HomeMy WebLinkAboutR-83-0416T-83-352 RESOLUTION NO. -~' A RESOLUTION ACCEPTING THE COMPLETED WORK PERFORMED BY L.G.H. CONSTRUCTION CORPORATION AT A TOTAL COST OF $122,210.94 FOR SWIMMING POOL - RENOVATIONS - 1982; AND AUTHORIZING A FINAL PAYMENT OF $14,435.94. WHEREAS, there exists a contract dated August 10, 1982 between the City of Miami and L.G.H. Construction Corporation; and WHEREAS, the original contract was increased on March 18, 1983 by Resolution No. 83-224 in the amount of $5,000.00; and WHEREAS, the work has been satisfactorily completed, and L.G.H. Construction Corporation has furnished the re- quired documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by L.G.H. Construction Corporation for SWIMMING POOL - RENOVATIONS - 1982 at a total cost of $122,210.94 is hereby approved. Section 2. The proper officials of the City of Miami are herewith authorized to pay $14,435.94 to L.G.H. Construction Corporation as full and final payment for all work performed and all materials furnished in connection with SWIMMING POOL - RENOVATIONS - 1982. CITY COT41MSSION OF MAY 12 1983 m 41 PASSED AND ADOPTED this 12th day of May , 1983. ATTEST: City erk PREPARED AND APPROVED BY: A,4 • Deputy City Attorney APPROVED AS TO FORM AND CORRECTNESS: ty Attorney - 2 - au ice A. Ferre M A Y O R. 83"/3IC- F�3 CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM FAV TO Howard V. Gary DATE April 27, 1983 FILE B-2839 City Manager ,R- ;on�aled W. at er % Director of Public Works SJB:EZ- SWIMMING POOL - RENOVATIONS - 1982 - Resolution for Final Payment RErEREhGES (For Commission meeting ENCLOSJRFS of May 12, 1983) The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorzing a final payment of $14,435.94 to L.G.H. Construction Corporation for SWIMMING POOL - RENOVATIONS - 1982. L.G.H. Construction Corporation has completed the project Con- sisting of modifications to the pump room at Curtiss Park Pool, including the repair of baffles system and three existing filter tanks, and replacement of conduit and electrical wiring around the perimeter of the pool at Curtiss Park, located at 2300 N. W. North River Drive; also, modifications to the pump room, installing new filters and new pool lighting system at Morningside Park Pool, located at 850 N. E. 55 Terrace. The original contract amount was $119,750.00, and was increased by Resolution No. 83-224 in the amount of $5,000.00 on March 18, 1983. The completed amount is $122,210.94, and it was com- pleted on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. LEL.hc Resolution attached 83_ 116 ♦ 4' y FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER ' JOB NAME Swimming Pool - Renovations - 1982 B-2839 CONTRACTOR L.G.H. Construction Corporation JOB SCOPE Make modifications to the pump room at Curtis Park Pool located at 2300 N. W. North River Drive. Also modifications to the pump room installing new filters and new pool lighting system at Morningside Park Pool at 850 N. E. 55 Terrace. REASON FOR WORK Replace deteriorated equipment SOURCE OF FUNDS Swimming Pool Renovations PROJECT Bids Received: 6/22/82 HISTORY Contract Awarded: 7/22/82 Preconstruction Meeting: 8/30/82 CONTRACT TIME STARTED 11/12/82 CONTRACT 80 Working days plus five days delay for extra TIME electrical work. SCHEDULED COMPLETION — DATE 3/17/83 ACTUAL COMPLETION DATE 3/17/83 BID AMOUNT $ 124,750.00 (Includes $5,000.00 increase in contract for unforeseen extra work, authorized by Comm. Reso. 83-224.) CONTRACT FINAL COST $ 122,210.94 CURRENT ITEM FOR Resolution to accept complete work and authorize CONSIDERATION final payment to the contractor. y 83-(11G