Loading...
HomeMy WebLinkAboutR-83-0232J-33-178 2 RESOLUTION NO. A RESOLUTION ACCEPTING THE COMPLETED WORK OF DOCK AND MARINE CONSTRUCTION, INC. AT A TOTAL COST OF $29,552.00 FOR MIAMARINA AND WATSON ISLAND - PILE REPLACEMENT (BID A); AND AUTHORIZING A FINAL PAYMENT OF $2,955.20 WHEREAS, there exists a contract dated September 15, 1982 between the City of Miami and Dock and Marine Con- struction, Inc.; and WHEREAS, the work has been satisfactorily completed, and Dock and Marine Construction, Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Dock and Marine Construction, Inc. for MIAMARINA AND WATSON ISLAND - PILE REPLACEMENT - BID A at a total cost of $29,552.00 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $2,955.20 to Dock and Marine Construction, Inc. as full and final payment for all work performed and all materials furnished in connection with MIAMARINA AND WATSON ISLAND - PILE REPLACEMENT - BID A. PASSED AND ADOPTED this 18 day of MARCH 1983. MAURICE A. FERRE ATTEST: M A Y O R Cit Clerk PREPARED AND APPROVED BY: APPROVED AS TO FORM AND CORRECTNESS• Deputy City Attorney City Attorney l�l/IL. a El r 8 51J4, 63 INTER -OFFICE MEMORANDUM TO Howard V. Gary City Manager FROM Donald W. Ca�her " Director o1fi�Pu tW6 s CITY OF MIAMI. FLORIDA DATE- March 2, 1983 FILE B-2849A SUBJECT MIAMARINA AND WATSON ISLAND - PILE REPLACEMENT (Bid "A" - Miamarina) Resolution for REFERENCEinal Payment ENCLOSURES. (For Commission Meeting of March 18,1983) The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $2,955.20 to Dock & Marine Construction, Inc. for MIA14ARINA AND 14ATSON ISLAND - PILE REPLACEMENT (Bid "A" - Miamarina) Dock & Marine Construction, Inc. has completed the project consisting of removing and replacing 24 pier piles and 6 mooring piles at Miamarina. The original contract amount was for $29,740.00, and the completed amount is $29,552.00. It was completed on time. It -is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. The source of funds is "Miamarina and Watson Island Marinas - Major Maintenance" account. -- az solution attached t � =I NJ Z- ON E8@ 301330 S,830VNVW 4110 S-3-%�3A, 40 • FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME Miamarina and Watson Island - Pile Replacement (Bid "A" - Miamarina) - B-2849 CONTRACTOR Dock and Marine Construction, Inc. JOB SCOPE Remove and replace 24 pier piles and 6 mooring piles at Miamarina REASON FOR WORK Replacement of deteriorated piles SOURCE OF FUNDS Miamarina and Watson Island Marinas - Major Maintenance PROJECT Bids Received: 8/24/82 HISTORY Contract Awarded: 9/9/82 Preconstruction Meeting: 10/28/82 CONTRACT TIME STARTED 12/13/82 CONTRACT TIME 30 Working days SCHEDULED COMPLETION DATE 1/25/83 ACTUAL COMPLETION DATE 1/7/83 BID AMOUNT $ 29,740.00 CONTRACT FINAL COST $ 29,552.00 CURRENT ITEM FOR Resolution to accept completed work and authorize CONSIDERATION final payment to the contractor.