RESOLUTION NO. '
A RESOLUTION AUTHORIZING AN INCREASE IN
THE TURNKEY CONTRACT, BETWEEN rHE CITY
AND MIAMI CENTER ASSOCIATES, INC., FOR
THE CONVENTION CENTER PARKING, GARAGE, IN
THE AMOUNT OF $171,740; SAID FUNDS TO BE
PROVIDED FROM THE CONSTRUCTION ACCOUNT
ESTABLISHED FROM THE SALE OF CONVENTION
CENTER AND PARKING GARAGE REVENUE BONDS.
WHEREAS, there exists a Turnkey Contract between the
City of Miami and Miami Center Associates, Inc., dated
May 20, 1980, for the building of a parking garage of at
least 1,450 spaces at a cost not to exceed $15,000,000 and
providing for appropriate cost safeguards; and
WHEREAS, the Citv Commission, on November 26, 1980,
authorized an increase in the scope of the Turnkey Contract
in the amount of $4,800,000 with the requirement that said
funds be provided by Dade Savings and Loan and be deposited
with the Pan American Hank, in accordance with the applicable
Trust Indenture provision and that the basic provisions of
the Turnkey Contract remain the same; and
WHEREAS, by Resolution No. 82-251, the City Commission
authorized the City Manager to increase the Turnkey Contract
in the amount of $127,660 for unforeseen foundation work; and
WHEREAS, the Contract provides for changes in the work
to be ordered by the City and additional work requested by
Dade County Transportation Administration was necessary to
accommodate the Downtown Component of Metrorail; and
WHEREAS,the above changes, together with changes in the
work requested by the Department of Off -Street Parking for
public safety and convenience, have resulted in an overrun to
the Turnkey Contract in an amount of. $171,740; and
WHEREAS, the Project Director and the consultants
recommend approval of the request for the herein increase in
the Contract; and
CITY COMMISSION
:`llF.i:TIiv'C OF
J U �1 9 1983 I
WHEREAS, funds for the increase are available from
Convention Center and Parkinq Garage Revenue Bond Funds;
MOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA:
Section 1. The Turnkey Contract between the City of
Miami and Miami Center Associates, Inc., dated May 20, 1980,
for the Convention Center Parking Garage, is hereby increased
in the amount of $171,740, with funds for the herein
increase to be provided from the Construction Account
established from the sale of Convention Center and Parking
Garage Revenue Bonds.
PASSED AND ADOPTED this 9th day of June , 1983.
ATTEST:
RALPol G. ONGIE
CITY CLERK
PREPARED AND APPROVED BY:
ROBERT F. CLARK
DEPUTY CITY ATTORNEY
Maurice A. Ferre
MAURICE A. FERRE
M A Y 0 R
APPROVED AS TO FORM AND CORRECTNESS:
SE R. GARCIA-PEDROSA
ITY ATTORNEY
-2=
83- 10
:kill
._....
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
3 ","'3
To Howard v. Gary LATE April 28, 1983 FILE,
City Manager_
FROM! Ai lan I . oftlS
Project Director
Conference Center
SUBJECT. Convention Center Parking Garage -
Resolution to Increase Turnkey
Contract Amount
REFERENCES.
ENCLOSURES:
A resolution authorizing an increase in
the Turnkev Contract between the City of
Miami and Miami Center Associates, Inc.
for the construction of the Convention
Center Parking Garage in the amount of
$171,740 said funds to be provided from
the construction account established
from the sale of Convention Center and
Parking Garage Revenue Bonds.
The construction of the Convention Center Parking Garage is nearing
completion and all of the cash allowance provided under the present
Turnkey Contract has been expended. Within the Parking Garage
structure are provisions to accommodate the Downtown Component of
Metrorail (DCM), and it was essential to incorporate changes including
future track inserts, drains and piping for the platform and related
DCM elevator and escalator, and miscellaneous electrical work. The
Transportation Coordinator, Warren J. Higgins, has provided the City
with a letter indicating the costs of these changes ($87,678) will be
credited the City's share in the overall funding of the DCM project.
The Department of Off -Street Parking requested changes necessary to
improve the public safety and convenience and the operations of the
garage. These changes include additional safety bollards, stair
railings and interior directional signage. Also included are Architect's
fees on change order work and miscellaneous waterproofing and FPL meter
work. The cost of these changes ($84,062) has been recommended for
approval by the consultants.
The total cost of the additional work requested above is $171,740.
Funds for the increase in the Turnkey Contract are available from the
Construction Account established from the sale of Convention Center
and Parking Garage Bonds.
