Loading...
HomeMy WebLinkAboutR-83-0231,T-83-I53 RESOLUTION N0. I,;,.1 1'-,,1 a A RESOLUTION ACCEPTING THE COMPLETED WORK OF MET CONSTRUCTION, INC. AT A TOTAL COST OF $13,161.00 FOR ORANGE BOWL - PUMP STATION MODIFICATIONS - ROOF REPLACEMENT - 1982; AND AUTHORIZING A FINAL PAYMENT OF $3,566.10. WHEREAT,, there exists a contract dated July 27, 1982 between the City of Miami and MET Construction, Inc.; and WHEREAS, the work has been satisfactorily completed and MET Construction, Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE CO1MISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by MET Construction, Inc, for ORANGE B01,-JL - PUMP SATATIO14 MODIFICATIONS - ROOF REPLACEMENT - 1982 at a total cost of $13,161.00 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $3,566.10 to MET Construction, Inc. as full and final payment for all work performed and all materials furnished in connection with ORANGE BOWL - PUMP STATION MODIFICATIONS ROOF REPLACEMENT - 1982. PASSED AND ADOPTED this 18 day of MARCH 11983. MAURICE A. FERRE M A Y 0 R ATTEST: City AClerk PREPARED AND APPROVED BY: APPROVED AS TO FORM AND CORRECTNESS: ` • 4&� D puty City Attorney 1ty Attorney CITY COMMISSION MEETING OF MAR 18 1983 RESUuiliu., w„ F(tr��liK N 62 TO. FROM CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM tex %' Howard V. Gary DATE. February 23, 1983 FILE B-5467-A City Manager sU11ECT ORANGE BOWL - PUMP STATION MODIFICATIONS - ROOF REPLACEMENT - 1982 - Resolution for Final Payment Donald 14. CatEex REFERENCES: 'recto Works (For Commission Meeting of Z. 14 ENCLOSURES: March 18, 1983) The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $3,566.10 to MET Construction, Inc, for ORANGE BOIL - PUMP STATION MODIFICATIONS - ROOF REPLACEMENT - 1982. ■ MET Construction, Inc. has completed the project consisting ., of removing the existing roof, joints, decking and roofing material and replacing with new, including a new fire rated dry wall ceiling. The pump station is located at N.W. 7 St. and N.W. 17 Place. The original contract amount was for $13,161.00, and the completed amount is $13,161.00. It was completed on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. LE -a;. ution attached -mac N n. A O n9 a � to O -Tr7 r c'J �• rn FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME Orange Bowl - Pump Station Modifications - Roof Replacement 1982 - B-5467A CONTRACTOR MET Construction, Inc. JOB SCOPE Remove existing roof, joists, deck and roofing material and replacing with new including the addition of a fire rated drywall ceiling. The building is located at N. W. 7 Street and N. W. 17 Place. REASON FOR WORK Roof deteriorated and leaking. SOURCE OF FUNDS Orange Bowl Pump Station Modifications PROJECT Bids Received: 6/22/82 HISTORY Contract Awarded: 7/22/82 Preconstruction Meeting: 8/31/82 CONTRACT TIME STARTED 10/1/82 CONTRACT TIME 30 Working days SCHEDULED COMPLETION DATE 11/15/82 ACTUAL COMPLETION DATE 11/2/82 _ BID AMOUNT $ 13,161.00 CONTRACT FINAL COST $ 13,161.00 CURRENT ITEM FOR Resolution to accept completed work and authorize CONSIDERATION final payment to the contractor. al-7 3/8.3