Loading...
HomeMy WebLinkAboutR-83-054317, 3-83-484 rr RESOLUTION NO. 83-543, A RFSOLt1TION APPRf3VING THE ATTACHED FUNDING PROPOSAL DATED JUNE 79 1983 FOR IMPLEMENTING THE FULL DOWNTOWN PEOPLE MOVER SYSTEM WITH FUNDS FROM THE FLORIDA POWER AND 1,1G11I FRANCHISE TAX IN AN AMOUNT NOT TO EXCEED 10,5F, MILI.TON DOLLARS AS THE CITY'S FUNDING SHARE. WHEREAS, the Pity Commi:,si.on adopted Resnlution No. 79-744 on October 31, 1979 approving a funding proposal for the Downtown People Mover Project which provided For a contribution of up to 9.9 million dollars as the City's funding share; and WHEREAS, an extension of the syst.ein as originally designed has been recommended by Metropolitan Dade County with most of the funding to be requested from the United States Department. of Transportation; and WHEREAS, the expansion of the system is a critical need to adequately serve the downtown arei3; and W H E R E A 5 9 the additional .66 million dollars is expected to generate over $150,000,000 in additional federal dollars to construct the system; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The funding plan outlined in the attached Funding Proposal for implementing the full Downtown People Mover System dated June 7, 1983 is hereby approved. Section 2. Use of funds from the Florida Power and Light Franchise tax in the amount specified in the said Proposal is hereby committed upon the assurance that the City's funding share in the funding plan delineated in the said Proposal not exceed 10.56 Million Dollars. CITY COMMISSION MEETING OF J U N 15 1983 i'Bol u i,a., P.EMAPKS. , I PASSED AND ADOPTED this 15th day of June , 1983. Maurice A. Ferr MAURICE A. FERRE M A Y O R 1 RAL 1 G. ONGIE, CITY Cl__ K PREPARED AND APPROVED BY: ROBERT F. CI_ARK DEPUTY CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: ? 29t:�� J G RCIA-PEDROSA °.CITY ATTORNEY 83--S 43! V I. 36 Honorable Mayor and Members of the City Commission �,.., Howard V. Gary City Manager IIt :Mt. �, c,V. =T� June 7, 1983 9-ILE Downtown People Mover Stage II Funding 4 EFF ENC 5 .`JG 1. C.3..=1�5. In October 1979, Miami City Commission Resolution 79-744 committed the use of Florida Power and Light Franchise Tax proceeds in an amount not to exceed $9,900,000 as our portion of the local share for the Downtown People Mover (DPM). At that time, the total system was expected to cost $165,000,000. Subsequently, Metropolitan Dade County received Federal approval for the DPM Stage I funding to construct the 1.9 mile DPM loop. The current cost estimate for the loop is approximately $140,000,000 with $2,440,000 provided by the City of Miami. Metropolitan Dade County and the People Mover Advisory Committee have agreed to seek full Stage II funding (Brickell and OMNI legs) from the Federal Government and the County has prepared a grant application seeking $150,835,500 as part of a total package of approximately $201,114,000. The funding package assumes State participation for 12-1/2% of the funds and an imposition of a special assessment on private development(s) similar to the one imposed in the Downtown loop area. This assessment will generate $10,000,000 for the DPM. The formula would require the balance of the original $9.9 million, plus an additional $659,320 from the City. Since our original share of the $165,000,000 project defined in 1979 was $9,900,000, a $659,320 increase in relationship to a total budget increase of over $165,000,000 is not excessive. Therefore, it is recommended that the City Commission enact a resolution indica- ting that it will pledge Florida Power and Light Franchise Tax por- ceeds in an amount not to exceed $10,560,000 for the DPM. This resolution would enable the County to file the application for full DPM Stage II funding with the assurance that the City's funds would be forthcoming as needed. This project is extremely important to the future of Downtown and it is recommended that the Commission enact the attached resolution. Attached for your information is a letter from County Manager Merrett Stierheim requesting the additional monies and transmitting background information. 83-543r I Howard V. Gary June 7, 1983 -ILE. City Manager Downtown People Mover Stage II Funding 7_ �c Jim Reid °F='F`" = ROM i-- Assistant City Manager - ��� In October 1979, Miami City Commission Resolution 79-744 committed the use of Florida Power and Light Franchise Tax proceeds in an amount not to exceed $9,900,000 as our portion of the local share for the Downtown People Mover (DPM). At that time, the total system was expected to cost $165,000,000, Subsequently, Metropolitan Dade County received Federal approval for the DPM Stage I funding to construct the 1.9 mile DPM loop. The current cost estimate for the loop is approximately $130,000,000 with $2,440,000 provided by the City of Miami. Metropolitan Dade County and the People Mover Advisory Committee have agreed to seek full Stage II funding (Brickell and OMNI legs) from the Federal Government and the County has prepared a grant application seeking $150,835,500 as part of a total package of approximately $201,114,000. The funding package assumes State participation for 12-1/20 of the funds and an imposition of a special assessment on private development(s) similar to the one imposed in the Downtown loop area. This assessment will generate $10,000,000 for the DPM. The formula would require the balance of the original $9.9 million, plus an additional $659,320 from the City. Since our original share of the $165,000,000 project defined in 1979 was $9,900,000, a $659,320 increase in relationship to a total budget increase of over $165,000,000 is not excessive. Therefore, it is recommended that the City Commission enact a resolution indica- ting that it will pledge Florida Power and Light Franchise Tax pro- ceeds in an amount not to exceed $10,560,000 for the DPM. This resolution would enable the County to file the application for full DPM Stage II funding with the assurance that the City's funds would be forthcoming as needed. This project is extremely important to the future of Downtown and it is recommended that the Commission enact the attached resolution. Attached for your information is a letter from County Manager Merrett Stierheim requesting the additional monies and transmitting background information. 