HomeMy WebLinkAboutR-83-0416T-83-352
RESOLUTION NO. -~'
A RESOLUTION ACCEPTING THE COMPLETED WORK
PERFORMED BY L.G.H. CONSTRUCTION CORPORATION
AT A TOTAL COST OF $122,210.94 FOR SWIMMING
POOL - RENOVATIONS - 1982; AND AUTHORIZING
A FINAL PAYMENT OF $14,435.94.
WHEREAS, there exists a contract dated August 10,
1982 between the City of Miami and L.G.H. Construction
Corporation; and
WHEREAS, the original contract was increased on
March 18, 1983 by Resolution No. 83-224 in the amount of
$5,000.00; and
WHEREAS, the work has been satisfactorily completed,
and L.G.H. Construction Corporation has furnished the re-
quired documents certifying that all bills for labor and
materials have been paid in full in connection with the
aforesaid contract; and
WHEREAS, the City Manager and the Department of
Public Works recommend that the completed work be accepted
and final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION
OF THE CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by L.G.H.
Construction Corporation for SWIMMING POOL - RENOVATIONS -
1982 at a total cost of $122,210.94 is hereby approved.
Section 2. The proper officials of the City of
Miami are herewith authorized to pay $14,435.94 to L.G.H.
Construction Corporation as full and final payment for all
work performed and all materials furnished in connection
with SWIMMING POOL - RENOVATIONS - 1982.
CITY COT41MSSION
OF
MAY 12 1983
m
41
PASSED AND ADOPTED this 12th day of May ,
1983.
ATTEST:
City erk
PREPARED AND APPROVED BY:
A,4 •
Deputy City Attorney
APPROVED AS TO FORM AND CORRECTNESS:
ty Attorney
- 2 -
au ice A. Ferre
M A Y O R.
83"/3IC-
F�3
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
FAV
TO Howard V. Gary DATE April 27, 1983 FILE B-2839
City Manager
,R- ;on�aled W. at er %
Director of Public Works
SJB:EZ- SWIMMING POOL - RENOVATIONS -
1982 - Resolution for Final
Payment
RErEREhGES
(For Commission meeting
ENCLOSJRFS of May 12, 1983)
The Department of Public Works recommends
the adoption of the resolution accepting
the completed work and authorzing a final
payment of $14,435.94 to L.G.H. Construction
Corporation for SWIMMING POOL - RENOVATIONS -
1982.
L.G.H. Construction Corporation has completed the project Con-
sisting of modifications to the pump room at Curtiss Park Pool,
including the repair of baffles system and three existing
filter tanks, and replacement of conduit and electrical wiring
around the perimeter of the pool at Curtiss Park, located at
2300 N. W. North River Drive; also, modifications to the pump
room, installing new filters and new pool lighting system at
Morningside Park Pool, located at 850 N. E. 55 Terrace.
The original contract amount was $119,750.00, and was increased
by Resolution No. 83-224 in the amount of $5,000.00 on March 18,
1983. The completed amount is $122,210.94, and it was com-
pleted on time.
It is now in order for the Commission to accept the completed
work and authorize final payment, after all conditions are
met.
LEL.hc
Resolution attached
83_ 116
♦ 4'
y
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER '
JOB NAME
Swimming Pool - Renovations - 1982 B-2839
CONTRACTOR
L.G.H. Construction Corporation
JOB SCOPE
Make modifications to the pump room at Curtis Park
Pool located at 2300 N. W. North River Drive. Also
modifications to the pump room installing new
filters and new pool lighting system at Morningside
Park Pool at 850 N. E. 55 Terrace.
REASON
FOR WORK
Replace deteriorated equipment
SOURCE
OF FUNDS
Swimming Pool Renovations
PROJECT
Bids Received: 6/22/82
HISTORY
Contract Awarded: 7/22/82
Preconstruction Meeting: 8/30/82
CONTRACT
TIME
STARTED
11/12/82
CONTRACT
80 Working days plus five days delay for extra
TIME
electrical work.
SCHEDULED
COMPLETION
— DATE
3/17/83
ACTUAL
COMPLETION
DATE
3/17/83
BID AMOUNT
$ 124,750.00 (Includes $5,000.00 increase in contract
for unforeseen extra work, authorized
by Comm. Reso. 83-224.)
CONTRACT
FINAL COST $ 122,210.94
CURRENT
ITEM FOR Resolution to accept complete work and authorize
CONSIDERATION final payment to the contractor.