rr RESOLUTION N0. N3-496t
A RESOLUTION ACCEPTING THE COMPLETED WORK
OF MET CONSTRUCTION, INC. AT A TOTAL COST
OF $ 40 , 367 FOR ORANGE BOWL - WEST END
ZONE BLEACHERS; AUTHORIZING AN INCREASE
IN THE JUNE 1, 1982 CONTRACT WITH MET
CONSTRUCTION, INC. FOR SAID WORK IN THE
NET AMOUNT OF $2,500 AND AUTHORIZING A
FINAL PAYMENT OF $6,286.70.
WHEREAS, there exists a contract dated June 1, 1982
between the City of Miami and MET Construction, Inc. for
ORANGE BOWL - WEST END ZONE BLEACHERS; and
WHEREAS, the work has been satisfactorily completed, and
MET Construction, Inc. has furnished the required documents
certifying that all hills for .labor and materials have been
paid in full in connection with the aforesaid contract; and
WHEREAS, it was determined after the demolition of the
existing bleachers that the concrete pads supporting the
understructure were broken, missing, or out of grade with
this extra work requiring
an increase
in
the contract; and
WHEREAS, sufficient
funds for
the
increased cost are
available from Tourist Development Funds already allocated to
the project; and
WHEREAS, the City Manager and the Director of the
Department of Puhlic works recommend the increase of $2,500
to cover the increase in the contract;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE,
CITY OF MIAMI, FLORIDA:
Section 1. The amount of the June 1, 1982 contract with
MET Construction, Inc. for ORANGE BOWL - WEST END ZONE
BLEACHERS is hereby increased in the net amount of $2,500
with monies therefor hereby allocated from Tourist
Development Authority Funds.
Section 2. The completed work performed by MET
Construction, Inc. for ORANGE BOWL - WEST END ZONE BLEACHERS
is hereby accepted at a total cost of $40,367.
CITY COMMISSION
MEETING OF
J U N 9 1983
hE41�liK5,
S
Section 3. The proper officials of the City of Miami
are hereby authorized to pay MET Construction, Inc. a
balance of $6,286.70 as full and final payment for all work
performed and all materials furnished in connection with the
aforesaid contract.
PASSED AND ADOPTED this 9th day of
ATTEST:
R ALPIH G. ONGIE
ITY CLERK
PREPARED AND APPROVED BY:
�� i ��1 (_ f � l ,• 1, ��.. � \ _ -_-
ROBERT F. CLARK
DEPUTY CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
OSE R. GARCIA—PEDROSA
CITY ATTORNEY
June , 1983.
Maurice A. Perre
MAURICE A. FERRE
M A Y 0 R
-2-
83-49t;t
CITY OF MIAMi. FLORIDA
r
/
65
INTER-OME-6 t -ME440R.ANDIUM
„ .
TO
Howard V. Gary
DATE
May 24, 1983 FILE B-2842
City Manager
SUBJECT
ORANGE BOWL - WEST END ZONE
BLEACHERS - Resolution for
Increase in Contract and
Final Payment
FROM
Donald W. Cather
REFERENCES
Dfor
Works
(For Commission Meeting
t
ENCLOSURES.
of June 9, 1983)
The Department of Public Works recommends
the adoption of the resolution accepting
the completed work performed by MET
Construction, Inc. at a total cost of
$40,367.00 for ORANGE BOWL - WEST END
ZONE BLEACHERS; authorizing an increase
in the contract in the amount of
$2,500.00; and authorizing a final payment
of $6,286.70.
MET Construction, Inc. has completed the project consisting
of the removal of the existing metal structure with wood and
fiberglass seating, and replacing with a new all aluminum
portable type bleachers. After the demolition of the
existing bleachers, it was determined that the concrete pads
supporting the understructure were broken, missing, or out
of grade, causing an overrun to the contract amount.
Funds to cover the overrun are available from "Tourist
Development Authority Funds". This was a lump sum contract
in the amount of $40,367.00, including a $2,500.00 increase
in contract amount to cover the extra work. The work was
completed on time.
It is now in order for the Commission to accept the completed
work and authorize final payment, after all conditions are
met.
- eL:hc
solution attached
8 3-4961
61
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NAME Orange Bowl - West End Zone Bleachers - B-2842
CONTRACTOR MET Construction, Inc.
JOB SCOPE Remove existing bleachers from west end zone and
replace them with new aluminum bleachers. The
Orange Bowl Stadium is located at 400 N. W. 14
Avenue.
REASON
FOR WORK Deteriorating wood and fiberglass bleachers.
SOURCE
OF FUNDS Tourist Development Authority Funds
PROJECT
Bids Received: 4/28/82
HISTORY
Contract Awarded: 5/27/82
Preconstruction Meeting: 7/8/82
CONTRACT
TIME
STARTED
8/11/82
CONTRACT
TIME
10 Working days
SCHEDULED
COMPLETION
DATE
8/24/82
ACTUAL
COMPLETION
DATE
8/14/82
BID AMOUNT
$ 37,867.00
CONTRACT
FINAL COST
$ 40,367.00
CURRENT Resolution to accept completed work, increase contract
ITEM FOR amount $2,500.00, and authorize final payment to the
CONSIDERATION contractor.