83-543( C METROPOLITAN DADE COUNTY, FLORIDA METRO DADE t Mr. Howard Gary City Manager City of Miami Pan American Plaza City Hall Miami, Florida 33 33 Dear h1r. ry: The purpose of this correspondence is to City of iMiami's understanding of funding Component of Metrorail (DCM). OFFICE OF COUNTY MANAGER 911 COURTHOUSE MIAMI, FLORIDA 33130 (305) 579.5311 MAY 1 N '983 finalize Dade County's, and the commitments for the Downtown As you know Dade County considers the DCM to be an integral element of the county's overall transportation program. For this reason Dade County has diligently worked with the Urban Mass Transportation Administration (UMTA), the City of Miami, and the private sector to form an excellent working relationship with the primary goal of making the DCM a reality. As originally conceptualized, the DCM will consist of a loop around the central business district (CBD); a northern leg serving the Omni area; and a southern leg serving the Brickell Avenue area (see attachment). Funding constraints imposed by UMTA made construction of the entire system in a single step infeasible. Stage I, which consists of the CBO loop, has received funding and is currently under construction. The extension of the system, which consists of both the north and the south legs, has had preliminary engineering performed and work is underway on a draft environ- mental impact statement. In order to proceed with the implementation of the extensions, approximately $201,114,000 must be made available. Dade County is prepared to submit a capital grant application to UMTA for $150,835,500, which is equal to 75ro of the total project cost. Prior to submission of the application, however, we must be able to show that the 25110 local match equaling $50,278,500 is avail- able. The City Commission, in Resolution No.79-744, committed $9.9 million to assist in the construction of the DCM. To date $3,320,070 has been encumbered as follows: 83-54�, 4 Mr. Howard Gary Page -2- Cont'd S 2,340,000 - Stage I Contribution $ 732,400 - Agreed upon Changes to World Trade Center Garage S 87,678 - Additional Changes to World Trade Center Garage S 59,992 - Changes made at Dade County's request to World Trade Center 100,000 - City share for Biscayne Boulevard Parking Improvements. The importance of the City's contribution can best be illustrated by the progress that has occurred in the DCH project to date. The above mentioned $3,320,070, when coupled with.Dade County's contribution of over $17 million and the private sector's dedication of $20 million, has enabled us to secure over $64 million in federal funds and almost $12 million from the state. The net result is that full funding is on hand for the Stage I C5D loop. It is our hope that we can continue to rely on the City of Miami in our efforts to secure funding for the Stage II,extensions. As mentioned earlier the sum of S50,278,500 is required by UMTA as a local match. Dade County, the State of Florida, and the private sector will be able to commit a maximum total of $43,039,250. The only other source available for the balance of local funding ($7,239,250) is the City of Miami. In order to provide this sum, which is essential to our effort to obtain federal funding for the exten- sions, it is necessary for the City to exceed its previous commitment of S9.9 million by $659,320. Therefore, please consider this letter a formal request that the City of Miami make the sum of-S7,239,250 available, to complete the local match, :ihich would allow Dade. County to secure the $150,335,500 in federal funds for completion of the Stage II DCM extensions. This matter has been discussed and endorsed by the Downtown Transportation Policy Committee at their January, 1983 meeting. In addition, we have coordinated this approach with Jim Reid of your staff and with the Downtown Development Authority. A copy of the draft DC[4 extension application is enclosed for your review, along with a copy of the City's original resolution for the full DCM system. Endorsement by the City Commission of the draft application is needed, along with the commitment of City funds, prior to submitting the application to UMTA. If you need any additional information pertaining to this subject please feel free to contact Mr. Alan C. Wulkan, Director of Governmental Relations for the Dade County Transportation ministration at 579-3802. S ncere L N. R. Stierheim L S County Manager 83-54 ADOPTED D P M ALIGNMENT :, - m u& % tt,.&-.CE 0 F, ed STATIC" 8 "o .3, 83-543' A R ,OLUILIC AP : RO'liii:i THE ATTACHED P=' d FUIZI;IG PRCFGSAL J_ I;'IFL:.;i;✓"iTiii_, THE FULL Si, N OF THE DOWNTG.-IN PEOPLE ;MOVER PRODE CT ,'JITH FUNDS THEREFOR FROM THE FLORIDA POWER AND LIGHT FRAINCHISE TAX, WITH THE CITY' S FUNDING SHARE NIOT TO EXCEED 9.-S MULLION DcL�ARS . is J ;!HERE 3, the City of ',Iiar,i desires to construct the full Do:into:,n P'eoplc !'lover System to serve the transportation needs of the Do:•rnto:•m area and the re=ion; and iHEF-EAS, the � „ funding proposal has been developed to secure fu+_ unding of the Dcwnto:•rn Pecple "lover project by the Urban Mass Transit Administration; NO:v, THEREFCRE: BE IT RESOLVED BY THE C0;•7?IISSION OF THE CITY OF MIAIMI, FLORIDA: Section 1. The City Commission approves and endorses the funding plan outlined in the attached Pr-erian Fundin.�*Proposal. Section 2. The City Commission hereby co,;,r.,its the use of funds from the Florida Power and Light Franchise tax in the amount sneeified In the said Prsnosal to ensure that the City's funding share in the funding plan delineated in the said Pro- cosp 1 not exceed Killion Dollars. - PASSED AND ADOPTED this 3trr-'day of October 19�9. Ci--_P- C L PRE?, D AND APPROVED/ Maurice A. Ferre M A Y C R "DOCUMENT NDEX ITEM N0. IF 83-543k PART I APPLICATION FORTS c 83-543 FEDERAL ASSISTANCE Z. APPLI- i. NUMBER _ CANrs FL-03-0050 1. TYPE PREAPPIICA71ON APPLI• b. DATE ACTION O APPLICATION CATION 19 Year esoatA dap r1.10� �� [] MOTIF! IATION OF INTEW (Opt) Leave Cos:) REPORT OF FEOERA1 ACTION Blasts 4. LEGAL APPLICANT/RECIPIENT e. Applec-ntNlme : ?Metropolitan Dade County b. OrcanitatiortUnit : Transportation Administration e. sttafl/P.O. Boa : 44 West F l a g l e r St. d. City : *Miami o. County : Dade I. State : Florida 9. ZIP Code: 33130 b. Canhet P-11 (Name Alan C. Wul{can & trtooph,>w• No.) : (305) 5 79-3502 7. TITLE JLWO DESCRIPTION OF APPLICANT'S PROJECT Miami Downtown People Mover Project -Funds to cons- truct two extensions to the fully elevated, double guideway system that will provide downtown Miami a circulation/distribution system linking Metrorail with the City's major economic centers. OMB Aoproval No. 29-RO218 3. STATE NUMBER APILICA. 80-2066 TION IDENT1. b. DATE Year r""th date FIER ASSIGNED 19 5. FECERAL EIAPLOYER IDENTIFICATION 110. 59-6000573 aRo a• MUMSER ( 0! 0 15 10 1 o 1 GRAM b. TITLE FFdcrw Urban :-lass Transportation Catalog) Capital Improvement Grant & TYPE OF APPLICANT/RECIPIENT A -Slats t1-Wnmunlry Arlen Altnry B-Intantatie I- M,tntr El UCA1,0•.el Irtt.tatlow C-1"vite I• -Indian Tribe ulw.d K-01nr (Specify): D-1ountt C- C.Iy F- Sc pool 01 strict G-aofnal Pt:r9r�e Otsuict Cater approrr(ats letter !! 