED
COMPLETION
DATE
ACTUAL
COMPLETION
DATE
BID AMOUNT
CONTRACT
FINAL COST
CURRENT
ITEM FOR
CONSIDERATION
4/29/82
4/29/82
$ 282,954.77
$ 249,712.18
Resolution to accept completed work and authorize
final payment to the contractor.