83-51C
0
METROPOLITAN DADE COUNTY, FLORIDA
METRO -DADS
APR 2 ; 1333
Mr. Vincent Grimm, Jr.
Assistant City Manager
City of Miami
P.O. Box 330708
Miami, FL 33133
Dear Mr. Grimm:
TRANSPORTATION ADMINISTRATION
"W. FLAGLER STREET
MIAMI, FLORIDA 33130
(305) 579-5675
We have received a copy of Change Order No. 12 for the Miami World Trade
Center Parking Garage and, based on the documentation provided, concur
that the expenditures covered by this change $87,678.00 are reasonable
and necessary to accommodate the Downtown Component of Metrorail (DCM)
within the garage structure.
It is my understanding that costs incurred by the City in effecting this
change will be credited towards the City's $9.9 million contribution to the
DC,4 project. Please call if you have any questions.
Sin ly ,
barre.Higgins
n
ransportation Coordinator
WJH:GFW:ara
cc: M. Feldman
J. Moreno
R. Canelas
0
MIAMI CENTER ASSOCIATES, INC.
April 8, 1983 ,
rs
Jim Moreno, Engineer
Dade County Transportation Administration =-
44 West Flagler Street
Miami, Florida 33130
Re: MIAMI W.T.C. PARKING GARAGE �..
FILE: 77-2000
Dear Jim:
There is a Change Order pending with the City of Miami, for additional work per-
formed for the D.C.M. in the Miami W.T.C. Parking Garage.
The amount of this Change Order is: $87,678.00
Work Accomplished Is:
1. Installation of future track inserts allowing DCM track the flexibility
to travel North or West. Hyman Change Proposal Number 81097R
2. Sixteen additional electrical sleeves through floor into the DCM
Electrical Room below. Hyman Change Proposal Number 81111
3. Mechanical work as per bid pack 13 consisting of underground drainage
for DCM Escalator and Elevator Pits. Hyman Change Proposal Number 81130
4. Installation of roof drain and piping for DCM handicapped elevator at
garage level 2. Hyman Change Proposal Number 81151
S. Re-routing fire alarm conduit, previously installed, so that added
Electrical Rooms for DCM could be constructed. Hyman Change Proposal
Number 81172
6. Architectural fees not previously charged for Change Orders previously
submitted.
The mechanical work described above was beyond the scope of the Developer's Turnkey
Contract with the City of Miami, but had to be installed at this time to prevent
future installation problems with the Garage. Delaying this installation would have
resulted in a more costly and conflicting future construction.
The installation of the sleeves and the re-routing of the fire alarm conduit are a
result of field conditions encountered in the construction of the Electrical Rooms.
TWELFTH FLOOR • 150 5 E :nd AVF.NL1E • AIIAAII FLORIDA all 11 • PHO%f t3051 )58-::77
83--51 C
' -33- ;14
Ak
Jim Moreno, Engineer
Dade County Transportation Administration
April 8, 1983
Page 2 of 2
Since'this work has been accomplished, and in order to refresh the memories of
the principals namely, you, Simon Zweighaft, Vince Grimm and Rich Heisenbottle,
it is essential we have a meeting at your earliest convenience. At that time
DCM approval can be given to the City on the line below. I am awaiting your
phone call scheduling this meeting.
Thank you for your cooperation.
V ry truly yours,
M AMI CENTERIATES, INC.
ort Feldman
Project Manager
MF:Ih
cc: Allan I. Poms
Vincent E. Grimm, Jr.
William Fitzpatrick
Richard Heisenbottle
Approved D.C.M.
By:
83-S1C
VA
MIAMI CENTER ASSOCIATES, INC.
April 28, 1983
Allan I. Poms
Project Director
CITY OF MIAMI
150 S.E. 2nd Avenue
Miami, Florida 33131
Re: FILE: MIAMI WORLD TRADE CENTER PARKING GARAGE
77-100
Dear Allan:
Change Orders Number Thirteen and Fourteen have been submitted for funding.
By way of summation they contain:
1. Change Order Thirteen - George Hyman Construction Company
Proposal Number 81082 for furnishing additional Bollards
and Hand Rails. Architectural Fees, Developer Overhead
Expense. - $63,235.00
2. Change Order Fourteen:
a. George Hyman Construction Co. Number 81151 - water-
proofing for level one above Retail Areas at
Escalators.
b. George Hyman Construction Company Number 81158 - added
interior signs.
c. George Hyman Construction Co. Number 81132 - added
disconnect switch for Florida Power & Light Meter. - $20,827.00
Thank you for your prompt attention.
(Sincer ly Vurs,
MIAMI ER Q�OCIATES, Inc. _
--re i ow
ect Manager
MF:lh