9. TYPE OF ASSISTANCE A-Bes1e Grant 0-Insurance B�SusDlemen a1 Grant E-0thes Enter a„ro- A C-lala prance Istta-(•) M AREA OF PROJECT I!.IPACT Wames of cities, counties. 11. ESTIMATED NUM 112. TYPE OF APPLICATION States, etc.) BER OF PERSOtvS A. -Now C-Revlslon E-1ulmentat:om BENEFITING F-1 voorel D-Catt.nwttatl Metropolitan Dade County 1,620,000 Enter appro:mate teeter 1I 13. PROPOSED FU.tCING 14. CONGRESSIONAL DISTRICTS OF: 15. TYPE OF CHANGE (For tte or its) A-Inerue Volition F-Dtiew (Spenlp): a-cocrrase Oa.ers e• a. AiPLtCAtlT •. FT'E ..L s 150 , 535 , 500.A b. PROJECT i� b. Aro;tr_.ctl 6 900 000.•,i0! 16 17 18 19 Same C-1^.-rfese Q%wos D-Cear"a:Wsow. TnrrnaSe SC61De E-Canc&uAs a 5'AtE ! 25 . 1 39 ; 16. PROJECT START 17. PROJECT L25(tc0 DATE Year wto"k day i 7 239 250:a ! UPATION 98 Cater a-pra. I C r it. Lox 19 33 11 1 !Now:Ss pru:e n::areel ,A , a. OTUER 1 1 000 n0O 3 j 1!. fcTIMATEO DATE TO Year w o"h .Lay 19. EXISTING FEDERAL IC:NTIFICAT10N NU48ER , , Dr- !i U.4MITTED TO 1. TCTAL_1 S 201 .114,()0FECERAL AGENCY 1.- 19 83 6 10 FL-03-0050 _ M FEI-M%L. AGENCY TO RE2L Vs- REQUEST toms, Caaf. State. ZIP code) 21. REMARKS ACC:O Urban 'lass Transportation :Administration Atlanta,-Ga. 303013 I [ Yes No 22. 1 a. Ta the bast of no turavtidts end "tiff, b. It required by OMB C.mvler A-95 Wa is ?'a c• r.ercnss } -:f ie L1,a praapW ullongCDtluLon era stntctions thenln, to tpw:Dtiate c uwnetotoisn Sao sit rssoor.laa arc sravft; sp.:-se a::3.ne4 S1 THE I t » ens cores, the dormment has ban APPLICANT ; d..:y t..!wn3ad by the tonrnlnt body 0 CERT'F'.a t t:.e a:onoat ens :ae amlimet will torttcly I t (1) Dade County Planning Department ❑ 03 'o"t6 a;a � rt� �"Oe °~ Hs"e'''' o -South Florida Regional Planning Council �' ❑ -- FlnrjrL.'! Tlnn.orrmnnr of .1ri•-,i.,ir-rr�ririr, - M a "et1 f.sLt ant '..L _---^. tam :.:AA:.LL .. G �EPat�. M. R. Stierheim s• vwL� clap _ :cam-• •c County 'Manager ' p T,: or:- :L. 7 :.:r. Ci.`++h �•.^.w►L 6\11T + 27. ACv.IhtIsTRAr..YIE CFsaCL I' i=CRr-ss 3.1 . :rtAL '104T +� al. ACT;-,N TAK£Y 1 32. FUNDING Year .wowtA dap } �. la•I:A ,..y ❑ e. )N:?;ED a F;CiZ': ; CO 1 33. ACT;T.4 R+TE ► 19 13.1. DATE 19 • ❑b. F._'_. E9 ►. A- It•:t1rT 00 33. C ;y7r•CT F.1? AGDIT:C-AL tK0,_RIA.4 :S YN► nldwt� caa T1�'ti ^ ?! 1.4aw• scat t.:aWore •ewNl -. r. L�."ED FOR III S_a'E tJ 3A. 19 T J e. :_.. 'a � e. :twee• i t:.1 1 -. V. t C] 1 a •n ere a 4rw ec: C.M. s'ev -.% _ '.'t :Kew V1 ' • • c'ear I01 .a•r .�► ► \ •. arms -^ ti -- _- a/�.t. 11 ette.T •el �onse .a ..f iin6w t:.:v..." .A YeA 1. ♦.• r. el 4.., a •w.e ..e Ce.'e r.wr . rye n .. ••l e Trssrr.l.d be "its llriY:rr '/-i i of 83-543 a• NUMBER FEDERAL ASSISTANCE 2. APPLI• _ CANrs FL-03-0050 1. TYPE ❑ PRFAPPLICATION APPLI• b. DATF. OF ACTION � APPLICATION CATION Year enon(A day 19 [� NCITIFI `1010N OF INTENT (Opt) Lm" yf3o�ii bog) [] REPORT OF FEDERAL ACTtON Ma"k 4. LEGAL APPLICANT/RECIPIENT a.APpbcznlName :'Metropolitan Dade County b.OquiititichUnIl Transportation Administration C. Street/P.O. Bal : 44 West F l a g l e r St. a. C,IV Miami •• County : Dade f. stals : Florida B• ZIP Code: 33130 e- Contid Par— IN— Alan C. Wulkan & letiphowe No.► t (109)) 5 7Q—'iRll? 7. TITLE AAJO DESCRIPTION OF APPLICANT'S PROJECT Miami Downtown People Mover Project -Funds to cons- truct two extensions to the fully elevated, double guideway system that will provide downtown Miami a circulation/distribution system linking Metrorail with the City's major economic centers. OMB Approval No. 29-RO218 3. STATE NUMBER APPLICA. 80-2066 TION IDENTI• b. DATE Year +north daY FIER ASSIGMEO 19 5. FEDERAL VAPLOYER IDENTIFICATION NO. 59-60005i3 6. PRO- •. MUMBER ( 010 15 (0 ( 0 GRAM b. TITLE Wro'n Urban Mass Transportation Frderal catalog) Capital Improvement Grant B. TYPE OF APPLICANT/RECIPIENT A-St,u H-Cxen:uarry ActIan Altnct B-Intentato 1- Wrner Edutauo^.al IritIN110e C-'.'1tees 1-Ind'an rube ww,d K-Other (SpenlY): D-County E- C ty F-Sc4oal ;)1Strict G-bpenol Purpose Gnuid Enter opprorriats letter I !) 9. TYPE OF ASSISTANCE A-8134 Grant D-Insurance & iuvolem•ntat Grant E-0Uur Enter a-;rr C-Loeat prate tette•!e1 10. AREA OF PROJECT IMPACT l `'ante. of e-.ties, counties. IL ESTIMATED NUM. 112. TYPE OF APPLICATION Staler, eta.! B_R OF PERSONS A -)I w C-Rrrlslon E-Aulmanut:oa BENEFITING B,t_" 0-C4nimvatlon .. Metropolitan Dade County 1,620,000 Enter appro,7r{atsletter lI 13. PROPOSED FUhCING 14. MNGRESSIONAL DISTRICTS OF: a. MDERIL f 150.535 , 500.�0. a. AiPLICAMT 0. PROJECT b. APoatl.JTI 6.900 000 o 16 l7 1S 19 Same e. S"AIE 25, 139 , 25(1C0 116. PROJECT START 17. PROJECT e. LC AL I 7 239 , DATE Year "wrath day 250:a ! 19 83 11 1 UPATION 98 W a O-$•ER 11,000,000 16. VSTIMATED OATS TO Year mosm r. ToTAL ' s 201,114 , 1)00, lie SUBMITTED TO FECERAL AGENCY ► 19 83 6 M FE0L;VL AGENCY TO RE2L:VE RCQUEST Wame. CatY. State, ZIP code) I IS. TYPE OF CHANGE Uror its or /gel ---! A-Incnass Nolen F-Otlar ISptc+fYl : t1 au easy 'Doan e-t ^crease yyY..aw 'D-Cearaw.wlt>M TnrrE+a5�' SC11L1.t: j E-Canc«ut,w II Enter u, 7ro- --i ettie rru.e . :tarraf IA�J day ( 19. EXISTING FEDERAL IC:dVTIFICA TION NUMBER T n I r.T _n-T_nncn 21. FEMRRKS ADC:D Urban 'lass Trnnuortation :'Administration, Atlanta Ga. 30301) I G Yesr-t No 2L •. % the bast of mi tniwiW a• and Nhrf, b. It repvirod by CUB C.rcvler A-15 this a;;. "l-A -r. c;-+-ttel, sanest to -I !' -c. 3 j -,to is Lt.a ,taoDN uuon/a CD�'uLon an stractione tbersm, to 1GS:;Gran c:o.af.nal•uaa• sea oal rzswjes ors Rest>e,.: rpV-er at:Jcned !HS I L:a 114 =r-W. t`• docunenl hu been APPLICAy:T + CER-•F•_; ; dr:y e.•brusd by th• p vwinl body Of I I" ,;scam and :a• &xIlca:..11 tan+d, u) Dade County Planning Department ❑ t1 u G -mAT► eta -a r"toL+r aswan+o.• d the,gams$- q .South Florida Regional Planning; Council r' ❑ T'Tnri(1i UP pqr tmenI- Li f .'lfl•n31.1l ctr-lt1 C= ti ♦ k: CE4.. ♦% •EPv,. M. R. Stierheim =� 'a' •E County Manager `a.ist '• Cw'7a"JAL 1.XrT 27. A,',N.IMISTRAr..YZ CFFICIE _ T•r Y '11 r"i^tL aril f�i.'C'N _1. I_C11E.`.S 3J .:::'tAL 7a-41 •� V.,-F.:A...;A al. ACT.;Vi TAKEN 1 32. f 1rtEINO Year anowtA der I &I. 1,.7 •. 34+0:_D • I:Ci2`i I i CO ( 33. ACT;^_N PATE ► 19 I` OgrE• rG19 r b. E_'17E.1 a. a-'!.'%hT pp 15. C ;•!'ACT FO^ AL0IT:CN111_ INF•:RIA.A. S. 1'.ir nwwth eas •• �^- Tli Y I tiawe aai l..a u C. ?���. "EO FOR I e. S_A'E 00 I i.•owI • e w►v e E•'�lA.,a .. � DA._ 19 .. a.aaLz : VT I I tom— ..J a s a►.1acrsa::an.►q•.�• .a:acr.h'•edw ►o.a••.�. to • a•J. N eltr.T •o JWS4 .a ..a rnrbo t W :Tee r .a al- T/G•. t:^....a d Pa.1 1, �.• ►. . r �... • eeJ ..�Ca.'a e..r uer.l.d it ::.•, fraer� _.sc.,: .:wt��nsr..r rt-t 83--543 0 4 PART II ?OJECT APPROVAL IHFORmiAT ION' APPLICABLE TO THE UMJ A PROGRAM) BI 83-54& PART III BUDGET FORMS 83-5431 INfO11MATION PA13T ttl — BUDGET V3 Pa�c 1 i. -- SECTION A — GUDGET SUrt1rv+ArtY Nnt of Arr�,rd 6�•!9rt £11imalrl U^obbgalyd Funds 1Nd Grant fro9•ar". Nan rrdrrarwf••d t Ir� Ir1 .------- ru-r: -en radr,31 e, Ca1a:nONo• r•t Id1 It) $ 15t) His >() Art..i1Y 164 101 S 1 r0 jt) 15 50 25 1 V) 250 5 $ 25 139 'Sn 1. t, t?. 5c�c.3 �().500 tTA-. 250 25,139,250 25 ,139 , 7. l no r 3. Local S SU,218,500 $ 2()1, 114,000 __- --. 4. S 150,835,500 5. TOTALS LSUDGET CgTEGEtRtES SECTION 0— 1 � Gant f•oq•am, runthon or AtlrrrlY Terri IS} jai 131 171 S , g. Object Class Categories ttt S S S 3. Personnel b. F,ingc genelitS C. d EauiPrnent C. Su,,i-,)"Cs t, Contractual g Co!.%Structlon .1. f RkM.r Cont ingency i. Tot at Dirrct ChargeS S j. indticct charges S S $ - S S k. TOTALS S S S S 7. ProgrZ-It income---- W +- s PAIIT III - BUDGET WoRMATION Bane 2 C'j Tr ova KM e1) I40130 SECTION C - NON-FEDERAL AESOUIICL: 1.1 GRANT PROCFIA%l lb) APPLICANT Iel'STATE Idl OTHER'SOURCES Ie1 TOTALS e Dade Countv S 6,9001000 S IS S 9 i laity of Miami 7 2-'Q 250 %.t39 250 ;0 Private Sector 11,000 000 11,000,0()0 11, Florida Department of Transportation 25,139,250 IS 25.13250 12 TOTALS Is 6,900.000 25,139 250 IS 18,239.25Q IS 50-27,9-500 SECTION 0 - FORECASTED CASH NEEDS Tout for lit Yea, lit Oupter 2nd Quarter 3•d Oua•Ur Un Qua.te. S 21,000,000 5 250 000 5,250,000 7 Q00 000 1,750,000 ;5 TOTAL 28,000,000 7,000,000 7,000,000 7,000,000 7,000,000 SECTION E - BUDGET ESTIMATES OF FEDERAL FUNDS NEEDED FOR OALANCE OF THE PROJECT lal GRANT PROGRAM FUTURE FUNDING PERIODS IYEARSI (t,l f IRIST Ial SCCONU IJI iHIRp lei iOURtN 1G. UNTA Section 3 S 77,901,300 5 32,458,875 19,475,325 S 17. Florida Department of Transportation 12,983,550 5P409,812.5 3,245,887. ;o oca Funds 12,983,550 5,409,812.5 3,245,887. 19 20 TOTALS S 103,868,400 IS 43,278,500 IS 25,967,100 S SECTION F — OTHER BUDGET INFORMATION (AINth aJJd•OOaI $AatU d NKeN�•r) 21. D/rro Chargcy: 27 Inrl•rcct Cla.gcr 23. Rcrn3,ktt' • A PROPOSED PROJECT BUDGET The project budget and corresponding cost k_stimates are as failows: LINE ITEM ESTI'I.%TED CODE DESC.:IPTIO'- Bt - �'rT 20.01.00 Purchase of Transit Vohicles $ 29,429,65; 20.02.00 Support Equipment S 30,035,232 20.02.04 System Testing $ 4,473,600 20.06.10 Land Acquistion $ 17,3-6,:00 20.08.00 Professional Service Contracts $ 24,814,280 20.11.00 Construction of Facilities S 73,166,077 20.16.00 County Administration $ 5,142,S56 32.00.00 Contingency S 16,706,305 TOTAL S201,1i4,J00 83-543► I PART IV . PROGRAM NARRATIVE 83-543, 61 A' EXHIBIT A PROJECT DESCRIPTION w. 83-5431 EXHIBIT A: PROJECT DESCRIPTION GENERAL DESCRIPTION The Miami Downtown Component of Metrorail (I)CM) is a completely automated circulation/distribution system consisting of an elevated double guideway approximately 4.35 miles in length. The first increment, which previously received funding and will be completed by the summer of 1985, is comprised of a double guideway about 1.9 miles long in a loop configuration around the central business district (CBD) (see Figure I). The CBD loop includes ten on-line stations and operates with driverless vehicles at approximately two -minute headways. The roundtrip travel time on each guideway loop will take about twelve minutes. The subject of this proposal involves two extensions that will connect the CBD with downtown Miami's other two major commerce centers. These two centers are known as the Omni area and the Brickell Avenue area. Both extensions will be elevated double guideway systems that will interface with the CBD loop through a system of switches. Because the CBD loop is contiguous to the Metrorail north -south transit line, the DCM extensions will provide rail commuters with direct access to all three major developed areas of Miami. Preliminary engineering for the extensions has been completed and work is currently underway on an environmental impact statement for the project. Final design engineering, which will take approximately eighteen months to complete, will begin upon receipt of funding. Construction will be initiated upon completion of the final design and will take an additional two years to complete. 83-54& It Figure 1 I i-E471., =an ran U.— ` - for! D.Y.1101 r r World Tr"o COMW v 10 • 1 i r r ^.` t•. an j MIAMI DOWNTOWN COMPONENT OF METRORAIL 83-3431 The Omni extension will originate north-west of the (Miami Dade Community) College Station which is being constructed as part of the CBD loop (see Figure 2). Travel time to the Miramar Station, which is the terminus point for this 7,270 foot extension, will be slightly over six minutes. Passengers will have the opportunity to disembark at six different stations along the route in each direction. The switches connecting this extension with the CBD loop will be located between the EdCom Station and College Station. The Brickell area extension will interface with the CBD loop between the Fort Dallas Park and World Trade Center stations (see Figure 3). The terminus point for the south extension will be the Coral Way.Station at S.E. 14th Street and Brickell Avenue. This section of the DCM will be 5,680 feet in length and travel time on it will be approximately five and a half minutes. The Brickell Station will be fully integrated with the Metrorail System. It will include a DCM Station and a Metrorail Station for the north -south transit line. When the CBD loop of the DCM system is operational, vehicles will move in a counterclockwise direction on the outer loop and clockwise over the inner loop. When the northern and southern segments become operational some vehicles on the outer loop will be routed to the Brickell extension, and some to the Omni extension. The inner loop's operation will not be affected by the extensions. If the peak period transit requirements exceed the capacity, the direction of vehicle movement on the CBD loop can be reversed to meet the need without major physical changes to the guideway network. The system is designed with enough flexibility to allow northern trains to either loop the CBD or to continue onto the southern extension with the selected operational procedure based on actual operating experience and requirements. 83-543' IV FI CURE LJ-.- LiINC IS ST �. _M IRAMAR STATION • I Ll�-1 Ll L Ll Li \ l N [ 12 ST 1 1 ELEVENTH Sr ---A --7 STATION I ��`' i OMNI ,-STATION "BICENTENNIAL PARK S TAT I O N I I l 1 1 N[ .o ST 1 I f 9 ST i PARK WEST STATION Iv IN i N [ 7 ST �m FREEDOM TOWER � `\ STATION ED C_O_M CAT1z . w [ • S T � \ .� COLL GE E F - STATION - O 4C0 800 1200 83-543, 11 t FIGURE 3 k.VORLD TRADE : -FORT DALLAS ItENTER ,STATION STATION RIVERV IALK STATION � � 1 ; � a � Lam---_ NORTH BRICKELL STATION s r EIGHTH ST. STATION TENTH ST! BRICKELL STATION STATION CORAL WAY f/ STATION 11 1 11 1 1 i�� 83-543 A flat fare, to be collected by coin -operated turnstiles, will be charged for use of the system. Free fare transfers will be provided at Government Station and Brickell Station for trips originating on the Metrorail System. In addition bus transfer capabilities are planned for other DCM Stations. SYSTEM ALIGNMENT The northern extension connects to the outer loop of the CBD loop alignment in the vicinity of the N.E. 5th Street and N.E. 2nd Avenue intersection. From this point the alignment extends north along the western side of N.E. 2nd Avenue between N.E. 5th Street and the I-395 expressway. A station is to be located north of N.E. 6th Street in the immediate vicinity of Freedom Tower. As the guideway proceeds north along Second Avenue two more stations will be encountered. The first will be situated at N.E. 8th Street and the second at N.E. llth Street. These stations will be utilized to service the new residential development known as Park West. At this juncture, the alignment turns eastward along the southern edge of I-395. A DCM station will be located adjacent to Bicentennial Park on -the east side of Biscayne Boulevard and south of the expressway. As the guideway leaves the Bicentennial Park Station it will parallel the eastbound lane of I-395 and cross it on a parallel line with the eastern curb of North Bayshore Drive. The alignment then bisects the northeast corner of North Bayshore Drive and N.E. 14th Street. At N.E. 15th Street, the alignment turns west along the south curb of N.E. 15th Street. A station between North Bayshore Drive and Biscayne Boulevard will serve the Omni Complex. From the Omni the alignment continues west along the south side of N.E. 15th Street to a point between Biscayne Boulevard and N.E. 2nd Avenue, remaining on the south side of the street until it reaches its terminus at Miami Place. A terminal station will serve the midtown activity center and provide for future expansion of the system. 83-542, I t The southern extension will be connected to the CBD loop between Miami Avenue and S.E. 1st Street just north of the I-95 expressway ramps and west of the World Trade Center, which is presently under construction. This extension will also be connected with the outer CAD loop. From this location the alignment extends south over the I-95 access and egress ramps. The first station will be located just west of Fort Dallas Park and will serve the Convention Center as well as potential development along the river. At the Fort Dallas Park Station the alignment crosses the Miami River allowing a 15 foot clearance above mean high water. After crossing the river the alignment continues in a southernly direction on private property to the southwest corner of the S.E. 1st Avenue and S.E. 8th Street intersection. Through this distance, the alignment parallels South Miami Avenue which is approximately 325 feet to the west. In this area two stations are to serve the vicinity from their locations at S.E. 5th Street and 8th Street. The 8th Street Station will serve the businesses along north Brickell Avenue. After this station, the southern extension follows S.E. 1st Avenue to S.E. 10th Street. At S.E. loth Street the alignment turns west and a station will be placed at South Miami Avenue. Upon leaving this station the guideway will proceed west to the Metrorail right-of-way, which parallels S.W. 1st Avenue. At the right-of-way, the alignment reverts back to a southernly direction. A DCM station will be constructed adjacent to the Brickell Metrorail Station which will provide service to passengers from the rapid transit system and regional bus system. The guideway continues south to S.W. 14th Street where it turns east and a terminal station will be developed at S.W. 14th Street and Brickell Avenue. There will be expansion capabilities designed into this terminal. 83-5431 DCM STATIONS There will be a total of twelve new stations for the extensions of the DCM. Six stations will be associated with the Omni extension and six with the $rickell extensions. The size, configuration, and use of materials will be similar to stations constructed for the C$D loop. Most of the stations on both extensions will be a central platform design, with the platform between the double guideways (see Figure 4). Each station will be totally accessible and barrier -free with elevators, escalators, and stairs provided for vertical circulation. Escalators will be incorporated into the design depending on capacity requirements and the elevation of the.station above ground level. DCM stations generally will have two levels. They are: an entrance level at grade; and a platform level which generally will be 22.5 feet above the existing street elevation. Platform levels will vary, however, contingent upon the guideway alignment profile. Each station will have a free area which will be accessible from public sidewalks and in some cases pedestrian bridges. Paid areas will be separated from free areas by the fare collection area and turnstiles. Provisions for road vehicle drop-off zones between piers will be provided at some stations. All stations are designed so that station agents are not required. Fares will be collected at turnstiles utilizing exact change or possibly magnetic cards (transfers from Metrorail will ride DCM free of charge). Visual and audio monitors will connect each station to the central control facility. The central control facility will also regulate movement of all vehicles, except those under on -board manual control. � 83-543 .I J PLATFORM LEVEL PLAN ! lip_ O EL[G't1lFCAL ow . Ito Ii � f PM. .w• «..n+ RM. � IpttEN RATTEr- ! `•' 11 • � � • _ _ - - T H � 11, } GROUND LEVEL PLAN 1 - II ' TYPICAL. STATION PLAN GUIDEWAY The guideways for both extensions of the DCM will be totally compatible with the CBD loop guideway. These guideways will be completely elevated and two directional throughout their entire lengths. The guideway provides for support and guidance of the vehicles as well as for all interface with electrical power, stations, control, communication, and maintenance facilities. Two switches are required at the intersection of the north exten- sion and the CBD loop and two switches are also required where the southern extension connects to the downtown loop. In addition, switches will be located at the terminus of each extension to assist in changing the direction of the vehicles. The guideway structural components include the guide beams, steel girders, concrete vehicle running surfaces, columns, and foundations. The guide beams are located midway between the track supporting girders (see Figure 5). These guide beams have been designed to resist.the forces required to steer or pivot the front and rear axles on the curves and resist all lateral forces transmitted from the vehicle. The clearance of the guideway will normally be 16.5 feet above the existing surface (except for the Miami River crossing) and column height will be adjusted accordingly. Preliminary engineering indicates that approximately 70 percent of the guideway will be supported by reinforced concrete pile caps individually supported by a concrete pile. In addition to the guideway, an emergency evacuation walkway will be provided. This walkway will be approximately two feet wide and will be attached to the plate girder on each side of the guideway. 83-543- • � � Figure 5 i f. GU:.EVIA, �rc S'EE: GIRDER � I �' • CONCRETE PIER 1 CONCRETE COLUMN III; •II I ;III 2'.6• MIH 1 IPREFERREDI ji;) • 1 I • 1 1 I 1 r--1----1--� SPREAD I FOOTING -J ' SINGLE GUIDEWAY STEEL GIRDEQ CONCRETE PIER CONCRETE COLUMN I I SPREA-2 1---------�--- 1 FOOTING DOUBLE GUIDEWAY BASELINE GUIDEWAY SECTIONS 83-543, I t VEHICLES The automated transit vehicles for the DCM system will be bottom supported, electrically propelled, and automatically controlled. The Westinghouse vehicle has been selected for the CBD loop of the DCM (see Figure 6). Due to the need for the two extensions to be compatible with the CBD loop, it is anticipated that the Westinghouse vehicle will also be utilized for the extensions. The basic vehicle is approximately thirty-nine feet long, nine and a half feet wide, and eleven feet high. Maximum speed will be thirty miles per hour and normal capacity is 110 passengers. The length of each consist (two or more vehicles connected) will not exceed seventy-eight feet in order to meet station length requirements. The vehicles are intended primarily for standing passengers, however, seating for eight passengers will be provided. The design of the vehicle provides for use by the elderly and handicapped by including such amenities as grab bars, chimes to signal closing and opening of doors, and space for wheelchair users to maneuver. Each vehicle will be equipped with thermostatically controlled heating, cooling and ventilation systems. Interiors will be bright, attractive, easily maintained and resistent to vandalism. Bi-parting doors will be provided on each side, with sufficient width to ensure quick access and egress during peak demand periods. The doors adjacent to the platform will be automatically opened for patrons to exit and board through the same door. Two-way communication systems will be installed in each vehicle and connected with the central control facility. Power will be supplied to DCM vehicles through rails mounted at a low level on the guideway. The power rails will be shielded to prevent accidental contact by personnel on the guideway. 83-54.5 u Go W _G f rj �_ir ._� Q�7 C-100 VEHICLE ENVELOPE DIMENSIONS Itt I,r,q m EmmT E TRANSIT SYSTE" OVERVIEW 83--543, EXHIBIT B Transit System and Urbanized Area Description The Transit System and Urbanized Area Description information submitted to UMTA in the Project No. FL-05-4072 grant application on :larch 6, 1979, as updated by additional material submitted in the application for FL-05-4110, November 4, 1981 and herein, accurately describes the transit system and urbanized area associated with this project and are herein incorporated by reference and made part of this application. The following material updates the Transit System and Urbanized Area Descriptive Information submitted on November 4, 1981. Section numbers and titles reference those in the first submission. A. Transit System Overview 3. Hours of Operation: Metrobus has routes in revenue service from 4:35 A.M. through 3:05 A.M. daily which include 5 mid -day only routes, 25 peak hour routes 34 routes operating 6 A.M. to after 12 A.M., 30 routes operating from 6 A.M. and ending between 6 P.M. and midnight, and 1 route operating from 7 A.M. to 6 P.M. 4. Institutional Characteristics: In FY 1980-31, a total of 73,171,995 passengers were carried by a Metrobus operating fleet of 669 buses. Metrobus was forced to increase fares in January, 1981 to a $.75 base fare and-$1.00 for express service. Elderly, handicapped and student fares were increased to $.35 on July 1, 1981. The transfer charge was increased on August 1, 1982. Passengers must pay $.20 for the transfer when issued. Free Transfers - Transfers are free during off-peak hours (9:30 A.M. to 3:30 P.M.; except weekends and major holidays) to elderly, handicapped and students with Medicare or Metrobus identification cards. 5. Annual Ridership The following chart represents the total ridership for each fiscal year since 1971-72 and the percentage increase over the preceding year. Fiscal Year Total Ridership % Increase 1971-1912 54,6714,811 2.7 1972-1973 56,691,307 3.7 1973-1974 60,793,654 7.2 1974-1975 61 ;-130,412 0.6 1975-19/6 63,409,368 3.7 1976-1977 64,270,282 1.4 1977-1978 65,806,008 2.4 83""S�a ' 1978-1979 67,520,214 2.6 1979-1980 76,538,662 13.4 1980-1981 73,171,995 (4.51 1981-1982 62,675,701 1982-1983 (projected) 63,000,000 5.17 (Projected) Ridership has been increasing from FY 1972 to FY 1979 at an average rate of 3%. The 13.4% increase in passengers during FY 1979-1980, reflected the ridership gained during fiscal year 1979 due to fuel shortages and skyrocketing gasoline prices. Ridership for FY 1980-1981 was first projected to increase to 90,400,000 anual passengers. The ridership growth was expected due to fuel prices, sub- stantial population increases and the receipt of 260 Advance Design Buses. Fare increases and a reduction in transit services caused by budget cuts have caused a decline in ridership. The actual annual ridership for FY 1980-1981 totalled 73,171,995 passengers which constitutes a 41'. decrease from the preceding year. Ridership during FY 1981-1982 was 62,675,701 annual passengers; a 14.31' decrease from the previous year. The increase in fares, elimination of free transfer and service cuts are the main reasons for the decline in ridership. A slight increase (5.17%) in ridership is anticipated for 1982-83. 6. Other Mass Transportation Carriers Metrobus is the mass transportation carrier in the Miami Urbanized area. The Broward County Transit Agency (BCTA) has four routes tone peak -hour express and three local routes operating between 6 A.M. and 7 P.M.) which serve northern Dade County. An agreement on transfer exchange and inter -county transfer points between Metrobus and BCTA became effective November 1, 1980. Passengers transferring from a Broward Transit route to a Metrobus local route are required to deposit the difference between Broward's base fare and Metrobus' base fare (25C)• These passengers are not required to pay 20C with their Broward transfer. Conversely, passengers transferring from a Metrobus route to a Broward route will be required to pay 20C to ;tetrobus when the transfer is issued. Transferring between 'Metrobus and BCTA.routes is permitted only at the following inter -county transfer points: 1) N.E. loth Avenue and 215th Street 2) West Dixie Highway and N.E. 215th Street 3) 163rd Street Shopping Center 4) Collins Avenue and 194th Street 5) Diplomate Mall, Hallandale 6) Young Circle, Hollywood 7) U.S. 441/N.W. 215th Street Elderly and Handicapped Programs Since 1972, the Dade County METROBUS system has maintained a reduced fare program for the elderly and handicapped. The RTS-2 kneeling buses are used on routes with heavy concentrations of elderly persons. The regular base fare for METROBUS patrons is 75C, with a 20C charge for transfers. Elderly and handicapped patrons with a Medicare card or a special I.D. card issued by METROBUS may ride during off-peak hours for a fare of 35C, with no charge for transfers. METROBUS carried more than 22,500,000 reduced fare patrons in Fiscal Year 1981. Metro -Dade County also sponsors the Special Transportation Services (STS), a shared - ride, curb -to -curb transportation service for handicapped and mobility -impaired persons who are unable to use '-IETROBUS. Service is provided countywide by taxicabs and lift -equipped, for -hire vehicles, five days a week, from 6. a.m, to midnight. Patrons pay a minimum fare of $2.00 and a maximum fare of $5.00 per one-way trip, depending upon the length of the trip. Reservations are made by calling the reser- vation office on the business day before the patron wishes to travel. 83-5 43, The STS Project is locally funded with a budget of $1.5 million for Fiscal Year 1982. As of January 1, 1982, approximately 55,000 persons were certi- fied eligible to use STS. During the first quarter of Fiscal Year 1982, 30,952 trips were made using STS at an approximate cost of $366,000. Dade County actively participates in the 16(b) (2) program each year by providing technical assistance to the Florida Department of Transportation's program for private non-profit agencies serving elderly and handicapped people. In an effort to increase the coordination between local social service agencies and the state, Dade County acts as a project coordinator for this program. 83-5431, EXHIBIT C PROJECT JUSTIFICATION Q 83-5434 EXHIBIT C: PROJECT JUSTIFICATION CURRENT COYDITIONS The current transportation demand within Metropolitan Dade County has been estimated by the Florida Department of Transportation, to be in excess of 5.2 million person trips per day. The private car is the prevalent mode of transportation for these people. Public transportation is Limited to a coordinated bus system which is characterized by slow travel time, high operating costs, and low ridership. Downtown Miami serves as the primary destination point in Dade County during the peak morning hours, as well as the primary debarkation point during the peak afternoon hours. The net result is that many of the major arterials are serving traffic far in excess of their design capacity. Despite the recent recession, Miami has been experiencing a steady pattern of growth. Most of this growth has been in the form of high density development and redevelopment in the three major commercial areas of downtown Miami. These areas are the central business district (CBD), the Omni area north of the CBD, and the Brickell Avenue area to the south. ` In order to reduce demand on the over burdened highway system into downtown Miami; Dade County, with the assistance of UMTA, the State of Florida, the City of Miami, and the private sector is constructing a 20.5 mile long rapid transit line and a downtown circulation system. The heavy rail line extends from the south Dadeland area and runs northwestward to the City of Hialeah. Government Center Station, on the western border of the CBD, serves as the focal point for the system drawing.riders from the northwest and southern portions of Dade County. This station also serves the DCM and will be the most heavily utilized DCM station, as well as the most heavily utilized 83-543 1 4 Metrorail station. It is anticipated that by the end of the first full year of operation more than 200,000 people per day will utilize the Metrorail System. The primary reason for most of these passengers to utilize this system is to reach, and subsequently leave, various destination points located in downtown Miami. All Metrorail stations are designed to interface with the Metrobus System, with two exceptions. The first is the Civic Center, which is designed to serve primarily as a destination, with all major activity points in close proximity. The second is Government Center, the only station developed to service the CBD. This station is also designed to serve primarily as a desti- nation, however, in contrast to the Civic Center Station all major activity points are not in close proximity to the station. Due to slow travel time for street vehicles in the CBD, especially during peak hours, buses were viewed as inadequate for moving large numbers of people from the Government Center Station to their ultimate destination. In order to insure that ridership of the Metrorail does not suffer because of lack of an effective downtown circulation system a fully automated people mover system, which will serve as the Downtown Component of Metrorail, is under construction. The original concept of, and planning for, the DCM included both the north and south extensions as well as the CBD loop. Due to funding constraints, however, implementation has proceeded in two increments. The first increment includes an elevated guideway slightly less than two miles in length, with ten on-line stations. This system, scheduled for completion in 1984, will operate 83-543t I ,0 with driverless vehicles at approximately two minute headways and is projected to transport up to 41,000 passengers daily by 1985. The second increment, which is to serve the Brickell and Omni areas, has received and utilized previously allocated funding to perform preliminary engineering and to begin work on an environmental impact statement. BENEFITS OF THE PROJECT Development of the extensions will produce positive impacts on a myriad of private and public interests. The most significant of these impacts is ridership. The ultimate success measure for any transportation system is acceptance and use by the public. When the extensions are implemented, the area served by the DCM will almost triple in size. This will encourage far greater use of DCM than is envisioned for the CBD loop. Greater use of the DCM system will, in turn, enhance the view of Metrorail as an effective transportation system to commuters and other local travelers. This will lead to increased ridership for the entire system. In fact, estimates indicated that when the CBD loop of the DCM is tied into the main north - south transit line, ridership of the total Metrorail system will almost double. It is anticipated that implementation of the extensions will have a similar dramatic impact on ridership. Another important issue that is sure to be impacted positively by the imple- mentation of the extensions concerns the socio-economic composition of Miami. Both areas that are to be served by the extensions are substantially more residential in nature then the CBD. The Omni area, while undergoing some upper -income redevelopment along the shore of Biscayne Bay, is predominently a lower and middle income area. Brickell Avenue is characterized by large scale upper -income residential development, but just west of Brickell lower income 820--54?� housing prevails. The job opportunities available in both these areas are primarily white collar office positions, while the work force is predominently semi -skilled blue collar. In fact, less than half of the jobs that exist within the Miami City limits are held by city residents. Construction of the extensions will directly and indirectly create over 8,000 man years of employment. But, even more significant from an employment opportunity perspective is the long range effect of this project. The Hialeah/Medley area has the largest concentration of industrial job opportunities in Dade County. As this area is the northern terminus of the Metrorail system, completion of the extensions of the DCM will enable semi -skilled blue collar workers from.the inner city to share the convenience of rapid transit with white collar commuters from the suburbs. The impact on ambient air quality is too important to not include in a discus- sion of benefits that will result from implementation of the extensions. The United States Environmental Protection Agency (EPA) recently cited Dade County for being an area of non -attainment with regard to provisions of the Clean Air Act. The reason for this designation is that the amount of ozone measured in the ambient air exceeds what is allowable under federal law. Almost seventy-five percent of the ozone present in Dade County comes from one source; the combustion engine. When the north and south extensions of Metrorail and both the CBD loop and the extensions of the DPM are operational there will be over 100,000 less vehicles on the road then would be the case if there were no rapid rail transit system. This means that the amount of hydrocarbons, which react with sunlight to form ozone, in the atmosphere will be greatly reduced. When the south leg of the Metrorail System is opened there will be a reduction of hydrocarbon emissions 83-5431 40 in excess of 300 tons per year. By the time the north leg of Metrorail and the CBD loop of the DCM are operational the projected annual hydrocarbon emission reduction will have soared to over 1,200 tons per year. Figures are not yet available for estimates on hydrocarbon emission reduction that will result from the implementation of the extensions of the DCM, but it is safe to assume the trend toward reduction will continue. Other economic benefits are as follows. Because of the increased accessibi- lity afforded by the DCM and its permanency as a circulation corridor, the system will serve as a key element in the ongoing effort to revitalize the city's urban core. DCM stations will encourage more intensive development near stations, resulting in higher land valdes and increased property tax revenues. Convention and hotel activity will be stimulated and retail sales of businesses in proximity to stations will be enhanced. Also, the City of Miami, Dade County, and the State of Florida will receive increased revenues from expanded hotel taxes, sales taxes,and convention revenues. Combined, all the above mentioned economic benefits will result in increased employment opportunities for both blue and white collar workers. The reduced demand for downtown parking spaces when the extensions are developed will produce three distinct economic advantages to the community. First, prime locations will no longer be tied up from development as parking lots and will be put to more productive use. Second, commuters will be able to utilize fringe parking areas which are substantially less expensive than downtown lots. Third, developers will be spared the expense of providing as many off-street parking spaces as.they are currently mandated by building and zoning regulations. 83-543, 0 Some of the additional benefits to be enjoyed from the development of the extensions include the following. Travel time between the most active commercial centers of Miami will be greatly enhanced, expanding the noontime domain of downtown workers. The reduction in vehicular congestion will facilitate surface transportation while at the same time reducing consumption of energy. An important social aspect of this project is that it will provide much needed access to Bicentennial Park. This $10 million park, which has been plagued by a lack of users, will have one station adjacent to the park and another within short walking distance. 83-543► .t r EXHIBIT D PROJECT FINANCING 83-5 43 EKHIBIT D: PROJECT FINANCING 1. Proceeds of sale of facilities or equipment to be replaced This project does not involve replacement of facilities or equipment. 2. Financing from transportation system revenues There are no transportation system revenues available for use toward this project. 3. Private Financing $10 million dollars will be provided by the private sector from a special assessment that will be levied on all leasable property in the DPM service area. An additional $1 million will be generated from several miscella- neous programs. 4. Financing Plan The estimated total cost of this capital improvement project is $201,114,000. U?tTA, in this application is being asked to fund 75 percent,or $150,835,500. Of the non-federal share, it is anticipated that 50 percent, or $25,139,250 will be provided by the Florida Department of Transportation. The private sector of Dade County will assist in the funding of this project by con- tributing almost 22 percent of the non-federal funds, a sum equalling $11 million. The City of Miami will dedicate $7,239,250 from revenue derived _ from utility franchise fee revenue. The remaining $6.9 million will be provided by Dade County from Decade of Progress Bond revenue and interest. 83-543